Pumped storage benchmark capacity electricity price pricing method
Through the quantitative evaluation of the resources of pumped storage stations and the pricing of electricity price for electricity prices in benchmark capacity, the problems of insufficient incentives and high price verification costs in the existing electricity price mechanism are solved, the incentive transmission and cost control of the electricity price mechanism are realized, and the power station is improved Management and investment benefits.
Patent Information
- Application Number
- CN202411176769.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pumped storage electricity price mechanism is insufficient in promoting the reasonable growth of power station scale and optimizing layout, the incentive mechanism is not sound, the price verification cost is high and the cycle is long, and the boundaries of some cost are unclear, which affects the overall efficiency and stability of the power system.
The pricing method for the benchmark capacity electricity price of pumped storage energy is proposed. By zoning and grading quantitative evaluation of the pumped storage station resources in the target area, demarcating resource areas and setting benchmark capacity electricity prices, and using statistical methods to fit each characteristic parameter and capacity electricity price The relationship between the two power stations is corrected, including installed capacity, number of units and number of consecutive full-time hours as correction parameters, and combined with cost-effective quantitative analysis, a segmented linear function is formulated for correction.
The incentive and transmission role of the price mechanism has been realized, and the workload and audit pressure of the 'one-stop, one-core' cost supervision and auditing model has been reduced, and the investment enterprises have been mobilized to take reasonable measures to improve management level, save investment, promote technological innovation, and improve the functions of power plants. Benefit and cost control.
Smart Images

Figure CN119048144A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of pumped capacity electricity price, and specifically relates to a method for pricing pumped storage benchmark capacity electricity price. Background Art
[0002] Pumped-storage power stations, as key regulating hubs in the power system, have unique operating models and functional characteristics that are significantly different from traditional power stations. Traditional power stations mainly obtain economic benefits by selling electricity, while pumped-storage power stations play an important role in "peak-shaving and valley-filling" in the power system with their powerful energy storage and release capabilities. Their investment returns mainly rely on capacity services rather than direct electricity sales. This difference is not only reflected in the operating model, but also has a profound impact on the design and implementation of the electricity price mechanism;
[0003] At present, the price mechanism of pumped storage power generation at home and abroad is diversified, including the non-market two-part price mechanism, the internal accounting system, the semi-market leasing system, the fixed income + variable bidding system and the full market bidding system. These mechanisms have their own advantages and disadvantages, but the common point is that they all revolve around the recovery and profit of capacity service costs, and the electricity revenue exists more as an incentive mechanism to encourage efficient operation of power stations and respond to system needs.
[0004] In my country, the model of pumped-storage power stations obtaining investment returns through capacity electricity prices has become relatively mature, thanks to the issuance of a series of policy documents including Document No. 633 of the Development and Reform Commission (2021), which provides a clear policy orientation and a stable external environment for the implementation of the two-part electricity price system; however, with the rapid development of the pumped-storage power station industry, the existing electricity price mechanism has also exposed some problems that cannot be ignored;
[0005] First, an imperfect incentive mechanism is one of the important factors that restrict the healthy development of the industry. The existing electricity price mechanism is still insufficient in promoting the reasonable growth of power plant scale and optimizing layout, and has failed to effectively guide resources to more efficient areas and time periods; this has led to an oversupply or shortage of power plants in some areas, affecting the overall efficiency and stability of the power system;
[0006] Secondly, the problems of high cost and long cycle of price verification are becoming increasingly prominent; with the completion and commissioning of large-scale pumped-storage power stations in the future, the difficulty of conducting cyclical rolling price verification for each power station will increase significantly; this not only increases the operating costs of power companies, but also affects the timeliness and effectiveness of electricity price policies; in addition, the unclear boundaries of some costs also increase the complexity and uncertainty of price verification. Summary of the invention
[0007] The purpose of the present invention is to provide a method for pricing pumped storage benchmark capacity electricity prices to solve the problems raised in the above background technology.
[0008] In order to achieve the above object, the present invention provides the following technical solution: a method for pricing a benchmark capacity electricity price for pumped storage, the method comprising:
[0009] S1, regional benchmark electricity price determination:
[0010] Through the quantitative evaluation of the pumped storage site resources in the target area by zoning and grading, the resource areas are delineated in the target area accordingly, and the benchmark capacity electricity price is set for each resource area according to the different conditions of the resource areas;
[0011] S2, correction of installed capacity of a single power station:
[0012] S2.1, select one or several scale characteristic parameters for correction;
[0013] S2.2. For several selected scale characteristic parameters, statistical methods are used to fit the quantitative relationship between each characteristic parameter and the capacity electricity price calculated by the standard method in turn; the fitting samples here can be the characteristic parameters of pumped-storage power stations in the entire region and / or in each resource zone - the capacity electricity price samples calculated by the standard method.
[0014] S2.3, using the fitting relationship obtained in step S2.2 to correct the partitioned benchmark capacity electricity price, to obtain the capacity electricity price of a single power station.
[0015] Preferably, the scale characteristic parameters include: installed capacity, number of units, continuous full-power hours, and designed energy storage capacity.
[0016] Preferably, if the selected scale characteristic parameter is installed capacity, the correction method is the installed capacity correction method, and the correction coefficient s of the installed capacity correction method is used in the installed capacity correction method. m Make corrections; m Negatively correlated with installed capacity, set upper and lower bounds; select the installed capacity with higher frequency as the benchmark installed capacity c m,b , and its corresponding correction coefficient is set to s m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting:
[0017]
[0018] Where: s m,i is the installed capacity correction coefficient corresponding to power station i;
[0019] s m,b The base installed capacity is c m,b The corresponding correction coefficient can be set to 1;
[0020] e 1 and e 2are the linear correction slopes in the corresponding cases respectively;
[0021] c i is the installed capacity corresponding to power station i.
[0022] Preferably, if the selected scale characteristic parameter is the number of units, the correction method is a unit number correction method, in which the unit number correction coefficient r is used. m make corrections;
[0023] The r m Positively correlated with the number of units, set upper and lower bounds; select the number of units with higher frequency as the benchmark number of units n r,b , and its corresponding correction coefficient is set to r m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting:
[0024]
[0025] Where: r m,i is the correction coefficient of the number of units corresponding to power station i;
[0026] r m,b is the number of base units n ,r,b The corresponding correction coefficient can be set to 1;
[0027] f 1 and f 2 are the linear correction slopes in the corresponding cases respectively;
[0028] n i is the number of units corresponding to power station i.
[0029] Preferably, if the selected scale characteristic parameter is the number of continuous full-load hours, the correction method is the continuous full-load hours correction method, in which the continuous full-load hours correction coefficient k is used. m Make corrections; the k m It is positively correlated with the number of full-load hours, and sets upper and lower bounds; select the number of consecutive full-load hours with a higher frequency as the benchmark number of consecutive full-load hours h k,b , and its corresponding correction coefficient is set to k m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting:
[0030]
[0031] Among them, k m,i is the correction coefficient of the continuous full-power hours corresponding to power station i;
[0032] km,b The number of continuous full-load hours is the benchmark k,b The corresponding correction coefficient can be set to 1;
[0033] d 1 and d 2 are the linear correction slopes in the corresponding cases respectively;
[0034] h i is the number of consecutive full-power hours corresponding to power station i.
