Foundation pit soil deformation determination method, device and equipment

By determining soil deformation based on the horizontal displacement data of the foundation pit wall, the problem that the foundation pit soil deformation monitoring technology is susceptible to external environment is solved, real-time and efficient deformation monitoring is achieved, and the safety of foundation pit projects is improved and Economical.

CN119437146AInactive Publication Date: 2025-02-14TIANJIN UNIV

Patent Information

Application Number
CN202510025356.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-02-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The internal deformation monitoring technology of foundation pit soil is easily affected by rainfall, corrosion and construction disturbances, resulting in poor durability, high cost, low accuracy, and low monitoring efficiency. It is impossible to timely warn of potential deformation risks, affecting the safety of foundation pit projects and Economical.

Method used

By determining the deformation data of the wall based on the horizontal displacement data of the foundation pit wall, the deformation data of the wall is determined using rotation data, translation data and hinge data to determine the horizontal and vertical strain data of the soil, and then obtaining the soil deformation results of the foundation pit.

Benefits of technology

Real-time and efficient monitoring of soil deformation in foundation pits is achieved, the safety and economicality of foundation pit projects are improved, and the defects of difficult monitoring, low efficiency and accuracy in traditional technologies are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119437146A_ABST
    Figure CN119437146A_ABST
Patent Text Reader

Abstract

The invention provides a foundation pit soil deformation determination method, device and equipment, which can be applied to the technical field of foundation pit engineering, and the method comprises the following steps: based on horizontal displacement data of a foundation pit wall, determining deformation data corresponding to the wall, the deformation data comprising rotation data, translation data and hinge data; the rotation data, the translation data and the hinge data are utilized to determine soil body strain data, and the soil body strain data comprise horizontal strain data and vertical strain data; mapping the horizontal strain data and the vertical strain data to respective corresponding initial matrixes to obtain a horizontal strain increment matrix and a vertical strain increment matrix; and determining soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain a soil deformation result of the foundation pit. By means of the method, the soil deformation condition of the foundation pit can be efficiently monitored in real time, and the safety and economical efficiency of foundation pit engineering are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of foundation pit engineering technology, and more specifically, to a method, apparatus and equipment for determining the deformation of foundation pit soil. Background Technology

[0002] In the field of foundation pit engineering, determining the internal deformation of the soil is crucial for ensuring the safety and stability of the project. During the excavation process, relevant technologies mainly include soil deformation monitoring techniques such as fiber optic monitoring, earth pressure monitoring, and array displacement gauge monitoring to monitor the deformation of the foundation pit soil.

[0003] In the process of conceiving this invention, the inventors discovered that the methods for monitoring foundation pit soil in related technologies have the following drawbacks: the soil internal deformation monitoring technology is easily affected by external environmental factors such as rainfall, corrosion, and construction disturbance, resulting in low survival rate of monitoring equipment, poor durability, high monitoring costs, and low accuracy of monitoring results; the integration level of monitoring systems of different types of monitoring equipment is not high, and the monitoring of soil internal deformation is easily limited by the sampling frequency, resulting in low monitoring efficiency, inability to provide timely warning of potential deformation risks, and easy to miss the best support opportunity, making it difficult to guarantee the economy and safety of foundation pit projects. Summary of the Invention

[0004] In view of this, the present invention provides a method, apparatus, equipment, medium and program product for determining the deformation of foundation pit soil.

[0005] One aspect of the present invention provides a method for determining soil deformation in a foundation pit, comprising: determining deformation data corresponding to the foundation pit wall based on horizontal displacement data of the wall, wherein the deformation data includes rotation data, translation data, and hinge data; determining soil strain data using the rotation data, translation data, and hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data; mapping the horizontal strain data and vertical strain data to their respective initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix; and determining soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain the soil deformation result of the foundation pit.

[0006] According to an embodiment of the present invention, determining soil deformation vector data based on the above-mentioned horizontal strain increment matrix and the above-mentioned vertical strain increment matrix includes: processing the above-mentioned horizontal strain increment matrix and the above-mentioned vertical strain increment matrix to obtain soil deformation data; and determining the above-mentioned soil deformation vector data based on the above-mentioned soil deformation data.

[0007] According to an embodiment of the present invention, determining soil deformation vector data based on the aforementioned horizontal strain increment matrix and the aforementioned vertical strain increment matrix includes: superimposing the aforementioned horizontal strain increment matrix and the aforementioned vertical strain increment matrix respectively to obtain a target horizontal matrix and a target vertical matrix; mapping the aforementioned target horizontal matrix and the aforementioned target vertical matrix to soil grid data respectively to generate soil horizontal deformation data and soil vertical deformation data; and determining the aforementioned soil deformation vector data based on the aforementioned soil horizontal deformation data and soil vertical deformation data.

