Support-free dismantling process for existing reinforced concrete building

By dismantling floor slabs, beams and columns layer by layer and using temporary support and steel slats to support, the problem of concrete building dismantling has been solved, and unsupported dismantling and efficient recycling have been achieved. Reduced construction costs.

CN119062151AActive Publication Date: 2024-12-03XIAMEN UNIV

Patent Information

Application Number
CN202411264980.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-03
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The existing concrete building dismantling methods have adverse effects on surrounding facilities and high cost of recycling construction waste and low utilization rate, and require a large number of support parts and secondary steel bars to tie up to increase construction costs.

Method used

Use floor slabs, beams and columns to disassemble each floor in order, cut floor slabs directly through angle grinders, cut beams at horizontal joints, and saw columns horizontally. Temporary support and steel slat support are used during the cutting process to reduce the support process and steel bar stubble are generated to achieve unsupported disassembly and straight-section welding assembly.

Benefits of technology

It reduces the support process and costs during the dismantling process, reduces construction waste, simplifies the later assembly process, and improves the recycling efficiency of concrete components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062151A_ABST
    Figure CN119062151A_ABST
Patent Text Reader

Abstract

The invention discloses a support-free reinforced concrete building disassembling method which comprises the following steps: sawing a floor slab by adopting an angle grinder to cut strips and blocks in a straight seam manner according to a specific supporting structure condition, sawing a beam by adopting support-free sawing of a cross section of which the end part is shaped like a Chinese character'hu ', and sawing a column from a column foot along a horizontal plane; no support is needed, all sections are straight, construction waste is reduced, secondary steel bar binding and high-grade concrete pouring during later splicing are omitted, and procedures and cost are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to concrete buildings, in particular to the technical field of dismantling and recycling of concrete frame structure buildings. Background Art

[0002] According to incomplete statistics, the total area of ​​multi-story concrete residential buildings built in my country exceeds 50 billion square meters. Most modern buildings use cast-in-place integral reinforced concrete structures, which are constructed by formwork, reinforcement, and cast-in-place methods. The columns, beams, and slabs are connected with steel bars, and the concrete is poured and hardened into a solid whole. A small part is built into an integral structure by prefabricated assembly that is "equivalent to cast-in-place". When the building structure is damaged or needs to be demolished for other reasons, it needs to be dismantled. The current demolition methods mainly include blasting or knocking down and smashing. However, due to the dense urban buildings, the blasting, knocking down, and natural collapse of a building will have a great adverse impact on neighboring buildings and other facilities outside the red line, causing serious social problems. It is necessary to develop a dismantling method that is harmless to the surrounding area within the red line of the building. At the same time, the recycling of construction waste is too costly, the utilization rate is low, and the mechanical and durability properties of the high-strength concrete obtained are poor.

[0003] Chinese patent CN109797971A discloses a method for disassembling and assembling building components of cast-in-place reinforced concrete frame structure. The frame structure is decomposed into a transverse frame, a longitudinal connecting beam, a secondary beam and a floor slab in the main force direction. It is disassembled layer by layer from top to bottom, and the disassembly order of each structural layer is carried out in the order of floor slab, secondary beam, longitudinal connecting beam and transverse frame. The floor slab is dismantled by drawing a disassembly belt around the floor slab, crushing and removing the concrete within the disassembly belt, and then cutting the steel bars from the middle of the disassembly belt, so that steel bar stubble is left around the floor slab and the surrounding beams for connection when reassembling. The shortcomings of this scheme are that, first, support is required for the disassembled parts, which consumes man-hours and a large number of support parts; second, steel bar stubble needs to be left at the edge of the disassembled parts, and secondary steel bar bundling is required when reusing and splicing, and concrete with a strength grade higher than the original structural member needs to be poured at the splicing part, which increases the construction cost. Summary of the invention

[0004] The object of the present invention is to provide a reinforced concrete building disassembly process for disassembling reinforced concrete floor strips, beams and columns into recyclable components without support.

[0005] To achieve the above-mentioned purpose, the present invention provides a support-free dismantling process for existing reinforced concrete buildings, which dismantles the building layer by layer from top to bottom in the order of slabs, beams, and columns, wherein:

[0006] 1) The floor slab is cut by straight seam cutting with an angle grinder according to the specific supporting structure conditions. Temporary hanging supports are provided throughout the cutting process, and the cut slabs can be transported out of the building at any time;

[0007] 2) When dismantling the beam, keep the beam head with the short upper end and long lower end at the column ends on both sides. Corresponding to the beam head, the two ends of the beam are long at the upper end and short at the lower end. First, drill holes at both ends of the horizontal section of the beam head and the beam end, cut the horizontal seam with a rope saw, and then saw the vertical seams on the upper and lower sides. The cut beam will still be stably supported in place, and then it can be hoisted and transported out of the building;

[0008] 3) The column is sawn along the horizontal plane from the column foot to form a floor column section. When cutting the column, temporary support should be provided to prevent collapse. The removed column should be hoisted out of the building in time;

[0009] 4) Inspect and repair dismantled building components for recycling.

[0010] After cutting the horizontal seam in the beam, insert steel strips with the same thickness as the seam width to provide level support.

[0011] During the process of cutting columns, fill the horizontal saw seams with steel strips of the same thickness at any time so that the cut columns can still stand upright.

