Automobile roll-on roll-off transport ship channel operation device and installation method
By adopting an electric winch and pull-rope drive structure of outer storage ramp and inner extension ramp in a car Ro-Ro-carrier ship, combined with a reinforcement frame and an electromagnet, the problem of cumbersome and time-consuming ramp assembly in the prior art is solved. Achieve more efficient and reliable ramp operation and installation.
Patent Information
- Application Number
- CN202411168290.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-29
AI Technical Summary
The assembly and deployment and storage process of existing car ro-ro-carrier ships is cumbersome and time-consuming when they dock with the dock.
Using an operating device including an outer storage ramp and an inner extension ramp, the electric winch and extension rope drive structure is combined with a transverse and longitudinal reinforcement frame to simplify the expansion and contraction control of the ramp, reduce the use of hinges and pulleys, and use test winches and Electromagnets ensure proper installation and use of the ramp.
The assembly and commissioning process of ramps is simplified, installation errors are reduced, the use strength and efficiency of ramps are improved, the risk of rework is reduced, and normal working failure is avoided due to deformation.
Smart Images

Figure CN119037639A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of roll-on / roll-off transport ships, in particular to a channel operating device and an installation method for a roll-on / roll-off transport ship for automobiles. Background Art
[0002] The characteristic of car roll-on / roll-off transportation is that it has changed the mode of loading and unloading cargo by tower cranes. Cars can be driven up and down directly through the connecting plate at the stern. There is a special fixing system, and the efficiency of transporting cars is very high. Cars can be driven in and out. The transportation ramp of the car roll-on / roll-off transport ship includes: a movable ramp connected between the upper and lower plywood and a movable ramp set on the outside of the hull. The movable ramp set on the outside of the hull is also called: stern door. The stern door is a watertight door for loading and unloading cargo while allowing people to enter and exit. The movable ramp connected between the plywood is set up to pass through from top to bottom. The car carrying capacity of the roll-on / roll-off car transport ship is usually expressed by converting the number of car parking spaces. The main feature of the ship structure is that it has a multi-layer full-through loading deck and a retractable movable ramp connected to the dock.
[0003] However, the hull movable ramps (stern doors) of car roll-on / roll-off transport ships currently on the market are mostly folded and unfolded through multiple hinge pulley structures when docking with the dock. Therefore, the assembly and splicing are relatively cumbersome, and the unfolding and storage are also time-consuming. Summary of the invention
[0004] In view of the existing problems, the present invention provides a channel operating device and an installation method for a car roll-on / roll-off transport ship, which can effectively solve the problems raised in the background technology when used in combination.
[0005] To solve the above problems, the present invention adopts the following technical solutions:
[0006] The channel operating device of a car roll-on / roll-off transport ship comprises an outer storage ramp and an inner extension ramp, wherein a partition is installed at one side end of the inner part of the outer storage ramp, a rope through hole is provided inside the partition, and a fixed reversing pulley is installed on the front surface of the partition, an electric winch is installed at one side end of the inner part of the outer storage ramp away from the partition, a test winch is installed inside the outer storage ramp, an extension rope is connected between the test winch and the inner extension ramp through the rope through hole, a transverse reinforcement frame is installed in an array on the lower surface of the outer storage ramp, a sliding mechanism is installed inside the transverse reinforcement frames located at both side ends, a sliding track is provided on the lower surface of the inner extension ramp below the sliding mechanism, and a longitudinal reinforcement frame is installed in an array on the inner side wall of the sliding track located inside the inner extension ramp.
[0007] As a further solution of the present invention: a roller is installed on the inner side of the sliding track below the sliding mechanism, a lifting ear plate is installed on the inner side of the front end of the inner extension ramp, an armature is installed below one end of the extension rope at the end of the inner extension ramp, and an electromagnet is installed on one side of the partition at a position corresponding to the armature.
[0008] As a further solution of the present invention: an auxiliary roller is installed on the outer side of the front end of the outer storage ramp corresponding to the inner side of the sliding track.
