Environment-friendly fluid soil and foundation pit fertile groove backfilling method thereof

By mixing industrial solid waste such as blast furnace slag powder, desulfurization gypsum, fly ash with a small amount of cement, preparing fluid soil for backfill of foundation pit fertilizer trough, solving the problems of large cement usage and poor backfill quality, and achieving an efficient and environmentally friendly foundation Backfilling of pit fertilizer troughs reduces energy consumption and CO2 emissions.

CN118955065APending Publication Date: 2024-11-15GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410957135.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The amount of cement used in the existing foundation pit fertilizer tank backfill method is too large, resulting in high energy consumption and high CO2 emissions, and the backfill quality is poor, which cannot meet the strength specification requirements.

Method used

The site's native slag soil is used to mix industrial solid waste such as blast furnace slag powder, desulfurization gypsum, fly ash and other industrial solid waste with a small amount of cement, combined with water reducing agent, premature strength agent and thickening agent, and prepare fluid soil for backfilling, and form through stirring. The slurry relies on its own gravity flow to fill the fertilizer tank, and layered backfills are used to ensure density and strength.

Benefits of technology

The amount of cement required for backfill per cubic meter is significantly reduced, achieving 80% savings, achieving environmentally friendly and efficient backfill, reducing carbon dioxide emissions and costs, and meeting the strength and density requirements of foundation pit backfill.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118955065A_ABST
    Figure CN118955065A_ABST
Patent Text Reader

Abstract

The invention relates to the field of environment-friendly backfilling of foundation pit fertilizer grooves, and discloses environment-friendly fluid soil and a foundation pit fertilizer groove backfilling method. According to the invention, the fluid soil backfill fertilizer groove is prepared from the site raw muck and various industrial solid wastes and a small amount of cement, the use amount of the cement only accounts for 1% of the total mass of the solidified soil, the backfill compactness and strength are good, and the purpose of environment-friendly backfill of the foundation pit fertilizer groove is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of environmentally friendly backfilling of a foundation pit fertilizer trough. The invention adopts original slag soil on site, various industrial solid wastes and a small amount of cement to prepare a fluidized soil backfilling fertilizer trough. The cement usage accounts for only 1% of the total solidified soil mass. The backfilling density and strength are good, thereby achieving the purpose of environmentally friendly backfilling of the foundation pit fertilizer trough. Background Art

[0002] At present, most foundation pit fertilizer troughs are backfilled by directly dumping the original soil of the site. Due to the limited construction space of the fertilizer trough and the presence of various pipelines in the fertilizer trough, it is not suitable to use mechanical compaction and other construction methods. Therefore, most of them use watering and waiting for the backfill soil to settle naturally. This type of construction results in extremely poor backfill quality of the foundation pit fertilizer trough, and the strength cannot meet the requirements of relevant specifications. At present, there is a technology that uses cement slurry mixed with original soil for backfilling, but the related construction method uses a large amount of cement. Backfilling one cubic meter of soil requires at least 100 kilograms of cement. However, cement is a high-energy consumption, high-CO 2 The discharged materials are obviously not environmentally friendly when using cement slurry to prepare fluidized soil to backfill the fertilizer tank. Therefore, a new method for backfilling the foundation pit fertilizer tank is urgently needed to reduce the amount of cement used and reduce CO 2 Emissions and cost reduction also need to ensure the strength of foundation pit backfill. Summary of the invention

[0003] One of the purposes of the present invention is to provide a fluidized soil and method for backfilling a foundation pit fertilizer trough, which can ensure the backfill strength of the foundation pit.

[0004] One of the purposes of the present invention is to provide a fluidized soil and method for backfilling a foundation pit fertilizer trough, thereby reducing the amount of cement used per cubic meter of backfill and achieving environmentally friendly and efficient backfilling of the foundation pit fertilizer trough.

[0005] One of the purposes of the present invention is to provide a fluidized soil and method for backfilling a fertilizer trough in a foundation pit, which can realize in-situ backfilling of slag soil.

[0006] The above-mentioned purpose of the present invention is achieved by the following technical means.

