A column migration structure capable of reinforcing crane beams
By designing the column migration structure, using technical means such as embedded platform plates, drag components and industrial steel frames, the problem of difficulty in adjusting installed columns and crane beams is solved, and the rapid migration of truss columns and crane beams are realized. , ensuring smooth transportation and structural stability.
Patent Information
- Application Number
- CN202411707328.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-27
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-11-27
AI Technical Summary
In factory workshops, it is difficult to directly adjust the position of installed columns and crane beams, which affects the transportation of large items.
A column migration structure was designed, including embedded platform plates, fixed-point truss columns, target truss columns, crane single beams, migration hoist, drag components and transition tracks, etc., to achieve target truss by traction steel strands and drag components. The columns are moved smoothly and the crane beam is reinforced by means of a work-shaped steel frame.
The rapid, convenient and safe migration of truss columns of the crane beam system is achieved, and the structural strength of the crane beam after migration is ensured through the reinforcement structure, avoiding the adverse impact of column migration on the overall structure of the crane beam.
Smart Images

Figure CN119195532B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of crane components, and in particular to a column migration structure capable of reinforcing a crane beam. Background Art
[0002] Many steel structure factories are equipped with crane beam systems. Crane beams are installed on the columns of the longitudinal walls on both sides of each span of the steel structure factory. Both ends of the crane rails are installed on the crane beams. The crane beams are connected to the main steel structure of the factory through the crane beam auxiliary system structure for reinforcement. The crane beam system is one of the very important load-bearing structures of various industrial factories. It is generally designed as a simply supported structure. The simply supported structure has the advantages of clear force transmission, simple structure and convenient construction. It mainly includes crane beams, crane rails, cranes, truss columns and ground embedded parts.
[0003] After the installation of columns and crane beams in a new factory workshop is completed, it is often found during the use process that when the transport vehicles are transporting large items, the installation position of some truss columns will affect the turning action of the large transport vehicles. Therefore, the truss columns need to be relocated. However, under the premise that the columns and crane beams have been installed, the position of the columns themselves is difficult to adjust directly. For this reason, a column migration structure that can reinforce the crane beam is proposed. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that after the columns and crane beams inside the factory have been installed, the position of the columns themselves is difficult to adjust directly. The present invention provides a column migration structure that can reinforce the crane beams.
[0005] In order to achieve the above-mentioned purpose, the present invention specifically adopts the following technical solutions:
[0006] A column migration structure capable of reinforcing a crane beam comprises a concrete hardened ground, a plurality of evenly distributed embedded cap plates are embedded on the top of the concrete hardened ground, a plurality of evenly distributed fixed-point truss columns and a target truss column are erected on the top of the concrete hardened ground, the fixed-point truss columns and the target truss columns are respectively arranged on the tops of a plurality of embedded cap plates, a crane single beam arranged in the same horizontal direction is placed on the tops of the plurality of fixed-point truss columns and the target truss columns, a plurality of bolt fasteners are respectively fixedly installed between the two ends of the fixed-point truss columns and the target truss columns and the embedded cap plates and the crane single beam, a migration winch is placed on the top of the concrete hardened ground, and the migration winch A traction steel strand is wound on the machine, and a traction hook is fixedly installed at one end of the traction steel strand. A dragging assembly is arranged between the traction hook and the target truss column, and the dragging assembly can enable the target truss column to be migrated while keeping a balanced and stable condition at the bottom. The traction hook is connected to the target truss column through the dragging assembly, and a migration embedded plate is buried on the top of the concrete hardened ground, and the migration embedded plate is located between the migration winch and the target truss column. A transition plate is placed on the top of the concrete hardened ground, and the transition plate is located between the migration embedded plate and the target truss column. An inclined I-shaped steel frame is arranged between the target truss column and the crane single beam.
[0007] Furthermore, the towing assembly includes a towing plate arranged between the target truss column and the towing hook, a C-shaped telescopic towing frame is fixedly installed on the side of the towing plate facing the target truss column, the towing plate and the C-shaped telescopic towing frame are jointly sleeved on the bottom end of the target truss column, a four-rope towing structure is fixedly installed on the side of the towing plate away from the target truss column, a towing ring is fixedly installed on the end of the four-rope towing structure away from the towing plate, and the towing ring and the towing hook are clamped with each other.
