Fence type bank protection slope protection structure and construction method thereof
By adopting the fence -type protection slope protection structure in the construction of the shore protection, the use of technical means such as arrow pile unit modules and supporting skeleton solve the problems of long construction cycle, high cost, and poor stability in the existing construction method, and achieve flexible construction, reduce Cost and improve the effect of protection.
Patent Information
- Application Number
- CN202411270763.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-12-11
- Filing Date
- 2024-09-11
- Publication Date
- 2025-01-24
AI Technical Summary
The existing construction methods for bank protection slope protection have problems such as long construction period, high cost, poor stability, difficult maintenance and inability to build high construction.
A fence-type bank and slope protection structure is adopted, including multiple arrow pile unit modules. Each module is composed of a pipe tube, an arrow insertion part, and a connector. The support skeleton and cement mortar mixture are used to enhance the structural strength. Combined with the design of fenders and caps, Achieve flexible construction and efficient protection.
The structure of this structure is flexible, reducing the difficulty and cost of construction, and at the same time improve the protection effect. It has a long service life, has a small life, has a small area, has good flood prevention and flood discharge. The structure is adjustable, the maintenance is convenient, and the appearance is beautiful.
Smart Images

Figure CN119352465A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bank protection, in particular to a fence-type bank protection and slope protection structure and a construction method thereof. Background Art
[0002] Bank and slope protection is an engineering measure that is artificially reinforced on the original lake or river bank slopes to prevent soil erosion, waves, water flow invasion and scouring, and groundwater action, and to maintain the stability of the coastline.
[0003] At present, there are about six methods of slope protection and bank protection, namely:
[0004] 1. Timber pile slope protection and bank protection method; 2. Stone stacking method; 3. Crushed stone mortar stacking method; 4. Superposition method of cement sand and gravel prefabricated blocks and asphalt gravel mixed prefabricated blocks; 5. Reinforced concrete pouring method; 6. Prefabricated cement flat pile direct pressing method.
[0005] The above six construction methods all have obvious disadvantages and shortcomings. Among them, the wooden pile slope protection method has the disadvantages of short service life and poor protection effect, although it is simple to construct and low in cost.
[0006] The defects of other methods are: high cost; long construction period; poor stability, loose bank feet in some areas will cause the overall collapse of the bank protection structure above; difficult and costly maintenance after collapse; complicated construction methods, the river channel must be blocked at both ends in sections before construction, and construction can only be carried out after water is pumped out. If it rains during construction, the water must be pumped out several times; the original slope bank is destroyed, the bank foot base soil is leveled and then the concrete cushion layer is poured; a large amount of materials are used, and simple roads need to be paved in advance for material transport vehicles to pass; the chassis is not stable enough, resulting in no base support, and the slope protection is poorly stressed and cannot be built high, so it is difficult to build the slope protection to the ideal height. Summary of the invention
[0007] In order to solve the above technical problems, the present invention relates to a fence-type bank and slope protection structure, which is simple and reliable, effectively solves the above technical problems, and is suitable for popularization and use. In order to achieve the above purpose, the present invention is implemented by the following technical solutions:
[0008] A fence-type bank and slope protection structure comprises a plurality of arrow pile unit modules, wherein the plurality of arrow pile unit modules are evenly spaced along the length direction of the river bank, each of the plurality of arrow pile unit modules comprises a tube, an arrowhead insertion portion, and a connector, wherein the connector is used to connect the tube with the arrowhead insertion portion, wherein the arrowhead insertion portion gradually decreases in diameter from top to bottom and gradually converges into a tip, and the inner cavity of the tube is provided with a support frame, wherein the support frame is configured to enhance the structural strength and hardness of the arrow pile unit module together with a filler injected into the inner cavity of the tube.
[0009] On the basis of the above solution and as a preferred solution of the above solution: the arrow pile unit module further includes a cap, and the cap is configured to tightly cover the top of the tube so as to close the top opening of the tube.