[0009] As a further solution of the present invention: the test winch includes: a winch base, a base distance plate, a winding steel pipe, and a backing plate.
[0010] As a further solution of the present invention: a rotating ear plate is installed on the lower surface of one end of the outer storage ramp away from the inner extension ramp, and a hull vehicle entry channel is arranged below the rotating ear plate.
[0011] As a further solution of the present invention: a lifting wire rope is installed on the outer side of the lifting ear plate, one end of the lifting wire rope is located on the inner side of the hull vehicle entry channel and a lifting roller is installed, and one side of the lifting roller is located on the inner side of the hull vehicle entry channel and a reversing pulley is provided.
[0012] As a further solution of the present invention: a movable through hole is opened inside the partition and located on the outer side of the lifting ear plate, and the roller is rotatably connected to the sliding mechanism.
[0013] As a further solution of the present invention: an auxiliary roller is provided inside the pull rope through hole and outside the extension pull rope, the transverse reinforcement frame is fixedly connected to the outer storage ramp, and the longitudinal reinforcement frame is fixedly connected to the inner extension ramp.
[0014] As a further solution of the present invention: the winding steel pipe is movably connected to the winch base, and the backing plate is fixedly connected to the winding steel pipe.
[0015] The installation method of the above-mentioned vehicle roll-on / roll-off transport ship channel operation device includes the following steps:
[0016] Step 1: Ramp production,
[0017] The outer storage ramp and the inner extension ramp are assembled within the range of welding deformation and dimensional deformation, and multiple assembly parts, brackets, hinge seats, bases, etc. inside the inner extension ramp and the outer storage ramp are positioned and welded before spraying;
[0018] Step 2: Ramp accessories connection,
[0019] After installing the base distance plate inside the external storage ramp, the winch base is welded to the two side ends of the base distance plate, and after connecting the backing plate at a fixed distance on the outside of the winding steel pipe, the winding steel pipe is connected to the inside of the winch base, and the overall installation of the electric winch is completed. After the extension pull rope is formed by kneading the hemp rope, one end of the extension pull rope is wound inside the test winch, and the other end of the extension pull rope is passed through the inside of the pull rope perforation, bypassed the outside of the fixed reversing pulley, and fixed to the end of the inner extension ramp;
[0020] Step 3: Ramp commissioning and installation,
[0021] When the ramp is transported to the dock for installation, various connection components are embedded and installed at the interface between the outer storage ramp and the opening of the hull vehicle access channel. This includes passing the lifting wire rope on the outside of the lifting roller around the reversing pulley and connecting it to the inside of the lifting ear plate. The lifting arm base is welded, and the lifting wire rope, junction box and other cable connections are installed. The opening and closing of the outer storage ramp as a whole and the extension and retraction of the inner extension ramp inside the outer storage ramp are adjusted.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. The telescopic control of the outer storage ramp and the inner extension ramp is driven by the assembly test winch in combination with the hand-rubbing extension rope. After assembly, it can be used to detect whether the inner extension ramp of the outer storage ramp box can work normally. It can also be used for the positioning of the subsequent winch, avoiding the installation of a large number of reversing pulleys, cylinders, lifting arms and other mechanisms, and reducing the difficulty of assembly caused by installation errors.
[0024] 2. The driving structure of the external storage ramp and the internal extension ramp is relatively simple, which can reduce the risk of rework at the dock and wharf construction site, reduce the number of turning over during the ramp production process, effectively control the overall deformation size, ensure the installation integrity and correctness of the ramp operating device, and use extended pull ropes and winches for pulling and releasing. The construction is relatively convenient and effectively avoids the situation where the motor load is large due to the use of motor drive.
[0025] 3. The transverse reinforcement frame cooperates with the longitudinal reinforcement frame to ensure the overall strength of the ramp when the relative positions of the inner extension ramp and the outer storage ramp are adjusted as a whole, and can ensure the supporting function when the vehicle moves, avoiding excessive deformation after use that makes subsequent recovery unable to be realized normally.
