Intelligent construction equipment and construction process for vibroflotation stirring diaphragm wall
By using intelligent construction equipment for vibratory mixing anti-seepage walls, vibratory mixers and hollow drill rods are combined to form pile banks, achieving vibratory drilling and rotary trenching. Combined with high-pressure water and compressed air to mix the filler material, the problems of large concrete consumption and low construction efficiency in existing technologies are solved, achieving efficient anti-seepage and energy-saving and emission-reduction effects.
Patent Information
- Application Number
- CN202411418685.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-29
AI Technical Summary
Existing anti-seepage wall construction equipment lacks compaction, resulting in large concrete consumption, requiring pre-excavation and grout replacement processes, and low construction efficiency.
The intelligent construction equipment for vibratory mixing seepage prevention walls is adopted. The vibratory mixer and hollow drill rod are combined to form piles. The power head drives the vibratory mixing and rotary drilling operations to realize vibratory hole making and rotary trenching. The filling material is mixed with high-pressure water and compressed air to directly compact the trench wall, eliminating the need for grout replacement.
It achieves good seepage prevention effect, reduces concrete usage, eliminates liquefaction and uneven foundation settlement, improves construction efficiency, saves energy and reduces emissions, and the seepage prevention wall is less than 120mm thick, with high strength and significant seepage prevention effect.
Smart Images

Figure CN119041469A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of anti-seepage wall construction, and in particular to intelligent construction equipment and a construction process for a vibro-mixing anti-seepage wall. Background Art
[0002] In the soft soil foundation reinforcement project, some geological conditions require the construction of anti-seepage walls, which are common in earth-rock dams and concrete dam foundations. Anti-seepage measures for the weir body and foundation of earth-rock cofferdams and dangerous dam reinforcement. It is suitable for areas with thick gravel layers in the dam foundation (15-60 meters), high groundwater levels, large permeability coefficients (more than 200m / d), complex strata, alternating permeable and impermeable layers, and high anti-seepage requirements.
[0003] Existing anti-seepage wall construction equipment generally uses hydraulic bucket equipment or double-wheel milling. The disadvantage is that it has no compaction effect on the hole wall, so it usually requires a slurry replacement process, and a large amount of concrete is used (the minimum width of the hydraulic bucket equipment or double-wheel milling is greater than 300mm), and pre-digging, slurry replacement and other processes are also required.
[0004] Based on this, the present invention is proposed. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides intelligent construction equipment and construction technology for vibro-mixing anti-seepage wall, and the technical scheme thereof is as follows:
[0006] The intelligent construction equipment for vibratory mixing anti-seepage wall comprises a plurality of vibrators, a hollow drill rod located between two adjacent vibrators, a lower crossbeam, an upper crossbeam arranged in parallel with the lower crossbeam, and a power head for applying power to the vibrators and the hollow drill rods, wherein the vibrators are arranged at equal intervals, the vibrators and the hollow drill rods are combined with each other into a row of piles, and the lower crossbeam and the upper crossbeam are used to connect the vibrators and the hollow drill rods into a row of piles; the power head drives the vibrators to perform vibratory construction, and the power head drives the hollow drill rod to perform rotary drilling operations, and a concrete pump is externally connected to the upper end of the hollow drill rod.
[0007] As a further solution of the present invention, the vibrator includes a vibrator body, a vibrator guide rod coaxially connected to the vibrator body, and a shock absorber installed between the vibrator guide rod and the vibrator body, the lower cross beam is provided with a first mounting hole for the shock absorber to pass through, and the upper cross beam is provided with a second mounting hole for the vibrator guide rod to pass through.
[0008] As a further solution of the present invention, a connecting frame is fixedly installed between the upper cross beam and the power head, and the upper end of the shock absorber is fixedly connected to the lower cross beam.
[0009] As a further solution of the present invention, the vibrator further includes a plurality of high-pressure water pipes arranged outside the vibrator body and a guard plate for protecting the high-pressure water pipes, and the guard plate is fixedly connected to the vibrator body.