[0010] On the basis of the above scheme and as a preferred scheme of the above scheme: the arrow-shaped insertion part includes an inner cavity, and the inner cavity of the arrow-shaped insertion part is connected with the inner cavity of the tube to form a common structural cavity to accommodate the supporting frame and the filler.
[0011] On the basis of the above scheme and as a preferred scheme of the above scheme: the support skeleton includes at least one cross-shaped reinforcing support body along the cross-section of the tube, and the at least one cross-shaped reinforcing support body divides the inner cavity of the support skeleton into multiple chambers, thereby forming a plurality of filling distribution areas in the tube.
[0012] On the basis of the above scheme and as a preferred scheme of the above scheme: a solid tip is provided at the bottom of the arrow insertion portion.
[0013] On the basis of the above solution and as a preferred solution of the above solution: the tube is made of plastic material.
[0014] On the basis of the above scheme and as a preferred scheme of the above scheme: the filler is a mortar mixture.
[0015] On the basis of the above scheme and as a preferred scheme of the above scheme: the connector includes an outer sleeve, the outer sleeve is provided with a limit block protruding inward, the outer diameter of the tube is the same as the outer diameter of the top end of the arrow insertion part, the tube and the arrow insertion part are respectively clamped on the upper and lower sides of the outer sleeve, the bottom end of the tube contacts the upper surface of the limit block, and the top end of the arrow insertion part contacts the lower surface of the limit block.
[0016] On the basis of the above solution and as a preferred solution of the above solution: a mudguard is provided between every two adjacent arrow pile unit modules.
[0017] The present invention also relates to a construction method of a fence-type bank protection and slope protection structure, wherein the fence-type bank protection and slope protection structure comprises a plurality of arrow pile unit modules, each of which comprises a tube, an arrowhead insertion portion, and a connector. The construction method comprises the following steps:
[0018] S1, determine the construction scope and demarcate the construction area, determine the spacing between adjacent arrow pile unit modules according to the actual stress conditions of the river bank, and then demarcate the marking area;
[0019] S2, fixing the tube and the arrowhead inserting portion together through a connector to form a prefabricated arrow pile structure;
[0020] S3, pre-pressing and fixing a plurality of prefabricated arrow pile structures in each of the designated marked areas;
[0021] S4, connecting the pile driving device to the pressure head, sinking and pressing each prefabricated arrow pile until it reaches a predetermined depth and then stops;
[0022] S5, placing a supporting frame into the inner hole of the tube of each prefabricated arrow stake;
[0023] S6, using a plunger pump in a cement mixer to fill the cement mortar mixture into the structural cavity of the prefabricated arrow pile and make the upper layer flush with the upper surface of the tube;
[0024] S7, after the cement mortar filling is hardened, a cap is put on the cap to form a final arrow pile unit module;
[0025] S8, installing a fender between two adjacent arrow pile unit modules, and fixing the fender to the outer wall of the tube of the arrow pile unit module by bolts;
[0026] S9, perform earth filling operation.
[0027] Compared with the prior art, the present invention has the following outstanding and beneficial technical effects: the bank protection and slope protection structure has the advantages of flexible construction, can be designed according to the terrain of the river channel and river slope, is not restricted by the terrain, greatly simplifies the construction difficulty and reduces the construction cost, while improving the protection effect; it is sturdy, durable and has a long service life; it occupies a small area and makes full use of the space; it has good flood control and flood discharge performance; the size and height of the overall structure of the bank protection and slope protection can be adjusted according to the actual situation of the slope; it is not easy to grow covering plants, so that the water flow in the river channel is faster; the damaged position can be repaired and replaced separately, which is convenient and quick; the appearance color can change with the slope and is more beautiful; the bank protection and slope protection structure has a wide range of applications, and can be used for water, fields, and mountains. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the module structure of the arrow pile unit;
[0029] Figure 2 This is the internal schematic diagram of the Arrow Stake Unit Module;
[0030] Figure 3 This is a diagram of fender installation;
[0031] Figure 4 is a schematic diagram of a reinforced support body;
[0032] Figure 5 This is a connection diagram. DETAILED DESCRIPTION
[0033] In order to make the objectives, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments. However, the specific implementation methods and embodiments described below are for illustrative purposes only and are not intended to limit the present invention.
