Transformation method for shortening delay time of steam extraction check valve of steam turbine
Through hard wiring modification and simplification of the logic path, the OPC solenoid valve is directly controlled, which solves the problem of the delay time of the turbine check valve operation exceeding the standard, realizes the rapid closing of the check valve, and improves the safety of the turbine.
Patent Information
- Application Number
- CN202411105671.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-12-06
AI Technical Summary
The operation delay time of the turbine check valve often exceeds the standard, resulting in the valve closing time that cannot meet the safety requirements. The existing transformation strategies are difficult to effectively solve, and there are safety hazards.
Through hard wiring modification, the OPC solenoid valve is directly controlled by manual gate signal, simplifying the logic path, avoiding the delay in the transmission of intermediate thermal logic signals, and using relays to achieve rapid closing of the check valve, ensuring that the operation delay time is within the standard range.
It effectively shortens the operation delay time of the check valve, reduces safety risks, improves the operation safety of the turbine, and is easy to promote and implement.
Smart Images

Figure CN119084091A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of thermal power generation equipment, in particular to a transformation method for shortening the delay time of a steam turbine extraction check valve. Background Art
[0002] The closing test of the main steam valve, regulating steam valve, heat recovery system check valve, heating quick-closing valve and check valve of the steam turbine in a thermal power plant can examine the rapid response capability of the steam turbine regulating system. During the operation of the steam turbine generator set, once an abnormal shutdown and load shedding occurs, the rapid closing of the valve can greatly reduce the risk caused by the accident, or even avoid the occurrence of an accident. In the past, the closing time of the main steam valve and regulating steam valve has received sufficient attention, and testing and rectification have been in place. However, for the steam extraction check valve (hereinafter collectively referred to as "check valve") directly connected to the cylinder body for steam turbine heating, steam supply and extraction heat recovery, due to the many aspects involved, complex problems and difficulty in handling, its testing and rectification work is often easily overlooked, and there are problems such as missed testing or long-term over-standard operation, which bury hidden dangers for the safe operation of the steam turbine unit.
[0003] In DL / T 711-2019 "Test Guidelines for Steam Turbine Regulation and Safety Systems", 4.8.2 stipulates the closing time of the check valve: "The closing time of the extraction check valve, the total closing time of the extraction check valve directly connected to the turbine cylinder should be less than 1s". In 6.2.2.2, the shutdown signal is clearly stated: "In the measurement of the valve closing time, the shutdown signal should be connected to the manual shutdown button on the operating console". The total valve closing time can be composed of two parts: the action delay time and the net valve closing time.
[0004] T total = T delay + T shut (1) Where: T total is the total valve closing time, i.e. the total time from the trip signal to the valve being completely closed, in ms; T delay is the action delay time, that is, the time from the trip signal to the valve starting to act, ms; T shut is the net closing time of the valve, that is, the time from the start of the valve movement to the complete closing, in ms.
[0005] At present, the phenomenon of excessive delay time of steam turbine check valve is common. In 2017, 36 turbines of 22 thermal power companies in Northeast China were found to have exceeded the standard or not measured (4 turbines had no check valves). At the same time, through the test of the closing time of steam turbine valves after overhaul of nearly 30 thermal power units in Northeast China from 2020 to 2024, it was found that the compliance rate of check valve closing time was generally low, only 17.6%. The reason for the overtime is often related to the excessive delay time, and a few are caused by the net closing time of the valve (most of which can be easily solved by disassembly inspection of valves during overhaul). The delay time of valve action is difficult to handle and troubleshoot due to many problems such as thermal logic configuration, wiring components and actuator solenoid valves. The problem has not been thoroughly rectified for a long time, and most of them have become legacy problems.