[0026] 4. The overall storage and extension of the outer storage ramp and the inner extension ramp do not require a large number of hinges and pulleys, which improves the efficiency of storing and extending the inner extension ramp and prevents the foldable and flip-type active ramp from being deformed after being pressed by a vehicle and causing it to fail to work normally. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a schematic diagram of the structure of the channel operating device of the car ro-ro transport ship;
[0028] Figure 2 It is a schematic diagram of the overall structure of the ramp in the channel operation device of the car roll-on / roll-off transport ship;
[0029] Figure 3 It is a cross-sectional view of the entire ramp in the channel operating device of the car roll-on / roll-off transport ship;
[0030] Figure 4 It is a bottom view of the whole ramp in the channel operation device of the car roll-on / roll-off transport ship;
[0031] Figure 5 This is an enlarged view of the position of the bulkhead in the gangway operating device of a car ro-ro transport ship;
[0032] Figure 6 This is a schematic diagram of the structure of the test winch in the channel operation device of the car ro-ro transport ship;
[0033] Figure 7 This is a partial enlarged view of the extension of the inner extension ramp in the channel operating device of the car roll-on / roll-off transport ship.
[0034] In the figure: 1. External storage ramp; 2. Internal extension ramp; 3. Hull vehicle access channel; 4. Lifting wire rope; 5. Reversing pulley; 6. Lifting roller; 7. Rotating ear plate; 8. Test winch; 101. Sliding mechanism; 102. Partition; 103. Electric winch; 104. Auxiliary roller; 105. Fixed reversing pulley; 106. Roller; 107. Extended pull rope; 108. Horizontal reinforcement frame; 109. Pull rope penetration; 801. Winch base; 802. Base distance plate; 803. Winding steel pipe; 804. Backrest plate; 201. Sliding track; 202. Lifting ear plate; 203. Longitudinal reinforcement frame; 204. Armature; 205. Electromagnet. DETAILED DESCRIPTION
[0035] The present invention is further described below in conjunction with specific inventions, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.
[0036] In the description of this specification, the description with reference to the terms "this embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic expressions of the above terms do not necessarily refer to the same embodiment or example, and the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.
[0037] like Figure 1-7As shown, the present embodiment provides a channel operating device for a car roll-on / roll-off transport ship, including an outer storage ramp 1 and an inner extension ramp 2. When the inner extension ramp 2 is stored as a whole inside the outer storage ramp 1, the uppermost end of the inner extension ramp 2 will not exceed the deck plane of the ship body, thereby preventing the increase of wind resistance during driving. A sealing strip is arranged on the upper surface of the outer storage ramp 1, and when the outer storage ramp 1 is rotated as a whole toward the ship body, water (air) tightness can be ensured, thereby ensuring the airtightness of the interior of the ship body. A partition 102 is installed at one side end of the inner part of the outer storage ramp 1, and a pull rope through hole 109 is opened inside the partition 102. A fixed reversing pulley 105 is installed on the front surface of the partition 102. The electric winch 103 has a test winch 8 installed inside the outer storage ramp 1. The test winch 8 and the inner extension ramp 2 are connected to the extension rope 107 through the rope through hole 109. The test winch 8 includes a winch base 801, a base distance plate 802, a winding steel pipe 803, and a backing plate 804. The winding steel pipe 803 is movably connected to the winch base 801, and the backing plate 804 is fixedly connected to the winding steel pipe 803. The inside of the rope through hole 109 is provided with an auxiliary roller on the outside of the extension rope 107. The lower surface array of the outer storage ramp 1 is provided with a transverse reinforcement frame 108, which is fixedly connected to the outer storage ramp 1. The transverse reinforcement frame 108 is located at both ends of the transverse reinforcement frame 108. The sliding mechanism 101 is installed inside. A sliding track 201 is provided on the lower surface of the inner extension ramp 2 below the mechanism 101, and an auxiliary roller 104 is installed on the inner side of the sliding track 201 corresponding to the outer side of the front end of the outer storage ramp 1. A longitudinal reinforcement frame 203 is installed on the inner side wall of the sliding track 201 in the internal array of the inner extension ramp 2. The longitudinal reinforcement frame 203 is fixedly connected to the inner extension ramp 2. The transverse reinforcement frame 108 is arranged to cooperate with the longitudinal reinforcement frame 203 to ensure the overall strength of the ramp when the relative positions of the inner extension ramp 2 and the outer storage ramp 1 are adjusted as a whole. The supporting function when the vehicle