Underground large-space ultra-shallow-buried underground excavation construction method
By adopting a new spatial stress system of square steel tubes and honeycomb steel concrete components, the problems of material waste and headroom encroachment in traditional arched beam structures are solved, and efficient, low-cost ultra-shallow excavation construction in large underground spaces is achieved. Improved structural integrity and strength.
Patent Information
- Application Number
- CN202410916824.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-29
AI Technical Summary
The traditional tube curtain prefabrication method has the problems of material waste and headroom encroachment when constructing the arched beam system, resulting in increased construction costs and low material utilization efficiency.
Square steel tubes and honeycomb steel concrete components are used to construct a new spatial stress system of square steel tube concrete tube curtains and honeycomb steel concrete rib beams. Through the jacking, cutting and arch rib installation of square steel tubes, combined with steel bar binding and grouting, the whole structure is formed. Structure to reduce material waste.
Effective use of material stress properties reduces construction costs and welding engineering volume, improves structural integrity and strength, avoids material waste, and improves construction efficiency.
Smart Images

Figure CN118855484A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of underground structure construction methods, and more specifically to an ultra-shallow buried dark excavation construction method for a large underground space. Background Art
[0002] The pipe-curtain prefabrication method, also known as the new pipe-curtain method, is a new type of underground structure space dark excavation construction technology. It has irreplaceable advantages over other methods in solving the construction of underground structures under complex conditions, the construction of underground structures with high environmental protection requirements, ultra-shallow buried large-span underground structures, and the construction of underground structures close to the ground. When the pipe-curtain prefabrication method is used for construction, multiple densely packed large-diameter steel pipes are first pushed into the construction site of the underground structure, and the steel pipes are connected to each other by cutting support between pipes or by using annular rib beams. Then, the steel bar binding and concrete winding operations are completed in the internal space of the interconnected pipes to form an underground structure. Finally, the underground space is excavated under the support of the structure. This method is called the prefabrication method because the structure is formed first and then the underground space is excavated.
[0003] When the ring beam is used to connect the densely packed large-diameter steel pipes that are pushed in, the longitudinal steel pipes and the ring beam form a pipe-curtain prefabricated arched beam structure, and its force transmission path is: the surrounding rock load is transferred to the longitudinal steel pipe beam, and the steel pipe beam transfers the load to the arch ribs at both ends. This structure is essentially a longitudinal and transverse beam structure of an underground space. When the pipe-curtain prefabrication method is used to construct the beam structure, circular-section steel pipes are often pushed in the longitudinal direction. When such components are bent, they cannot fully exert their force-bearing performance, resulting in material waste.
[0004] At the same time, the arch ribs bear multiple concentrated loads from the steel tube beams on both sides. When reinforced concrete components are used, the cross-sectional height will be very large, which will in turn encroach on the clearance. The design requires increasing the excavation surface, which increases the construction cost. Therefore, although the traditional pipe-roof prefabrication method has irreplaceable advantages in controlling settlement, the resulting arched beam structure has material waste. Summary of the invention
[0005] In order to overcome the above-mentioned defects of the prior art, the present invention provides a method for ultra-shallow buried dark excavation construction in a large underground space to solve the problems existing in the above-mentioned background technology.
[0006] The present invention provides the following technical solution: a method for constructing a large underground space ultra-shallow buried dark excavation, comprising the following steps:
[0007] Step A: Engineering survey and design, and design and manufacture of steel pipes;
[0008] Step B: excavate the working pit, install support, set up drainage system, install load-bearing structure and power system;
[0009] Step C: Pushing and connecting the square steel pipe, and removing the remaining soil in the square steel pipe;
[0010] Step F: Pipe wall cutting and arch rib installation;
[0011] Step G: Installation of steel bars in square steel tube beams;
[0012] Step H: grouting between longitudinal pipes and transverse ribs, followed by excavation of the soil inside the structure;
[0013] Step J: welding steel plates to connect adjacent longitudinal steel pipes and steel pipes and pipe ribs;
[0014] Step K: Internal structure construction and finishing.