[0006] Through actual on-site tests, it was found that the delay time of the logic signal transmission part of the logic control path of the existing technology was too long, averaging 500ms or more, and the investment cost was high and the rectification was difficult. Many existing transformation strategies and methods remained only in the theoretical stage, without actual engineering support, and the transformation projects were not actually implemented, resulting in the problem of the check valve closing delay timeout being unable to be effectively solved. Summary of the invention
[0007] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a method for modifying a steam turbine extraction check valve to shorten the delay time. The method is easy to modify and easy to promote and implement, and can effectively solve the problem of action delay timeout in valve closing time test, thereby reducing the safety risk of check valve timeout to the steam turbine.
[0008] The technical solution adopted by the present invention to solve the above-mentioned problem is: a modification method for shortening the delay time of the steam turbine extraction check valve, characterized in that: the modification starting point of the hard wiring is selected at the input DI point of the hard manual brake button of the ETS cabinet steam turbine, the modification end point of the hard wiring is selected at the OPC solenoid valve power supply control circuit of the control cabinet, and the indirect control of the OPC solenoid valve by the hard manual brake button is completed through the relay; by simplifying the logical path and avoiding multiple cross-connections, the manual brake signal is associated with the OPC solenoid valve control circuit in the form of electrical hard wiring, the OPC solenoid valve is energized by manual brake, the oil discharge oil circuit is connected, the air guide valve that loses the pressure oil push is quickly closed under the action of the spring force, the compressed air in the upper chamber is cut off and discharged, and the extraction check valve (generally 6 to 8) that loses the total air source is quickly closed. This process avoids the intermediate logic signal transmission delay part such as the scanning cycle of the intermediate thermal logic control system, the allocation partition, and the overlapping of multiple relays, thereby achieving the purpose of shortening the action delay time and adding a guarantee path in the process of handling unit accidents.
[0009] Furthermore, the starting and ending lines are connected in parallel, which does not interfere with the existing logic control of the unit; OPC1 and OPC2 are independently controlled and redundantly configured to increase system reliability.
[0010] Furthermore, the hard-wired lines can be connected by hard-wiring the empty nodes of the control cabinet or by separate wiring and parallel connection. The hard-wired lines use the same core cables as the existing cables in the cabinet.
[0011] Compared with the prior art, the present invention has the following advantages and effects: Combined with engineering practice, hard-wired jumper is adopted to skip the long part of the intermediate thermal signal transmission delay, and the gate signal is directly used to control the total driving air source of the check valve. After cutting off the air source, the check valve closes quickly due to air loss, and the check valve closing delay time meets the standard requirements.
[0012] By simplifying the logic path, avoiding multiple jumpers, and circumventing the intermediate logic signal transmission delay parts such as the intermediate thermal logic control system scanning cycle, allocation partitions, and multiple relay overlaps, the purpose of shortening the check valve action delay time is achieved, and an additional protection path is added during the unit accident handling process. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a logic flow chart of the transformation method of the present invention.
[0014] Figure 2 It is a schematic diagram of the manual braking command to the OPC relay in the present invention.
[0015] Figure 3 It is a schematic diagram of the OPC solenoid valve before modification in the present invention.
[0016] Figure 4 It is a schematic diagram of the modified OPC solenoid valve in the present invention.
[0017] in, Figure 1 The asterisk in the middle represents the operation of three high-pressure heaters, a single low-pressure heater or a single heating network heater. DETAILED DESCRIPTION
[0018] The present invention will be further described in detail below with reference to the accompanying drawings and by way of examples. The following examples are intended to explain the present invention but the present invention is not limited to the following examples.
[0019] Example
[0020] See also Figures 1 to 4In this embodiment, a modification method for shortening the delay time of the steam turbine extraction check valve is provided. The modification starting point of the hard wiring is selected at the input DI point of the hard manual operation button of the steam turbine in the ETS cabinet, and the modification end point of the hard wiring is selected at the OPC solenoid valve power supply control circuit of the control cabinet. The indirect control of the OPC solenoid valve by the hard manual operation button is completed through the relay. The starting point and the end point lines are connected in parallel, and no interference is caused to the existing logic control of the unit; OPC1 and OPC2 are independently controlled and redundantly configured to increase system reliability. The hard-wired line can be cross-connected by hard wiring of the empty node of the control cabinet or connected in parallel by separate wiring. The hard wiring uses the same core cable as the existing one in the cabinet.
