Intermittent operation control method of water electrolysis hydrogen production system and water electrolysis hydrogen production system

By displacing inert gas when the electrolytic water hydrogen production system is shut down and checking the success of replacement again during startup, the problem of long start-up time and insufficient safety is solved, and fast response and efficient operation are achieved.

CN118910675AInactive Publication Date: 2024-11-08CUMMINS HYDROGEN TECH (SHANGHAI) CO LTD

Patent Information

Application Number
CN202411419103.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing electrolytic hydrogen production system has a long start time from complete shutdown to normal production, and an inert gas replacement process must be carried out at each startup, which limits the rapid start-up and safety of the system.

Method used

Inert gas replacement is performed in the system shutdown state. If it is not successful, replace it again at startup. Inert gas replacement is performed using the time interval between shutdown and startup, and the inert gas replacement step is optimized to shorten the startup time and improve safety sex.

Benefits of technology

It significantly shortens the system startup time, improves the system utilization and online rate, and provides dual guarantees, improving operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118910675A_ABST
    Figure CN118910675A_ABST
Patent Text Reader

Abstract

The invention discloses an intermittent operation control method of a water electrolysis hydrogen production system and the water electrolysis hydrogen production system. The method comprises the steps that when a system shutdown instruction is received, inert gas is supplied to a system to replace hydrogen of the system; when the supply of the inert gas meets a first preset condition, the supply of the inert gas is stopped, and the system is kept in a shutdown state; when a system starting instruction is received, judging whether the system meets a starting condition or not; when the system meets the starting condition, the system is started; and when the system does not meet the starting condition, inert gas is supplied to the system to replace hydrogen of the system, and when supply of the inert gas meets a second preset condition, supply of the inert gas is stopped, and the system is started. By applying the method, the inert gas replacement step sequence can be carried out by fully utilizing the time interval between shutdown and start of the system, namely fully utilizing the non-effective hydrogen production time interval, so that the start time of the system can be greatly shortened, the response speed of the system is increased, and the utilization rate and the online rate of the system are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy technology, and in particular to an intermittent operation control method for a water electrolysis hydrogen production system and a water electrolysis hydrogen production system. Background Art

[0002] With the consumption of non-renewable energy such as coal, oil, and natural gas, the development and utilization of renewable energy such as wind power and photovoltaics has become an important trend worldwide. When renewable energy such as wind power and photovoltaics is used as a power source, the water electrolysis hydrogen production system needs to be started intermittently, quickly, and safely to produce hydrogen as soon as possible following the power load.

[0003] The startup time of the existing water electrolysis hydrogen production system from complete shutdown to normal production is usually long, even taking several hours. In addition, for safety reasons, the inert gas replacement process must be carried out every time it is started up. However, this process is also a limiting step for the long startup time of the water electrolysis hydrogen production system. Summary of the invention

[0004] The purpose of this application is to provide an intermittent operation control method for a water electrolysis hydrogen production system in order to address the deficiencies of the prior art.

[0005] In order to solve the above technical problems, the present application adopts the following technical solution: a method for controlling intermittent operation of a water electrolysis hydrogen production system, comprising: When receiving a system shutdown command, supplying inert gas to the system to replace the hydrogen in the system; When the supply of the inert gas meets the first preset condition, the supply of the inert gas is stopped and the system remains in a shutdown state; When a system start-up instruction is received, it is determined whether the system meets the start-up conditions; when the system meets the start-up conditions, the system starts; when the system does not meet the start-up conditions, an inert gas is supplied to the system to replace the hydrogen in the system, and when the supply of the inert gas meets a second preset condition, the supply of the inert gas is stopped and the system starts.

[0006] In a specific implementation manner, the first preset condition includes: the supply amount of the inert gas reaches a preset value.

[0007] In a specific possible implementation method, the supply amount of the inert gas reaches a preset value, including: supplying the inert gas multiple times, depressurizing the system after each supply of the inert gas, and the total supply amount of the inert gas reaches the preset value; or, supplying the inert gas once, and the supply amount of the inert gas reaches the preset value.

[0008] In a specific implementation manner, the start-up condition includes: the supply amount of the inert gas reaches a preset value.

[0009] In a specific implementation scheme, the start-up conditions include: when the supply of inert gas is stopped and the system remains in a shutdown state, the system pressure is P1; when a system start-up instruction is received, the system pressure is P2, wherein (P1-P2) / P1≤n.

[0010] In a specific embodiment, 0.1≤n≤0.25.

[0011] In a specific feasible implementation scheme, the start-up conditions include: when the supply of inert gas is stopped and the system remains in a shutdown state, the time is T1; when a system start-up instruction is received, the time is T2, wherein the interval between T2 and T1 does not exceed a preset value.

[0012] In a specific embodiment, the interval between T2 and T1 does not exceed 24 hours.