[0007] On the one hand, the present invention provides a fluidized soil for backfilling a foundation pit fertilizer tank, which comprises the following components:

[0008] (1) 100-400 parts by weight of cementitious material: comprising 50-400 parts by weight of blast furnace slag powder, 10-50 parts by weight of desulfurized gypsum, and 10-50 parts by weight of fly ash;

[0009] (2) 10 to 40 parts by weight of fluidized soil solidifying admixture: comprising 5 to 30 parts by weight of water reducing agent, 1 to 5 parts by weight of early strength agent water, 1 to 5 parts by weight of thickener, and 1 to 5 parts by weight of surfactant;

[0010] (3) 10 to 100 parts by weight of cement;

[0011] (4) 1000 to 5000 parts by weight of slag;

[0012] (5) 500 to 2000 parts by weight of water.

[0013] In some preferred embodiments, the fluidized soil backfilled in the foundation pit fertilizer tank comprises the following components:

[0014] (1) 170-400 parts by weight of cementitious material: comprising 150-350 parts by weight of blast furnace slag powder, 10-30 parts by weight of desulfurized gypsum, and 10-20 parts by weight of fly ash;

[0015] (2) 13 to 30 parts by weight of fluidized soil solidifying admixture: comprising 8 to 20 parts by weight of high-efficiency water reducing agent, 2 to 4 parts by weight of early strength agent water, 2 to 4 parts by weight of thickener, and 1 to 2 parts by weight of surfactant;

[0016] (3) 20 to 40 parts by weight of cement;

[0017] (4) 2000-4000 parts by weight of slag;

[0018] (5) 700 to 1400 parts by weight of water.

[0019] In some specific embodiments, the water reducer is selected from one or more of naphthalene-based water reducers, polycarboxylic acid water reducers and lignin sulfonate water reducers.

[0020] In some preferred embodiments, the water reducer is selected from naphthalene-based water reducers.

[0021] In some embodiments, the early strength agent is selected from soluble water glass powder (sodium silicate powder) and has a modulus of 2 to 3.

[0022] In some embodiments, the thickener is selected from one or more of hydroxypropyl methylcellulose, hydroxymethyl cellulose and hydroxyethyl cellulose.

[0023] In some preferred embodiments, the thickener is selected from hydroxypropyl methylcellulose.

[0024] In some embodiments, the surfactant is selected from polyethylene glycol.

[0025] In some embodiments, the slag is screened to remove large-sized rocks in the slag to prevent damage to the mixer blades.

[0026] On the other hand, the present invention provides a method for backfilling a foundation pit fertilizer tank, which comprises the following steps:

[0027] S1. Place the mixing tank next to the fertilizer tank to be backfilled in the foundation pit, and install a chute at the discharge port directly connected to the fertilizer tank to be backfilled;

[0028] S2. Add environmentally friendly solidifying cementitious materials, fluidized soil solidifying admixtures, cement, and water into a flat mixing tank for stirring to form a fluidized slurry material;

[0029] S3. Keep the mixing tank in a stirring state, add the slag and water into the mixing tank several times, fully stir the slag and slurry to mix evenly, and make the moisture content between 30% and 45%.

[0030] S4. Let the fluidized soil flow into the fertilizer trough of the foundation pit by its own gravity to fill the gaps in the fertilizer trough.

[0031] In some embodiments, after some fertilizer troughs are backfilled to the same level as the ground level, the surface of the fertilizer trough can be almost automatically leveled by taking advantage of the large fluidity of fluid soil. For the uneven parts, putty knives or scrapers are used to manually level and smooth the surface to ensure that the appearance of the backfilled fertilizer trough is smooth and beautiful.

[0032] For fertilizer troughs with a depth greater than 2 meters, backfilling is done in layers. The previous layer is filled after final setting, and the thickness of each layer should not be greater than 2 meters. Backfilling in layers can ensure the density of the fertilizer trough backfill.

[0033] In some preferred embodiments, the backfill height of the first layer is 1 meter.

[0034] In some embodiments, the weight ratio of the cementitious material, fluidized soil solidifying admixture, cement, slag and water is 100-400: 10-40: 10-100: 1000-5000: 500-2000.