[0035] Preferably, if more than one scale characteristic parameter is selected, correction is performed using the selected multiple scale characteristic parameters.
[0036] Preferably, step S1 is divided into the following five steps:
[0037] A1: Evaluation results:
[0038] Carry out zoning and grading quantitative evaluation of pumped storage site resources in the target area, and obtain zoning and grading quantitative evaluation results of pumped storage site resources in the target area under the selected evaluation indicators;
[0039] A2: Delineate the price verification area:
[0040] Combined with the quantitative evaluation results of the zoning and grading, and administrative regions, the static unit kilowatt intervals are classified and merged, and a number of price-reducing zones are delineated in the target area, and the benchmark electricity price range or specific value of each price-reducing zone is proposed accordingly;
[0041] A3: Classification resource area:
[0042] Taking the static unit kilowatt investment amount as the step length, the pumped storage construction conditions in the target area are divided into n types of resource areas, and the quantitative evaluation results of pumped storage site resource classification based on administrative divisions are further obtained;
[0043] A4: Calculate the benchmark capacity electricity price in different regions:
[0044] Calculate the capacity electricity price corresponding to different static unit kilowatt investments based on the operating period, internal rate of return on capital, current 5-year LPR, capital ratio of 20% and advanced operation and maintenance level;
[0045] A5, formulate benchmark capacity electricity price:
[0046] The capacity electricity price corresponding to the static unit kilowatt investment in the selected interval of each type of resource area is used as the benchmark capacity electricity price for that resource area.
[0047] Preferably, if the selected scale characteristic parameters are: the number of units and the number of continuous full-power hours, the capacity price calculation formula for a single power station i is modified as follows:
[0048] Pc,i =P c,zone ·(1+r m,i )·(1+k m,i )
[0049] Where: P c,i = is the capacity electricity price of power station i;
[0050] P c,zone × is the capacity electricity price in the area where power station i is located;
[0051] r m,i is the correction coefficient of the number of units corresponding to power station i;
[0052] k m,i is the correction coefficient of the continuous full-generation hours corresponding to power station i.
[0053] Preferably, if the selected scale characteristic parameters are: installed capacity, number of units and continuous full-power hours, the calculation formula for the capacity electricity price of power station i is jointly corrected as follows:
[0054] P c,i =P c,zone (1+s m,i )(1+r m,i )(1+k m,i )
[0055] Where: P c,i = is the capacity electricity price of power station i;
[0056] P c,zone × is the capacity electricity price in the area where power station i is located
[0057] s m,i is the installed capacity correction coefficient corresponding to power station i;
[0058] r m,i is the correction coefficient of the number of units corresponding to power station i;
[0059] k m,i is the correction coefficient of the continuous full-generation hours corresponding to power station i.
[0060] Preferably, the division of price steps in the core price zone needs to take into account the representativeness of administrative and geographical divisions. If the step length is too long, it will be unfavorable for the incentive and transmission effect of the benchmark capacity electricity price mechanism. If the step length is too short, it will cause the benchmark capacity electricity price mechanism to fail and will also result in too few samples of pumped storage projects in the core price zone, which will be unrepresentative.
[0061] Preferably, the installed capacity scale of the single power station is replaced by the designed energy storage scale of the single power station, and the capacity electricity price of the target power station is corrected, that is, the capacity electricity price of the target power station is corrected by multiplying the installed capacity scale of the target power station by the continuous full-power generation hours of the target power station.
[0062] Note: The regional benchmark capacity electricity price and the capacity electricity price of a power station in the region are two different concepts.
[0063] The beneficial effects of the present invention are as follows:
[0064] 1. The present invention provides a benchmark capacity electricity price pricing mechanism based on resource zoning of pumped storage sites based on data statistical analysis, which can give full play to the incentive and conduction role of the price mechanism and establish a good mechanism to encourage investment companies to independently seek optimized design and save investment.
[0065] 2. The present invention reduces the workload and audit pressure of the "one station one core" cost supervision model through benchmark capacity electricity prices.
[0066] 3. After the implementation of the present invention, pumped storage investment enterprises can be fully mobilized to adopt a variety of reasonable measures and scientific management to promote the improvement of construction technology and operation management level, accelerate project commissioning, save project investment, and stimulate technological innovation. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] Figure 1 It is a schematic diagram of the process of the present invention;
[0068] Figure 2 This is a schematic diagram of the process of determining the regional benchmark electricity price in the present invention. DETAILED DESCRIPTION
[0069] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0070] The functional characteristics of pumped-storage power stations determine that they are different from conventional power stations that can obtain income through electric energy, but rely on capacity services to obtain investment returns. The existing pumped-storage electricity price mechanisms at home and abroad include a non-market two-part electricity price mechanism, an internal accounting system, a semi-market leasing system, a fixed income + variable bidding system, and a fully market-based bidding system. It can be seen that the operation mode of pumped-storage power stations mainly revolves around the recovery and profitability of capacity service costs, and the electricity revenue is mainly manifested as an incentive mechanism. On the basis of considering maintaining the consistency of electricity price policies, the present invention proposes four pricing methods: a single core price, a benchmark electricity price, a bidding electricity price based on a guidance price, and a market-based electricity price for comparative analysis on the basis of reducing the cost of core prices, improving policy practicability, and ensuring the healthy development of the industry. The advantages and disadvantages of various methods are shown in Table 1.
[0071] Table 1 Applicable scope, advantages and disadvantages of each electricity price pricing method
[0072]
[0073] The model of pumped storage power stations obtaining investment returns through capacity electricity prices has problems such as an imperfect incentive mechanism, inability to reasonably guide the scale and layout of power stations, high price verification costs, long price verification cycles, and unclear cost boundaries. With the completion and commissioning of large-scale pumped storage power stations in the future, the difficulty of rolling price verification for each power station will gradually increase.
[0074] In addition, the distribution of pumped-storage power stations is both demand-oriented and resource-oriented. Therefore, the capacity electricity price of pumped-storage power stations in different regions needs to reasonably reflect the differences in construction and operation costs, as well as the differences in market demand. The capacity electricity price is mainly determined by investment and construction costs, operating costs, etc., reflecting resource orientation. However, when demand orientation and resource orientation cannot be fully coordinated (such as there are no pumped-storage resource sites in areas with demand, or pumped-storage resource sites are distributed in areas where demand is not prominent), it is necessary to coordinate resources and demand on the basis of the conventional two-part electricity price. From the perspective of construction cost, the high investment and construction cost of pumped-storage power stations is the main factor determining the capacity electricity price, and should be used as the basis for pricing; from the perspective of market demand, in areas where the scale of demand is not obvious, the demand coefficient can be corrected on the basic capacity electricity price.
