A prestressed partially steel-clad T-shaped composite beam and its construction method

Through prestressed prefabricated assembly technology, combined with honeycomb steel and ultra-high performance concrete, the complex problems of traditional prestress construction are solved, and efficient and environmentally friendly prestressed composite beam construction is achieved, which improves the crack resistance and bending stiffness of the building. It adapts to industrial construction needs.

CN112854595BActive Publication Date: 2024-11-22XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202110246651.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-05
Publication Date
2024-11-22
Estimated Expiration
2041-03-05

AI Technical Summary

Technical Problem

Traditional prestressing technology is complex in construction and is difficult to adapt to the requirements of industrialized and intelligent construction, resulting in an increase in the load-bearing of high-rise and super-high-rise buildings, affecting the spatial layout and seismic resistance, and is not conducive to the development of green and environmentally friendly buildings.

Method used

Prestressed prefabricated assembly technology is adopted, and prestressed rectangular combined beams are combined with cast-in-place concrete flange plates, and prefabricated parts are completed in the factory using honeycomb steel, longitudinal bars, stirrups, prestressed steel strands and ultra-high performance concrete. Tensile prestressing to simplify on-site construction.

Benefits of technology

It achieves simplicity of construction and green environmental protection, improves the crack resistance and stiffness of beams, reduces the structure's own weight, reduces construction costs and construction time, and meets the requirements of energy conservation and emission reduction in green buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112854595B_ABST
    Figure CN112854595B_ABST
Patent Text Reader

Abstract

A prestressed partially steel-clad T-shaped composite beam, based on prestressed prefabrication assembly technology, is mainly composed of a prestressed prefabricated rectangular composite beam and a cast-in-place concrete flange plate. The prestressed prefabricated rectangular composite beam includes honeycomb steel; tie bars arranged in the holes of the honeycomb steel and perpendicular to the steel web; closed stirrups arranged between the honeycomb steel flanges; a first longitudinal bar in the beam arranged at the bottom of the closed stirrup ring and parallel to the long direction of the beam; a second longitudinal bar in the beam arranged at the top of the closed stirrup ring and parallel to the long direction of the beam; a number of prestressed steel strands arranged on the upper part of the lower flange of the honeycomb steel and parallel to the long direction of the beam; prefabricated UHPC (ultra-high performance concrete) filled between the honeycomb steel flanges; and bolts arranged at the top of the upper flange of the honeycomb steel. The cast-in-place concrete flange plate includes double-layer bidirectional steel bars arranged in the cast-in-place flange plate; and cast-in-place concrete filled at the top of the prestressed prefabricated rectangular composite beam. The invention has excellent stress-bearing performance, can significantly improve the crack resistance and bending rigidity of the beam, and is convenient for on-site construction, thus shortening the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction, and particularly relates to a prestressed partially steel-clad T-shaped composite beam and a construction method thereof. Background Art

[0002] With the rapid development of the economy, high-rise, super-high-rise and large-span spatial structures are increasing, and the loads borne by the components have increased exponentially. In order to meet the load-bearing requirements of the main structure, the cross-sectional size of the components needs to be increased to meet the needs. This increases the deadweight of the main structure, affects the spatial layout and aesthetics, and reduces the seismic performance, which is not conducive to the development of green and environmentally friendly buildings.

[0003] Applying prestress to steel-concrete composite beams can effectively solve the problems of low cracking and insufficient stiffness of beams in large-span structures. However, traditional prestressing technology requires on-site prestressing, and the construction process is complicated, making it difficult to adapt to the requirements of industrialized and intelligent construction. Summary of the invention

[0004] In order to overcome the shortcomings of the above-mentioned prior art, the purpose of the present invention is to provide a prestressed partially steel-clad T-shaped composite beam and a construction method thereof, which solves the complex problems of on-site construction of traditional prestressed structures based on prestressed prefabrication and assembly technology, and has the advantages of high bearing capacity, good crack resistance, high rigidity, small component cross-sectional size, and low deadweight.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A prestressed partially steel-clad T-shaped composite beam, comprising a prestressed prefabricated rectangular composite beam 1 and a cast-in-place concrete flange plate 2, characterized in that:

[0007] The prestressed prefabricated rectangular composite beam 1 comprises:

[0008] Honeycomb steel 101;

[0009] Tie bars 103 disposed in the holes of the honeycomb steel 101 and perpendicular to the web of the honeycomb steel 101;

[0010] A plurality of closed stirrups 102 are arranged between the flanges of the honeycomb steel 101 and are symmetrically distributed on both sides of the web, and the plane where the closed stirrups 102 are located is perpendicular to the web;

[0011] A plurality of longitudinal ribs 105 disposed on the upper portion of the lower flange of the honeycomb steel 101 and parallel to the length direction of the honeycomb steel 101;

[0012] A plurality of longitudinal ribs 107 disposed at the lower portion of the upper flange of the honeycomb steel 101 and parallel to the length direction of the honeycomb steel 101;

[0013] A plurality of prestressed steel strands 104 disposed on the upper portion of the lower flange of the honeycomb steel 101 and parallel to the length direction of the honeycomb steel 101;

[0014] Precast ultra-high performance concrete (UHPC) 106 filled between upper and lower flanges of the honeycomb steel 101;

[0015] as well as,

[0016] A number of equally spaced studs 108 disposed on the top of the upper flange of the honeycomb steel 101;

[0017] The cast-in-place concrete flange plate 2 comprises:

[0018] Double-layer bidirectional steel bars 201 disposed in the cast-in-place flange plate;

[0019] The cast-in-place concrete 202 is filled on the top of the prestressed prefabricated rectangular composite beam 1 , and the double-layer bidirectional steel bars 201 are cast and covered by the cast-in-place concrete 202 .

[0020] The honeycomb steel 101 is made of high-strength I-beam with holes uniformly opened on its web or is cut and welded from high-strength steel plates.

[0021] The tensioning bars 103 are welded to the contact positions of the holes of the honeycomb steel 101, and are tied and fixed to the closed stirrups 102 on both sides, and steel bars with a diameter greater than or equal to the diameter of the closed stirrups 102 are used; the closed stirrups 102 are located at the holes of the honeycomb steel 101, the longitudinal bars 105 are tied to the lower parts of the closed stirrups 102 on both sides, and the longitudinal bars 107 are tied to the upper parts of the closed stirrups 102 on both sides. The prefabricated ultra-high performance concrete 106 is cast at one time on both sides of the web of the honeycomb steel 101 to form a whole and does not exceed the honeycomb steel 101 in the length direction.

[0022] The prestressed steel strand 104 passes through the interior of the embedded corrugated pipe, the corrugated pipe is fixed to the lower side of the reinforcing bar 103, the arrangement form of the prestressed steel strand 104 is selected to be linear or parabolic according to the specific project conditions, and the prestressed steel strand 104 is tensioned to the design value by post-tensioning method.

[0023] The studs 108 are connected to the honeycomb steel 101 by welding and arranged according to design requirements.

[0024] The double-layer bidirectional steel bars 201 in the cast-in-place flange plate are arranged at equal intervals in the longitudinal and transverse directions.

[0025] The cast-in-place concrete 202 is made of ordinary concrete.