[0034] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0036] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0038] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0039] In order to solve the above technical problems, Figure 1-5 As shown, the present invention designs a low-cost, easy-to-construct fence-type bank and slope protection structure, including an arrow pile unit module. Specifically, the arrow pile unit module includes a tube 1, an arrow insertion portion 2, and a connector 3. The tube 1 is preferably made of plastic material. The plastic structure has a low manufacturing cost and is easy to form. Compared with metal materials, it has better corrosion resistance and a certain impact resistance and tensile strength while being lighter. The height of the tube 1 can be about 2-6 meters, and the wall thickness is about 2 mm, which can be determined according to the actual situation of the river bank soil layer. The higher the height, the deeper the depth of the soil layer can be driven into, making the structure more stable.
[0040] The diameter of the arrow insertion portion 2 gradually decreases from top to bottom and gradually converges into a tip, and its structure is approximately a cone, so that its tip is perpendicular to the soil layer and can be penetrated by applying pressure from top to bottom. Considering that the prefabricated arrow pile structure needs to be pressed into the soil layer before filling the cement mortar mixture, and the tip of the arrow insertion portion 2 receives a large pressure during the pressing process, it is easy to break or wear. Preferably, a solid tip 21 is provided at the bottom of the arrow insertion portion 2, and the overall height of the arrow insertion portion 2 is about 20-30 cm, while the height of the solid structure is about 5 cm. The solid structure can enhance the strength and rigidity of this part, improve its stability in use, and avoid breakage.
[0041] The connector 3 in this embodiment includes an outer sleeve 31, the height of the outer sleeve 31 is about 12 cm, and the outer sleeve 31 is provided with a limit block 32 protruding inwardly. The outer diameter of the tube 1 is the same as the outer diameter of the top of the arrow insertion part 2. The tube 1 and the arrow insertion part 2 are clamped on the upper and lower sides of the outer sleeve 31 respectively. The bottom end of the tube 1 contacts the upper surface of the limit block 32, and the top of the arrow insertion part 2 contacts the lower surface of the limit block 32. The connector 3 can quickly connect the tube 1 with the arrow insertion part 2. Since the prefabricated arrow pile composed of the tube 1 and the arrow insertion part 2 is only subjected to pressure from top to bottom during construction and installation, the expansion and pressing effect of each component can be better and the connection is stable.
[0042] The inner hole of the tube 1 communicates with the inner cavity of the arrow insertion part 2 to form a structural cavity for injecting the filler 5. The inner hole of the tube 1 is provided with a support framework 4. The support framework 4 is in a cylindrical structure. In this embodiment, the support framework 4 can be made of materials such as steel pipes, steel bars, and bamboo. Its specific selection depends on the actual situation of the riverbank. Materials such as steel bars and steel pipes have better and more stable support effects as skeletons but relatively higher costs, and are suitable for large river basins. When the slope protection in some small rivers is not under much pressure, materials such as bamboo can be selected as supports, with lower costs. The filler 5 is a mortar mixture, which is mainly a mixture prepared by mixing sand with other additives such as cement and lime in a certain proportion. After cement is mixed with water, a hydration reaction occurs, generating hardening substances. These hardening substances can fill the voids between the aggregates, thereby improving the structural strength and stability of the entire arrow pile unit module.
[0043] Furthermore, the arrow pile unit module further includes a cap 6. The cross-section of the cap 6 is in a U-shaped structure. The cap 6 covers the top of the tube 1 to seal the top opening of the tube 1. The upper surface of the cap 6 is in a planar structure. The setting of the cap 6 can, on the one hand, prevent the inner hole of the tube 1 from being exposed, and on the other hand, can also improve the overall aesthetics and coordination. In a possible implementation scheme, the cap 6 can be fixed by means of threaded connection, and the installation connection is more stable and not easy to separate.