[0008] Furthermore, two trapezoidal platforms are provided on one side and another side facing away from the dragging plate at the bottom end of the target truss column, the dragging plate is located on the top of two of the trapezoidal platforms, a C-shaped binding plate is fixedly installed on one side of the trapezoidal platforms, the trapezoidal platform and the C-shaped binding plate located at the same place are fixedly sleeved on the bottom end of the target truss column, and a plurality of evenly distributed dragging rollers are rotatably installed on the bottom of the trapezoidal platforms.
[0009] Furthermore, a plurality of transition rails connected to each other are placed on the top of the transition plate, and the plurality of transition rails correspond to the positions of the four trapezoidal platforms.
[0010] Furthermore, U-shaped connecting frames are fixedly installed on two side surfaces of the C-shaped telescopic towing frame adjacent to the towing plate, and the bottom ends of the U-shaped connecting frames located at the same position are fixedly installed on one side of the two trapezoidal platforms.
[0011] Furthermore, two termination nails are fixedly inserted into the top of the concrete hardened ground, and the termination nails are located between the migration winch and the migration embedded plate. The positions of the two termination nails correspond to the positions of the four trapezoidal platforms respectively.
[0012] Furthermore, a plurality of evenly distributed track positioning nails are fixedly inserted on the top of the concrete hardened ground surface, and the plurality of track positioning nails are distributed on both sides of the transition plate and respectively correspond to the positions of the plurality of transition tracks.
[0013] Furthermore, a temporary support steel frame is erected on the top of the concrete hardened ground, and the temporary support steel frame is located on a side of the target truss column away from the plurality of fixed-point truss columns and at the bottom of one end of the crane single beam.
[0014] The beneficial effects of the present invention are as follows:
[0015] 1. The column migration and crane beam reinforcement structure provided by the present invention can enable the truss columns of the crane beam system to be migrated quickly, conveniently and safely. At the same time, the I-shaped steel frame is used to strengthen one end of the crane beam suspended after losing the truss support, thereby reducing the impact of the truss migration on the overall structure of the crane beam and ensuring that the crane beam still has sufficient structural strength after the truss migration;
[0016] 2. The present invention sets a dragging assembly so that when the migration winch drags the target truss column through the traction steel strand and the traction hook, the traction force is shared at the four corners of the dragging plate through the four-rope traction structure, and then acts on the bottom end of the target truss column through the C-shaped telescopic dragging frame, thereby increasing the force-bearing area of the target truss column and fixing the position of the force-bearing point of the target truss column, thereby ensuring that the force on the target truss column is stable during the dragging process;
[0017] 3. The present invention sets a trapezoidal platform so that the trapezoidal platform is located on both sides of the bottom end of the target truss column and has a trapezoidal structure, thereby increasing the ground contact area of the bottom end of the target truss column and greatly reducing the risk of the target truss column tipping over during the dragging process. At the same time, the dragging rollers at the bottom of the trapezoidal platform can reduce the friction of the trapezoidal platform and reduce the impact of the installation of the trapezoidal platform on the smoothness of the dragging process;
[0018] 4. The present invention sets a transition track so that after the transition track is installed, when the migration winch drags the target truss column, the trapezoidal platforms on both sides can move inside the transition track, so that the transition track can limit and guide the moving trajectory of the target truss column, thereby preventing the target truss column from deviating from the migration position;
[0019] 5. The present invention provides a U-shaped connecting frame so that the dragging force of the C-shaped telescopic dragging frame on the target truss column is shared by the bottom end of the target truss column and the four trapezoidal platforms at the same time, thereby increasing the integrity of the entire structure during the dragging process and further improving the stability of the migration of the target truss column;
[0020] 6. The present invention sets a stop pin so that when the target truss column is dragged to the top center of the migration embedded plate, the front ends of the two trapezoidal platforms will contact the two stop pins respectively, so that the target truss column cannot move further and stops at the predetermined migration position, thereby realizing automatic braking of the target truss column and avoiding excessive migration of the target truss column and causing position deviation;
