Bolt net shotcreting and bolting-grouting inverted arch supporting method
Through the anchor spraying and injection of the anti-bottom arch support method, the problems of high labor intensity, high cost and poor control effect of the coal mine tunnel bottom drum are solved, and gangue recycling and effective control of tunnel bottom drum are realized.
Patent Information
- Application Number
- CN202411188612.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
Due to the impact of ground pressure and mining, the tunnel bottom drum problem is prone to occur in underground tunnels of coal mines. The construction of existing stone back-bottom arches is very labor-intensive, cumbersome, high cost and poor control effect.
The anchor mesh spraying anchor injection anti-bottom arch support method is adopted, including leveling the bottom plate at the bottom drum of the tunnel, applying rebar anchor rods and grouting anchor rods, spraying machine materials layer by layer, laying metal mesh, and tightening anchor rods. Backfill the gangue to form a multi-layer anchor rod group and a metal mesh structure.
It reduces the workload of workers to carry gangue, reduces labor intensity and support costs, and improves the control effect of tunnel kick drums.
Smart Images

Figure CN118933937A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, in particular to an anchor net shotcrete anchor injection reverse bottom arch support method. Background Art
[0002] Coal mine tunnels are prone to floor heave problems due to ground pressure and mining. In the past, stone anti-bottom arch was usually used to control the floor heave of the tunnel. However, the construction of stone anti-bottom arch not only leads to high labor intensity for construction workers, but also cumbersome and high cost, and the control effect of floor heave is relatively poor. Summary of the invention
[0003] In view of the problems of high labor intensity, complicated construction, high cost and poor bottom drum control effect in the current construction method of using rubble stone to build a reverse bottom arch, the present invention provides an anchor net spraying anchor injection reverse bottom arch support method.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0005] The invention discloses an anchor mesh spraying anchor inverted bottom arch support method, comprising the following steps: S1, laying the bottom at the bottom drum of the tunnel, finding the outline of the reverse bottom arch section after removing the gangue, and leveling and compacting it; S2, applying a plurality of threaded steel anchor rods and a plurality of grouting anchor rods on the bottom plate; S3, spraying a first layer of thick machine material on the bottom plate, laying a first layer of metal mesh on the first layer of thick machine material, then spraying a second layer of thick machine material on the first layer of metal mesh, and finally spraying a third layer of thick machine material on the second layer of thick machine material; S4, grouting the grouting anchor rods, and fastening the threaded steel anchor rods and the grouting anchor rods through a supporting plate; S5, backfilling the gangue on the third layer of thick base material.
[0006] Further, in S2, a plurality of threaded steel anchor rods and a plurality of grouting anchor rods are located at the middle position between the bottom plate and the bottom feet of the two sides. The plurality of threaded steel anchor rods and the plurality of grouting anchor rods form a plurality of rows of anchor rod groups, and the anchor rod groups are divided into a first row of anchor rod groups, a second row of anchor rod groups, and a third row of anchor rod groups, and each row of anchor rod groups is arranged in a circular manner in the direction of the roadway.
[0007] Furthermore, the threaded steel anchor rods or grouting anchor rods located at the footing positions of the two side walls extend 200mm below the wall foundation, and the threaded steel anchor rods or grouting anchor rods located between the two side walls are exposed in the anti-bottom arch section with a length ranging from 130mm to 250mm.
[0008] Furthermore, the spacing between adjacent anchor groups is 1 m.
[0009] Furthermore, the first row of anchor rods includes three threaded steel anchor rods and two grouting anchor rods, threaded steel anchor rods are respectively arranged at the bottom position of the two side walls and the middle position of the bottom plate, and grouting anchor rods are arranged between adjacent threaded steel anchor rods.
[0010] Furthermore, the second row of anchor rods includes five threaded steel anchor rods, and threaded steel anchor rods are respectively arranged at the bottom positions of the two side walls and the middle position of the bottom plate, and threaded steel anchor rods are further arranged between adjacent threaded steel anchor rods.
[0011] Furthermore, the third row of anchor rods includes three grouting anchor rods and two threaded steel anchor rods. Grouting anchor rods are respectively arranged at the foot position of the two side walls and the middle position of the bottom plate, and threaded steel anchor rods are arranged between adjacent grouting anchor rods.