[0012] The present invention is disassembled from the top to the bottom. Since the floor slabs and columns are cut straight, they can be hoisted out of the building with simple temporary supports, which reduces a lot of support processes and costs. The cutting method used for the beams does not require any support. In addition, all the cut surfaces of the present invention are straight, which reduces the construction waste generated by the steel bar stubble left in the background technology. The present invention can assemble the components like a steel structure building by welding steel plates with screw holes on the straight cut surfaces, eliminating the need for secondary steel bar bundling and high-grade concrete pouring during later assembly, saving processes and costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the disassembly of the floor slab, beams and columns of the present invention;

[0014] Figure 2 This is a schematic diagram of floor cutting according to the present invention;

[0015] Figure 3 This is a schematic diagram of cantilever plate cutting of the present invention;

[0016] Figure 4 It is a schematic diagram of beam cutting of the present invention;

[0017] Figure 5 It is a schematic diagram of the beam component of the present invention.

[0018] Description of labels:

[0019] 1. Column; 2. Beam; 21. Beam cut; 211. Beam drilling; 212. Horizontal seam; 213. Upper vertical seam; 214. Lower vertical seam; 3. Floor slab; 31. Floor slab cutting seam; 32. Cantilever slab cutting seam. DETAILED DESCRIPTION

[0020] In order to explain the technical content, structural features, achieved objectives and effects of the present invention in detail, the following is a detailed description in conjunction with the implementation methods and the accompanying drawings.

[0021] See also Figure 1 The present invention adopts 1) dismantling from top to bottom, layer by layer; 2) the floor slab is sawn into strips according to the specific supporting structure conditions. Figure 2 , 3 As shown, the floor slab 3 is provided with temporary hanging support (not shown in the figure) throughout the cutting process, the position of the vertical cutting seam 31 of the plate edge (100mm to 200mm within the inner skin of the beam around the floor slab; the cantilever plate is cut vertically along the top of the root beam), the cut plate can be transported out of the building at any time, and the floor slab is cut with straight seams using an angle grinder; Figure 4 , 5 Beam 2 adopts the "mutual" shaped cross section of the end without support sawing, that is, first drill a hole 211 at the waist of the pre-cut section at the end of the beam, then cut a horizontal seam 212 with a rope saw, and insert a steel strip with the same thickness as the seam width to fill it flat, and then saw the upper and lower vertical seams 213 and 214. The cut beam will still be stably supported in place, and then it can be hoisted and transported out of the building. The upper vertical sawing surface of the frame beam is set 600 to 1000mm outside the outer skin of the column; the lower vertical sawing surface of the beam is set 800 to 1400mm outside the outer skin of the column; the horizontal simply supported surface at the end of the beam is 200 to 400mm long and is located in the center of the height of the beam section (half the height of the beam) and nearby. The column is sawed along the horizontal plane from the foot of the column to become a floor column section. During the cutting process, the horizontal sawing seam is filled with steel strips of the same thickness at any time to make the cut column still upright. Temporary support should be done when cutting the column to prevent collapse, and the column should be removed and hoisted out of the building in time. 3) The cut components can be recycled or stored as finished concrete components after necessary repair for reuse (see the case of prefabricated reinforced concrete columns, beams and slabs with application number 202410227339.9 filed by the applicant on February 29, 2024 (publication date June 18, 2024)). 4) The present invention has only a very small amount of construction waste, which minimizes the discharge of solid waste.

[0022] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A support-free dismantling process for existing reinforced concrete buildings, which dismantles the building layer by layer from top to bottom in the order of slabs, beams, and columns, and is characterized by: 1) The floor slab is cut by straight seam cutting with an angle grinder according to the specific supporting structure conditions. Temporary hanging supports are provided throughout the cutting process, and the cut slabs can be transported out of the building at any time; 2) When dismantling the beam, keep the beam head with the short upper end and long lower end at the column ends on both sides. Corresponding to the beam head, the two ends of the beam are long at the upper end and short at the lower end. First, drill holes at both ends of the horizontal section of the beam head and the beam end, cut the horizontal seam with a rope saw, and then saw the vertical seams on the upper and lower sides. The cut beam will still be stably supported in place, and then it can be hoisted and transported out of the building; 3) The column is sawn along the horizontal plane from the column foot to form a floor column section. When cutting the column, temporary support should be provided to prevent collapse. The removed column should be hoisted out of the building in time; 4) Inspect and repair dismantled building components for recycling.

2. The support-free dismantling process for existing reinforced concrete buildings according to claim 1, characterized in that: After cutting the horizontal seam in the beam, insert steel strips with the same thickness as the seam width to provide level support.

3. The support-free dismantling process for existing reinforced concrete buildings according to claim 1, characterized in that: During the process of cutting columns, fill the horizontal saw seams with steel strips of the same thickness at any time so that the cut columns can still stand upright.

Citation Information

Patent Citations

  • Method for demolition construction of high-rise cast-in-place concrete building

    CN107642251A

  • Mechanical segmented cutting construction method for concrete supporting system without supporting base

    CN109252693A

  • Method for dismantling and splicing cast-in-place reinforced concrete frame structure building components

    CN109797971A

  • High-rise cast-in-place concrete building demolition construction method

    CN110512895A

  • Method for dismantling monolithic reinforced concrete beamless floor with recycling of materials left after disassembly

    RU2811515C1

Cited By

  • Disassembly method

    JP7825104B1