is moved can be ensured, and the deformation after use is too large, which may cause the subsequent recovery to fail to be realized normally. A roller 106 is installed on the inner side, and the roller 106 is rotatably connected to the sliding mechanism 101. A lifting ear plate 202 is installed on the inner side of the front end of the inner extension ramp 2. An armature 204 is installed at the end of the inner extension ramp 2 below one end of the extension rope 107. An electromagnet 205 is installed on one side of the partition 102 at the position corresponding to the armature 204. When the inner extension ramp 2 is controlled to extend outward, the end of the inner extension ramp 2 will contact the side surface of the partition 102. After the control electromagnet 205 is energized to generate magnetism, the electromagnet 205 will absorb and fix the armature 204 as a whole, which can ensure that the inner extension ramp 2 and the outer storage ramp 1 will not shake. The interior of the partition 102 is provided with a movable through hole on the outside of the lifting ear plate 202.The outer storage ramp 1 is located at the lower surface of one end away from the inner extension ramp 2 and is equipped with a rotating ear plate 7. The electric winch 103 is arranged to cooperate with the rotating ear plate 7 to control the opening and closing of the outer storage ramp 1. A hull vehicle entry channel 3 is arranged below the rotating ear plate 7. A lifting wire rope 4 is installed on the outer side of the lifting ear plate 202. One end of the lifting wire rope 4 is located on the inner side of the hull vehicle entry channel 3 and is equipped with a lifting roller 6. One side of the lifting roller 6 is located on the inner side of the hull vehicle entry channel 3 and is equipped with a reversing pulley 5. The lifting wire rope 4 is driven by the lifting roller 6 The lifting wire rope 4 is wound and retracted, and the movement of the lifting wire rope 4 is controlled under the guidance of the reversing pulley 5, so that the opening and closing of the ramp as a whole on the outside of the hull is realized. The lifting roller 6 and the reversing pulley 5 as a whole can be used to be installed at the uppermost deck position of the hull, and the installation of the ramp as a whole on decks at different levels can be selected. It is only necessary to control the length of the lifting wire rope 4 to meet the connection of different positions, so that the vehicle can be loaded into the decks at different levels, which can greatly reduce the number of lifting mechanisms.
[0038] The installation method of the above-mentioned vehicle roll-on / roll-off transport ship channel operation device includes the following steps:
[0039] Step 1: Ramp production,
[0040] The outer storage ramp 1 and the inner extension ramp 2 are assembled within the range of welding deformation and dimensional deformation, and multiple assembly parts, brackets, hinge seats, bases, etc. inside the inner extension ramp 2 and the outer storage ramp 1 are positioned and welded before spraying;
[0041] Step 2: Ramp accessories connection,
[0042] After installing the base distance plate 802 inside the external storage ramp 1, the winch base 801 is welded to the two side ends of the base distance plate 802, and the backing plate 804 is connected to the outside of the winding steel pipe 803 at a fixed distance, and the winding steel pipe 803 is connected to the inside of the winch base 801, the electric winch 103 is installed as a whole, and the extension rope 107 is formed by kneading the hemp rope, and one end of the extension rope 107 is wound inside the test winch 8, and the other end of the extension rope 107 is passed through the rope through hole 109. After the inner part passes through the outer side of the fixed reversing pulley 105, it is fixed to the end of the inner extension ramp 2. The test winch 103 as a whole serves the purpose of debugging and positioning. After the entire test winch 103 is assembled and installed inside the storage ramp 1, the extension pull rope 107 is connected to control the test winch 103 to drive 107 to detect whether the outer storage ramp 1 and the inner extension ramp 2 can be retracted. When the detection can work normally, the test winch 103 can be disassembled and an electric winch can be installed at the test position for subsequent work;
[0043] Step 3: Ramp commissioning and installation,
[0044] When the ramp is transported as a whole to the dock or slipway for installation, various connection components of the interface between the outer storage ramp 1 as a whole and the opening of the hull vehicle access channel 3 are pre-buried and assembled in sequence, including the lifting wire rope 4 on the outside of the lifting roller 6 passing over the reversing pulley 5 and then connected to the inside of the lifting ear plate 202, and the welding of the lifting arm base, the threading of the lifting wire rope, the junction box and other cable connections, etc., by debugging the opening and closing of the outer storage ramp 1 as a whole and the extension and retraction of the inner extension ramp 2 inside the outer storage ramp 1.