[0021] 7. The present invention provides track positioning nails, so that after placing the transition plate or transition track, multiple track positioning nails can be nailed into the concrete hardened ground on both sides of the transition plate. The number of track positioning nails is consistent with the position of the transition track, so that the track positioning nails can limit the transition plate and the transition track, and prevent the position deviation between the transition plate, the transition track and the migration embedded plate and the embedded base plate;
[0022] 8. The present invention sets a temporary support steel frame so that the temporary support steel frame is clamped between the concrete hardened ground and the crane single beam, so that the temporary support steel frame can temporarily support the suspended end of the crane single beam during the migration of the target truss column until the I-shaped steel frame is assembled and then the temporary support steel frame is dismantled to ensure that the internal structure of the crane single beam will not change outside the expected range. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the three-dimensional structure of the target truss column of the present invention before migration;
[0024] Figure 2 It is a schematic diagram of the three-dimensional structure of the target truss column after the migration of the present invention;
[0025] Figure 3 The present invention Figure 2 Schematic diagram of the structure at A in the middle;
[0026] Figure 4 The present invention Figure 2 Schematic diagram of the three-dimensional structure at B in the middle;
[0027] Figure 5It is a schematic diagram of the three-dimensional structure of the target truss column and the migration winch of the present invention;
[0028] Figure 6 It is a schematic diagram of the three-dimensional structure of the target truss column and the drag assembly of the present invention;
[0029] Figure 7 It is a schematic diagram of the three-dimensional structure of the drag assembly of the present invention;
[0030] Figure 8 It is a schematic diagram of the three-dimensional structure of the transition track, transition plate and track positioning pins of the present invention;
[0031] Figure numerals: 1. Concrete hardened ground; 2. Embedded pedestal plate; 3. Fixed-point truss column; 4. Target truss column; 5. Crane single beam; 6. Bolt fasteners; 7. Migration winch; 8. Traction steel strand; 9. Traction hook; 10. Migration embedded plate; 11. Transition plate; 12. I-shaped steel frame; 13. Drag plate; 14. C-shaped telescopic drag frame; 15. Four-rope traction structure; 16. Traction ring; 17. Trapezoidal platform; 18. C-shaped binding plate; 19. Drag roller; 20. Transition track; 21. U-shaped connecting frame; 22. Track positioning nails; 23. Termination nails; 24. Temporary support steel frame. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0033] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0035] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the inventive product is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0036] like Figures 1 to 8 As shown, a column migration structure capable of reinforcing a crane beam comprises a concrete hardened ground surface 1, a plurality of evenly distributed embedded cap plates 2 are buried on the top of the concrete hardened ground surface 1, a plurality of evenly distributed fixed-point truss columns 3 and a target truss column 4 are erected on the top of the concrete hardened ground surface 1, the fixed-point truss columns 3 and the target truss columns 4 are respectively arranged on the top of the plurality of embedded cap plates 2, and a crane single beam 5 arranged in the same horizontal direction is placed on the top of the plurality of fixed-point truss columns 3 and the target truss columns 4, as shown in FIG. Figure 3 As shown, multiple bolt fasteners 6 are fixedly installed between the two ends of the fixed point truss column 3 and the target truss column 4 and the embedded base plate 2 and the crane single beam 5, respectively. Figure 5 , Figure 7 As shown, a migration winch 7 is placed on the top of the concrete hardened ground 1. In this embodiment, depending on the actual situation of the construction site, the migration winch 7 can be replaced with a simpler traction device or tool such as a hand winch. A traction steel strand 8 is wound on the migration winch 7, and a traction hook 9 is fixedly installed on one end of the traction steel strand 8. A dragging assembly is arranged between the traction hook 9 and the target truss column 4. The dragging assembly can make the target truss column 4 migrate while keeping a balanced and stable state at the bottom. The traction hook 9 is connected to the target truss column 4 through the dragging assembly. A migration embedded plate 10 is buried on the top of the concrete hardened ground 1. The migration embedded plate 10 is located between the migration winch 7 and the target truss column 4, as shown in FIG. Figure 8 As shown, a transition plate 11 is placed on the top of the concrete hardened ground 1, and the transition plate 11 is located between the migration embedded plate 10 and the target truss column 4. Figure 4As shown, an inclined I-shaped steel frame 12 is