[0008] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix; the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix; mapping the horizontal strain data and the vertical strain data to their respective initial matrices to obtain the horizontal strain increment matrix and the vertical strain increment matrix includes: mapping the horizontal strain data to the initial matrices to obtain the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, and the hinge horizontal strain increment matrix; and mapping the vertical strain data to the initial matrices to obtain the rotational vertical strain increment matrix, the translational vertical strain increment matrix, and the hinge vertical strain increment matrix. The horizontal strain increment matrix and the vertical strain increment matrix include their respective element data and mesh length data. The element data includes rotational element data, translational element data, and hinge element data, and the hinge element data includes multiple hinge element sub-data.

[0009] According to an embodiment of the present invention, the rotation data represents the data corresponding to the rotational deformation of the wall other than the bottom of the wall when the bottom of the wall is fixed, the translation data represents the data corresponding to the movement of the wall in a preset direction, and the hinge data represents the deformation data of the remaining wall in multiple directions when the bottom and top of the wall are fixed.

[0010] According to an embodiment of the present invention, the method further includes: determining horizontal strain data and vertical strain data corresponding to the rotation data, translation data and hinge data respectively from the soil strain data, to obtain rotation strain data, translation strain data and hinge strain data.

[0011] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix; the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix. Mapping the horizontal strain data and the vertical strain data to their respective initial matrices to obtain the horizontal strain increment matrix and the vertical strain increment matrix includes: mapping the rotational strain data to the initial matrix to obtain the rotational horizontal strain increment matrix and the rotational vertical strain increment matrix; mapping the translational strain data to the initial matrix to obtain the translational horizontal strain increment matrix and the translational vertical strain increment matrix; and mapping the hinge strain data to the initial matrix to obtain the hinge horizontal strain increment matrix and the hinge vertical strain increment matrix.

[0012] According to an embodiment of the present invention, determining soil strain data using the aforementioned rotation data, translation data, and hinge data includes: determining a deformation strategy corresponding to each of the aforementioned rotation data, translation data, and hinge data; and determining the aforementioned horizontal strain data and the aforementioned vertical strain data based on the aforementioned deformation strategy, the aforementioned rotation data, the aforementioned translation data, and the aforementioned hinge data.

[0013] Another aspect of the present invention provides a device for determining soil deformation in a foundation pit, comprising: a deformation data determination module, configured to determine deformation data corresponding to the foundation pit wall based on horizontal displacement data of the wall, wherein the deformation data includes rotation data, translation data, and hinge data; a strain data determination module, configured to determine soil strain data using the rotation data, translation data, and hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data; a mapping module, configured to map the horizontal strain data and vertical strain data to their respective initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix; and a vector data determination module, configured to determine soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain the soil deformation result of the foundation pit.

[0014] Another aspect of the present invention provides an electronic device comprising:

[0015] One or more processors;

[0016] Memory, used to store one or more programs.

[0017] When the above one or more programs are executed by the above one or more processors, the above one or more processors implement the methods described above.

[0018] Another aspect of the present invention provides a computer-readable storage medium storing computer-executable instructions, which, when executed, are used to implement the methods described above.

[0019] Another aspect of the present invention provides a computer program product comprising computer-executable instructions which, when executed, are used to implement the method described above.

[0020] According to the method, apparatus, and equipment for determining soil deformation in foundation pits provided by the present invention, the deformation data of the foundation pit wall can be directly determined based on the horizontal displacement data of the foundation pit wall. Then, the horizontal and vertical strain data of the soil can be determined using the rotational, translational, and hinge data in the deformation data. Furthermore, the soil deformation data of the foundation pit can be obtained based on the horizontal and vertical strain data. Since the soil deformation results of the foundation pit can be obtained simply by processing the deformation data of the foundation pit wall, the drawbacks of traditional technologies, such as the difficulty, low efficiency, and low accuracy of obtaining deformation data through internal soil monitoring, are avoided. This allows for real-time and efficient monitoring of the soil deformation in the foundation pit, further improving the safety and economy of foundation pit engineering. Attached Figure Description

[0021] The above and other objects, features and advantages of the present invention will become more apparent from the following description of embodiments of the invention with reference to the accompanying drawings, in which:

[0022] Figure 1 The illustration shows an application scenario of the method, apparatus, equipment, medium, and program product for determining soil deformation in a foundation pit according to an embodiment of the present invention.

