Heat preservation and heating system for water seepage and freezing treatment of tunnel in cold region
Through construction joint treatment, water drainage and heat tracing systems, the problems of water seepage and freezing in tunnels in cold areas have been solved, effective insulation and anti-freezing effects have been achieved, and the safe operation and structural stability of the tunnel have been ensured.
Patent Information
- Application Number
- CN202410901393.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-18
AI Technical Summary
In tunnels in cold regions, safe operations and structural stability are often affected by water seepage and freezing. The traditional trench drainage method may cause secondary freezing damage, and more effective technical solutions need to be sought.
Adopt construction joint treatment system, tunnel surface restoration system, drainage system and heat tracing system, including isolation columns, STP vacuum insulation panels, drainage pipes, prefabricated insulation ditches and electric heating technology, through grouting and spray film waterproof layer , drain pipe settings, prefabricated insulated ditches and electric heating systems to monitor and control the temperature in real time to prevent freezing.
It effectively prevents the accumulation of seepage water, improves the insulation effect of tunnel arches and side walls, avoids icing, and ensures safe operation and structural stability of the tunnel.
Smart Images

Figure CN118793465A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel insulation and heating, and in particular to a tunnel insulation and heating system for water seepage and icing treatment in cold regions. Background Art
[0002] With the large-scale construction of transportation infrastructure, a large number of tunnel projects will inevitably appear in the construction of mountain highways. Tunnels in cold regions are usually located in mountainous areas or high-altitude areas. The climatic conditions in these areas are more severe, and tunnel construction and maintenance face greater challenges. Tunnels in cold regions often suffer from various diseases due to freezing, and are a type of tunnel with more problems among the tunnels currently built. The problem of water seepage and freezing in cold region tunnels is a complex engineering challenge, which involves multiple factors, including tunnel design, construction, maintenance, and local climatic conditions. In cold regions, water seepage and freezing in tunnels are often causal, forming a vicious cycle, which seriously affects the safe operation of tunnels and the stability of structures. When the water flows out from behind the tunnel lining along weak waterproof positions such as deformation joints and construction joints, it is affected by low temperature and forms ice on the arch, and icicles accumulate on the side walls, which intrude into the limit and endanger driving safety.
[0003] To address this problem, a variety of measures need to be taken to prevent water seepage from the source, and insulation measures should be taken to prevent freezing. The traditional method of trenching and drainage may cause secondary frost damage in cold areas, so a more effective technical solution needs to be sought. Summary of the invention
[0004] The present invention provides a cold region tunnel water seepage and icing treatment insulation and heating system, which aims to solve the common water seepage and icing problems in cold region tunnels and ensure the safe operation of the tunnel and the long-term stability of the structure.
[0005] The technical solution of the present invention is as follows:
[0006] A cold region tunnel water seepage and icing treatment insulation and heating system, comprising
[0007] A construction joint treatment system, comprising an isolation column placed on a construction joint of the construction joint treatment system, grouting in the construction joint partitioned based on the isolation column and sealing the surface with an acrylate spray waterproof layer;
[0008] A tunnel surface restoration system, wherein the tunnel surface restoration system is laid after the construction joint treatment system;
[0009] Among them, the tunnel surface restoration system includes STP vacuum insulation panels and tunnel coatings laid on the acrylate spray waterproof layer in sequence;
[0010] A drainage system, wherein the drainage system is arranged on the construction joint above the cable trench;
[0011] The drainage system includes: a drainage pipe arranged in a rectangular groove chiseled along the annular construction joint and a drainage pipe arranged below the tunnel cable trench, the drainage pipe in the rectangular groove is connected through a drainage semicircular pipe, the end of the drainage semicircular pipe is connected to a drainage pipe, the drainage pipe is connected to a longitudinal prefabricated insulation ditch, the drainage pipe below the tunnel cable trench is directly connected to the longitudinal prefabricated insulation ditch, and the longitudinal prefabricated insulation ditch is connected to a central ditch through a transverse prefabricated insulation ditch;
[0012] The heating system is a heating cable arranged inside the rectangular groove, the longitudinal prefabricated insulation ditch and the transverse insulation ditch. The heating cable is installed with an electric heating temperature detection probe. The heating cable and the electric heating temperature detection probe are both controlled by an on-site control box.
[0013] Furthermore, the grouting method in the construction joint is: oblique holes are drilled on both sides of the construction joint as grouting holes, grouting is started from the bottom to the top through the grouting holes, and after the grouting of each grouting hole is completed, the grouting nozzle is closed with quick-drying cement.