provided between the target truss column 4 and the crane single beam 5; specifically, when the target truss column 4 is to be relocated, the final relocation position of the target truss column 4 is first selected, a pre-buried pit is dug at the relocation position, and the relocation pre-buried plate 10 is buried in the pre-buried pit for fixing, and a new assembly hole is opened at the corresponding position at the bottom of the crane single beam 5, and the transition plate 11 is placed between the relocation pre-buried plate 10 and the original pre-buried cap plate 2, and a leather hammer is used to knock. The transition plate 11 is tightly stuck between the two and eliminates the height difference between the transition plate 11 and the migration embedded plate 10 and the embedded cap plate 2. Then the migration winch 7 is fixed on the concrete hardened ground 1, the towing assembly is assembled at the bottom end of the target truss column 4, the towing hook 9 is hung on the towing assembly, and then the bolt fasteners 6 at the upper and lower ends of the target truss column 4 are removed to release the assembly relationship between the target truss column 4 and the embedded cap plate 2 and the crane single beam 5. The transfer winch 7 can reel in the traction strand 8, and then drag the target truss column 4 through the traction hook 9, so that the target truss column 4 moves on the embedded cap plate 2, and moves to the transfer embedded plate 10 through the transition plate 11 and stops. At this time, two sets of bolt fasteners 6 are used to re-assemble and fix the upper and lower ends of the target truss column 4 with the crane single beam 5 and the transfer embedded plate 10, and one side of the target truss column 4 and the suspended end of the crane single beam 5 are welded, screwed, etc. The I-shaped steel frame 12 is fixedly installed in a certain manner so that the I-shaped steel frame 12 plays the role of a diagonal reinforcement structure. Finally, the transition plate 11 and the migration winch 7 are removed to complete the migration of the target truss column 4, so that the truss column of the crane beam system can be quickly, conveniently and safely migrated. At the same time, the I-shaped steel frame 12 is used to strengthen one end of the crane beam suspended after losing the truss support, thereby reducing the impact of the truss migration on the overall structure of the crane beam, and ensuring that the crane beam still has sufficient structural strength after the truss migration.
[0037] like Figure 6 As shown, the towing assembly includes a towing plate 13 disposed between the target truss column 4 and the towing hook 9, as shown in FIG. Figure 7As shown, a C-shaped telescopic towing frame 14 is fixedly installed on the side of the towing plate 13 facing the target truss column 4, and the towing plate 13 and the C-shaped telescopic towing frame 14 are jointly sleeved on the bottom end of the target truss column 4. In the present embodiment, the C-shaped telescopic towing frame 14 is a C-shaped bidirectional telescopic steel frame, and the two telescopic ends of the C-shaped telescopic towing frame 14 are symmetrical to each other, and a telescopic slide groove is provided inside the end where the two telescopic ends are close to each other, and the same inner slide plate is slidably installed inside the two telescopic slide grooves, and the towing plate 13 and the C-shaped telescopic towing frame 14 are assembled and fixed by bolts, so that the towing plate 13 and the C-shaped telescopic towing frame 14 are fixedly sleeved on the bottom end of the target truss column 4, and a four-rope traction structure 15 is fixedly installed on the side of the towing plate 13 away from the target truss column 4, and a traction ring 16 is fixedly installed on the end of the four-rope traction structure 15 away from the towing plate 13, and the traction ring 16 is mutually clamped with the traction hook 9; specifically, by setting The towing assembly is installed by first stretching the C-shaped telescopic towing frame 14 so that the distance between the two ends of the opening is greater than the width of the target truss column 4, and then the C-shaped telescopic towing frame 14 is sleeved on the target truss column 4, and then the C-shaped telescopic towing frame 14 is retracted to its original state. At this time, the towing plate 13 is screwed and fixed to the C-shaped telescopic towing frame 14 by bolts, so that the towing plate 13 and the C-shaped telescopic towing frame 14 are locked and sleeved on the bottom end of the target truss column 4, and then the towing hook 9 is pulled. By being mutually engaged with the traction ring 16, when the migration winch 7 drags the target truss column 4 through the traction steel strand 8 and the traction hook 9, the traction force will be shared at the four corners of the towing plate 13 through the four-rope traction structure 15, and then act on the bottom end of the target truss column 4 through the C-shaped telescopic towing frame 14, thereby increasing the force-bearing area of the target truss column 4 and fixing the position of the force-bearing point of the target truss column 4, thereby ensuring that the force on the target truss column 4 is stable during the towing process.