[0075] The benchmark electricity price fully reflects the functional benefits of pumped storage power stations, and to a certain extent reflects the demand orientation, and is more conducive to the cost control of the entire life cycle of pumped storage. It is an obviously better pricing method when the spot market and ancillary service market are not yet fully mature. When considering the formulation of benchmark capacity electricity prices, it is recommended to comprehensively consider the functional positioning and cost structure characteristics of pumped storage power stations, take single power stations as the basis, guide technological progress and cost reduction as the goal, support policy mechanisms, and combine administrative regions to establish an electricity price mechanism that combines "upper limit" regional benchmark capacity electricity prices with price verification details.
[0076] The idea of the present invention is as follows:
[0077] 1. Analysis of construction cost characteristics of pumped storage
[0078] The construction cost of a pumped storage power station is a key factor affecting the investment return of the power station and an important basis for the formation of capacity electricity prices. Pumped storage power stations are mainly large underground caverns. The factors affecting the level of project investment involve many aspects such as geology, hydrology, and engineering technology. Standardization is difficult. Analyzing the composition and characteristics of construction costs is conducive to clarifying whether a benchmark electricity price can be formed through cost classification, and can provide a basis for subsequent benchmark electricity price control.
[0079] 2. Determination of regional benchmark electricity prices
[0080] Determine the target area and select a sufficient number of representative pumped-storage power stations with reliable price data as research samples, and count the static investment per kilowatt, capacity electricity price, etc. of each site; combine pumped-storage resource conditions and administrative regions, and classify and merge them according to a certain static unit kilowatt range, and accordingly delineate 3 to 5 price-core zones in the target area, and propose the benchmark electricity price range or specific values for each price-core zone.
[0081] III. Modification of installed capacity of a single power station
[0082] The installed capacity is the most important indicator of a pumped-storage power station in terms of both construction cost and function, and is of great significance for determining a reasonable capacity price. In terms of cost, pumped-storage power stations have economies of scale. The larger the installed capacity, the lower the investment per kilowatt. In terms of function, the larger the scale, especially the more units, the stronger the power station's ability to participate in various auxiliary services and the stronger its ability to deal with risks such as planned maintenance and system failures.
[0083] 4. Correction of continuous full-power hours for a single power station
[0084] The continuous full-power hours have a relatively important impact on the construction cost of pumped-storage power stations, and are an important indicator for measuring the utilization rate of pumped-storage power stations, which is of great significance for determining a reasonable capacity electricity price. Representative pumped-storage power stations are selected as samples in the target area (the national area in this embodiment), and the differences in construction costs and benefits of different continuous full-power hours schemes of the sample power stations are studied, and the relationship curves between unit continuous full-power hours investment and capacity electricity price, coal consumption, etc. are fitted.
[0085] like Figure 1 to Figure 2 As shown, the embodiment of the present invention provides a method for pricing a benchmark capacity electricity price for pumped storage, which is:
[0086] S1, determination of regional benchmark electricity price: by zoning and grading the pumped storage site resources in the target area (the national area in this embodiment), quantitative evaluation is performed, and resource areas are delineated in the target area (the national area in this embodiment) accordingly, and benchmark capacity electricity price is set for each resource area according to different conditions of the resource area; in order to optimize electricity price management, four types of benchmark capacity electricity price are set in this embodiment according to different conditions of the resource area;
[0087] Firstly, the national pumped storage site resources are evaluated by zoning and grading quantitative evaluation method of pumped storage site resources, and the results of zoning and grading quantitative evaluation of national pumped storage site resources under a certain evaluation index are obtained. Combined with the zoning and grading quantitative evaluation results and administrative regions, classification and merging are carried out according to a certain static unit kilowatt interval, and a certain number of nuclear price areas are delineated across the country, and the benchmark electricity price range or specific value of each nuclear price area is proposed accordingly. The division of price steps in each nuclear price area needs to take into account the representativeness of administrative divisions and geographical divisions. If the step length is too long, it will not be conducive to the incentive and transmission role of the benchmark capacity electricity price mechanism. If the step length is too short, it will lead to the failure of the benchmark capacity electricity price mechanism and the sample size of pumped storage projects in the nuclear price area will be too small and unrepresentative.
[0088] According to the above method, taking into account the cost level and distribution range of future projects to be implemented, this embodiment divides the construction conditions of pumped-storage power stations across the country into four resource areas with a static unit kilowatt investment of 500 yuan as a step size, see Table 2.
[0089] Table 2 Resource Area Static Unit Kilowatt Investment Table
[0090] Resources Static unit kilowatt investment (yuan) Category I Less than 5500 Category II 5500~6000 Three categories 6000~6500 Four categories 6500 and above
[0091] The results of the quantitative evaluation of pumped storage site resource classification based on administrative divisions are as follows:
[0092] Table 3 Evaluation results of pumped storage station resource endowment in administrative division dimension
[0093]
[0094]
[0095] Based on this, the benchmark capacity electricity prices in different regions are further calculated. This embodiment calculates the capacity electricity prices corresponding to different static unit kilowatt investments according to a 40-year operating period, an internal rate of return of 6.5% on capital, a LPR of more than 5 years in April 2023, a capital ratio of 20%, and an advanced operation and maintenance level, without considering excess electricity or ancillary service income. The results are shown in Table 4.
[0096] Table 4 Capacity electricity prices corresponding to different static unit kilowatt investments
[0097]
[0098] The above process of obtaining the characteristic unit kilowatt static investment and the regional benchmark capacity electricity price is obtained according to the relevant regulations, specifications, notification requirements, etc. If the relevant regulations, specifications, notification requirements, etc. change in the future, the relationship between the characteristic unit kilowatt static investment and the regional benchmark capacity electricity price will also change. The process of achieving this purpose based on the future changed regulatory requirements still falls within the protection scope of the present invention.
[0099] Furthermore, for the optimization process, the capacity electricity price corresponding to the static unit kilowatt investment in the selected interval of each type of resource area (the selected interval here is a selected characteristic value, such as: median, mean, maximum value, minimum value and their corresponding offset. The median is selected in this embodiment) is used as the benchmark capacity electricity price of the resource area. The benchmark capacity electricity price of Class I resource areas is 600 yuan / kilowatt·year, the benchmark capacity electricity price of Class II resource areas is 645 yuan / kilowatt·year, the benchmark capacity electricity price of Class III resource areas is 700 yuan / kilowatt·year, and the benchmark capacity electricity price of Class IV resource areas is 740 yuan / kilowatt·year.
[0100] S2, correction of installed capacity of a single power station:
[0101] S2.1, select one or several scale characteristic parameters for correction;
[0102] S2.2. For the selected scale characteristic parameters, statistical methods are used to fit the quantitative relationship between each characteristic parameter and the capacity electricity price calculated by the standard method in turn; the fitting samples here can be the characteristic parameters of the pumped-storage power stations in the entire region and / or each resource zone - the capacity electricity price samples calculated by the standard method.
[0103] S2.3, using the fitting relationship obtained in step S2.2 to correct the partitioned benchmark capacity electricity price, to obtain the capacity electricity price of a single power station.