[0026] The present invention also provides a construction method for the prestressed partially steel-clad T-shaped composite beam, the steps of which are as follows:

[0027] 1. In the factory, firstly, the longitudinal reinforcement 105 is placed at the bottom of the closed stirrup 102 circle, and the longitudinal reinforcement 107 is placed at the top of the closed stirrup 102 circle, and they are all tied and fixed with wire to form a steel cage. The steel cage composed of the longitudinal reinforcement 104, the longitudinal reinforcement 107 and the closed stirrup 102 is placed at the predetermined position in the flanges on both sides of the web of the honeycomb steel 101. The tie bar 103 is vertically passed through the hole of the web of the honeycomb steel 101, and the tie bar 103 is spot welded and fixed at the contact position between the tie bar 103 and the hole of the honeycomb steel 101, and then tied and fixed with the closed stirrup 102. The prestressed steel strand is passed through the corrugated pipe and placed under the tie bar 103 and tied and fixed with the tie bar 103. After completion, the precast UHPC 106 is poured. After the concrete strength reaches more than 75%, the prestressed steel strand is tensioned according to the design requirements, and finally the studs 108 are welded;

[0028] 2. On site, connect the two ends of the honeycomb steel 101 to the composite columns or steel columns;

[0029] 3. Set up the formwork, arrange the double-layer bidirectional reinforcement 201 in the cast-in-place flange plate, and cast the cast-in-place flange plate 202.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1) Simple construction, green and environmentally friendly

[0032] The prestressed prefabricated rectangular composite beam in the new prestressed partially steel-clad T-shaped composite beam is to place the longitudinal reinforcement, stirrups, tension bars and prestressed steel strands in the predetermined position, pour the UHPC, and when the concrete strength reaches a certain level, the prestressing is tensioned in the factory to complete the construction. Compared with the traditional composite beam, it avoids the tensioning of prestressing on the construction site, reduces the workload of pouring concrete on site, simplifies the construction process, can greatly improve the construction efficiency, and meet the requirements of energy conservation and emission reduction of green buildings.

[0033] 2) Strong integrity and low cost

[0034] The new type of prestressed part is a steel-clad T-shaped composite beam. The concrete of the prestressed prefabricated rectangular composite beam can be poured at one time. The web opening is a natural shear connector, which connects the concrete on both sides of the web into a whole. It can strengthen the bonding performance of the steel and concrete, make them work together as a whole, and reduce the cost of additional welding shear studs. The prefabricated part and the cast-in-place part can use concrete of different strength grades. The web part uses UHPC and applies prestress to increase the cracking load and stiffness of the beam. The flange plate uses recycled concrete, lightweight aggregate concrete, sound insulation concrete, etc. The use of differential concrete can reduce the cost while ensuring the various properties of the beam.

[0035] 3) Excellent performance and flexible design

[0036] The new type of prestressed partially steel-clad T-shaped composite beam uses prefabricated prestressing technology in high-strength honeycomb steel and ultra-high performance concrete UHPC composite beams, effectively improving the beam's stress performance, increasing beam stiffness, reducing cross-sectional area, and reducing the structure's own weight to facilitate earthquake resistance.

[0037] Generally speaking, the new prestressed partially steel-clad T-shaped composite beam can not only give full play to the advantages of the composite structure, but also meet the requirements of architectural aesthetics and functionality, while simplifying the construction steps and speeding up the construction progress. It can be widely used in various building structures, contributing to the development of the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0039] Figure 2 It is a partial side view of the honeycomb steel, longitudinal reinforcement, straight prestressed steel strands, stirrups and tension reinforcement of the present invention.

[0040] Figure 3 It is a three-dimensional schematic diagram of the linear prestressed partially steel-clad T-shaped composite beam of the present invention.

[0041] Figure 4 It is a three-dimensional schematic diagram of the parabolic prestressed partially steel-clad T-shaped composite beam of the present invention.

[0042] Figure 5 It is a three-dimensional schematic diagram of the combination of the prefabricated part and the column connected to the cast wing plate of the present invention.

[0043] Figure 6 for Figure 5 The A-A section detail drawing is a schematic diagram of the cross section of the steel section where no holes are opened.

[0044] Figure 7 for Figure 5 The B-B section detail is a schematic diagram of the cross section at the opening of the steel section. DETAILED DESCRIPTION

[0045] The embodiments of the present invention are described in detail below with reference to the accompanying drawings and examples.