[0012] Further, in S3, the thickness of the first layer of thick machine material is 50 mm, the thickness of the second layer of thick machine material is 50 mm, and the thickness of the third layer of thick machine material is 20 mm.
[0013] Furthermore, in S3, the first layer of metal mesh and the second layer of metal mesh overlap the protective mesh on both sides by 100 mm, and are connected with iron wires every 300 mm.
[0014] Furthermore, the diameter of the first layer of metal mesh and the diameter of the second layer of metal mesh are both 6 mm, and the diameter of the iron wire is 14 mm.
[0015] The beneficial effects of the present invention are as follows: the present invention reduces the workload of workers in carrying the gangue by recycling the gangue, which not only reduces the labor intensity and support cost, but also effectively improves the effect of tunnel floor heave control. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Shown is a schematic diagram of the structural principle of an embodiment of the present invention. DETAILED DESCRIPTION
[0017] The invention discloses an anchor net spraying anchor injection reverse bottom arch support method, and an implementation mode of the invention is described in detail below in conjunction with the accompanying drawings.
[0018] like Figure 1 As shown, the anchor net spraying anchor injection reverse bottom arch support method specifically includes the following steps: the first step is to carry out undercover work at the bottom drum position of the tunnel according to the pre-designed size, and after removing the gangue, find the contour line of the reverse bottom arch section and level and compact it.
[0019] In the second step, a number of threaded steel anchors and a number of grouting anchors are applied on the bottom plate 1. The threaded steel anchors and the grouting anchors form a number of anchor groups. The anchor groups are divided into the first row of anchor groups, the second row of anchor groups and the third row of anchor groups. Each anchor group is arranged in a circular pattern along the direction of the tunnel, and the spacing between adjacent anchor groups is 1m. The first row of anchor groups includes three threaded steel anchors and two grouting anchors. The threaded steel anchors are respectively arranged at the foot positions of the sides 2 on both sides of the tunnel and at the middle position of the bottom plate 1. The grouting anchors are respectively arranged on the bottom plate 1 between adjacent threaded steel anchors. The threaded steel anchors at the foot positions of the sides 2 on both sides of the tunnel extend 200mm below the wall foundation. The length of the threaded steel anchors and grouting anchors on the bottom plate 1 between the sides 2 on both sides of the tunnel exposed in the anti-bottom arch section ranges from 130mm to 250mm. The second row of anchor rods includes five threaded steel anchor rods. A threaded steel anchor rod is set at the foot position of the two side walls 2, and a threaded steel anchor rod is set at the middle position of the bottom plate 1. A threaded steel anchor rod is set on the bottom plate 1 between the adjacent threaded steel anchor rods that have been injected, so that the position of each anchor rod in the second row of anchor rods corresponds to the position of each anchor rod in the first row of anchor rods. The threaded steel anchor rods located at the foot position of the two side walls 2 of the tunnel extend 200mm below the wall foundation. The length of the threaded steel anchor rods on the bottom plate 1 between the two side walls 2 of the tunnel exposed in the anti-bottom arch section ranges from 130mm to 250mm. The third row of anchor rods includes three grouting anchor rods and two threaded steel anchor rods. The grouting anchor rods are respectively set at the foot position of the two side walls 2 of the tunnel and the middle position of the bottom plate 1. The threaded steel anchor rods are respectively set on the bottom plate 1 between the adjacent grouting anchor rods. The grouting anchor rods located at the foot position of the two side walls 2 of the tunnel extend 200mm below the wall foundation. The length of the grouting anchor rods and the threaded steel anchor rods on the bottom plate 1 between the walls 2 on both sides of the tunnel exposed in the anti-bottom arch section ranges from 130mm to 250mm.
[0020] The third step is to spray a first layer of thick machine material with a thickness of 50 mm on the bottom plate 1, and then lay a first layer of metal mesh with a diameter of 6 mm on the first layer of thick machine material. The first layer of metal mesh overlaps the protective mesh on the two side arms 2 by 100 mm, and is connected with a wire with a diameter of 14 mm every 300 mm. Subsequently, a second layer of thick machine material with a thickness of 50 mm is sprayed on the first layer of metal mesh, and then a second layer of metal mesh with a diameter of 6 mm is laid on the second layer of thick machine material. The second layer of metal mesh overlaps the protective mesh on the two side arms 2 by 100 mm, and is connected with a wire with a diameter of 14 mm every 300 mm. Finally, a third layer of thick machine material with a thickness of 20 mm is sprayed on the second layer of thick machine material.