[0013] In a specific possible implementation, when a system shutdown command is received, an inert gas is supplied to the system to replace the hydrogen in the system, including: when a system shutdown command is received, an inert gas replacement function is activated; when the inert gas replacement function is successfully activated, an inert gas is supplied to the system to replace the hydrogen in the system.

[0014] In a specific implementation scheme, when the inert gas replacement function is not successfully activated, the system is depressurized so that the system pressure meets the first preset pressure and the system remains in a shutdown state; the first preset pressure is P3.

[0015] In a specific feasible implementation, when the inert gas replacement function is successfully activated, inert gas is supplied to the system to replace the hydrogen in the system, including: when the inert gas replacement function is successfully activated, the system is depressurized so that the system pressure meets a second preset pressure, and inert gas is supplied to the system to replace the hydrogen in the system; the second preset pressure is P4, wherein P4>P3.

[0016] In a specific possible implementation scheme, system startup includes: the system produces hydrogen to increase the system pressure, and when the system pressure increases to a third preset pressure, the system maintains a production state.

[0017] In a specific implementation manner, the second preset condition is the same as the first preset condition.

[0018] A water electrolysis hydrogen production system using the above-mentioned intermittent operation control method of the water electrolysis hydrogen production system comprises an electrolyzer, a hydrogen separator and a purifier, wherein the hydrogen separator is connected to the electrolyzer, and the purifier is connected to the hydrogen separator.

[0019] Compared with the prior art, the beneficial effects of this application are: The intermittent operation control method of the electrolysis water hydrogen production system provided in the present application supplies an inert gas to the system to replace the hydrogen of the system when the electrolysis water hydrogen production system is in a shutdown state, that is, performs inert gas replacement when the system is in a shutdown state. If the inert gas replacement is not successfully performed when the system is in a shutdown state, the inert gas replacement is performed again when the system is started. This method can make full use of the time interval between the shutdown and startup of the system, that is, make full use of the non-effective hydrogen production time interval to perform the inert gas replacement step, which can significantly shorten the system startup time, speed up the system response speed, and improve the system utilization rate and online rate. In addition, when the inert gas replacement is not successfully performed when the system is in a shutdown state, the inert gas replacement can be performed again when the system is started, which provides double protection in terms of the system inert gas replacement and improves the safety of the system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A flow chart of the intermittent operation control method of the water electrolysis hydrogen production system provided by the present application during the system shutdown stage is shown; Figure 2 A flow chart of the intermittent operation control method of the water electrolysis hydrogen production system provided in the present application during the system startup phase is shown. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical scheme and advantages of the present application clearer, the embodiments of the present application will be further described in detail below in conjunction with the accompanying drawings. However, the example implementation can be implemented in various forms and should not be construed as being limited to the implementations set forth herein. The same reference numerals in the figures represent the same or similar structures, and thus their repeated description will be omitted. The words expressing position and direction described in the embodiments of the present application are all described with reference to the accompanying drawings as examples, but changes may be made as needed, and the changes made are all included in the scope of protection of the present application. The drawings of the embodiments of the present application are only used to illustrate the relative position relationship and do not represent the true proportion.

[0022] The following description sets forth specific details to facilitate understanding of the present application, but the embodiments of the present application can be implemented in a variety of other ways different from those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the embodiments of the present application. Therefore, the present application is not limited to the specific implementation methods disclosed below.

[0023] For ease of understanding, the application scenario of the intermittent operation control method of the electrolysis water hydrogen production system involved in the present application is first explained. The intermittent operation control method of the electrolysis water hydrogen production system provided in the embodiment of the present application can be adapted to the electrolysis water hydrogen production system, in particular, it can be adapted to the electrolysis water hydrogen production system with wind power and photovoltaic as the power supply side. The electrolysis water hydrogen production system is generally a closed hydrogen production system, which may include an electrolyzer, a hydrogen separator and a purifier, etc. The electrolyzer is used to electrolyze alkaline solution, the hydrogen separator is connected to the electrolyzer, and the purifier is connected to the hydrogen separator.

[0024] In the related art, in order to improve the safety of the operation of the water electrolysis hydrogen production system, an inert gas replacement process is required each time the system is started. However, the inert gas replacement process takes a long time and is a major step that limits the system startup time, which greatly delays the startup of the system and makes it difficult for the system to start quickly. Based on this, the present application provides an intermittent operation control method for a water electrolysis hydrogen production system. The intermittent operation control method for the water electrolysis hydrogen production system is described in detail below.