[0038] like Figure 7As shown, two trapezoidal platforms 17 are provided on the bottom end of the target truss column 4 facing and away from the dragging plate 13, the dragging plate 13 is located on the top of the two trapezoidal platforms 17, and a C-shaped binding plate 18 is fixedly installed on one side of the trapezoidal platform 17. The trapezoidal platform 17 and the C-shaped binding plate 18 located at the same place are fixedly sleeved on the bottom end of the target truss column 4, and a plurality of evenly distributed drag rollers 19 are rotatably installed on the bottom of the trapezoidal platform 17. In this embodiment, taking the common I-type steel frame 12-type truss column on the market as an example, there are four column legs at the upper and lower ends of the fixed truss column 3 and the target truss column 4, and the trapezoidal platform 17 and the C-shaped binding plate 18 are assembled and fixed by bolts. The trapezoidal platform 17 and the C-shaped binding plate 18 are fixedly sleeved on the four column legs at the bottom end of the target truss column 4; specifically, by setting the trapezoidal platform 17, after the dragging plate 13 is fixed, the four groups of trapezoidal platforms 17 and C-shaped binding plates 18 are respectively fixed and assembled on the four column legs at the bottom end of the target truss column 4 by bolts, so that the trapezoidal platform 17 is located on both sides of the bottom end of the target truss column 4 in a trapezoidal structure, thereby increasing the ground contact area of the bottom end of the target truss column 4 and greatly reducing the risk of rollover of the target truss column 4 during the dragging process. At the same time, the dragging roller 19 at the bottom of the trapezoidal platform 17 can reduce the friction of the trapezoidal platform 17 and reduce the influence of the installation of the trapezoidal platform 17 on the smoothness of the dragging process.
[0039] like Figure 8 As shown, a plurality of transition rails 20 connected to each other are placed on the top of the transition plate 11, and the plurality of transition rails 20 correspond to the positions of the four trapezoidal platforms 17. In this embodiment, the thickness of the transition plate 11 can be selected according to actual needs. When the transition rail 20 is not used, the thickness of the transition plate 11 is the height of the embedded base plate 2 and the migration embedded plate 10 above the ground. If the transition rail 20 is used, the thickness of the bottom of the transition rail 20 plus the thickness of the transition plate 11 is the height of the embedded base plate 2 and the migration embedded plate 10 above the ground. Specifically, by setting the transition rail 20, if the transition rail 20 is needed, a thinner transition rail 20 can be selected. A transition plate 11 is provided, and a plurality of transition tracks 20 connected to each other are placed on the top of the transition plate 11, so that the overall length of the transition track 20 is equal to the transition plate 11, and the overall thickness of the transition track 20 and the transition plate 11 is equal to the height of the ground surface of the migration embedded plate 10, and then the transition track 20 is knocked with a leather hammer to eliminate the height difference between the transition track 20 and the migration embedded plate 10 and the embedded base plate 2. When the migration winch 7 drags the target truss column 4, the trapezoidal platforms 17 on both sides can move inside the transition track 20, so that the transition track 20 has a role of limiting and guiding the moving trajectory of the target truss column 4, thereby preventing the target truss column 4 from deviating from the migration position.