[0014] Furthermore, the construction joint uses bonding mortar to fix the STP vacuum insulation panel to the tunnel lining surface within the treatment range.
[0015] Furthermore, both sides of the rectangular groove are sprayed with an acrylate waterproof layer and wrapped with a first geotextile.
[0016] Furthermore, the surface of the drain pipe is wrapped with a second geotextile, and waterproof epoxy mortar is filled between the drain pipe and the excavated hole wall.
[0017] Furthermore, the longitudinal prefabricated insulation ditch is provided with a reserved blind pipe outlet, and a saddle-shaped fastener is used to connect the drain pipe and the longitudinal prefabricated insulation ditch, and is sealed with waterproof glue. The saddle-shaped fastener and the drain pipe are sealed with a waterproof glue sealing ring.
[0018] Furthermore, a cover plate insulation layer and a prefabricated ditch cover plate are installed on the upper part of the longitudinal prefabricated insulation ditch.
[0019] Furthermore, the longitudinal prefabricated thermal insulation ditch is provided with a built-in thermal insulation layer in the ditch and a concrete outer layer in the ditch.
[0020] Furthermore, the heating cable is connected to the cable in the cable trench, and a heat conducting plate is arranged on the side wall of the longitudinal prefabricated insulation trench.
[0021] The beneficial effects of the present invention are as follows: First, the grooving and pipe laying technology can effectively lead out the seepage water and prevent it from accumulating inside the tunnel. The setting of the drainage hole further ensures the smooth discharge of the seepage water. Under the same conditions, the thermal insulation effect of the STP vacuum insulation board is 3-6 times that of the conventional insulation board, which can more effectively reduce heat loss, thereby improving the thermal insulation effect of the tunnel arch and side walls. The prefabricated insulation ditch adopts full-package insulation, and the prefabricated ditch-shaped insulation board is installed in the ditch, and an insulation cover is added to form a closed insulation space on all sides, reducing the impact of the temperature change of the surrounding structure of the ditch on the internal temperature of the ditch, thereby improving the overall thermal insulation effect of the ditch. The electric heating technology prevents the internal temperature of the tunnel drainage facility from being too low by actively heating, thereby avoiding the occurrence of ice. The temperature detection probe can monitor the water flow temperature in the insulation ditch in real time, and timely feedback to the control cabinet to ensure that the water flow in the insulation ditch does not freeze. As the core of the whole system, the control cabinet is responsible for controlling and managing the work of each part. It can adjust the working state of electric heating according to the temperature feedback data of the temperature detection probe. The connecting cables in the tunnel cable trough ensure the reliability and safety of power supply. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic elevation view of a cold region tunnel water seepage and icing treatment and heat preservation and heating technology of the present invention;
[0023] Figure 2 It is a schematic diagram of an arch treatment scheme of a cold region tunnel water seepage and icing treatment and heat preservation heating technology of the present invention;
[0024] Figure 3 It is a schematic cross-sectional view of a drainage hole of a cold region tunnel seepage and icing treatment and heat preservation heating technology according to the present invention;
[0025] Figure 4 A schematic diagram of the location of a prefabricated heat-insulating water ditch for a heat-insulating and heating technology for treating water seepage and ice formation in cold-region tunnels according to the present invention;
[0026] Figure 5 This is a prefabricated heat-insulating water ditch for treating water seepage and freezing in cold-region tunnels according to the present invention;
[0027] Figure 6 A schematic diagram of the connection between the prefabricated insulation ditch and the drainage pipe of the invention for the treatment of water seepage and ice formation in cold regions tunnels Figure 1 ;
[0028] Figure 7 A schematic diagram of the connection between the prefabricated insulation ditch and the drainage pipe of the invention for the treatment of water seepage and ice formation in cold regions tunnels Figure 2 ;
[0029] Figure 8A schematic diagram of electric heating and heating cable control for a cold region tunnel water seepage and icing treatment insulation heating technology according to the present invention;
[0030] As shown in the figure: isolation column 1, surrounding rock 2, initial support 3, secondary lining 4, grouting hole 5, acrylate spray waterproof layer 6, insulation board bonding mortar 7, STP vacuum insulation board 8, tunnel coating 9, rectangular groove 10, first geotextile 11, drainage semicircular pipe 12, drain pipe 13, cable 14, longitudinal drainage pipe 15, waterproof epoxy mortar 16, medium coarse sand 17, longitudinal prefabricated insulation ditch 18, transverse prefabricated insulation ditch 19, center ditch 2 0, geotextile 21, hole wall 22, prefabricated cover 23, concrete road slab 24, asphalt pavement lower layer 25, asphalt pavement upper layer 26, heating cable 27, electric heating temperature detection probe 28, electric heating heat conducting plate 29, construction joint 30, cable trench 31, drain pipe 32, cover insulation layer 33, ditch built-in insulation layer 34, ditch outer concrete 35, waterproof rubber sealing ring 36, saddle-shaped fastener 37, reserved blind pipe outlet 38. DETAILED DESCRIPTION
[0031] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific embodiments:
[0032] Combine the following Figure 1-8 The embodiment of the present invention is described, which is a heat preservation and heating technology for treating water seepage and icing in cold-region tunnels, including a construction joint treatment system, a tunnel surface restoration system, a drainage system and a heating system.