[0046] A prestressed partially steel-clad T-shaped composite beam, based on prestressed prefabrication and assembly technology, has excellent stress-bearing performance, can significantly improve the beam's crack resistance and bending stiffness, and is convenient for on-site construction, shortening the construction period. Figure 1 As shown, it is mainly composed of a prestressed prefabricated rectangular composite beam 1 and a cast-in-place concrete flange plate 2.

[0047] refer to Figure 2 , Figure 3 , Figure 4The prestressed prefabricated rectangular composite beam 1 includes: honeycomb steel 101, a plurality of closed stirrups 102, a plurality of tension bars 103, a plurality of longitudinal bars 105, a plurality of longitudinal bars 2 107, a plurality of prestressed steel strands 104, prefabricated ultra-high performance concrete 106 and a plurality of studs 108; the cast-in-place concrete flange plate 2 mainly includes double-layer bidirectional steel bars 201 and cast-in-place concrete 202.

[0048] Specifically, the honeycomb steel 101 is made of high-strength I-beam with holes uniformly opened on its web or is cut and welded from high-strength steel plates.

[0049] The closed stirrups 102 are arranged between the flanges of the honeycomb steel 101 and are symmetrically distributed on both sides of the web, and can be correspondingly distributed at the holes of the honeycomb steel 101. The plane where the closed stirrups 102 are located is perpendicular to the web.

[0050] The tie bars 103 are arranged in the holes of the honeycomb steel 101 and are perpendicular to the web of the honeycomb steel 101 , are welded at the contact position with the holes of the honeycomb steel 101 , are tied and fixed with the closed stirrups 102 on both sides, and use steel bars with a diameter greater than or equal to that of the closed stirrups 102 .

[0051] The prestressed steel strand 104 is arranged on the upper part of the lower flange of the honeycomb steel 101 and is parallel to the length direction of the honeycomb steel 101. It passes through the interior of the embedded corrugated pipe, and the corrugated pipe is fixed to the lower side of the tie rod 103. The arrangement form of the prestressed steel strand 104 is selected to be linear or parabolic according to the specific project conditions. The prestressed steel strand 104 is tensioned to the design value by post-tensioning method.

[0052] The longitudinal reinforcement 105 is arranged on the upper part of the lower flange of the honeycomb steel 101 and is parallel to the length direction of the honeycomb steel 101. The longitudinal reinforcement 105 is tied to the lower part of the closed stirrups 102 on both sides.

[0053] The second longitudinal reinforcement 107 is arranged at the lower part of the upper flange of the honeycomb steel 101 and is parallel to the length direction of the honeycomb steel 101. The second longitudinal reinforcement 107 is tied to the upper part of the closed stirrups 102 on both sides.

[0054] The studs 108 are arranged at equal intervals on the top of the upper flange of the honeycomb steel 101, connected to the honeycomb steel 101 by welding, and arranged according to design requirements.

[0055] The prefabricated ultra-high performance concrete 106 is filled between the upper and lower flanges of the honeycomb steel 101 and is poured at both sides of the web of the honeycomb steel 101 to form an integral body and does not exceed the honeycomb steel 101 in the length direction.

[0056] Double-layer bidirectional steel bars 201 are set in the cast-in-place flange plate and arranged at equal intervals in the longitudinal and transverse directions.

[0057] The cast-in-place concrete 202 is made of ordinary concrete, which is filled on the top of the prestressed prefabricated rectangular composite beam 1, and the double-layer bidirectional steel bars 201 are cast and covered therein.

[0058] like Figure 4 , Figure 5 , Figure 6 , Figure 7 As shown, honeycomb steel 101, precast ultra-high performance concrete 106, longitudinal reinforcement 105, prestressed steel strand 104, closed stirrups 102, tension reinforcement 103, longitudinal reinforcement 2 107, and studs 108 are all precast parts. The double-layer bidirectional reinforcement 201 in the flange plate and the flange plate concrete 202 are all cast-in-place parts, and the studs 108 are located in the cast-in-place part after casting.