[0045] The working principle of the present invention is: after the outer storage ramp 1 and the inner extension ramp 2 are prepared as a whole and the multiple internal components are assembled within the allowable error range, the assembled ramp is hoisted as a whole to the position of the hull vehicle entrance channel 3, and the rotating ear plate 7 at the end of the outer storage ramp 1 is connected to the hull, and one end of the lifting wire rope 4 is integrally connected and fixed inside the lifting ear plate 202. The debugging process is divided into two steps. The first step is to drive the lifting wire rope 4 to be wound and retracted by the lifting roller 6, and the movement of the lifting wire rope 4 is controlled under the guidance of the reversing pulley 5, so as to realize the opening and closing of the ramp as a whole on the outside of the hull. The second step is to control the installation position of the inner extension ramp 2 as a whole inside the outer storage ramp 1 to adapt to the distance from the hull to the dock, and to control the rotation of the roller 106 as a whole by using the sliding mechanism 101. The rotating roller 106 is inside the sliding track 201. The inner extension ramp 2 is pushed downward by the friction force of rolling, so that the inner extension ramp 2 is extended from the inside of the outer storage ramp 1 to the outside as a whole. After the end of the inner extension ramp 2 contacts the side surface of the partition 102, the control electromagnet 205 is energized to generate magnetism, and the electromagnet 205 will absorb and fix the armature 204 as a whole, which can ensure that the inner extension ramp 2 and the outer storage ramp 1 will not shake. After the extension and debugging are completed, since the outer storage ramp 1 and the inner extension ramp 2 are arranged to be tilted downward as a whole, the inner extension ramp 2 has a large weight as a whole, and the friction of the roller 106 cannot achieve the reset processing, then the test winch 8 is used to wind the extension rope 107, and the reversing of the extension rope 107 is controlled under the guidance of the fixed reversing pulley 105, then a fixed reversing pulley group is formed between the test winch 8, the fixed reversing pulley 105 and the inner extension ramp 2, which is used to store and debug the inner extension ramp 2 as a whole.
[0046] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0047] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0048] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A channel operation device for a car roll-on / roll-off transport ship, comprising an outer storage ramp (1) and an inner extension ramp (2), characterized in that: A partition (102) is installed at one end of the inner side of the outer storage ramp (1), a pull rope through hole (109) is opened inside the partition (102), a fixed reversing pulley (105) is installed on the front surface of the partition (102), an electric winch (103) is installed at one end of the inner side of the outer storage ramp (1) away from the partition (102), a test winch (8) is installed inside the outer storage ramp (1), and the pull rope through hole (109) is passed through between the test winch (8) and the inner extension ramp (2). The hole (109) is connected to an extension rope (107) in its interior; a transverse reinforcement frame (108) is installed in an array on the lower surface of the outer storage ramp (1); a sliding mechanism (101) is installed in the interior of the transverse reinforcement frame (108) located at both ends; a sliding track (201) is provided on the lower surface of the inner extension ramp (2) below the sliding mechanism (101); and a longitudinal reinforcement frame (203) is installed in an array on the inner side wall of the sliding track (201) located inside the inner extension ramp (2).