[0035] In some embodiments, in step S1, the cementitious material contains 50 to 400 parts by weight of blast furnace slag powder, 10 to 50 parts by weight of desulfurized gypsum and 10 to 50 parts by weight of fly ash;

[0036] In some embodiments, the fluidized soil solidification admixture contains 5 to 30 parts by weight of a water reducer, 1 to 5 parts by weight of an early strength agent, 1 to 5 parts by weight of a thickener, and 1 to 5 parts by weight of a surfactant.

[0037] In some specific embodiments, the water reducer is selected from one or more of a naphthalene-based water reducer, a polycarboxylate water reducer and a lignin sulfonate water reducer.

[0038] In some preferred embodiments, the water reducer is selected from naphthalene-based water reducers.

[0039] In some embodiments, the early strength agent is selected from water glass powder (sodium silicate powder) and has a modulus of 2 to 3.

[0040] In some embodiments, the thickener is selected from one or more of hydroxypropyl methylcellulose, hydroxymethyl cellulose and hydroxyethyl cellulose; preferably, the thickener is selected from hydroxypropyl methylcellulose.

[0041] In some embodiments, the surfactant is selected from polyethylene glycol.

[0042] In some embodiments, the slag is screened to remove large-sized rocks in the slag to prevent damage to the mixer blades.

[0043] In some implementations, in order to verify the backfilling effect, one or more of the following two methods may be used:

[0044] Method 1: For every 20 cubic meters of fluidized soil mixed, fluidized soil is intercepted from the chute, and 12 specimens with a diameter of 100 mm and a height of 100 mm are cast and placed at the fertilizer trough casting site for natural curing for later quality monitoring. After 7 days, the unconfined compressive strength and water stability coefficient of the specimens are tested. The fluidity test of fluidized soil is carried out in accordance with GB / T 2419-2005 cement mortar fluidity determination method, the unconfined compressive strength test method is carried out in accordance with GB / T50123-2019 geotechnical test method standard, and the water stability coefficient is carried out in accordance with CJ / T 486-2015 soil solidification admixture regulations.

[0045] Method 2: 28 days after backfilling is completed, randomly check the effect of backfilling the fertilizer trough with fluidized soil by drilling and coring, and evaluate the density and strength of the fertilizer trough backfill based on the coring results.

[0046] Factories near the project produce a large amount of industrial solid waste every day, which needs to be processed. The present invention utilizes the industrial solid waste of the project in situ, blast furnace slag produced by the steel plant, desulfurized gypsum and fly ash produced by the thermal power plant, and adopts a suitable ratio to replace a large amount of cement to prepare environmentally friendly fluidized soil. The fluidized soil is prepared by mixing industrial solid waste with a small amount of cement and on-site slag, which reduces the cost of transporting slag, realizes waste utilization and energy conservation and emission reduction, and is a new type of environmentally friendly backfill foundation pit fertilizer tank construction method.

[0047] One of the above technical solutions has the following advantages and effects:

[0048] (1) An environmentally friendly fluidized soil solidifier was prepared. It was mainly prepared by mixing various solid wastes such as blast furnace slag from steel mills, desulfurization gypsum and fly ash from thermal power plants, etc., and its alkali excitation effect was used to mix with fluidized soil to generate strength, thus realizing the transformation and utilization of engineering slag and industrial solid waste.

[0049] (2) Only 15 to 20 kilograms of cement are needed to prepare each cubic meter of fluidized soil, which reduces the amount of cement used by 80% compared with the usual method of preparing fluidized soil, thus achieving the goal of energy conservation and emission reduction and green and environmentally friendly backfilling of foundation pit fertilizer troughs.

[0050] (3) The present invention proposes an environmentally friendly fluidized soil backfilling method for a foundation pit fertilizer trough, in which on-site engineering waste soil is mixed with an environmentally friendly curing agent to form fluidized soil for backfilling the foundation pit fertilizer trough, thereby reducing the cost of transporting waste soil and the waste of resources.