[0015] Preferably, in step A, before construction, a detailed geological survey is first conducted, including soil layer structure, groundwater level and surrounding environmental conditions, and based on the survey results, a configuration plan of the pipe curtain is designed, including steel pipe size, layout and required strength.
[0016] Preferably, in step B, earth is excavated at the location of the working well, the well wall support structure is designed and installed according to the soil quality and hydrological conditions, the starting bracket is installed, the rear support is installed, the cylinder frame and the cylinder are installed, the pressure equalizing ring is installed, the tunneling machine head is installed, the control circuit and pipeline are installed, the water stopping device is installed, and the drainage system is installed.
[0017] Preferably, in step C, after the square steel pipe is pushed in, the boring machine head will clean a portion of the soil, and then the workers will enter the pipe to clean the remaining soil.
[0018] Preferably, in step F, after the jacking of the square steel pipe curtain is completed, the pipe wall between adjacent steel pipes is cut to leave a T-shaped notch for installing a steel arch rib, wherein the steel arch rib is a honeycomb steel, and one leg and more than half of the waist of the steel arch rib are inside the curtain, and the other leg is inside the inner circle of the curtain.
[0019] Preferably, in step G, after the arch rib is installed, a steel bar structure is inserted into the honeycomb holes of the steel arch rib, steel bars are inserted between the outer ring of the arch rib and the inner wall of the tube curtain, and they are tied with steel wire and steel ring.
[0020] Preferably, in step H, grouting is performed between the longitudinal pipes and transverse ribs of the installed steel bar structure to form an integral structure, and after grouting, the cement mortar is allowed to form a longitudinal and annular spatial structural force system, and then the internal soil is excavated under the protection of the structure.
[0021] Preferably, in step J, after the internal soil excavation is completed, steel plates are welded to the gaps between adjacent longitudinal steel pipes and the gaps between the steel pipes and the pipe ribs to form a seal.
[0022] Preferably, in step K, after the structure is stabilized, reinforcement arrangement and concrete pouring operations are carried out inside to form a solid tunnel lining, necessary ventilation, lighting, drainage and other infrastructure are installed, and detailed safety inspections and structural integrity assessments are carried out.
[0023] Technical effects and advantages of the present invention:
[0024] 1. The present invention innovates the structural system, utilizes the characteristics of square steel tube components and honeycomb steel concrete components with good stress-bearing performance and easy construction, proposes a new pipe-curtain prefabricated arched beam system structure construction method, and constructs a new spatial stress-bearing system of square steel tube concrete pipe curtain plus honeycomb steel concrete rib beam, which is conducive to making full use of the stress-bearing performance of the material and avoiding material waste.
[0025] 2. The present invention constructs a new type of spatial force system of square steel tube concrete pipe curtain plus honeycomb steel concrete rib beam. In actual construction, the cross-sectional height is small and will not encroach on the clearance. There is no need to increase the excavation surface in the design, which reduces the construction cost, is more efficient, has better structural integrity, high structural strength, and reduces the amount of welding work. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0027] Figure 2 It is a partial cross-sectional view of the present invention;
[0028] Figure 3 This is a schematic diagram of the installation of a square steel pipe after cutting according to the present invention;
[0029] Figure 4 For the flow chart.
[0030] The accompanying drawings are marked as follows:
[0031] 1. Square steel pipe; 2. Steel arch rib; 3. Track buckle; 4. T-shaped notch. DETAILED DESCRIPTION
[0032] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The ultra-shallow buried dark excavation construction method for a large underground space involved in the present invention is not limited to the various structures recorded in the following embodiments. All other implementations obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.
[0033] Reference Figure 1-3 The present invention provides a method for constructing a large underground space ultra-shallow buried dark excavation, comprising the following steps:
[0034] Step A: Engineering survey and design, and design and manufacture of steel pipes;
[0035] Step B: excavate the working pit, install support, set up drainage system, install load-bearing structure and power system;
[0036] Step C: jacking and connection of the square steel pipe 1, and removal of the remaining soil in the square steel pipe 1;
[0037] Step F: Pipe wall cutting and arch rib installation;
[0038] Step G: Installation of steel bars in square steel pipe 1 beam;
[0039] Step H: grouting between longitudinal pipes and transverse ribs, followed by excavation of the soil inside the structure;
[0040] Step J: welding steel plates to connect adjacent longitudinal steel pipes and steel pipes and pipe ribs;
[0041] Step K: Internal structure construction and finishing.