[0040] like Figure 7As shown, U-shaped connecting frames 21 are fixedly installed on the two side surfaces adjacent to the towing plate 13 of the C-shaped telescopic towing frame 14, and the bottom ends of the U-shaped connecting frames 21 located at the same place are fixedly installed on one side of the two trapezoidal platforms 17. In this embodiment, assembly holes are opened on both sides of the bottom of the U-shaped connecting frame 21, so that the two bottom corners of the U-shaped connecting frame 21 are fastened to the trapezoidal platform 17 and the C-shaped binding plate 18 by the same bolts; specifically, by setting the U-shaped connecting frame 21, when assembling the trapezoidal platform 17 and the C-shaped binding plate 18, the trapezoidal platform 17 and the C-shaped binding plate 18 are first The U-shaped connecting frames 21 on both sides of the C-shaped telescopic dragging frame 14 will be located on one side of the trapezoidal platform 17, and the assembly holes at the two corners of the bottom of the U-shaped connecting frame 21 will correspond to the assembly holes on the trapezoidal platforms 17 and the C-shaped binding plate 18 on both sides. At this time, the bolts are directly screwed in for tightening, so that the dragging force of the C-shaped telescopic dragging frame 14 on the target truss column 4 will be shared by the bottom end of the target truss column 4 and the four trapezoidal platforms 17 at the same time, thereby increasing the integrity of the entire structure during the dragging process and further improving the stability of the migration of the target truss column 4.
[0041] like Figure 5 As shown, two end nails 23 are fixedly inserted on the top of the concrete hardened ground 1, and the end nails 23 are located between the migration winch 7 and the migration embedded plate 10, and the positions of the two end nails 23 correspond to the positions of the four trapezoidal platforms 17 respectively; specifically, by setting the end nails 23, the distance between the end nails 23 and the migration embedded plate 10 is equal to the distance between the front end of the trapezoidal platform 17 and the embedded base plate 2. Therefore, when the target truss column 4 is dragged to the top center of the migration embedded plate 10, the front ends of the two trapezoidal platforms 17 will contact the two end nails 23 respectively, so that the target truss column 4 cannot continue to move and stops at the predetermined migration position, thereby realizing automatic braking of the target truss column 4 and avoiding excessive migration of the target truss column 4 and causing position displacement.
[0042] like Figure 8 As shown, a plurality of evenly distributed track positioning nails 22 are fixedly inserted on the top of the concrete hardened ground surface 1, and the plurality of track positioning nails 22 are distributed on both sides of the transition plate 11 and respectively correspond to the positions of the plurality of transition rails 20; specifically, by setting the track positioning nails 22, after placing the transition plate 11 or the transition rail 20, a plurality of track positioning nails 22 can be nailed into the concrete hardened ground surface 1 on both sides of the transition plate 11, and the number of the track positioning nails 22 is consistent with the position of the transition rail 20, so that the track positioning nails 22 can play a limiting role on the transition plate 11 and the transition rail 20, thereby preventing the position deviation between the transition plate 11, the transition rail 20 and the migration embedded plate 10 and the embedded base plate 2.
[0043] like Figure 1 , Figure 2 As shown, a temporary support steel frame 24 is erected on the top of the concrete hardened ground 1, and the temporary support steel frame 24 is located on the side of the target truss column 4 away from the multiple fixed-point truss columns 3 and at the bottom of one end of the crane single beam 5; specifically, by setting the temporary support steel frame 24, before the target truss column 4 is moved, a temporary support steel frame 24 with a length equal to the height of the crane single beam 5 from the ground can be selected, and pushed between one end of the crane single beam 5 and the concrete hardened ground 1 to make it stand vertically, and then a leather hammer is used to knock the temporary support steel frame 24 to clamp it between the concrete hardened ground 1 and the crane single beam 5, so that the temporary support steel frame 24 temporarily supports the suspended end of the crane single beam 5 during the migration of the target truss column 4, until the temporary support steel frame 24 is removed after the I-shaped steel frame 12 is assembled, to ensure that the internal structure of the crane single beam 5 will not change outside the expected range.