[0104] The correction methods used include the following:
[0105] Installed capacity correction method 1: Installed capacity correction method
[0106] Using installed capacity correction factor s m Make corrections. m Negatively correlated with installed capacity, upper and lower bounds can be set; select an installed capacity with a higher frequency as the benchmark installed capacity c m,b , the corresponding correction coefficient can be set to s m,b =1; combined with the quantitative analysis of cost-effectiveness, a possible installed capacity correction function can be a linear function, and further a piecewise linear function. A possible piecewise linear function is as follows:
[0107]
[0108] Among them, s m,i is the installed capacity correction coefficient corresponding to power station i;
[0109] s m,b The base installed capacity is c m,b The corresponding correction coefficient can be set to 1;
[0110] e 1 and e 2 are the linear correction slopes in the corresponding cases, which can be obtained by statistical analysis and fitting; specifically, they can be obtained by fitting the capacity electricity price and installed capacity series samples actually calculated according to the requirements of relevant regulations and rules under the premise of controlling the installed capacity as a single variable in the above formula. When other formulas are used, the relevant parameters can also be obtained by similar statistical analysis as above;
[0111] c i is the installed capacity corresponding to power station i.
[0112] The following is an example of applying the above installed capacity correction method:
[0113] The installed capacity unit is 10,000 kilowatts; according to statistical methods, the benchmark installed capacity c is selected m,b = 1.2 million kilowatts, set its corresponding s m,b =1; Correction slope e 1 and e 2 The score is obtained by fitting, e 1 is -0.01, e 2 is 0.009; the corresponding correction function is:
[0114]
[0115] Installed capacity correction method 2: Unit number correction method
[0116] Adopt the correction factor r of the number of unitsm Make corrections. m Positively correlated with the number of units, upper and lower bounds can be set; select a unit number with a higher frequency as the benchmark unit number n r,b , and its corresponding correction factor can be set to r m,b =1; combined with the quantitative analysis of cost-effectiveness, a possible positive function of the number of units can be a linear function, and further a piecewise linear function. A possible piecewise linear function is as follows:
[0117]
[0118] Among them, r m,i is the correction coefficient of the number of units corresponding to power station i;
[0119] r m,b is the number of base units n ,r,b The corresponding correction coefficient can be set to 1;
[0120] f 1 and f 2 are the linear correction slopes in the corresponding cases, which can be obtained by statistical analysis and fitting; specifically, they can be obtained by fitting the capacity electricity price and the number of units series samples actually calculated according to the requirements of relevant regulations and rules under the premise that the number of units is controlled as a single variable in the above formula. When other formulas are used, the relevant parameters can also be obtained by similar statistical analysis as above;
[0121] n i is the number of units corresponding to power station i.
[0122] You can set r m,b =1; combined with the actual situation n r,b =4; combined with the cost-benefit analysis of the number of installed units, f 1 =-10 / 100, f 2 =-20 / 100; then we can get a common installed capacity electricity price adjustment coefficient table, see Table 5.
[0123] Table 5 Unit Number Adjustment Factor
[0124] Number of units 4 6 8 <![CDATA[Adjustment coefficient r for the number of units m,i > 0 -5% -10%
[0125] While the installed capacity correction method and / or the unit number correction method are used to correct the installed capacity scale of the single power station, the single power station continuous full power hours correction method can also be used to correct the target power station. Alternatively, the single power station continuous full power hours correction method is used to replace the single power station installed capacity correction process, and only the single power station continuous full power hours correction method is used to correct the target power station.
[0126] Correction method for continuous full-power hours of a single power station:
[0127] Use the correction factor k for continuous full-load hours m Make corrections. m It is positively correlated with the number of full-load hours, and the upper and lower limits can be set; select a number of consecutive full-load hours with a higher frequency as the benchmark number of consecutive full-load hours h k,b , and its corresponding correction factor can be set to k m,b =1; combined with the quantitative analysis of cost-effectiveness, a possible correction function for the continuous full-load hours can be a linear function, and further a piecewise linear function. A possible piecewise linear function is as follows:
[0128]
[0129] Among them, k m,i is the correction coefficient of the continuous full-power hours corresponding to power station i;
[0130] k m,b The number of continuous full-load hours is the benchmark k,b The corresponding correction coefficient can be set to 1;
[0131] d 1 and d 2 They are the linear correction slopes in the corresponding cases, which can be obtained by statistical analysis and fitting; specifically, they can be obtained by fitting the capacity electricity price and continuous full-fire hours series samples actually calculated according to the requirements of relevant regulations and rules under the premise of controlling the continuous full-fire hours as a single variable in the above formula. When other formulas are used, the relevant parameters can also be obtained by similar statistical analysis as above;
[0132] h i is the number of consecutive full-power hours corresponding to power station i.
[0133] Can set k m,b =1; combined with the actual situation h k,b =6; combined with the cost-benefit analysis of continuous full-load hours, d 1 =6 / 100,d 2 =-18 / 100; then we can get a common table of capacity price adjustment coefficients for continuous full-power hours, see Table 6.
[0134] Table 6 A common continuous full-power hours capacity price adjustment coefficient table
[0135]
[0136] The calculation formula of the capacity price of power station i, which is modified by the number of units and the continuous full-power hours, is as follows:
[0137] P c,i =P c,zone ·(1+rm,i )·(1+k m,i )
[0138] P c,i = is the capacity electricity price of power station i;
[0139] P c,zone × is the capacity electricity price in the area where power station i is located.
[0140] Taking the above case data as an example, if a pumped storage power station is located in a Class II resource area, has 4 installed units, and has a continuous full-power hour of 12 hours, the capacity electricity price of the pumped storage power station is:
[0141] P c =645×1×(1+6%)=645×100%×106%=683.7 yuan / (kW·year)
[0142] Similarly, the installed capacity, number of units and continuous full-load hours can be used to make corrections.
[0143] The calculation formula for the capacity price of power station i is modified by the installed capacity, the number of units and the continuous full-power hours as follows:
[0144] P c,i =P c,zone (1+s m,i )(1+r m,i )(1+k m,i )
[0145] P c,i = is the capacity electricity price of power station i;
[0146] P c,zone × is the capacity electricity price in the area where power station i is located.
[0147] Taking the above case data as an example, if a pumped storage power station is located in a Class II resource area, has an installed capacity of 1.3 million kilowatts, has 4 installed units, and has a continuous full-power hours of 12 hours, the capacity electricity price of the pumped storage power station is:
[0148] P c =645×(1-0.01×130 / 120)×1×(1+6%)=645×100%×106%=676.3 yuan /
[0149] (kW·year)
[0150] The above ideas can also be referred to and the designed energy storage scale can be used for correction. The installed capacity scale correction method and the single power station continuous full-power hours correction method can be replaced in order, or combined into one step, or the designed energy storage scale, that is, the product of the installed capacity scale and the continuous full-power hours can be used for correction. The effect is similar, which is also an innovation of the present invention and should be protected.
[0151] Based on statistical analysis of data, a benchmark capacity electricity price pricing mechanism based on resource zoning of pumped storage sites is proposed, which can give full play to the incentive and transmission role of the price mechanism and establish a good mechanism to encourage investment companies to independently seek optimized design and save investment.