[0010] As a further solution of the present invention, the hollow drill rod includes a hollow rod body, which includes an inverted cone-shaped drill head, a spiral blade mounting part, and a polished rod part from bottom to top, and the outer part of the spiral blade mounting part is sleeved with spiral blades; a discharge hole is provided at the connection between the drill head and the spiral blade mounting part, and the discharge hole is connected with the inner cavity of the hollow rod body; the polished rod part is driven to rotate by the power head, and the output end of the concrete pump is connected with the inner cavity of the polished rod part; the lower cross beam is provided with a third mounting hole for the spiral blade mounting part and the spiral blade to move, and the upper cross beam is provided with a fourth mounting hole for the polished rod part to move.
[0011] As a further solution of the present invention, the upper end of the hollow drill rod is externally connected to a concrete pump.
[0012] As a further solution of the present invention, the total number of the vibrators is n, n is an integer greater than 2, the distance between the axis of the hollow drill rod adjacent to a certain vibrator and the axis of the vibrator is x, and the power of all the vibrators 1 is P;
[0013] When n<8, nx=λP, λ is an empirical coefficient, and the vibration frequency of the vibrator 1 is a fixed frequency;
[0014] When n≥8, P=10kW, the vibrating frequency of the vibrator 1 is variable frequency, and the frequency is 1450Hz-3500Hz.
[0015] The intelligent construction process of vibromixing anti-seepage wall includes the following steps:
[0016] Step 1: Move the pile row to the design axis position of the anti-seepage wall, vibrate and punch holes, and rotate the hollow drill rod to drill holes. All vibrators and hollow drill rods punch holes and grooves at the same time until the set depth is reached to obtain the anti-seepage wall construction groove;
[0017] Step 2: lift the vibrator and the hollow drill rod upward for a distance, the vibrator performs a vibrating operation, the hollow drill rod stops rotating, and the filling material is injected into the cut-off wall construction groove from the lower end of the hollow drill rod through the inner cavity of the hollow drill rod by a concrete pump. The vibrator transports high-pressure water and compressed air into the cut-off wall construction groove to mix and compact the filling material and vibrate the wall of the cut-off wall construction groove;
[0018] Step 3, repeating step 2 until the vibrated filling material in the construction groove of the anti-seepage wall reaches the designed height, and the anti-seepage wall monomer is formed after the filling material solidifies;
[0019] Step 4: Repeat steps 1 to 3 to construct the cut-off wall monomers until all the cut-off wall monomers are solidified and connected to form the cut-off wall.
[0020] As a further embodiment of the present invention, the filler includes cement, clay, bentonite, fly ash, fine aggregate, coarse aggregate, water reducing agent and water.
[0021] As a further solution of the present invention, the two anti-seepage wall construction grooves are connected by 200 mm. When connecting, the power of the vibrator is set to decrease in sequence as it approaches the connecting position.
[0022] The thickness of the anti-seepage wall made by the invention is controlled within the range of 100 to 300 mm, thereby achieving the purposes of anti-seepage, energy saving, cost reduction, efficiency improvement and elimination of liquefaction.
[0023] Compared with the prior art, the beneficial effects of the present invention are:
[0024] 1. The present invention adopts the anti-seepage wall made by vibro-compaction and rotary drilling and then vibro-compaction technology, which has good anti-seepage effect. At the same time, it can eliminate liquefaction of the treated soil and eliminate uneven settlement of the foundation. It has strong soil pressure and high efficacy.
[0025] 2. The intelligent construction equipment for vibro-mixing anti-seepage wall of the present invention can effectively handle various complex foundation soils, including medium-coarse sand and pebble strata. The hollow drill rod with spiral blades can directionally spray filler to form a continuous wall and effectively and evenly stir the slurry. At the same time, during the lifting process, the vibrator effectively vibrates and compacts the filler, which also helps the bonding effect between it and the soil.
[0026] 3. Based on the verticality of the pile row, the verticality is adjustable and controllable, which can increase the downward pressure.
[0027] 4. The purpose of the present invention is to realize the construction of anti-seepage wall, compact the groove wall while opening the groove, and eliminate the process of changing slurry. After the groove is formed, the filling material (such as concrete) is directly poured, which can effectively eliminate the honeycomb surface of the filling material and improve the strength.
[0028] 5. Energy saving and emission reduction. Reduce the amount of filler (such as concrete). The wall thickness of the present invention is less than 120mm, which can reduce the amount of concrete by 60% and the amount of self-setting mortar or curing mortar by 100%. Save energy for pre-excavation and mortar replacement. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a structural schematic diagram of the intelligent construction equipment for vibratory mixing anti-seepage wall.