[0044] In summary: before migration: first select the location where the target truss column 4 will be finally migrated, dig a pre-buried pit at the migration location, bury the migration embedded plate 10 into the pre-buried pit for fixing, and open a new assembly hole at the corresponding position at the bottom of the crane single beam 5, place the transition plate 11 between the migration embedded plate 10 and the original embedded cap plate 2, use a leather hammer to knock the transition plate 11 so that the transition plate 11 is tightly stuck between the two and eliminate the height difference between the transition plate 11 and the migration embedded plate 10 and the embedded cap plate 2, then fix the migration winch 7 on the concrete hardened ground 1, and connect the towing plate 13 and the C-shaped telescopic towing frame 14 to the bottom end of the target truss column 4 through bolts, and then clamp the towing hook 9 and the towing ring 16 to each other, and first connect the four sets of trapezoidal platforms 17 and the C-shaped binding plate 18 to the four column legs of the target truss column 4, and the U-shaped connecting frames 21 on both sides of the C-shaped telescopic towing frame 14 will Located on one side of the trapezoidal platform 17, the assembly holes at the two corners of the bottom of the U-shaped connecting frame 21 will correspond to the assembly holes on the trapezoidal platforms 17 and the C-shaped binding plates 18 on both sides. At this time, the bolts are directly screwed in for tightening, and then the end nails 23 are nailed into the concrete hardened ground 1 between the migration winch 7 and the migration embedded plate 10, so that the distance between the end nails 23 and the migration embedded plate 10 is equal to the distance between the front end of the trapezoidal platform 17 and the embedded cap plate 2, and then a temporary support steel frame 24 with a length equal to the height of the crane single beam 5 from the ground is selected, and pushed between one end of the crane single beam 5 and the concrete hardened ground 1 to make it stand vertically, and then a leather hammer is used to knock so that the temporary support steel frame 24 is clamped between the concrete hardened ground 1 and the crane single beam 5, and finally the bolt fasteners 6 at the upper and lower ends of the target truss column 4 are removed to release the assembly relationship between the target truss column 4 and the embedded cap plate 2 and the crane single beam 5;
[0045] Among them, if it is necessary to use the transition track 20, a thinner transition plate 11 can be selected, and a plurality of transition tracks 20 spliced to each other can be placed on the top of the transition plate 11, so that the overall length of the transition track 20 is equal to the transition plate 11, and the overall thickness of the transition track 20 and the transition plate 11 is equal to the height of the ground surface of the migration embedded plate 10, and then the transition track 20 is knocked with a leather hammer to eliminate the height difference between the transition track 20 and the migration embedded plate 10 and the embedded base plate 2. When the migration winch 7 drags the target truss column 4, the trapezoidal platforms 17 on both sides can move inside the transition track 20, so that the transition track 20 has a limiting and guiding effect on the moving trajectory of the target truss column 4. After placing the transition plate 11 or the transition track 20, a plurality of track positioning nails 22 can be nailed into the concrete hardened ground 1 on both sides of the transition plate 11. The number of the track positioning nails 22 is consistent with the position of the transition track 20, so that the track positioning nails 22 can play a limiting role on the transition plate 11 and the transition track 20.
[0046] During migration: the migration winch 7 winds up the traction steel strand 8, and then drags the target truss column 4 through the traction hook 9, so that the target truss column 4 moves on the embedded cap plate 2, and moves to the migration embedded plate 10 through the transition plate 11. When the target truss column 4 is dragged to the top center of the migration embedded plate 10, the front ends of the two trapezoidal platforms 17 will contact the two end nails 23 respectively, so that the target truss column 4 cannot continue to move and stops at the predetermined migration position;
[0047] After the migration: use two sets of bolt fasteners 6 to re-assemble and fix the upper and lower ends of the target truss column 4 with the crane single beam 5 and the migration embedded plate 10, and fix the I-shaped steel frame 12 between one side of the target truss column 4 and the suspended end of the crane single beam 5 by welding, screwing, etc., so that the I-shaped steel frame 12 plays the role of a diagonal reinforcement structure, and finally remove the transition plate 11 and the migration winch 7 and other structural components to complete the migration of the target truss column 4.