[0033] The construction joint treatment system includes: isolation columns 1, grouting holes 5, and acrylate spray film waterproof layer 6. Specifically, in the water seepage and ice formation area of the tunnel in the cold region, the concrete surface to be constructed and the surrounding area are first cleaned, and rubber rods are vertically drilled at intervals of 2-3m at the seepage construction joint 30 to be placed as partition isolation columns 1, and the construction joint is divided into several relatively small closed sections. Within each partition, oblique holes are drilled on both sides of the construction joint 30 as grouting holes 5. After the construction of the grouting holes 5 in each partition area is completed, grouting is started from the bottom to the top. After the grouting of each grouting hole is completed, the grouting nozzle is immediately sealed with quick-drying cement. After the grouting of a construction joint 30 is completed, the concrete surface is cleaned again, and the surface of the construction joint 30 is sealed with an acrylate spray film waterproof layer 6.
[0034] The tunnel surface restoration system includes: insulation board bonding mortar 7, STP vacuum insulation board 8, and tunnel coating 9. Specifically, the construction joint 30 uses bonding mortar 7 to fix the STP vacuum insulation board 8 to the tunnel lining surface within the treatment range, and after the bonding mortar solidifies, the surface of the STP vacuum insulation board is protected with plaster mortar, and finally the tunnel coating 9 is restored.
[0035] The drainage system includes: drainage semicircular pipes 12, drainage pipes 13, longitudinal drainage pipes 15, longitudinal prefabricated insulation ditches 18, transverse prefabricated insulation ditches 19 and central ditches 20. Specifically, a rectangular groove 10 is chiseled along the circumferential construction joint, and a 100mm oblique drainage pipe 13 is drilled above and below the cable trench 32, and wrapped with a second geotextile 21. The drainage pipe 13 and the drilled hole wall 22 are filled with waterproof epoxy mortar 16. A 100mm drainage semicircular pipe 12 is laid along the rectangular groove and fixed with a pipe clamp. The lower end of the drainage semicircular pipe 12 is connected to the 100mm drainage pipe 32 and connected to the longitudinal prefabricated insulation ditch 18. The acrylate waterproof layer 6 is sprayed on both sides of the rectangular groove 10 and wrapped with a first geotextile 11. Longitudinal prefabricated heat-insulating trenches 18 are excavated on both sides of the road surface close to the cable trenches 31 to collect water from the construction joint drain holes 13 and the construction joints 30, and the road surface structure (concrete road surface slab 24, asphalt road surface lower layer 25, asphalt road surface upper layer 26) is restored above the prefabricated cover plate 23 of the longitudinal prefabricated heat-insulating trenches 18. The cable trenches 31 are filled with medium-coarse sand 17.
[0036] The seepage water from the construction joint 30 is collected by the newly built longitudinal prefabricated insulation ditch 18, and then a transverse insulation ditch 19 is set every 25m in the treatment section to be introduced into the originally designed central drainage ditch 20.
[0037] The longitudinal prefabricated thermal insulation ditch 18 is provided with a built-in thermal insulation layer 34 and a ditch outer concrete 35. When the prefabricated thermal insulation ditch 18 is installed, the inner surface of the slotted ditch should be polished and leveled first, and a blind pipe outlet 38 is reserved for the thermal insulation side ditch. The drain pipe 32 and the longitudinal prefabricated thermal insulation ditch 18 are connected by a saddle-shaped fastener 37, and a waterproof glue seal 36 is used to seal, so that the φ100mm drain pipe 32 and the longitudinal prefabricated thermal insulation ditch 18 are seamlessly connected. After the prefabricated thermal insulation ditch 18 is installed, the cover plate thermal insulation layer 33 and the prefabricated ditch cover plate 23 are installed on the upper part to form a closed thermal insulation space.