[0042] Specifically, the present invention mainly improves the construction method of the prefabricated arched beam structure of the pipe curtain. The structural innovation is carried out by changing the round steel tube concrete components in the prefabricated arched beam structure of the pipe curtain into square steel tube concrete components and designing the arch ribs into honeycomb steel concrete components. Compared with the traditional method of jacking through circular cross-section steel tubes and then setting reinforced concrete structure arch ribs, the present invention has higher efficiency, better structural integrity, higher structural strength, and reduces the amount of welding engineering.
[0043] Reference Figure 1 In step A, before construction, a detailed geological survey is first carried out, including soil structure, groundwater level and surrounding environmental conditions. Based on the survey results, the configuration plan of the pipe curtain is designed, including the steel pipe size, layout and required strength.
[0044] Specifically, before construction, a detailed geological survey is first conducted, including soil structure, groundwater level and surrounding environmental conditions. Based on the survey results, the configuration plan of the pipe curtain is designed, including the steel pipe size, layout and required strength. The accuracy of the design is the key to ensure the success of the construction. According to the design requirements, steel pipes that meet the mechanical properties are manufactured. These steel pipes have pre-designed track buckles 3 and grouting holes for subsequent installation and grouting operations.
[0045] Reference Figure 1 In step B, excavate the earth at the location of the working shaft, design and install the shaft wall support structure according to the soil quality and hydrological conditions, install the starting bracket, install the rear support, install the cylinder frame and cylinder, install the equalizing ring, install the tunneling machine head, install the control circuit and pipeline, install the water stop device, and install the drainage system.
[0046] Specifically, first arrange the construction site, select suitable locations to set up the starting well and receiving well, and prepare and arrange the site according to ground conditions and construction safety requirements; then excavate the earth at the location of the working well, and design the well wall support structure according to the soil and hydrological conditions, such as steel sheet piles, concrete walls or other support structures, to ensure the stability of the earth during the excavation process; then set up the necessary drainage system at the bottom of the working well to ensure that the inside of the working well is dry during construction to prevent soil erosion from affecting construction safety.
[0047] The interval between working pits is determined according to the specific construction environment and soil conditions. If the geological conditions are complex or unstable, working pits may need to be set up more frequently to facilitate construction and safety.
[0048] After excavating the working well, it is necessary to install the starting bracket, which ensures the accuracy of jacking, so the installation of the starting bracket must be accurate; then install the backrest, install the cylinder frame and cylinder, install the equalizing ring, install the tunneling machine head, install the control circuit and pipeline, install the water-stopping device, and install the drainage system to ensure that the entire jacking operation is carried out in a safe and dry environment.
[0049] Reference Figure 1 In step C, after the square steel pipe 1 is pushed in, the boring machine head will clean a part of the soil, and then the workers will enter the pipe to clean the remaining soil.
[0050] Specifically, after the jacking position is determined, the jacking operation is started. After the first square steel pipe 1 is jacked, each subsequent square steel pipe 1 must make the track buckles 3 of two adjacent steel pipes engage with each other to form a seal.
[0051] After jacking, part of the soil in the square steel pipe 1 will be discharged by the boring machine head, and the remaining soil needs to be cleaned by workers entering the square steel pipe 1 to ensure that there is no residual soil on the inner wall of the square steel pipe 1 to prevent the cement mortar from not fitting with the inner wall of the steel pipe after subsequent grouting.
[0052] Reference Figure 2 Step F, after the jacking of the square steel pipe 1 is completed, the pipe wall between adjacent steel pipes is cut to leave space for installing the steel arch rib 2. The steel arch rib 2 is a honeycomb steel. One side leg and more than half of the waist of the steel arch rib 2 are inside the pipe curtain, and the other side leg is in the inner circle of the pipe curtain.