[0152] Through benchmark capacity electricity prices, the workload and audit pressure of the "one station, one core" cost supervision model can be reduced.
[0153] We can fully mobilize pumped storage investment companies to adopt a variety of reasonable measures and scientific management to promote the improvement of construction technology and operation management level, accelerate project commissioning, save project investment, and encourage technological innovation.
[0154] The guidance and incentives for the role of pumped storage can be strengthened. Pumped storage power stations are an important part of the new power system. As the proportion of new energy in the power system increases, the regulation capacity of pumped storage power stations will become increasingly important.
[0155] The step S1 in this embodiment can be divided into five steps, namely:
[0156] A1, the evaluation results are as follows:
[0157] Carry out a zoning and grading quantitative evaluation of the national pumped storage site resources, and obtain the zoning and grading quantitative evaluation results of the national pumped storage site resources under a certain evaluation index;
[0158] A2, define the price verification area:
[0159] Combined with the quantitative evaluation results of the zoning and grading, and administrative regions, classification and merging are carried out according to a certain static unit kilowatt interval, and a certain number of price-reducing areas are delineated across the country, and the benchmark electricity price range or specific value of each price-reducing area is proposed accordingly;
[0160] A3, Classified Resources Area:
[0161] Taking the static unit kilowatt investment as a step of 500 yuan, the construction conditions of pumped storage power plants in China are divided into four resource areas, and the results of the quantitative evaluation of pumped storage power plant resource classification based on administrative divisions are further obtained;
[0162] A4, calculate the benchmark capacity electricity price in different regions:
[0163] Based on a 40-year operating period, an internal rate of return of 6.5% on capital, a five-year LPR in April 2023, a capital ratio of 20%, and advanced operation and maintenance levels, the capacity electricity price corresponding to different static unit kilowatt investments is calculated;
[0164] A5, formulate benchmark capacity electricity price:
[0165] The capacity electricity price corresponding to the static unit kilowatt investment in the selected interval of each type of resource area (a certain characteristic value selected in the selected interval here, such as the median, average, maximum value, minimum value and their corresponding offset) is used as the benchmark capacity electricity price for the resource area.
[0166] This embodiment systematically optimizes the evaluation and management of pumped-storage site resources across the country. First, step A1 uses precise quantitative evaluation of site resources to lay a solid foundation for subsequent decision-making. Next, step A2 cleverly combines quantitative results with administrative regions, delineates price verification areas and sets benchmark electricity price ranges, which promotes the rationality and fairness of electricity price formulation. Step A3 further refines resource classification, divides the country into four types of resource areas based on investment costs, and enhances the pertinence of policy implementation. Step A4 scientifically calculates the benchmark capacity electricity prices in different regions by setting parameters such as operating period and rate of return, ensuring the economy and feasibility of electricity price levels. Finally, step A5 formulates and clarifies the benchmark capacity electricity prices for each resource area, providing a clear price guide for the investment and operation of pumped-storage projects and promoting the healthy and orderly development of the industry.
[0167] The piecewise linear function of installed capacity correction method plays a vital role in the benchmark capacity electricity price pricing system of pumped storage. Its role is not limited to simple numerical adjustment, but goes deep into the core logic of electricity price formulation. By constructing a flexible installed capacity correction mechanism, the function fully considers the differences in installed capacity, operating efficiency and economic benefits of different pumped storage power stations. The accurate reflection of this difference is the basis for formulating reasonable and fair electricity prices. In specific operations, the function adjusts the electricity price in a piecewise linear manner according to the installed capacity of each power station and its corresponding correction coefficient, combined with the key operating indicator of the power station's continuous full-power hours. Fine-tuning not only reflects the power generation capacity and potential value of the power station, but also takes into account the economic and social benefits of the power station operation, ensuring the scientific and rational pricing of electricity prices. In addition, the application of the piecewise linear function of the installed capacity correction method can also help promote the healthy development of the pumped-storage industry. Through accurate pricing, it can guide the rational investment of social capital and promote the optimized layout and efficient operation of pumped-storage power stations. At the same time, a reasonable electricity price level can also encourage power stations to improve their operating efficiency and management level and achieve sustainable development of the industry. Therefore, the role of the piecewise linear function of the installed capacity correction method in the pricing of pumped-storage benchmark capacity electricity prices is irreplaceable.
[0168] The piecewise linear function of the unit number correction method plays an indispensable role in the pricing process of the benchmark capacity electricity price of pumped storage power plants. This function deeply analyzes the multi-dimensional impact of the key variable of the number of units on the electricity price setting, and realizes the further optimization and refinement of the electricity price structure. The number of units, as an important indicator to measure the scale and operation efficiency of power plants, directly affects the power generation capacity, operation and maintenance strategy and long-term economic benefits of pumped storage power plants. Different numbers of units mean different capital investment, operation and maintenance complexity and market adaptability, which need to be fully considered when setting electricity prices. The piecewise linear function of the unit number correction method is carefully designed based on this cognition. It cleverly combines the unit number correction coefficient (r m,i ), number of base units (n r,b ), actual number of units (n i ) and its correction factor (r m,b , usually set to 1 to simplify calculations), and introduce a linear correction slope (f 1 and f 2 ), a price adjustment model that can dynamically respond to changes in the number of units was constructed. This model can not only capture the overall law of the impact of changes in the number of units on electricity prices, but also achieve more detailed adjustments in different intervals, ensuring that electricity prices can reflect both the actual situation of the power station and the fairness and rationality of the market. Through this refined adjustment, the benchmark capacity electricity price of pumped-storage power stations can more accurately reflect their intrinsic value, providing strong support for the healthy development of the industry.
[0169] In the pricing method of benchmark capacity electricity price for pumped storage, the role of piecewise linear function for correcting the continuous full-power hours of a single power station is crucial. This function introduces the correction coefficient of continuous full-power hours (k m,i ) and benchmark continuous full-load hours (h k,b )Corresponding correction factor (k m,b , usually set to 1 to simplify calculation), combined with the actual continuous full-power hours of the power station (h i ) and the linear correction slope (d 1 and d 2), realizing the refined adjustment of electricity prices. The continuous full-generation hours are an important indicator to measure the power generation capacity and economic benefits of pumped-storage power stations. Due to differences in geographical location, hydrological conditions, grid demand and other factors, different power stations often have different continuous full-generation hours, which in turn affects the operation and maintenance costs and profit expectations of the power stations. Therefore, in the process of electricity price pricing, the impact of continuous full-generation hours must be fully considered to ensure the fairness and rationality of electricity prices. The piecewise linear function of the continuous full-generation hours of a single power station is designed to solve this problem. It allows the continuous full-generation hours of the power station and the corrected piecewise linear function to be adjusted according to the continuous full-generation hours of the power station. The difference between it and the benchmark value is used to dynamically adjust the electricity price through a piecewise linear method. This adjustment mechanism can not only reflect the overall trend of the impact of continuous full-generation hours on electricity prices, but also achieve more refined control in different intervals, thereby ensuring the accuracy and scientificity of electricity price pricing. In short, the role of the piecewise linear function corrected by the continuous full-generation hours of a single power station in electricity price pricing is that by comprehensively considering the differences in the continuous full-generation hours of the power station and its impact on electricity prices, a refined adjustment of the electricity price is achieved. This adjustment mechanism helps to more accurately reflect the power generation capacity and economic benefits of the power station.