[0021] By simplifying the logic path and avoiding multiple cross-connections, the manual trip signal is associated with the OPC solenoid valve control circuit in the form of electrical hard wiring. The OPC solenoid valve is energized by manual tripping, the OPC oil unloading oil circuit is connected, and the air guide valve that loses the pressure oil is quickly closed under the action of the spring force, cutting off and venting the compressed air in the upper chamber, and the steam extraction check valve (usually 6 to 8) that loses the total air source is quickly closed. This process avoids the intermediate logic signal transmission delay part such as the scanning cycle of the intermediate thermal logic control system, the allocation partition, and the overlapping of multiple relays, thereby achieving the purpose of shortening the action delay time and adding a guarantee path in the process of unit accident handling.
[0022] The scheme of the present invention was adopted during the overhaul of a steam turbine unit in a power plant. The input signal of the manual gate button in front of the panel was used from the ETS control cabinet to indirectly control the OPC solenoid valve power supply control circuit, thereby controlling the on-off of the check valve gas source, reducing the delayed closing time from the original 1000ms to about 200ms. The action delay time was qualified, and the test result of the total valve closing time met the requirements. The steam turbine protection means was increased, effectively ensuring the safe and stable operation of the steam turbine.
[0023] Table 1 Comparison of test results before and after the modification of the steam turbine check valve delay time Serial number name Delay time (ms) before transformation Delay time (ms) after transformation 1 One stage extraction check valve 1075 140 2 Second stage steam extraction check valve 995 160 3 Three-stage extraction steam check valve 1270 130 4 Four-stage extraction steam check valve 1 880 170 5 Four-stage steam extraction check valve 2 965 240 6 Five-stage steam extraction check valve 1215 170 7 Six-stage steam extraction check valve 1 1415 370 8 Six-stage steam extraction check valve 2 1375 340 The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0024] Although the present invention has been disclosed as above by way of embodiments, it is not intended to limit the protection scope of the present invention. Any changes and modifications made by any technician familiar with the technology without departing from the concept and scope of the present invention should fall within the protection scope of the present invention.
Claims
1. A method for shortening the delay time of a steam turbine extraction check valve, characterized in that: The starting point of the hard-wiring transformation is the input DI point of the hard-manual braking button of the ETS cabinet turbine, and the end point of the hard-wiring transformation is the OPC solenoid valve power supply control circuit of the control cabinet. The indirect control of the OPC solenoid valve by the hard-manual braking button is completed through the relay; by simplifying the logical path and avoiding multiple cross-connections, the manual braking signal is associated with the OPC solenoid valve control circuit in the form of electrical hard wiring. The OPC solenoid valve is energized by manual braking, the oil unloading oil circuit is connected, and the air guide valve that loses the pressure oil push is quickly closed under the action of the spring force, cutting off and releasing the compressed air in the upper chamber, and the steam extraction check valve that loses the total air source is quickly closed; this process avoids the delay part of the intermediate thermal logic signal transmission and shortens the action delay time.
2. The method for shortening the delay time of a steam turbine extraction check valve according to claim 1, characterized in that: The starting and ending lines are connected in parallel, which will not interfere with the existing logic control of the unit; OPC1 and OPC2 are independently controlled and redundantly configured to increase system reliability.
3. The method for shortening the delay time of a steam turbine extraction check valve according to claim 1, characterized in that: The hard-wired lines use the empty nodes of the control cabinet for hard-wiring jumper connection or adopt separate wiring and parallel connection. The hard-wired lines use the same core cables as the existing ones in the cabinet.