[0051] (4) The present invention proposes an environmentally friendly method for backfilling a fluidized soil and fertilizer trough, which adopts a layered backfilling method to further ensure the strength of the foundation pit backfill. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a construction flow chart of environmentally friendly fluid soil preparation and backfilling of foundation pit fertilizer tank;

[0053] Figure 2 It is the construction layout drawing of preparing fluidized soil backfill fertilizer trough on site; DETAILED DESCRIPTION

[0054] The technical solution of the present invention is further described below by specific embodiments, which do not limit the protection scope of the present invention. Some non-essential modifications and adjustments made by others based on the concept of the present invention still fall within the protection scope of the present invention.

[0055] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of further restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0056] Example 1: Fluidized soil backfilled in the foundation pit fertilizer tank

[0057] Table 1 Flowing soil for backfilling of foundation pit fertilizer trough

[0058]

[0059]

[0060] The fluidized soil for backfilling the above-mentioned foundation pit fertilizer trough can be prepared separately before use.

[0061] Example 2 Foundation pit fertilizer tank backfilling method (foundation pit height greater than 2m)

[0062] Method for backfilling foundation pit fertilizer tank using fluidized soil in Example 1

[0063] First, use urban solid waste to prepare an environmentally friendly fluidized soil solidifier, take 50 to 400 parts by weight of blast furnace slag powder, a solid waste from a steel plant, 10 to 50 parts by weight of desulfurization gypsum, and 10 to 50 parts by weight of fly ash, a solid waste from a thermal power plant, and mix the three types of urban solid waste evenly to prepare an environmentally friendly cementitious material for use.

[0064] Take 5 to 30 parts by weight of naphthalene-based high-efficiency water reducing agent, 1 to 5 parts by weight of water glass powder as an early strength agent, 1 to 5 parts by weight of hydroxypropyl methylcellulose as a thickener, and 1 to 5 parts by weight of polyethylene glycol powder as a surfactant, mix the four solid powders thoroughly and evenly to prepare a fluidized soil solidification admixture for use.

[0065] Place the flat-mouth mixing tank next to the fertilizer tank in the foundation pit to be backfilled, and install a chute at the discharge port to directly connect to the fertilizer tank to be backfilled. Under the action of gravity, the fluidized soil will self-level and backfill the fertilizer tank.

[0066] The construction waste soil from the foundation pit should be properly screened to remove the large-sized rocks in the waste soil to prevent damage to the mixer blades.

[0067] The total volume of backfill required is estimated based on the construction drawings and on-site measurements. The first layer of fluidized soil backfill in the fertilizer trough is poured with a thickness of 1m, and then each layer of fluidized soil is poured in layers with a thickness of 2m. The volume of fluidized soil required for each layer of backfill is estimated.

[0068] Each cubic meter of fluidized soil is prepared in the following manner: 100 to 400 kg of environmentally friendly solidifying cementitious material is added to a flat-mouthed mixing tank, 10 to 40 kg of fluidized soil solidifying admixture is added to a mixing tank, 10 to 100 kg of 42.5 grade ordinary Portland cement is added to a mixing tank, and 200 to 1000 kg of water is added to the mixing tank for stirring to form a fluid slurry material.

[0069] Take 1000-5000 kg of slag and add it into the mixing tank in two equal amounts. After adding half of the slag for the first time, no water is needed. Just stir the slag and slurry thoroughly to mix them evenly.

[0070] Keep the mixing tank in working condition, add 100-500 kg of water on the basis of the above mixing, and then add the remaining half of the slag for mixing. Observe the fluidity of the fluidized soil during the mixing process. According to the different moisture content of the soil on site, add 50-300 kg of water again to make the moisture content 30-45%, to ensure that the fluidized soil after mixing can achieve self-leveling.

[0071] A chute is set at the discharge port of the mixing tank, and the end of the chute is placed above the fertilizer tank to be backfilled. The discharge port of the mixing tank is opened and the stirring state is maintained. The fluidized soil relies on its own gravity to flow along the chute into the fertilizer tank of the foundation pit and fill the gaps in the fertilizer tank.

[0072] For fertilizer troughs with a depth greater than 2 meters, in order to ensure the density of the backfill, layered backfilling is generally adopted. The depth of the first backfill layer is 1 meter. After backfilling, wait for 1 day for the fluidized soil to complete final setting, and then backfill the second layer of fluidized soil. The thickness of each backfill layer shall not be greater than 2 meters, and the layered backfilling must wait until the upper layer completes final setting.