[0030] Figure 2 This is a schematic diagram of the side view of the vibratory mixing anti-seepage wall intelligent construction equipment.
[0031] Figure 3Schematic diagram of the structure of the vibrator.
[0032] Figure 4 Schematic diagram of the interior of a hollow drill rod.
[0033] Figure 5 It is a schematic diagram of the structure of the hollow drill rod. DETAILED DESCRIPTION
[0034] The present invention is described in detail below in conjunction with specific embodiments. The embodiments described below are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0035] Example 1
[0036] like Figures 1 to 5 As shown, the intelligent construction equipment for vibro-mixing anti-seepage wall includes multiple vibrators 1, a hollow drill rod 2 located between two adjacent vibrators 1, a lower crossbeam 3, an upper crossbeam 4 arranged in parallel with the lower crossbeam 3, and a power head 6 for applying power to the vibrators 1 and the hollow drill rod 2. The vibrators 1 are arranged at equal intervals, the vibrators 1 and the hollow drill rod 2 are combined with each other to form a row of piles, and the lower crossbeam 3 and the upper crossbeam 4 are used to connect the vibrators 1 and the hollow drill rod 2 to form a row of piles; the power head 6 drives the vibrators 1 to perform vibratory construction, and the power head 6 drives the hollow drill rod 2 to perform rotary drilling operations, and the upper end of the hollow drill rod 2 is externally connected to a concrete pump.
[0037] In some embodiments, the vibrator 1 is a hydraulic vibrator, and the power head 6 is integrated with corresponding hydraulic components.
[0038] In other embodiments, the vibrator 1 is an electric vibrator, and the power head 6 is integrated with corresponding electric vibrator-related electrical appliances.
[0039] The hollow drill rod 2 and the power head 6 are combined to form a long spiral drilling rig.
[0040] The vibrator 1 includes a vibrator body 11, a vibrator guide rod 15 coaxially connected to the vibrator body 11, and a shock absorber 13 installed between the vibrator guide rod 15 and the vibrator body 11. The lower cross beam 3 is provided with a first mounting hole for the shock absorber 13 to pass through, and the upper cross beam 4 is provided with a second mounting hole for the vibrator guide rod 15 to pass through.
[0041] A connecting frame 5 is fixedly installed between the upper cross beam 4 and the power head 6 , and the upper end of the shock absorber 13 is fixedly connected to the lower cross beam 3 .
[0042] The vibrator 1 further includes a plurality of high-pressure water pipes 12 disposed outside the vibrator body 11 and a guard plate 15 for protecting the high-pressure water pipes 12, wherein the guard plate 15 is fixedly connected to the vibrator body 11. The high-pressure water pipes 12 are externally connected to a high-pressure water pump, and the pressure of the high-pressure water pump is 0.3-0.6Mpa.
[0043] The hollow drill rod 2 includes a hollow rod body, which includes an inverted cone-shaped drill head 21, a spiral blade mounting part 22, and a polished rod part 23 from bottom to top, and the spiral blade mounting part 22 is sleeved with a spiral blade 24 on the outside; a discharge hole 25 is provided at the connection between the drill head 21 and the spiral blade mounting part 22, and the discharge hole 25 is communicated with the inner cavity of the hollow rod body; the polished rod part 23 is driven to rotate by the power head 6, and the output end of the concrete pump is communicated with the inner cavity of the polished rod part 23; a third mounting hole for the spiral blade mounting part 22 and the spiral blade 24 to move is provided on the lower cross beam 3, and a fourth mounting hole for the polished rod part 23 to move is provided on the upper cross beam 4.
[0044] The upper end of the hollow drill rod 2 is externally connected to a concrete pump.