[0021] The fourth step is to use mining inorganic high-strength reinforcement grouting material to grout the grouting anchor rod, and fasten the threaded steel anchor rod and the grouting anchor rod through the support plate. The length of the end of the anchor rod from the nut ranges from 10mm to 100mm.
[0022] The fifth step is to backfill the gangue on the third layer of thick machine material as required.
[0023] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. An anchor net spraying anchor injection anti-bottom arch support method, characterized in that: The following steps are involved: S1: Conduct undercover work at the bottom drum of the tunnel, remove all the waste rock, find out the outline of the reverse bottom arch section, and level and compact it; S2: driving a plurality of threaded steel anchor rods and a plurality of grouting anchor rods on the bottom plate (1); S3 sprays a first layer of thick machine material on the bottom plate (1), and lays a first layer of metal mesh on the first layer of thick machine material, then sprays a second layer of thick machine material on the first layer of metal mesh, and finally sprays a third layer of thick machine material on the second layer of thick machine material; S4 injects grout into the grouting anchor rod, and fastens the threaded steel anchor rod and the grouting anchor rod through the supporting plate; S5 backfills the gangue on the third thick base material.
2. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 1 is characterized in that: In S2, a plurality of threaded steel anchor rods and a plurality of grouting anchor rods are located at the middle position between the bottom plate (1) and the bottom footings of the two side walls (2); A plurality of threaded steel anchor rods and a plurality of grouting anchor rods form a plurality of rows of anchor rod groups, and the anchor rod groups are divided into a first row of anchor rod groups, a second row of anchor rod groups and a third row of anchor rod groups, and each row of anchor rod groups is cyclically arranged in sequence along the direction of the tunnel.
3. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 2 is characterized in that: The threaded steel anchor rods or grouting anchor rods at the footing positions of the two side ribs (2) extend 200mm below the wall foundation, and the threaded steel anchor rods or grouting anchor rods between the two side ribs (2) are exposed in the anti-bottom arch section in a length ranging from 130mm to 250mm.
4. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 2 is characterized in that: The spacing between adjacent anchor groups is 1m.
5. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 2 is characterized in that: The first row of anchor rods comprises three threaded steel anchor rods and two grouting anchor rods. A threaded steel anchor rod is arranged at the foot position of the two side walls (2) and at the middle position of the bottom plate (1), and a grouting anchor rod is arranged between adjacent threaded steel anchor rods.
6. The anchor net spraying anchor grouting reverse bottom arch support method according to claim 2 is characterized in that: The second row of anchor rods includes five threaded steel anchor rods. A threaded steel anchor rod is arranged at the bottom of the two side walls (2) and at the middle of the bottom plate (1). Another threaded steel anchor rod is arranged between adjacent threaded steel anchor rods.
7. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 2 is characterized in that: The third row of anchor rods includes three grouting anchor rods and two threaded steel anchor rods. Grouting anchor rods are respectively arranged at the foot positions of the two side walls (2) and at the middle position of the bottom plate (1), and threaded steel anchor rods are arranged between adjacent grouting anchor rods.
8. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 1 is characterized in that: In S3, the thickness of the first layer of thick machine material is 50 mm, the thickness of the second layer of thick machine material is 50 mm, and the thickness of the third layer of thick machine material is 20 mm.
9. The anchor net spraying anchor grouting anti-bottom arch support method according to claim 1 is characterized in that: In S3, the first layer of metal mesh and the second layer of metal mesh overlap the protective mesh on the two side walls (2) by 100 mm, and are connected with iron wires every 300 mm.
10. The anchor net spraying anchor grouting reverse bottom arch support method according to claim 9, characterized in that: The diameter of the first layer of metal mesh and the diameter of the second layer of metal mesh are both 6 mm, and the diameter of the iron wire is 14 mm.