[0170] Among them, the division of price steps in the core pricing zone needs to take into account the representativeness of administrative and geographical divisions. If the step length is too long, it will be unfavorable for the incentive and transmission effect of the benchmark capacity electricity price mechanism. If the step length is too short, it will cause the benchmark capacity electricity price mechanism to fail and will also lead to too few samples of pumped storage projects in the core pricing zone, which will be unrepresentative.
[0171] In this embodiment, the process of conducting a zoning and grading quantitative evaluation of the national pumped storage site resources is as follows:
[0172] Step 1: quantitatively evaluate the resource endowment conditions of individual pumped storage sites in the target area where preliminary work has been carried out, and collect data on individual projects;
[0173] Step 2: Determine the partition granularity;
[0174] Step 3: Based on the quantitative study of the resource endowment of a single site, the quantitative evaluation index of the resource endowment of the regional pumped storage site is obtained by weighted average of the geographical area and administrative area. The weight of the weighted average here is the corresponding installed capacity (kW) or energy storage scale (kWh). The larger the index, the worse the pumped storage resource endowment conditions in the region;
[0175] When executing step 1, in order to ensure the accuracy, timeliness and effectiveness of the data, for the same site resources, the data source priority is as follows: project feasibility study report > pre-feasibility study report > project planning report > preliminary analysis report;
[0176] When executing step 1, in order to ensure the comparability of data, for the unified zone site resources, under the premise of ensuring sufficient samples, the data should be preferentially from the following unified stages or similar stages: project feasibility study report > pre-feasibility study report > project planning report > preliminary analysis report;
[0177] When executing step 3, in order to eliminate the influence of the particularity of individual items on the overall data, samples whose deviation exceeds a certain degree of the regional weighted average in the same partition are eliminated. For example, the deviation degree of a single sample can be evaluated by standardized deviation degree (Z-score);
[0178] When executing step 3, in order to eliminate the impact of lower price level years on the overall data, samples with similar price level years should be selected, and samples with price level years far away from the price level years of most samples should be eliminated;
[0179] Further, a time sliding window of the same length is used to slide samples in different partitions, and the group with the largest number of samples under the time sliding window of the same length in the partition is selected as a reference;
[0180] When executing step three, carry out resource classification; classify resources according to the upper and lower bounds of the quantitative evaluation indicators of all samples analyzed and the number of classifications (or step length).
[0181] Among them, in step one, when conducting quantitative evaluation of resource endowment conditions of pumped storage sites and collecting project data, the specific steps include:
[0182] A1, Determination of quantitative evaluation indicators:
[0183] Unit scale investment: such as capacity electricity price, total investment per kilowatt, and static investment per kilowatt. These indicators are directly related to the investment cost and economic benefits of the project;
[0184] Special unit scale investment: further subdivided into civil engineering investment, equipment and installation engineering investment, environmental protection and soil and water conservation special engineering investment, construction land acquisition and resettlement compensation costs, in order to comprehensively assess the investment needs of the project in different areas;
[0185] A2, Project data collection: Detailed data collection work is carried out for each pumped storage site where preliminary work has been carried out, including:
[0186] Basic information: project name, construction cost and its corresponding price level year (used to consider the impact of factors such as inflation on costs);
[0187] Scale and progress: The project's installed capacity, project progress (such as feasibility study stage, design stage, construction stage, etc.), and the number of continuous full-power utilization hours of the project. This information helps to assess the project's scale and construction progress;
[0188] Development tasks and conditions: project development and construction tasks, altitude, project construction method (pure pumped storage or hybrid pumped storage), these factors affect the technical difficulty and feasibility of the project;
[0189] Engineering and environment: the main buildings of the hub project, as well as the project's considerations on environmental protection and soil and water conservation, including related special project investments;
[0190] Geographic location: grid, geographic region and administrative division. This information is crucial to understanding the regional characteristics and policy environment of the project;
[0191] Among them, in step 2, the granularity of the zoning is determined, and the two dimensions of geographical zoning and administrative zoning are comprehensively considered to ensure the rationality and representativeness of the zoning. The specific contents include:
[0192] B1. Geographical zoning: Based on large mountain ranges, mountain ranges directly affect the amount of work and construction difficulty, and thus become a key factor in investment differences. When selecting mountain ranges, we exclude those areas that do not have the conditions for pumped storage construction, such as plains and basins. Taking China as an example, geographical zoning can include large mountain ranges such as the Qinling Mountains, Greater Khingan Mountains, the Himalayas, the Hengduan Mountains, the Guangdong-Guangxi Hills, and the Tianshan Mountains. This zoning method can accurately reflect the investment differences between different regions due to natural geographical conditions;
[0193] B2, Administrative divisions: The granularity of administrative divisions needs to balance representativeness and specificity. Too coarse granularity may result in a region containing pumped storage sites of various resource endowment categories, thus losing the meaning of divisions; while too fine granularity will result in too many administrative divisions, and too few samples of pumped storage projects in each division, which is insufficient to represent the characteristics of the region. Combining existing data and actual conditions, this case selects prefecture-level administrative regions (such as prefecture-level cities, autonomous prefectures, etc.) as the granularity of administrative divisions. This choice not only ensures a certain number of project samples in each division, but also better reflects the administrative management and policy environment of the region;
[0194] B3, Analysis of influencing factors: Price fluctuations and policy and regulatory adjustments account for about 20% of the investment differences, while differences in engineering volume and construction difficulty account for the remaining 80%. When measuring engineering volume and construction difficulty, multiple factors such as installed capacity, distance-to-height ratio, excavation-to-reservoir ratio, rated water head, altitude, region, and water source conditions are used. Except for installed capacity, all factors are highly correlated with geographical divisions, namely mountain ranges. When determining the granularity of the division, it is crucial to fully consider these factors to improve the rationality and accuracy of the division;
[0195] Among them, the specific contents of the weighted average method in step three include:
[0196] C1, Application of weighted average method: Based on the installed capacity (kW) or energy storage scale (kWh) of different sites as weights, the resource endowment quantification results of each site in the region are weighted averaged; the selection of installed capacity or energy storage scale as weights is based on their ability to directly reflect the importance and influence of the site in the regional energy system, thereby ensuring the objectivity and accuracy of the evaluation results;
[0197] C2, weighted average of geographical regions: first, pumped storage sites in the same mountain range or similar natural geographical conditions are grouped into the same geographical region; then, the weighted average method is used to calculate the resource endowment quantitative evaluation index of all sites in the geographical region based on the installed capacity or energy storage scale of each site; this index not only takes into account the resource conditions of the site itself, but also incorporates its relative importance in the entire geographical region, thus fully reflecting the overall status of pumped storage resources in the geographical region;
[0198] C3, weighted average of administrative regions: The weights of the weighted average method are based on the installed capacity or energy storage scale of each site in the prefecture-level administrative region to which it belongs; this step aims to evaluate the richness and development potential of pumped storage resources in different administrative regions, and provide a basis for local governments to formulate energy development plans and policies; through the weighted average of administrative regions, a comprehensive index reflecting the quantitative evaluation of pumped storage resource endowment in the administrative region can be obtained;
[0199] C4, Significance and interpretation of the index: The size of the quantitative evaluation index of resource endowment of regional pumped storage sites constructed here does not directly represent the quality of resources, but reflects the relative advantages and disadvantages of resource endowment conditions; specifically, the larger the index, the greater the challenge faced by the region in the development of pumped storage resources, and the relatively poor resource endowment conditions; conversely, the smaller the index, the better the resource endowment conditions of pumped storage in the region, and the greater the development potential;