[0045] Example 2
[0046] The vibro-mixing anti-seepage wall intelligent construction equipment described in Example 1 is used for construction, and the vibro-mixing anti-seepage wall intelligent construction process includes the following steps:
[0047] Step 1, move the pile row to the design axis position of the anti-seepage wall, the vibrator 1 performs vibration and hole making, the hollow drill rod 2 performs rotation and drilling and hole making, all the vibrators 1 and hollow drill rods 2 simultaneously make holes and grooves until the set depth is reached, and the construction groove of the anti-seepage wall is obtained; wherein, the vibrator makes holes by horizontal vibration and water-gas linkage, and compacts the surrounding soil to reach the set depth; minimizes the defect of easy collapse of the hole wall caused by rotary drilling and hole making. Since the hole width of a single vibrator is small, even if multiple vibrators are arranged in parallel, interference is easily formed between two adjacent vibrators, resulting in easy damage to the vibrators; if two adjacent vibrators are too far apart, holes cannot be made into grooves. The present invention adopts a hollow drill rod arranged between two adjacent vibrators to rotary drill holes to achieve hole making and groove making.
[0048] Step 2, lift the vibrator 1 and the hollow drill rod 2 upward for a distance, the vibrator 1 performs the vibration operation, the hollow drill rod 2 stops rotating, and the filling material is injected into the anti-seepage wall construction groove from the lower end of the hollow drill rod 2 through the inner cavity of the hollow drill rod 2 by a concrete pump. The vibrator 1 transports high-pressure water and compressed air into the anti-seepage wall construction groove to mix and compact the filling material and vibrate the anti-seepage wall construction groove wall.
[0049] The filling material can be ordinary fine stone concrete or plastic concrete with better anti-seepage effect. The proportion of various materials in plastic concrete is: 120-180kg cement, 60-90kg clay, 60-120kg bentonite, 60-120kg fly ash, 800kg fine aggregate, 800kg coarse aggregate, 300kg water, 3kg water reducer. Cement is ordinary Portland cement, the particle size of coarse aggregate is 1-2cm; fine aggregate is ordinary river sand.
[0050] The filling material can also be transported by a pressure pump or a grouting pump and injected into the anti-seepage wall construction groove through the lower end of the hollow drill rod 2. With the participation of high-pressure water gas in the vibrator, the filling material is squeezed by the vibrator to make the filling material dense and form a uniform compacting effect on the soil around the anti-seepage wall construction groove.
[0051] The filling material delivery rate during construction is 0.5-1m3 / min.
[0052] Step 3, repeat step 2 until the vibrated filling material in the construction trench of the anti-seepage wall reaches the designed height, and the anti-seepage wall monomer is formed after the filling material solidifies; the width of the anti-seepage wall monomer is 2200mm and the thickness is greater than 100mm.
[0053] Step 4: construct the next cut-off wall monomer according to the interval of 2000mm of the axial slot section, repeat the construction of the cut-off wall monomer according to steps 1 to 3, and wait for all the cut-off wall monomers to solidify and connect to form the cut-off wall. Among them, the two slot sections are connected by 200mm, and the water-gas linkage of the vibrator is used to make the connection parts tightly connected, ensuring the continuity of the wall.
[0054] Example 3
[0055] The total number of the vibrators 1 is n, where n is an integer greater than 2, the distance between the axis of the hollow drill rod 2 adjacent to a certain vibrator 1 and the axis of the vibrator 1 is x, and the power of all the vibrators 1 is P;
[0056] When n<8, nx=λP, λ is an empirical coefficient, and the vibration frequency of the vibrator 1 is a fixed frequency;
[0057] When n≥8, P=10kW, the vibrating frequency of the vibrator 1 is variable frequency, and the frequency is 1450Hz~3500Hz.
[0058] Example 4
[0059] In Example 3, n=5, x=62.5cm, P=200kW, λ=1.56, and the vibration frequency of the vibrator 1 is 2000Hz; the maximum diameter of the vibrator body 11 is 100mm, and the diameter of the light rod 23 is 100mm. According to the above parameters, a single anti-seepage wall monomer is constructed. The anti-seepage wall is tested in the test area, including random core extraction test, anti-seepage performance test, etc. It was finally measured that when the seepage pressure was 1kPa, the average permeability coefficient was 2.2×10 -7 cm / s.