[0038] The heating system includes a heating cable 27, an electric heating temperature detection probe 28 and an electric heating heat conducting plate 29. Specifically, the heating cable 27 is arranged inside the rectangular groove 10 of the side wall, the longitudinal prefabricated insulation ditch 18 and the transverse insulation ditch 19, and the heat conducting plate 29 is arranged on the side wall of the longitudinal prefabricated insulation ditch 18, which can not only transfer the heat generated by the electric heating to the water flow in the insulation ditch in time, but also prevent the electric heating from being soaked in water for a long time and causing it to fail. When the electric heating temperature detection probe 28 detects that the water flow temperature in the semicircular pipe drainage 12, the longitudinal prefabricated insulation ditch 18 and the transverse insulation ditch 19 is close to the freezing temperature, the control box 20 automatically turns on the heating cable 27 to heat the tunnel drainage pipe and the insulation ditch to ensure that the water flow in the pipe and the insulation ditch does not freeze. The heating cable 27 can also be turned on or off by the remote control host and the switch in the on-site control box.
[0039] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.
[0040] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A cold region tunnel seepage and icing treatment insulation and heating system, characterized in that: include A construction joint treatment system, comprising an isolation column placed on a construction joint of the construction joint treatment system, grouting in the construction joint partitioned based on the isolation column and sealing the surface with an acrylate spray waterproof layer; A tunnel surface restoration system, wherein the tunnel surface restoration system is laid after the construction joint treatment system; Among them, the tunnel surface restoration system includes STP vacuum insulation panels and tunnel coatings laid on the acrylate spray waterproof layer in sequence; A drainage system, wherein the drainage system is arranged on the construction joint above the cable trench; The drainage system includes: a drainage pipe arranged in a rectangular groove chiseled along the annular construction joint and a drainage pipe arranged below the tunnel cable trench, the drainage pipe in the rectangular groove is connected through a drainage semicircular pipe, the end of the drainage semicircular pipe is connected to a drainage pipe, the drainage pipe is connected to a longitudinal prefabricated insulation ditch, the drainage pipe below the tunnel cable trench is directly connected to the longitudinal prefabricated insulation ditch, and the longitudinal prefabricated insulation ditch is connected to a central ditch through a transverse prefabricated insulation ditch; The heating system is a heating cable arranged inside the rectangular groove, the longitudinal prefabricated insulation ditch and the transverse insulation ditch. The heating cable is installed with an electric heating temperature detection probe. The heating cable and the electric heating temperature detection probe are both controlled by an on-site control box.
2. The cold region tunnel water seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: The grouting method in the construction joint is: oblique holes are drilled on both sides of the construction joint as grouting holes, grouting is started from the bottom to the top through the grouting holes, and after the grouting of each grouting hole is completed, the grouting nozzle is closed with quick-drying cement.
3. The cold region tunnel seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: The construction joint uses bonding mortar to fix the STP vacuum insulation panel to the tunnel lining surface within the treatment range.
4. The cold region tunnel seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: Both sides of the rectangular groove are sprayed with an acrylate waterproof layer and wrapped with a first geotextile.
5. The cold region tunnel seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: The surface of the drainage pipe is wrapped with a second geotextile, and waterproof epoxy mortar is filled between the drainage pipe and the excavated hole wall.
6. The cold region tunnel seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: The longitudinal prefabricated insulation ditch is provided with a reserved blind pipe outlet. The drain pipe and the longitudinal prefabricated insulation ditch are connected by a saddle-shaped fastener and sealed with waterproof glue. The saddle-shaped fastener and the drain pipe are sealed by a waterproof glue sealing ring.
7. The cold region tunnel seepage and icing treatment insulation and heating system according to claim 6 is characterized in that: A cover plate insulation layer and a prefabricated ditch cover plate are installed on the upper part of the longitudinal prefabricated thermal insulation ditch.
8. A cold region tunnel seepage and icing treatment insulation and heating system according to claim 6 or 7, characterized in that: The longitudinal prefabricated heat-insulating ditch is provided with a heat-insulating layer inside the ditch and concrete outside the ditch.
9. The cold region tunnel water seepage and icing treatment insulation and heating system according to claim 1 is characterized in that: The heating cable is communicated with the cable in the cable trench, and a heat conducting plate is arranged on the side wall of the longitudinal prefabricated heat-insulating trench.
Citation Information
Cited By
Coal mine shaft and construction method thereof
CN121047618A
High and cold area tunnel lining leakage water disease treatment structure and construction method thereof
CN121111320A