2. The channel operation device for a car ro-ro transport ship according to claim 1, characterized in that: A roller (106) is installed below the sliding mechanism (101) and on the inner side of the sliding track (201); a lifting lug plate (202) is installed on the inner side of the front end of the inner extension ramp (2); an armature (204) is installed below one end of the extension rope (107) and at the end of the inner extension ramp (2); and an electromagnet (205) is installed on one side of the partition plate (102) at a position corresponding to the armature (204).
3. The channel operation device for a car ro-ro transport ship according to claim 1, characterized in that: An auxiliary roller (104) is installed on the outer side of the front end of the outer storage ramp (1) corresponding to the inner side of the sliding track (201).
4. The channel operation device for a car ro-ro transport ship according to claim 1, characterized in that: The test winch (8) comprises: a winch base (801), a base distance plate (802), a winding steel pipe (803), and a backing plate (804).
5. The channel operation device for a car ro-ro transport ship according to claim 2, characterized in that: A rotating ear plate (7) is installed on the lower surface of one end of the outer storage ramp (1) which is located away from the inner extension ramp (2), and a hull vehicle entry channel (3) is arranged below the rotating ear plate (7).
6. The channel operation device for a car ro-ro transport ship according to claim 5, characterized in that: A lifting wire rope (4) is installed on the outer side of the lifting ear plate (202), one end of the lifting wire rope (4) is located on the inner side of the ship vehicle access channel (3) and is provided with a lifting roller (6), and one side of the lifting roller (6) is located on the inner side of the ship vehicle access channel (3) and is provided with a reversing pulley (5).
7. The channel operation device for a car ro-ro transport ship according to claim 2, characterized in that: A movable through hole is provided inside the partition (102) and located outside the lifting ear plate (202), and the roller (106) is rotatably connected to the sliding mechanism (101).
8. The channel operation device for a car ro-ro transport ship according to claim 1, characterized in that: An auxiliary roller is provided inside the pull rope through hole (109) and outside the extension pull rope (107); the transverse reinforcement frame (108) is fixedly connected to the outer storage ramp (1); and the longitudinal reinforcement frame (203) is fixedly connected to the inner extension ramp (2).
9. The channel operation device for a car ro-ro transport ship according to claim 4, characterized in that: The winding steel pipe (803) is movably connected to the winch base (801), and the backing plate (804) is fixedly connected to the winding steel pipe (803).
10. A method for installing the channel operation device of a car ro-ro transport ship according to claim 1, characterized in that: The steps include: Step 1: Ramp production, The outer storage ramp (1) and the inner extension ramp (2) are assembled within the range of welding deformation and dimensional deformation, and the multiple assembly parts, brackets, hinge seats, bases, etc. inside the inner extension ramp (2) and the outer storage ramp (1) are positioned and welded before spraying; Step 2: Ramp accessories connection, After installing the base distance plate (802) inside the external storage ramp (1), the winch base (801) is welded to the two side ends of the base distance plate (802), and after connecting the backing plate (804) at a fixed distance on the outside of the winding steel pipe (803), the winding steel pipe (803) is connected to the inside of the winch base (801), and the electric winch test winch (103) is installed as a whole. After the extension rope (107) is formed by kneading hemp rope, one end of the extension rope (107) is wound inside the test winch (8), and the other end of the extension rope (107) is passed through the rope through hole (109) and then passed around the outside of the fixed reversing pulley (105) and fixed to the end of the internal extension ramp (2); Step 3: Ramp commissioning and installation, When the ramp is transported as a whole to the dock (or slipway) for installation, various connection components are pre-buried and assembled at the interface between the outer storage ramp (1) as a whole and the opening of the hull vehicle access channel (3), including the lifting wire rope (4) on the outside of the lifting roller (6) passing around the reversing pulley (5) and then connected to the inside of the lifting ear plate (202), and the welding of the lifting arm base, the threading of the lifting wire rope, the wiring of the junction box and other cables, etc., by debugging the opening and closing of the outer storage ramp (1) as a whole and the extension and retraction of the inner extension ramp (2) inside the outer storage ramp (1).