[0060] Example 5
[0061] Based on Example 4, changing the value of n or x, the corresponding P also changes accordingly, and the other parameters remain unchanged. The results of the mean permeability coefficient are shown in Table 1:
[0062] Table 1
[0063] n x(cm) λ P(kW) Mean permeability coefficient (cm / s) 5 50 / 200 <![CDATA[1.8×10 -6 <!-- 4 -->]]> 5 68.6 1.56 220 <![CDATA[2.7×10 -7 ]]> 6 62.5 1.56 240 <![CDATA[2.1×10 -7 ]]> 6 62.5 / 250 <![CDATA[2.5×10 -6 ]]>
[0064] Example 6
[0065] In Example 3, n=8, x=62.5cm, P=10kW, the vibration frequency of the vibrator 1 is variable frequency, and the frequency is 1450Hz~3500Hz; the maximum diameter of the vibrator body 11 is 100mm, and the diameter of the light rod part 23 is 100mm. According to the above parameters, a single anti-seepage wall monomer is constructed. The anti-seepage wall is tested in the test area, including random core extraction test, anti-seepage performance test, etc. It was finally measured that when the seepage pressure was 1kPa, the average permeability coefficient was 2.6×10 -7 cm / s.
[0066] Example 7
[0067] The only difference between this example and Example 6 is that the vibration frequency of the vibrator 1 is 2000 Hz, and the rest remains unchanged. The corresponding average permeability coefficient is 9.1×10 -6 cm / s.
[0068] Example 8
[0069] The only difference between this example and Example 6 is that P = 15 kW, and the rest remain unchanged. The corresponding average permeability coefficient is 7.4×10 -6 cm / s.
[0070] Example 9
[0071] The two anti-seepage wall construction grooves are connected by 200mm. When connected, the power of the vibrator 1 is set to decrease in sequence as it approaches the connection position; n=5, the vibrators 1 are numbered, and according to the direction close to the connection position, they are the first vibrator, the second vibrator, the third vibrator, the fourth vibrator, and the fifth vibrator; the power of the first vibrator is 200kW, the power of the second vibrator is 190kW, the power of the third vibrator is 180kW, the power of the fourth vibrator is 160kW, and the power of the fifth vibrator is 130kW. The difference in power between two adjacent vibrators constitutes the Fibonacci sequence. In this way, the average compressive strength at the connection is 47.1MPa.
[0072] If the power of the five vibrators is 200kW, and the joints are connected according to this parameter, the average compressive strength of the joints will be 30.8MPa.
[0073] If the power of the 5th vibrator is 200kW, the power of the 4th vibrator is 190kW, the power of the 3rd vibrator is 180kW, the power of the 2nd vibrator is 160kW, and the power of the 1st vibrator is 130kW, the final average compressive strength of the joint is 28.5MPa.
[0074] If the power of the first vibrator is 200kW, the power of the second vibrator is 190kW, the power of the third vibrator is 180kW, the power of the fourth vibrator is 170kW, and the power of the fifth vibrator is 160kW, the average compressive strength of the final joint is 41.7MPa.
[0075] Example 10
[0076] In other embodiments, the power of each vibrator is the same and is 5-10 kW, and the vibratory frequency is the same.
[0077] In addition, it should be understood that those skilled in the art should regard the specification as a whole, and the technical solutions in each embodiment may also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. Intelligent construction equipment for vibratory mixing anti-seepage wall, characterized by: The invention comprises a plurality of vibrators (1), a hollow drill rod (2) located between two adjacent vibrators (1), a lower crossbeam (3), an upper crossbeam (4) arranged in parallel with the lower crossbeam (3), and a power head (6) for applying power to the vibrators (1) and the hollow drill rod (2); the vibrators (1) are arranged at equal intervals; the vibrators (1) and the hollow drill rod (2) are combined to form a row of piles; the lower crossbeam (3) and the upper crossbeam (4) are used to connect the vibrators (1) and the hollow drill rod (2) to form a row of piles; the power head (6) drives the vibrators (1) to perform vibratory construction; the power head (6) drives the hollow drill rod (2) to perform rotary drilling; and a concrete pump is externally connected to the upper end of the hollow drill rod (2).
2. The vibro-mixing anti-seepage wall intelligent construction equipment according to claim 1 is characterized in that: The vibrator (1) comprises a vibrator body (11), a vibrator guide rod (15) coaxially connected to the vibrator body (11), and a shock absorber (13) installed between the vibrator guide rod (15) and the vibrator body (11); the lower crossbeam (3) is provided with a first mounting hole for the shock absorber (13) to pass through, and the upper crossbeam (4) is provided with a second mounting hole for the vibrator guide rod (15) to pass through.