[0059] in:

[0060] 1) The prefabricated rectangular composite beam part adopts UHPC and prefabricated prestressed technology to improve the crack resistance and bending stiffness of the composite beam. The flange plate part adopts concrete with low strength grade, and can use recycled concrete, lightweight aggregate concrete, sound insulation concrete, etc.

[0061] 2) The length of the precast UHPC does not exceed the honeycomb steel, that is, after pouring the precast concrete, a small section of steel is still exposed. The purpose is to facilitate the connection with the reserved connectors of the steel column or steel beam, so as to make the construction more convenient.

[0062] 3) The prestressed steel strands are arranged in a straight line or parabola. The prestressing stage is completed in the factory prefabrication stage, which reduces the on-site construction process and has significant economic benefits.

[0063] 4) The openings of honeycomb steel can be circular, elliptical or rectangular. The opening form and position should be reasonably designed and properly arranged according to the bearing capacity requirements and actual engineering conditions. Honeycomb holes effectively connect precast concrete and steel to ensure good collaborative performance between the two.

[0064] The construction method of the present invention has the following steps:

[0065] First, prestressed prefabricated rectangular composite beams are made in the factory, then transported to the construction site for installation, and finally the cast-in-place concrete part of the upper part of the composite beam is cast integrally with the concrete floor slab. In the prefabricated rectangular composite beam, most of the honeycomb steel webs and longitudinal reinforcements, all prestressed steel strands, all stirrups, and all tension bars are wrapped with prefabricated UHPC; if the upper flange plate does not adopt the cast-in-place concrete form, it can adopt the form of corrugated steel plate composite plate, composite plate, etc. When adopting the above forms, special measures need to be taken for the connection between the lower web and the upper flange plate to ensure reliable connection performance and good working performance together. Through different forms of lower web and upper flange combinations, various forms of composite beams can be optimized to meet the needs of different engineering construction.

[0066] The present invention adopts honeycomb steel in the form of traditional steel-concrete composite beams, and uses tie bars to tie closed stirrups on both sides, so as to solve the stirrup connection problem of traditional partially outsourced steel-concrete beams, and better ensure the joint working performance of concrete and steel. At the same time, prestressed technology is used to effectively improve the stress performance of the beam, increase the beam stiffness, reduce the cross-sectional area, increase the cracking load, and enhance the stress performance during the use stage. According to the design method proposed in the present invention, the position, size and form of the web opening can be further optimized to be circular, elliptical, and rectangular, the arrangement form of the prestressed steel strands can be linear and parabolic, and the strength grade of the cast-in-place concrete can be recycled concrete, lightweight aggregate concrete, and sound insulation concrete to meet the actual needs of different projects.

Claims

1. A prestressed partially steel-clad T-shaped composite beam, comprising a prestressed prefabricated rectangular composite beam (1) and a cast-in-place concrete flange plate (2), characterized in that: The prestressed prefabricated rectangular composite beam (1) comprises: Honeycomb steel (101); Tie bars (103) disposed in holes of the honeycomb steel (101) and perpendicular to the web of the honeycomb steel (101); A plurality of closed stirrups (102) are arranged between the flanges of the honeycomb steel (101) and are symmetrically distributed on both sides of the web, wherein the plane where the closed stirrups (102) are located is perpendicular to the web; A plurality of longitudinal ribs (105) disposed on the upper portion of the lower flange of the honeycomb steel (101) and parallel to the length direction of the honeycomb steel (101); A plurality of longitudinal ribs (107) disposed at the lower portion of the upper flange of the honeycomb steel (101) and parallel to the length direction of the honeycomb steel (101); A plurality of prestressed steel strands (104) arranged on the upper portion of the lower flange of the honeycomb steel (101) and parallel to the length direction of the honeycomb steel (101); Precast ultra-high performance concrete (106) filled between the upper and lower flanges of the honeycomb steel (101); as well as, A plurality of equally spaced studs (108) disposed on the top of the upper flange of the honeycomb steel (101); The cast-in-place concrete flange plate (2) comprises: Double-layer bidirectional reinforcement (201) disposed in the cast-in-place flange plate; The cast-in-place concrete (202) is filled on the top of the prestressed prefabricated rectangular composite beam (1), and the cast-in-place concrete (202) casts and covers the double-layer bidirectional steel bars (201) therein; The prestressed steel strand (104) passes through the interior of the embedded corrugated pipe, and the corrugated pipe is fixed to the lower side of the tie rod (103). The arrangement form of the prestressed steel strand (104) is selected to be linear or parabolic according to the specific engineering conditions. The prestressed steel strand (104) is tensioned to the design value by post-tensioning method. The studs (108) are connected to the honeycomb steel (101) by welding and arranged according to design requirements.