[0200] Among them, when executing step three (i.e. obtaining the quantitative evaluation index of resource endowment of pumped storage sites in different regions through weighted average of geographical regions and administrative regions), in order to ensure the accuracy and representativeness of the evaluation results, the data in the same region are preprocessed to eliminate the adverse effects of the particularity of individual projects on the overall data. The specific contents include:
[0201] D1, identify and remove abnormal samples: identify samples that deviate significantly from the overall characteristics of the region within the same sub-area; these samples may show characteristics that are completely different from other projects in the region due to various special reasons (such as extreme geological conditions, special policy preferences, unusually large investment scale, etc.); in order to maintain data consistency and comparability, these abnormal samples need to be removed from the analysis set;
[0202] D2, standardized deviation assessment: Standardized deviation (such as Z-score) is used as an evaluation tool; Z-score is a statistical method used to measure the degree of deviation of a value from the mean and convert it into a unitless standardized score; the specific calculation method is: subtract the average value of all samples in the area from the observed value of a single sample, and then divide it by the standard deviation of the samples in the area;
[0203] D3, set the elimination criteria: After obtaining the Z-score of each sample, set a reasonable threshold to determine which samples should be eliminated; the selection of this threshold should be based on the distribution of the data, the purpose of the analysis, and the tolerance for outliers; if the absolute value of the Z-score of a sample is greater than a preset critical value (such as 2 or 3, depending on the specific situation of the data and the rigor of the analysis), the sample can be considered to be abnormal and considered to be eliminated from the analysis set;
[0204] D4, implement the elimination operation: according to the set elimination criteria, perform the actual elimination operation; remove the samples whose Z-score absolute value exceeds the critical value from the data set of the same partition to ensure that the data used in the subsequent weighted average calculation is more accurate and reliable;
[0205] Among them, when calculating the quantitative evaluation index of resource endowment of regional pumped storage sites through weighted average of geographical areas and administrative areas, in order to reduce the impact of different price level years on the overall data and ensure the fairness and comparability of the evaluation results, it is necessary to make special adjustments and sample screening to the price level year data. The specific operation steps include:
[0206] E1, Identify the price level year distribution: Count the price level years of all samples collected, and clarify their distribution range, mode, and median statistical characteristics. This helps us understand the overall distribution of samples in terms of price level years.
[0207] E2, set screening criteria: Set screening criteria based on the distribution of price level years. This criterion can be based on a certain range of the mode or median (such as ±5 years), or based on the data distribution percentile (such as the price level year range where 80% or 90% of the samples are located). The purpose is to retain samples with similar price level years and eliminate samples with price level years far away from most samples.
[0208] E3, perform sample screening: screen the samples according to the set screening criteria. Remove those samples whose price level years do not meet the criteria from the data set to ensure that the data set for subsequent analysis has relative consistency in price level years.
[0209] E4, Verify the screening results: After the screening is completed, recheck the price level years of the remaining samples to ensure that the screening results are in line with expectations. At the same time, you can also consider conducting a preliminary comparative analysis of the data sets before and after the screening to evaluate the impact of the screening operation on the overall data.
[0210] E5, proceed to step three: After confirming that the screening results are correct, continue to step three, that is, use the screened data set to perform weighted average calculations of geographical regions and administrative regions to obtain a quantitative evaluation index for resource endowment of regional pumped storage sites.
[0211] Among them, in order to analyze the changing trend of resource endowment of pumped storage sites in different zones more deeply and reduce the data deviation caused by time span differences, the time sliding window method is used to further process the samples in the zones. The detailed operations of this step include:
[0212] F1, determine the length of the time sliding window: clarify the length of the time sliding window. The sliding window length should be determined according to the specific needs of the study and the temporal resolution of the data. For example, a period of 5 years, 10 years or longer can be selected as a sliding window.
[0213] F2, build time sliding window: for each partition, take the set time sliding window length as the unit, start from the earliest data point, and gradually slide backward to build multiple time windows. Each time window contains sample data within a specific time period.
[0214] F3, count the number of samples in each window: For each time window in each partition, count the number of samples contained in the window. This helps to understand the richness of data in different time periods.
[0215] F4, select the group with the largest number of samples: among all the constructed time windows, select the group with the largest number of samples as the reference group for the partition under the time sliding window of this length. This group of samples is not only sufficient in number, but also can better represent the overall situation of the partition in this time period.
[0216] F5, Analyze reference group data: Conduct in-depth analysis of the selected reference group data, including calculating its resource endowment quantitative evaluation index, analyzing change trends, and identifying key factors. This helps us more accurately grasp the actual status and future development trends of the sub-region's pumped storage resources.
[0217] F6, cross-regional comparison: Compare the reference group data of different regions under the same length of sliding window to further reveal the differences in resource endowments and change characteristics between regions. This will help to formulate more scientific and reasonable regional energy development plans and policies.
[0218] Among them, after the execution, that is, the quantitative evaluation index of resource endowment of the sub-regional pumped storage sites is obtained through weighted average, in order to further refine the resource evaluation results, it is necessary to carry out resource classification. The resource classification aims to divide the pumped storage resources in different regions into different levels according to their endowment conditions, so as to more clearly show the distribution of resources and potential differences. The specific steps of resource classification include;
[0219] G1, determine the range of quantitative evaluation indicators: clarify the minimum and maximum values of all samples on the quantitative evaluation indicators, that is, the lower bound and upper bound. The boundary values will serve as the basis for resource classification;
[0220] G2, set the number of levels or step length: according to the needs and analysis purposes, set a reasonable number of levels or step length; the number of levels can be directly specified (such as three levels, five levels, etc.), or can be determined based on the step length (such as each increase in a certain score value is divided into one level); the choice of step length should be able to fully reflect the differences in resource endowments, while avoiding too many categories (levels) caused by too detailed grading;
[0221] G3, calculate the classification threshold: calculate the threshold between each level according to the set number of levels or step size; if the number of levels is directly specified, the quantitative evaluation index range needs to be divided into a corresponding number of intervals, and the upper and lower limits of each interval are determined as the classification threshold; if the step size is determined, the intervals are gradually divided according to the step size value, and the threshold of each interval is calculated;
[0222] G4, resource classification: compare the quantitative evaluation index of each sub-area or single site with the classification threshold, and determine its resource level according to the interval to which it belongs; the resource levels are arranged from high to low, with high levels representing superior resource endowment conditions and low levels representing relatively poor resource endowment conditions;
[0223] G5, Result Analysis and Display: Statistical analysis is conducted on the classification results to understand the distribution and quantity proportion of resources at each level; at the same time, resource classification results are intuitively displayed in the form of maps, charts, etc., so as to more clearly present the spatial distribution and quality differences of resources;
[0224] G6, Application and decision support: Apply resource classification results to regional energy planning, policy formulation and project investment decisions; high-level resource regions should give priority to the development and construction of pumped-storage power stations; low-level resource regions need to further evaluate their development potential and economic benefits, and formulate targeted development strategies and policy measures.