[0025] First refer to Figure 1 and Figure 2 , Figure 1 The flowchart of the intermittent operation control method of the water electrolysis hydrogen production system provided by the present application during the system shutdown stage is shown. Figure 2 The flowchart of the intermittent operation control method of the water electrolysis hydrogen production system provided by the present application during the system startup phase is shown. Figure 1 and Figure 2 As shown, the intermittent operation control method of the water electrolysis hydrogen production system provided in the embodiment of the present application may include the following steps: When receiving a system shutdown command, supplying inert gas to the system to replace the hydrogen in the system; When the supply of the inert gas meets the first preset condition, the supply of the inert gas is stopped and the system remains in a shutdown state; When a system start-up instruction is received, it is determined whether the system meets the start-up conditions; when the system meets the start-up conditions, the system starts; when the system does not meet the start-up conditions, an inert gas is supplied to the system to replace the hydrogen in the system, and when the supply of the inert gas meets a second preset condition, the supply of the inert gas is stopped and the system starts.

[0026] The intermittent operation control method of the water electrolysis hydrogen production system provided in the present application (hereinafter referred to as "this method") supplies inert gas to the system to replace the hydrogen in the system when the water electrolysis hydrogen production system (hereinafter referred to as "the system") is shut down, that is, the inert gas replacement is performed when the system is shut down. If the inert gas replacement is not successfully performed when the system is shut down, the inert gas replacement is performed again when the system is started. This method can make full use of the time interval between the shutdown and startup of the system, that is, make full use of the non-effective hydrogen production time interval, to perform the inert gas replacement step, which can significantly shorten the system startup time, speed up the system response speed, improve the system utilization rate and online rate, and make the system operation more convenient and efficient. In addition, when the inert gas replacement is not successfully performed when the system is shut down, the inert gas replacement can be performed again when the system is started, which provides double protection in terms of the system inert gas replacement and improves the safety of the system operation.

[0027] In a specific implementation, the inert gas may be nitrogen (N2), argon (Ar) or helium (He), etc. The canned inert gas may be connected to the air intake pipe (or air intake valve) of the system to replace the inert gas in the system, thereby replacing the hydrogen (H2) in the system out of the system and improving the safety of the system.

[0028] As a possible implementation, the first preset condition may include: the supply amount of inert gas (or "replacement amount") reaches a preset value. Specifically, the supply amount of inert gas reaches the preset value, which may include two supply methods. One is: multiple supply of inert gas, that is, multiple inert gas replacements, or multiple inert gas replacements, each time the inert gas is supplied, the system is depressurized, and the total supply amount of inert gas reaches the preset value; and, after each inert gas supply, the system can be depressurized, and then the next inert gas supply is performed, so that the inert gas replacement can be more sufficient and the safety of the system is further improved. The other is: a one-time supply of inert gas, that is, an inert gas replacement is performed once, or the number of inert gas replacements is one, and the supply amount of inert gas reaches the preset value. The supply amount of inert gas can be monitored by a flow meter. In actual applications, the second preset condition may be the same as the first preset condition, or a smaller change that meets the actual requirements of the system may be made with reference to the first preset condition.

[0029] In a possible implementation, the startup conditions may include three aspects: First, the supply of inert gas reaches a preset value. Second, when the supply of inert gas is stopped and the system remains in a shutdown state, the system pressure is P1; when the system startup command is received, the system pressure is P2, wherein (P1-P2) / P1≤n. Third, when the supply of inert gas is stopped and the system remains in a shutdown state, the time is T1; when the system startup command is received, the time is T2, wherein the interval between T2 and T1 does not exceed the preset value. In actual application, it can be preset that when all three aspects are met, the system starts directly without the need for inert gas replacement. In other words, if any aspect is not met, inert gas replacement is still required before the system is started for production.

[0030] In a specific implementation, illustratively, 0.1≤n≤0.25, that is, when the system changes from shutdown state to startup state, the system pressure is relatively good, and the system pressure drop is between 10% (inclusive) and 25% (inclusive), for example, the system pressure drop is 10%, 15%, 20%, 25%, etc., and the system pressure leakage is within the expected acceptable range. The monitoring of system pressure changes can be achieved through pressure monitoring devices such as pressure gauges. The interval between T2 and T1 does not exceed 24 hours to avoid excessive system pressure drop after the system is shut down for a long time.

[0031] As a possible implementation, when a system shutdown command is received, an inert gas is supplied to the system to replace the hydrogen of the system, which may include: when a system shutdown command is received, an inert gas replacement function is activated, and the activation here can be a manual operation or can be performed through a system preset program; when the inert gas replacement function is successfully activated, an inert gas is supplied to the system to replace the hydrogen of the system. In practical applications, when the inert gas replacement function is not successfully activated due to manual operation errors or program execution errors, the system is depressurized so that the system pressure meets the first preset pressure P3, and the system remains in a shutdown state. In specific implementation, the depressurization operation of the system can be achieved by controlling the opening of the system's outlet valve, and the system pressure can be reduced to near normal pressure, so that even if the inert gas replacement fails, the safety of the system can be improved. Exemplarily, P3 can be close to 100kPa.