2. According to claim 1, the prestressed partially steel-clad T-shaped composite beam is characterized in that: The honeycomb steel (101) is made of high-strength I-beam with holes uniformly opened on its web or is made by cutting and welding high-strength steel plates.

3. The prestressed partially steel-clad T-shaped composite beam according to claim 1, characterized in that: The tension bar (103) is welded to the contact position of the honeycomb steel (101) hole, and is tied and fixed to the closed stirrups (102) on both sides, and a steel bar with a diameter greater than or equal to the diameter of the closed stirrups (102) is used; the closed stirrups (102) are located at the holes of the honeycomb steel (101), the longitudinal bar 1 (105) is tied to the lower part of the closed stirrups (102) on both sides, and the longitudinal bar 2 (107) is tied to the upper part of the closed stirrups (102) on both sides; the precast ultra-high performance concrete (106) is cast at one time on both sides of the web of the honeycomb steel (101) to form an integral body and does not exceed the honeycomb steel (101) in the length direction.

4. The prestressed partially steel-clad T-shaped composite beam according to claim 1, characterized in that: The double-layer bidirectional steel bars (201) in the cast-in-place flange plate are arranged at equal intervals in the longitudinal and transverse directions.

5. The prestressed partially steel-clad T-shaped composite beam according to claim 1, characterized in that: The cast-in-place concrete (202) is ordinary concrete.

6. The construction method of the prestressed partially steel-clad T-shaped composite beam according to claim 1, characterized in that: Here are the steps: 1) In the factory, firstly, the longitudinal reinforcement 1 (105) is placed at the bottom of the closed stirrup (102) circle, and the longitudinal reinforcement 2 (107) is placed at the top of the closed stirrup (102) circle, and they are all tied and fixed with wire to form a steel cage. The steel cage composed of the longitudinal reinforcement 1 (105), the longitudinal reinforcement 2 (107) and the closed stirrup (102) is placed at the predetermined position in the flanges on both sides of the web of the honeycomb steel (101), and the tension bar (103) is vertically passed through the honeycomb steel (101). The web holes are fixed, and the contact position between the tie bars (103) and the holes of the honeycomb steel (101) is spot welded and fixed, and then tied and fixed with the closed stirrups (102). The prestressed steel strands are passed through the corrugated tube and placed under the tie bars (103) and tied and fixed with the tie bars (103). After completion, the precast ultra-high performance concrete (106) is poured. After the concrete strength reaches more than 75%, the prestressed steel strands are tensioned according to the design requirements, and finally the studs (108) are welded; 2) On site, connecting the two ends of the honeycomb steel (101) to the composite columns or steel columns; 3) Setting up formwork, arranging double-layer bidirectional reinforcement (201) in the cast-in-place flange plate, and pouring cast-in-place concrete (202).

Citation Information

Cited By

  • Novel prestressed reinforced concrete composite beam and construction method thereof

    CN121407691A