[0044] During specific implementation, a plurality of the arrow pile unit modules are arranged at equal intervals along the length direction of the riverbank, and a mudguard 7 is provided between every two adjacent arrow pile unit modules. The mudguard 7 is preferably fixedly connected to the outer wall of the tube 1 of the arrow pile unit module through bolt members, which is convenient for disassembly and assembly. The arrow pile unit module can reduce the cross-section of the base soil and increase the firmness of the arrow pile under the base soil. The mudguard 7 can be made of external building formwork, or stone plastic board and integrated plastic wallboard used for interior decoration. The setting of the mudguard 7 can prevent soil erosion, play a role in slope protection, and prevent the riverbank slope from being washed. The arrow pile unit module can support the mudguard 7, and several drainage holes are left on the plate surface to ensure the discharge of groundwater.
[0045] In another possible implementation scheme, as Figure 4 shown, a cross-shaped strengthening support body 41 is formed inside the support framework 4. The strengthening support body 41 divides the inner hole of the support framework 4 into four small chambers. Therefore, a number of filling layer distribution areas can be formed both between the tube 1 and the support framework 4 and inside the support framework 4, and cooperate with each other to squeeze to further improve the strength and hardness of the final structure.
[0046] In another possible implementation scheme, as Figure 5As shown, in this embodiment, the connector 3 includes an inner tube 33, the upper and lower parts of which are provided with external threads, and the middle part is provided with a protruding block 34, the outer diameter of the block 34 is matched with the outer diameter of the tube 1 and the top of the arrow insertion part 2, and the bottom of the tube 1 and the top of the arrow insertion part 2 are provided with internal threaded holes connected to the connector 3. The threaded connection method is more stable and convenient for disassembly and assembly, and this connection method makes the outer side of the prefabricated arrow pile structure no longer have a protruding structure, the overall structure is more coordinated and easy to install and insert into the soil layer.
[0047] In another possible implementation, considering that simply lengthening the length of the tube 1 of the arrow pile unit module will increase the difficulty of construction and make transportation inconvenient, when the depth of pile foundation needs to be lengthened to improve stability in areas with severe erosion and strong hydraulic power, it is only necessary to connect several sections of the tube 1 up and down through pipe connectors to increase the overall height of the arrow pile unit module, and the specific number of connections can be determined according to actual conditions.
[0048] The present invention relates to a construction method of a low-cost and easy-to-construct fence-type bank and slope protection structure, comprising the following steps:
[0049] S1. Determine the scope of construction and delineate the construction area. Determine the spacing between adjacent arrow pile unit modules based on the actual stress conditions of the river bank and then delineate the marking area. In large river basins with fierce water flow, the spacing between adjacent arrow piles can be reduced and the distribution can be more dense to improve strength.
[0050] S2, the tube 1 is fixedly connected to the arrow insertion part 2 through the connector 3 to form a prefabricated arrow pile structure;
[0051] S3, pre-pressing and fixing a plurality of prefabricated arrow pile structures in each of the designated marked areas;
[0052] S4, after connecting the pile driving equipment with the pressure head, sinking and pressing each prefabricated arrow pile until it reaches a predetermined depth and then stops. The pressure head mold adopts an inner plug type pressure head, that is, a T-type pressure head;
[0053] S5, placing a support frame 4 into the inner hole of the tube 1 of each prefabricated arrow stake;
[0054] S6, using the injection pump in the cement mixer to fill the cement mortar mixture into the structural cavity of the prefabricated arrow pile and make the upper layer flush with the upper surface of the tube 1;
[0055] S7, after the cement mortar filler 5 is hardened, the cap 6 is put on to form the final arrow pile unit module;
[0056] S8, installing a fender 7 between two adjacent arrow pile unit modules, and fixing the fender 7 to the outer wall of the tube 1 of the arrow pile unit module by bolts;
[0057] S9, perform earth filling operation to cover the fender 7 stably.