[0073] After the fertilizer trough is backfilled to the same level as the ground, the surface of the fertilizer trough can be almost automatically leveled by taking advantage of the large fluidity of the fluid soil. For the uneven parts, the surface is manually leveled and smoothed using a putty knife or scraper to ensure that the appearance of the backfilled fertilizer trough is smooth and beautiful.

[0074] Example 3 Foundation pit fertilizer trough backfilling method (foundation pit height less than 2m)

[0075] The same as Example 2, except that the foundation pit height is less than 2m. For fertilizer troughs with a depth of less than 2m, fluidized soil can be used for backfilling in one step without layered pouring.

[0076] Example 4 Test on unconfined compressive strength, fluidity and water stability coefficient of fluidized soil

[0077] The compressive strength, water absorption rate and water resistance of the backfill foundation pit of Example 1 were tested as follows:

[0078] For every 20 cubic meters of fluidized soil mixed, fluidized soil is intercepted from the chute, and 12 specimens with a diameter of 100 mm and a height of 100 mm are cast and placed at the fertilizer trough casting site for natural curing for later quality monitoring. After 7 days, the unconfined compressive strength and water stability coefficient of the specimens are tested. The fluidity test of fluidized soil is carried out in accordance with GB / T 2419-2005 cement mortar fluidity determination method, the unconfined compressive strength test method is carried out in accordance with GB / T50123-2019 geotechnical test method standard, and the water stability coefficient is carried out in accordance with CJ / T486-2015 soil solidification admixture regulations.

[0079] Performance Indicators Liquid soil 1 Liquid soil 2 Liquid soil 3 Initial fluidity (mm) 180 190 180 20min fluidity (mm) 150 160 150 Density (kg / m3) 1620 1630 1650 7-day unconfined compressive strength (MPa) 1.3 1.2 1.3 Water stability coefficient 90% 92% 90%

[0080] The initial fluidity and 20min fluidity of the three prepared flow states are all greater than 130mm, indicating that the fluidity is good and can ensure the density of the foundation pit backfill; the 7-day unconfined compressive strength is greater than 1MPa, meeting the requirement of greater than 0.5Mpa for fertilizer trough backfill; the water stability coefficient is greater than 90%, indicating that the durability of the foundation pit backfilled with fluidized soil is good, and it can still maintain a good bearing capacity after one day of soaking in water.

[0081] The performance of Example 4 is achieved by using ordinary Portland cement to prepare the fluidized soil backfill fertilizer trough. It takes 100-120kg of cement to backfill each cubic meter of the foundation pit fertilizer trough, while the present invention only needs to use 20kg of cement per cubic meter of the foundation pit fertilizer trough. According to the calculation that 600kg of carbon dioxide is emitted for every ton of cement produced, for a foundation pit fertilizer trough with a circumference of 100 meters, a width of 1 meter, and a height of 10 meters, the required backfill amount is 1000 cubic meters. The use of the ratio in the present invention can save 100 tons of cement and reduce 60 tons of carbon dioxide emissions. At the same time, the present invention also consumes 150kg of blast furnace slag powder, 10kg of desulfurized gypsum, and 10kg of fly ash per cubic meter of fluidized soil backfill, which rationally utilizes three types of industrial solid wastes, saves industrial solid waste storage sites, and promotes the resource recycling of solid wastes.

[0082] Therefore, compared with pure cement mixed slag, the fluidized soil solidification backfilling method of the present invention is more environmentally friendly, and using this method to backfill the foundation pit fertilizer tank is more in line with the requirements of energy conservation, emission reduction and solid waste utilization.

Claims

1. A fluidized soil for backfilling a foundation pit fertilizer tank, characterized in that: The following components are included: (1) 100-400 parts by weight of cementitious material: comprising 50-400 parts by weight of blast furnace slag powder, 10-50 parts by weight of desulfurized gypsum and 10-50 parts by weight of fly ash; (2) 10 to 40 parts by weight of fluidized soil solidifying admixture: comprising 5 to 30 parts by weight of water reducing agent, 1 to 5 parts by weight of early strength agent water, 1 to 5 parts by weight of thickener and 1 to 5 parts by weight of surfactant; (3) 10 to 100 parts by weight of cement; (4) 1000 to 5000 parts by weight of slag; (5) 500 to 2000 parts by weight of water.