[0053] Specifically, after the square steel pipe 1 tube curtain is set up, it is necessary to cut the adjacent tube wall. The cut position is just suitable for the installation of honeycomb steel. Honeycomb steel is a structural member that has been supported on the ground. One side leg and more than half of the waist of the steel arch rib 2 are inside the tube curtain, and the other side leg is in the inner circle of the tube curtain.
[0054] After installing the steel arch rib 2, it is necessary to perform preliminary welding between the inner wall of the pipe curtain and the steel arch rib 2 to form a longitudinal and circumferential spatial structural force system. At this time, the longitudinal force of the pipe curtain is constrained and supported by the steel arch rib 2, and the circumferential force of the pipe curtain is also evenly distributed to each steel arch rib 2, avoiding the waste of the mechanical properties of the material and also enabling the pipe curtain to have a stronger surrounding rock load.
[0055] Reference Figure 2 Step G: After the arch rib is installed, a steel bar structure is inserted into the honeycomb holes of the steel arch rib 2, steel bars are inserted between the outer ring of the arch rib and the inner wall of the tube curtain, and they are tied with steel wire and steel ring.
[0056] Specifically, after the arch rib is installed, preliminary welding is carried out, and then a steel bar structure is inserted into the honeycomb holes of the steel arch rib 2, and steel bars are inserted between the outer ring of the arch rib and the inner wall of the pipe curtain, and they are tied with steel wire and steel rings. The steel bar structure further strengthens the integrity between the pipe curtain and the steel section, and also improves the ability of the pipe curtain to bear greater circumferential loads in places where there is no steel arch rib 2.
[0057] Reference Figure 2 In step H, grouting is performed between the longitudinal pipes and transverse ribs of the installed steel structure to form an integral structure. After grouting, the cement mortar is formed to form a longitudinal and annular spatial structural force system, and then the internal soil is excavated under the protection of the structure.
[0058] Specifically, after the steel bars are tied, grouting is performed between the longitudinal pipes and the transverse ribs so that cement mortar is filled in the square steel pipe 1 between the pipe curtain and the steel arch rib 2. After the cement mortar solidifies, a stable underground structure can be formed. At this time, the underground structure has better integrity, can bear a larger load, has a small amount of welding work, is more reasonably distributed in the whole, and utilizes the mechanical properties of the material more thoroughly.
[0059] Reference Figure 1-3 , Step J, after the internal soil excavation is completed, the gaps between adjacent longitudinal steel pipes and the gaps between the steel pipes and the pipe ribs are welded with steel plates to form a seal.
[0060] Specifically, since the tube curtains are locked and restrained by rail-type locks, there are gaps between adjacent square steel tubes 1, and there are also gaps between the square steel tubes 1 and the steel arch ribs 2. These gaps are welded to form a closed structure to enhance the waterproof effect.
[0061] After the track-type lock is locked, a gap is reserved at the center of the lock, and grouting is performed in the gap to enhance the waterproof effect.
[0062] Reference Figure 1-3, Step K, after the structure is stable, reinforcement arrangement and concrete pouring operations are carried out inside to form a solid tunnel lining, necessary ventilation, lighting, drainage and other infrastructure are installed, and detailed safety inspections and structural integrity assessments are carried out.
[0063] Specifically, after the structure is stable, steel bar arrangement and concrete pouring operations are carried out inside to form a solid tunnel lining, followed by the installation of necessary ventilation, lighting, drainage and other infrastructure to ensure the tunnel's functional integrity and long-term safety; clean up the construction area, restore vegetation, handle waste generated during construction, and ensure that the construction area environment complies with regulations.
[0064] After all construction is completed, a detailed safety inspection and structural integrity assessment will be conducted to ensure that the performance of all facilities meets the design requirements. After completion, the project will be formally handed over to the customer or management unit.