[0032] In a possible implementation, when the inert gas replacement function is successfully activated, supplying inert gas to the system to replace the hydrogen in the system may include: when the inert gas replacement function is successfully activated, performing a pressure reduction operation on the system so that the system pressure meets the second preset pressure P4, and supplying inert gas to the system to replace the hydrogen in the system, wherein P4>P3. In specific implementation, the pressure of the system may be reduced to a pressure less than or equal to the pressure of the canned inert gas, so that the inert gas enters the system and realizes the inert gas replacement. Exemplarily, P4 may be close to 300 kPa.

[0033] As a possible implementation, system startup may include: the system produces hydrogen to increase the system pressure, and when the system pressure increases to a third preset pressure, the system maintains a production state. The third preset pressure may be a system pressure required for production, and illustratively, the third preset pressure may be close to 1000 kPa.

[0034] The above are only specific implementation methods of the present application, but the protection scope of the present application is not limited to the above embodiments. Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope and spirit of the present application. If these changes and modifications fall within the scope of the claims of the present application and their equivalent technologies, the intention of the present application also includes these changes and modifications.

Claims

1. A method for controlling intermittent operation of a water electrolysis hydrogen production system, characterized in that: include: When receiving a system shutdown command, supplying inert gas to the system to replace the hydrogen in the system; When the supply of the inert gas meets the first preset condition, the supply of the inert gas is stopped and the system remains in a shutdown state; When receiving a system startup instruction, determining whether the system meets the startup conditions; When the system meets the startup condition, the system starts; when the system does not meet the startup condition, the inert gas is supplied to the system to replace the hydrogen in the system, and when the supply of the inert gas meets the second preset condition, the supply of the inert gas is stopped and the system starts.

2. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The first preset condition includes: The supply amount of the inert gas reaches a preset value.

3. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 2, characterized in that: The supply amount of the inert gas reaches a preset value, comprising: The inert gas is supplied multiple times, and the system is depressurized after each supply of the inert gas, and the total supply of the inert gas reaches the preset value; or, The inert gas is supplied once, and the supply amount of the inert gas reaches the preset value.

4. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The start conditions include: The supply amount of the inert gas reaches a preset value.

5. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The start conditions include: When the supply of the inert gas is stopped and the system remains in a shutdown state, the system pressure is P1; when a system start-up instruction is received, the system pressure is P2, wherein (P1-P2) / P1≤n.

6. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 5, characterized in that: 0.1≤n≤0.25。 7. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The start conditions include: When the supply of the inert gas is stopped and the system remains in a shutdown state, the time is T1; when a system startup instruction is received, the time is T2, wherein the interval between T2 and T1 does not exceed a preset value.

8. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 7, characterized in that: The interval between T2 and T1 does not exceed 24 hours.

9. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: When a system shutdown command is received, inert gas is supplied to the system to replace the hydrogen in the system, including: When receiving a system shutdown command, the inert gas replacement function is activated; When the inert gas replacement function is successfully activated, inert gas is supplied to the system to replace the hydrogen in the system.

10. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 9, characterized in that: When the inert gas replacement function is not successfully activated, the system is depressurized so that the system pressure meets the first preset pressure and the system remains in a shutdown state; the first preset pressure is P3.

11. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 10, characterized in that: When the inert gas replacement function is successfully activated, inert gas is supplied to the system to replace the hydrogen in the system, including: When the inert gas replacement function is successfully activated, the system is depressurized so that the system pressure meets the second preset pressure, and inert gas is supplied to the system to replace the hydrogen in the system; the second preset pressure is P4, where P4>P3.

12. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The system starts up, including: The system produces hydrogen to increase the system pressure. When the system pressure increases to a third preset pressure, the system maintains a production state.

13. The intermittent operation control method of the water electrolysis hydrogen production system according to claim 1, characterized in that: The second preset condition is the same as the first preset condition.

14. A water electrolysis hydrogen production system using the intermittent operation control method of the water electrolysis hydrogen production system according to any one of claims 1 to 13, characterized in that: The invention comprises an electrolyzer, a hydrogen separator and a purifier. The hydrogen separator is connected to the electrolyzer, and the purifier is connected to the hydrogen separator.

Citation Information

Patent Citations

  • Water electrolysis device and shutdown reverse pole prevention method thereof

    CN117286517A

  • Water electrolysis hydrogen production system and wide-range operation control method and device thereof

    CN117721499A

  • Nitrogen replacement device of PEM water electrolysis hydrogen production system and control method

    CN118086921A

  • Pre-start automatic replacement device for water electrolysis hydrogen production device and replacement method of pre-start automatic replacement device

    CN118241221A

  • Operation control method and device of alkaline electrolyzed water system and alkaline electrolyzed water system

    CN118390112A

Cited By

  • Start-stop control method of water electrolysis hydrogen production system and related device

    CN120700543A