2. The fluidized soil according to claim 1, characterized in that: The following components are included: (1) 170-400 parts by weight of cementitious material: comprising 150-350 parts by weight of blast furnace slag powder, 10-30 parts by weight of desulfurized gypsum and 10-20 parts by weight of fly ash; (2) 13 to 30 parts by weight of fluidized soil solidifying admixture: comprising 8 to 20 parts by weight of water reducing agent, 2 to 4 parts by weight of early strength agent water, 2 to 4 parts by weight of thickener and 1 to 2 parts by weight of surfactant; (3) 20 to 40 parts by weight of cement; (4) 2000-4000 parts by weight of slag; (5) 700 to 1400 parts by weight of water.

3. The fluidized soil according to claim 1, characterized in that: The water reducer is selected from one or more of naphthalene-based water reducers, polycarboxylate-based water reducers and lignin sulfonate-based water reducers; preferably, the water reducer is selected from naphthalene-based water reducers.

4. The fluidized soil according to claim 1, characterized in that: The early strength agent is selected from instant water glass powder, and the modulus is 2-3.

5. The fluidized soil according to claim 1, characterized in that: The thickener is selected from one or more of hydroxypropyl methylcellulose, hydroxymethyl cellulose and hydroxyethyl cellulose; preferably, the thickener is selected from hydroxypropyl methylcellulose.

6. The fluidized soil according to claim 1, characterized in that: The surfactant is selected from polyethylene glycol.

7. The fluidized soil according to claim 1, characterized in that: The slag does not contain large-size rocks.

8. A method for backfilling a foundation pit fertilizer tank, characterized in that: Contains the following steps: S1. Place the mixing tank next to the fertilizer tank to be backfilled in the foundation pit, and install a chute at the discharge port directly connected to the fertilizer tank to be backfilled; S2. Add the cementitious material, fluid soil curing admixture, cement and water into a flat mixing tank and stir to form a fluid slurry material; S3. Keep the mixing tank in a stirring state, add the slag and water into the mixing tank several times, fully stir the slag and slurry to mix evenly, so that the moisture content is 30-45%; S4. Let the fluidized soil flow into the fertilizer trough of the foundation pit by its own gravity to fill the gaps in the fertilizer trough.

9. The method according to claim 8, characterized in that For fertilizer troughs with a depth greater than 2 meters, backfill in layers. After the final setting of the previous layer, backfill the next layer, and the thickness of each backfill layer shall not exceed 2 meters. Preferably, the backfill height of the first layer is 1 meter.

10. The method according to claim 8, characterized in that The weight ratio of the cementitious material, fluidized soil solidifying admixture, cement, slag and water is 100-400: 10-40: 10-100: 1000-5000: 500-2000; In step S1, the cementitious material contains 50 to 400 parts by weight of blast furnace slag powder, 10 to 50 parts by weight of desulfurized gypsum and 10 to 50 parts by weight of fly ash; Preferably, the fluidized soil solidification admixture contains 5 to 30 parts by weight of a water reducer, 1 to 5 parts by weight of an early strength agent, 1 to 5 parts by weight of a thickener, and 1 to 5 parts by weight of a surfactant; Preferably, the water reducer is selected from one or more of naphthalene water reducers, polycarboxylate water reducers and lignin sulfonate water reducers; preferably: the high-efficiency water reducer is selected from naphthalene water reducers; Preferably, the early strength agent is selected from instant water glass powder with a modulus of 2 to 3; Preferably, the thickener is selected from one or more of hydroxypropyl methylcellulose, hydroxymethyl cellulose and hydroxyethyl cellulose; Preferably: the thickener is selected from hydroxypropyl methylcellulose; Preferably, the surfactant is selected from polyethylene glycol; Preferably, the slag does not contain large-size rocks.

Citation Information

Cited By

  • Reinforcing device and method for kiln industry accumulation layer foundation

    CN120350661A

  • High-fluidity muck-based filling material as well as preparation method and application thereof

    CN121135348A