[0065] During use, by innovating the structural system and utilizing the characteristics of square steel tube components and honeycomb steel concrete components, which have good stress-bearing performance and are easy to construct, a new pipe-curtain prefabricated arched beam structure construction method was proposed, and a new spatial stress-bearing system of square steel tube concrete pipe curtain plus honeycomb steel concrete rib beam was constructed, which is conducive to making full use of the material's stress-bearing performance and avoiding material waste.
[0066] The working principle of the present invention is to use any one of the above working processes and the beneficial effects produced therefrom.
[0067] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0068] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
[0069] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for ultra-shallow underground excavation in a large space, characterized in that: The following steps are involved: Step A: Engineering survey and design, and design and manufacture of steel pipes; Step B: excavate the working pit, install support, set up the drainage system, install the load-bearing structure and power system; Step C: Pushing and connecting the square steel pipe, and removing the remaining soil in the square steel pipe; Step F: Pipe wall cutting and arch rib installation; Step G: Installation of steel bars in square steel tube beams; Step H: grouting between longitudinal pipes and transverse ribs, followed by excavation of the soil inside the structure; Step J: welding steel plates to connect adjacent longitudinal steel pipes and steel pipes and pipe ribs; Step K: Internal structure construction and finishing.
2. The method for ultra-shallow underground excavation in a large space according to claim 1 is characterized in that: In step A, before construction, a detailed geological survey is first conducted, including soil structure, groundwater level and surrounding environmental conditions. Based on the survey results, the configuration plan of the pipe curtain is designed, including the size, layout and required strength of the steel pipes.
3. The method for ultra-shallow underground excavation in a large space according to claim 2 is characterized in that: In step B, earth is excavated at the location of the working well, and the well wall support structure is designed and installed according to the soil quality and hydrological conditions, the starting bracket is installed, the rear support is installed, the cylinder frame and the cylinder are installed, the pressure equalizing ring is installed, the tunneling machine head is installed, the control circuit and pipelines are installed, the water stopping device is installed, and the drainage system is installed.
4. The method for ultra-shallow underground excavation in a large space according to claim 3 is characterized in that: In step C, after the square steel pipe is pushed in, the boring machine head will clean a portion of the soil, and then the workers will enter the pipe to clean the remaining soil.
5. The method for ultra-shallow underground excavation in a large space according to claim 4 is characterized in that: In the step F, after the jacking of the square steel pipe curtain is completed, the pipe wall between adjacent steel pipes is cut to leave a T-shaped notch for installing the steel arch rib, the steel arch rib is a honeycomb steel, one side leg and more than half of the waist of the steel arch rib are inside the curtain, and the other side leg is inside the inner circle of the curtain.
6. The method for ultra-shallow underground excavation in a large space according to claim 5 is characterized in that: In step G, after the arch rib is installed, a steel bar structure is inserted into the honeycomb holes of the steel arch rib, steel bars are inserted between the outer ring of the arch rib and the inner wall of the tube curtain, and they are tied with steel wire and steel ring.
7. The method for ultra-shallow underground excavation in a large space according to claim 6 is characterized in that: In the step H, grouting is performed between the longitudinal pipes and transverse ribs of the installed steel bar structure to form an integral structure. After grouting, the cement mortar is formed to form a longitudinal and annular spatial structural force system, and then the internal soil is excavated under the protection of the structure.
8. The method for ultra-shallow underground excavation in a large space according to claim 7 is characterized in that: In step J, after the internal soil excavation is completed, steel plates are welded to the gaps between adjacent longitudinal steel pipes and the gaps between the steel pipes and the pipe ribs to form a seal.
9. The method for ultra-shallow underground excavation in a large space according to claim 8, characterized in that: In step K, after the structure is stable, reinforcement arrangement and concrete pouring operations are carried out inside to form a solid tunnel lining, necessary ventilation, lighting, drainage and other infrastructure are installed, and detailed safety inspections and structural integrity assessments are carried out.
Citation Information
Cited By
Prefabricated steel shell concrete annular tunnel pipe joint structure
CN119507938A
A prefabricated steel shell concrete annular tunnel pipe segment structure
CN119507938B