3. The vibro-mixing anti-seepage wall intelligent construction equipment according to claim 2 is characterized in that: A connecting frame (5) is fixedly installed between the upper cross beam (4) and the power head (6), and the upper end of the shock absorber (13) is fixedly connected to the lower cross beam (3).
4. The vibro-mixing anti-seepage wall intelligent construction equipment according to claim 1 is characterized in that: The vibrator (1) further comprises a plurality of high-pressure water pipes (12) arranged outside the vibrator body (11), and a guard plate (15) for protecting the high-pressure water pipes (12), wherein the guard plate (15) is fixedly connected to the vibrator body (11).
5. The intelligent construction equipment for vibro-mixing anti-seepage wall according to claim 1 is characterized in that: The hollow drill rod (2) comprises a hollow rod body, which comprises, from bottom to top, an inverted cone-shaped drill head (21), a spiral blade mounting part (22), and a polished rod part (23), wherein the spiral blade mounting part (22) is sleeved with a spiral blade (24) on its exterior; a discharge hole (25) is provided at the connection between the drill head (21) and the spiral blade mounting part (22), wherein the discharge hole (25) is communicated with the inner cavity of the hollow rod body; the polished rod part (23) is driven to rotate by a power head (6), and the output end of the concrete pump is communicated with the inner cavity of the polished rod part (23); a third mounting hole for the spiral blade mounting part (22) and the spiral blade (24) to move is provided on the lower cross beam (3), and a fourth mounting hole for the polished rod part (23) to move is provided on the upper cross beam (4).
6. The intelligent construction equipment for vibro-mixing anti-seepage wall according to claim 5 is characterized in that: The upper end of the hollow drill rod (2) is externally connected to a concrete pump.
7. The intelligent construction equipment for vibro-mixing anti-seepage wall according to claim 1 is characterized in that: The total number of the vibrators (1) is n, where n is an integer greater than 2, the distance between the axis of the hollow drill rod (2) adjacent to a certain vibrator (1) and the axis of the vibrator (1) is x, and the power of all the vibrators (1) is P; When n<8, nx=λP, λ is an empirical coefficient, and the vibration frequency of the vibrator (1) is a fixed frequency; When n≥8, P=10kW, the vibration frequency of the vibrator (1) is variable frequency, and the frequency is 1450Hz-3500Hz.
8. Intelligent construction technology of vibromixing anti-seepage wall, characterized in that: The following steps are involved: Step 1, move the pile row to the design axis position of the anti-seepage wall, the vibrator (1) performs vibration and punching, the hollow drill rod (2) rotates to perform rotary drilling and punching, all the vibrators (1) and the hollow drill rods (2) simultaneously punch holes and grooves until a set depth is reached, thereby obtaining an anti-seepage wall construction groove; Step 2, the vibrator (1) and the hollow drill rod (2) are lifted upward for a certain distance, the vibrator (1) performs a vibrating operation, the hollow drill rod (2) stops rotating, and the filling material is injected into the anti-seepage wall construction groove from the lower end of the hollow drill rod (2) through the inner cavity of the hollow drill rod (2) by a concrete pump, and the vibrator (1) conveys high-pressure water and compressed air into the anti-seepage wall construction groove to mix and compact the filling material and vibrate the wall of the anti-seepage wall construction groove; Step 3, repeating step 2 until the vibrated filling material in the construction groove of the anti-seepage wall reaches the designed height, and the anti-seepage wall monomer is formed after the filling material solidifies; Step 4: Repeat steps 1 to 3 to construct the cut-off wall monomers until all the cut-off wall monomers are solidified and connected to form the cut-off wall.
9. The intelligent construction process of vibromixing anti-seepage wall according to claim 8 is characterized in that: The filler includes cement, clay, bentonite, fly ash, fine aggregate, coarse aggregate, water reducing agent and water.
10. The intelligent construction process of vibromixing anti-seepage wall according to claim 8 is characterized in that: The two anti-seepage wall construction grooves are connected by 200 mm. When connecting, the power of the vibrator (1) is set to decrease in sequence as it approaches the connecting position.
Citation Information
Cited By
Split type anti-seepage steel mould trolley and wave wall prefabrication forming device
CN121552526A