[0048] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A column migration structure capable of reinforcing a crane beam, characterized in that: The invention comprises a concrete hardened ground (1), wherein a plurality of evenly distributed embedded pedestal plates (2) are embedded on the top of the concrete hardened ground (1), a plurality of evenly distributed fixed-point truss columns (3) and a target truss column (4) are erected on the top of the concrete hardened ground (1), the fixed-point truss columns (3) and the target truss columns (4) are respectively arranged on the top of the plurality of embedded pedestal plates (2), a crane single beam (5) arranged in the same horizontal direction is placed on the top of the plurality of fixed-point truss columns (3) and the target truss columns (4), a plurality of bolt fasteners (6) are fixedly installed between the two ends of the fixed-point truss columns (3) and the target truss columns (4) and the embedded pedestal plates (2) and the crane single beam (5), and a migration winch (7) is placed on the top of the concrete hardened ground (1), and a traction steel strand (8) is wound on the migration winch (7). ), a traction hook (9) is fixedly installed at one end of the traction steel strand (8), a drag assembly is arranged between the traction hook (9) and the target truss column (4), and the drag assembly can enable the target truss column (4) to migrate while maintaining a balanced and stable bottom end, the traction hook (9) is connected to the target truss column (4) through the drag assembly, a migration embedded plate (10) is embedded at the top of the concrete hardened ground (1), the migration embedded plate (10) is located between the migration winch (7) and the target truss column (4), a transition plate (11) is placed at the top of the concrete hardened ground (1), the transition plate (11) is located between the migration embedded plate (10) and the target truss column (4), and an inclined I-shaped steel frame (12) is arranged between the target truss column (4) and the crane single beam (5).
2. A column migration structure capable of reinforcing a crane beam according to claim 1, characterized in that: The towing assembly comprises a towing plate (13) arranged between the target truss column (4) and the towing hook (9); a C-shaped telescopic towing frame (14) is fixedly mounted on the side of the towing plate (13) facing the target truss column (4); the towing plate (13) and the C-shaped telescopic towing frame (14) are jointly sleeved on the bottom end of the target truss column (4); a four-rope towing structure (15) is fixedly mounted on the side of the towing plate (13) facing away from the target truss column (4); a towing ring (16) is fixedly mounted on the end of the four-rope towing structure (15) away from the towing plate (13); and the towing ring (16) and the towing hook (9) are mutually engaged.
3. A column migration structure capable of reinforcing a crane beam according to claim 2, characterized in that: Two trapezoidal platforms (17) are provided on the side of the bottom end of the target truss column (4) facing toward and away from the dragging plate (13), and the dragging plate (13) is located on the top of two of the trapezoidal platforms (17). A C-shaped binding plate (18) is fixedly installed on one side of the trapezoidal platforms (17). The trapezoidal platforms (17) and the C-shaped binding plates (18) located at the same place are fixedly sleeved on the bottom end of the target truss column (4), and a plurality of evenly distributed dragging rollers (19) are rotatably installed on the bottom of the trapezoidal platforms (17).
4. A column migration structure capable of reinforcing a crane beam according to claim 3, characterized in that: A plurality of transition rails (20) that are spliced to each other are placed on the top of the transition plate (11), and the positions of the plurality of transition rails (20) correspond to the positions of the four trapezoidal platforms (17).
5. The column migration structure capable of reinforcing a crane beam according to claim 3, characterized in that: U-shaped connecting frames (21) are fixedly mounted on two side surfaces of the C-shaped telescopic towing frame (14) adjacent to the towing plate (13), and the bottom ends of the U-shaped connecting frames (21) located at the same location are fixedly mounted on one side of the two trapezoidal platforms (17).
6. The column migration structure capable of reinforcing a crane beam according to claim 3, characterized in that: Two terminating nails (23) are fixedly inserted at the top of the concrete hardened ground surface (1), and the terminating nails (23) are located between the migration winch (7) and the migration embedded plate (10), and the positions of the two terminating nails (23) respectively correspond to the positions of the four trapezoidal platforms (17).
7. The column migration structure capable of reinforcing a crane beam according to claim 4, characterized in that: A plurality of evenly distributed track positioning nails (22) are fixedly inserted on the top of the concrete hardened ground (1); the plurality of track positioning nails (22) are distributed on both sides of the transition plate (11) and respectively correspond to the positions of the plurality of transition tracks (20).
8. The column migration structure capable of reinforcing a crane beam according to claim 1, characterized in that: A temporary support steel frame (24) is erected on the top of the concrete hardened ground (1). The temporary support steel frame (24) is located on a side of the target truss column (4) away from the plurality of fixed-point truss columns (3) and is located at the bottom of one end of the crane single beam (5).
Citation Information
Patent Citations
Large-scale grid steel structure sliding installation device and construction method thereof
CN117052137A
Prefabricated crane girder of power house erects pulls sliding system
CN208534068U