[0058] The advantage of this bank and slope protection structure is that it is flexible in construction and can be designed according to the terrain of the river channel and river slope without being restricted by the terrain. It greatly simplifies the construction difficulty and reduces the construction cost while improving the protection effect. It is sturdy, durable and has a long service life. It occupies a small area and makes full use of the space. It has good flood control and flood discharge performance. The size and height of the overall structure of the bank and slope protection can be adjusted according to the actual situation of the slope. It is not easy to grow covering plants, which makes the water flow in the river faster. The damaged positions can be repaired and replaced separately, which is convenient and quick. The appearance color can change with the slope and is more beautiful. This bank and slope protection structure has a wide range of applications, and can be used for water, fields, and mountains.
[0059] It is worth noting that the technical features such as pile driving equipment, mixer, cement mortar mixture, etc. involved in the patent application of this invention should be regarded as prior art. The specific structure, working principle and possible control method and spatial layout method of these technical features can be selected by conventional methods in the field, and should not be regarded as the inventive point of this patent. This patent will not be further elaborated.
[0060] The above embodiments are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made by technicians in the relevant technical field based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A fence-type bank and slope protection structure, characterized in that: It comprises a plurality of arrow pile unit modules, which are evenly spaced along the length direction of the river bank, each of which comprises a tube, an arrowhead insertion part, and a connector, wherein the connector is used to connect the tube with the arrowhead insertion part, the arrowhead insertion part gradually decreases in diameter from top to bottom and gradually converges into a tip, the inner cavity of the tube is provided with a support frame, and the support frame is constructed to enhance the structural strength and hardness of the arrow pile unit module together with the filler injected into the inner cavity of the tube.
2. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The arrow pile unit module further includes a cap configured to tightly cover the top of the tube to close the top opening of the tube.
3. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The arrow-shaped insertion portion includes an inner cavity, and the inner cavity of the arrow-shaped insertion portion is connected with the inner cavity of the tube to form a common structural cavity to accommodate the support frame and the filler.
4. The fence-type bank and slope protection structure according to claim 3 is characterized in that: A solid tip is provided at the bottom of the arrow insertion portion.
5. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The support frame includes at least one cross-shaped reinforcing support body along the cross section of the tube, and the at least one cross-shaped reinforcing support body divides the inner cavity of the support frame into a plurality of chambers, thereby forming a plurality of filling material distribution areas in the tube.
6. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The tube is made of plastic material.
7. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The filler is a cement mortar mixture.
8. The fence-type bank and slope protection structure according to claim 1 is characterized in that: The connector includes an outer sleeve, which is provided with a limit block protruding inwardly. The outer diameter of the tube is the same as the outer diameter of the top end of the arrow insertion part. The tube and the arrow insertion part are respectively clamped on the upper and lower sides of the outer sleeve. The bottom end of the tube contacts the upper surface of the limit block, and the top end of the arrow insertion part contacts the lower surface of the limit block.
9. The fence-type bank and slope protection structure according to any one of claims 1 to 8, characterized in that: A fender is provided between every two adjacent arrow pile unit modules.
10. A construction method of a fence-type bank protection and slope protection structure, the fence-type bank protection and slope protection structure comprises a plurality of arrow pile unit modules, each of the plurality of arrow pile unit modules comprises a tube, an arrowhead insertion portion, and a connector, characterized in that: The construction method comprises the following steps: S1, determine the construction scope and demarcate the construction area, determine the spacing between adjacent arrow pile unit modules according to the actual stress conditions of the river bank, and then demarcate the marking area; S2, fixing the tube and the arrowhead inserting portion together through a connector to form a prefabricated arrow pile structure; S3, pre-pressing and fixing a plurality of prefabricated arrow pile structures in each of the designated marked areas; S4, connecting the pile driving device to the pressure head, and then sinking and pressing each prefabricated arrow pile until it reaches a predetermined depth and then stops; S5, placing a supporting frame into the inner hole of the tube of each prefabricated arrow stake; S6, using a plunger pump in a cement mixer to fill the cement mortar mixture into the structural cavity of the prefabricated arrow pile and make the upper layer flush with the upper surface of the tube; S7, after the cement mortar filling is hardened, a cap is put on the cap to form a final arrow pile unit module; S8, installing a fender between two adjacent arrow pile unit modules, and fixing the fender to the outer wall of the tube of the arrow pile unit module by bolts; S9, perform earth filling operation.