[0225] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0226] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. The pricing method of benchmark capacity electricity price for pumped storage is characterized by: The method comprises: S1, regional benchmark electricity price determination: Through the quantitative evaluation of the pumped storage site resources in the target area by zoning and grading, the resource areas are delineated in the target area accordingly, and the benchmark capacity electricity price is set for each resource area according to the different conditions of the resource areas; S2, correction of installed capacity of a single power station: S2.1, select one or several scale characteristic parameters for correction; S2.2, for several selected scale characteristic parameters, statistical methods are used to sequentially fit the quantitative relationship between each characteristic parameter and the capacity electricity price calculated by the standard method; S2.3, using the fitting relationship obtained in S2.2 to correct the regional benchmark capacity electricity price, to obtain the capacity electricity price of a single power station.
2. The method for pricing the benchmark capacity electricity price of pumped storage according to claim 1 is characterized in that: The scale characteristic parameters include: installed capacity, number of units, continuous full-power hours, and designed energy storage capacity.
3. The method for pricing the benchmark capacity electricity price of pumped storage according to claim 2 is characterized by: If the selected scale characteristic parameter is installed capacity, the correction method is the installed capacity correction method, and the correction coefficient s of the installed capacity correction method is used in the installed capacity correction method. m Make corrections; m Negatively correlated with installed capacity, set upper and lower bounds; select the installed capacity with higher frequency as the benchmark installed capacity c m,b , and its corresponding correction coefficient is set to s m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting: Where: s m,i is the installed capacity correction coefficient corresponding to power station i; s m,b The base installed capacity is c m,b The corresponding correction coefficient can be set to 1; e1 and e2 are the linear correction slopes in the corresponding cases; c i is the installed capacity corresponding to power station i.
4. The method for pricing benchmark capacity electricity price of pumped storage according to claim 2 is characterized by: If the selected scale characteristic parameter is the number of units, the correction method is the unit number correction method, in which the unit number correction coefficient r is used. m make corrections; The r m Positively correlated with the number of units, set upper and lower bounds; select the number of units with higher frequency as the benchmark number of units n r,b , and its corresponding correction coefficient is set to r m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting: Where: r m,i is the correction coefficient of the number of units corresponding to power station i; r m,b is the number of base units n ,r,b The corresponding correction coefficient can be set to 1; f1 and f2 are the linear correction slopes in the corresponding cases; n i is the number of units corresponding to power station i.
5. The method for pricing the benchmark capacity electricity price of pumped storage according to claim 2 is characterized by: If the selected scale characteristic parameter is the number of continuous full-load hours, the correction method is the continuous full-load hours correction method, in which the continuous full-load hours correction coefficient k is used. m Make corrections; the k m It is positively correlated with the number of full-load hours, and sets upper and lower bounds; select the number of consecutive full-load hours with a higher frequency as the benchmark number of consecutive full-load hours h k,b , and its corresponding correction coefficient is set to k m,b =1; combined with the cost-benefit quantitative analysis, the following piecewise linear function is obtained by using piecewise linear function fitting: Among them, k m,i is the correction coefficient of the continuous full-power hours corresponding to power station i; k m,b The number of continuous full-load hours is the benchmark k,b The corresponding correction coefficient can be set to 1; d1 and d2 are the linear correction slopes in the corresponding cases; h i is the number of consecutive full-power hours corresponding to power station i.
6. The method for pricing the benchmark capacity electricity price of pumped storage according to any one of claims 2 to 5, characterized in that: If more than one scale characteristic parameter is selected, correction is performed using the selected multiple scale characteristic parameters.
7. The method for pricing benchmark capacity electricity price of pumped storage according to claim 1 is characterized by: The step S1 is divided into five steps: A1, the evaluation results are as follows: Carry out zoning and grading quantitative evaluation of pumped storage site resources in the target area, and obtain zoning and grading quantitative evaluation results of pumped storage site resources in the target area under the selected evaluation indicators; A2, define the price verification area: Combined with the quantitative evaluation results of the zoning and grading, and administrative regions, the static unit kilowatt intervals are classified and merged, and a number of price-reducing zones are delineated in the target area, and the benchmark electricity price range or specific value of each price-reducing zone is proposed accordingly; A3, Classified Resources Area: Taking the static unit kilowatt investment amount as the step length, the pumped storage construction conditions in the target area are divided into n types of resource areas, and the quantitative evaluation results of pumped storage site resource classification based on administrative divisions are further obtained; A4, calculate the benchmark capacity electricity price in different regions: Calculate the capacity electricity price corresponding to different static unit kilowatt investments based on the operating period, internal rate of return on capital, current 5-year LPR, capital ratio of 20% and advanced operation and maintenance level; A5, formulate benchmark capacity electricity price: The capacity electricity price corresponding to the static unit kilowatt investment in the selected interval of each type of resource area is used as the benchmark capacity electricity price for the resource area.
8. The method for pricing the benchmark capacity electricity price of pumped storage according to claim 6 is characterized by: If the selected scale characteristic parameters are: number of units and continuous full-power hours, the capacity price calculation formula for a single power station i is modified as follows: P c,i =P c,zone ·(1+r m,i )·(1+k m,i ) Where: P c,i = is the capacity electricity price of power station i; P c,zone × is the capacity electricity price in the area where power station i is located; r m,i is the correction coefficient of the number of units corresponding to power station i; k m,i is the correction coefficient of the continuous full-generation hours corresponding to power station i.
9. The method for pricing benchmark capacity electricity price for pumped storage according to claim 6 is characterized by: If the selected scale characteristic parameters are: installed capacity, number of units and continuous full-power hours, the formula for jointly correcting the capacity price of power station i is as follows: P c,i =P c,zone (1+s m,i )(1+r m,i )(1+k m,i ) Where: P c,i = is the capacity electricity price of power station i; P c,zone × is the capacity electricity price in the area where power station i is located s m,i is the installed capacity correction coefficient corresponding to power station i; r m,i is the correction coefficient of the number of units corresponding to power station i; k m,i is the correction coefficient of the continuous full-generation hours corresponding to power station i.
10. The method for pricing benchmark capacity electricity price of pumped storage according to claim 1, characterized in that: The installed capacity of a single power station is replaced by the designed energy storage scale of the single power station, and the capacity electricity price of the target power station is corrected. That is, the capacity electricity price of the target power station is corrected by multiplying the installed capacity of the target power station by the continuous full-power hours of the target power station.