[0023] Figure 2 A flowchart of a method for determining soil deformation in a foundation pit according to an embodiment of the present invention is shown;

[0024] Figure 3 Schematic diagrams of different types of wall deformation according to embodiments of the present invention are shown;

[0025] Figure 4 A schematic diagram of the measured horizontal displacement of a wall according to an embodiment of the present invention is shown;

[0026] Figure 5 A schematic diagram of soil deformation data and soil deformation vector data according to an embodiment of the present invention is shown, wherein (a) is soil horizontal deformation data, (b) is soil vertical deformation data, and (c) is soil deformation vector field;

[0027] Figure 6 A schematic diagram illustrating the process of determining the deformation of the foundation pit soil according to an embodiment of the present invention is shown;

[0028] Figure 7A structural block diagram of a device for determining soil deformation in a foundation pit according to an embodiment of the present invention is shown;

[0029] Figure 8 A block diagram of an electronic device suitable for implementing a method for determining soil deformation in a foundation pit, according to an embodiment of the present invention, is shown. Detailed Implementation

[0030] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of the invention. In the following detailed description, numerous specific details are set forth to provide a thorough understanding of the embodiments of the invention for ease of explanation. However, it will be apparent that one or more embodiments may be practiced without these specific details. Furthermore, descriptions of well-known structures and techniques are omitted in the following description to avoid unnecessarily obscuring the concept of the invention.

[0031] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the invention. The terms “comprising,” “including,” etc., as used herein indicate the presence of features, steps, operations, and / or components, but do not exclude the presence or addition of one or more other features, steps, operations, or components.

[0032] All terms used herein (including technical and scientific terms) have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used herein are to be interpreted in a manner consistent with the context of this specification, and not in an idealized or overly rigid way.

[0033] When using expressions such as "at least one of A, B and C", they should generally be interpreted in accordance with the meaning that is commonly understood by those skilled in the art (e.g., "a system having at least one of A, B and C" should include, but is not limited to, a system having A alone, a system having B alone, a system having C alone, a system having A and B, a system having A and C, a system having B and C, and / or a system having A, B and C, etc.).

[0034] It should be noted that in the embodiments of this application, certain software, components, models and other existing solutions in the industry may be mentioned. These should be regarded as exemplary and are only intended to illustrate the feasibility of implementing the technical solution of this application. However, it does not mean that the applicant has used or necessarily used the solution.

[0035] In the technical solution of this invention, the user information (including but not limited to user personal information, user image information, user device information, such as location information) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved are all information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, storage, use, processing, transmission, provision, disclosure, and application of related data all comply with relevant laws, regulations, and standards, take necessary confidentiality measures, do not violate public order and good morals, and provide corresponding operation entry points for users to choose to authorize or refuse.

[0036] In scenarios involving automated decision-making using personal information, the methods, devices, and systems provided in this invention offer users corresponding entry points for choosing to agree to or reject the automated decision-making results. If the user chooses to reject, the process proceeds to the expert decision-making stage. Here, "automated decision-making" refers to the activity of automatically analyzing and evaluating an individual's behavioral habits, interests, or economic, health, and credit status through computer programs, and then making a decision. Here, "expert decision-making" refers to the activity of making decisions by personnel who specialize in a particular field, possess specialized experience, knowledge, and skills, and have reached a certain level of professional expertise.

[0037] In the process of conceiving this invention, the inventors discovered that the deformation monitoring technology for the interior of the foundation pit soil in related technologies is easily affected by external environmental factors such as rainfall, corrosion and construction disturbance, resulting in low survival rate of monitoring equipment, poor durability, high monitoring cost, and low accuracy of monitoring results. The integration level of monitoring systems of different types of monitoring equipment is not high, and the monitoring of internal soil deformation is easily limited by the sampling frequency, all of which lead to low monitoring efficiency, inability to timely warn of potential deformation risks, and easy to miss the best support time, making it difficult to guarantee the economy and safety of foundation pit projects.

[0038] In view of this, the present invention can directly determine the deformation data of the foundation pit wall based on the horizontal displacement data of the wall. Then, the horizontal and vertical strain data of the soil can be determined by using the rotation data, translation data and hinge data in the deformation data. Based on the horizontal and vertical strain data, the soil deformation data of the foundation pit can be obtained. Since the soil deformation result of the foundation pit can be obtained by processing the deformation data of the foundation pit wall, the defects of traditional technology, such as high difficulty, low efficiency and low accuracy in obtaining deformation data by monitoring the soil inside, are avoided. It can achieve real-time and efficient monitoring of the deformation of the foundation pit soil, and further improve the safety and economy of foundation pit engineering.

[0039] Embodiments of the present invention provide a method, apparatus, device, medium, and program product for determining soil deformation in a foundation pit. The method includes: determining deformation data corresponding to the foundation pit wall based on horizontal displacement data, wherein the deformation data includes rotation data, translation data, and hinge data; determining soil strain data using the rotation data, translation data, and hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data; mapping the horizontal strain data and vertical strain data to their respective initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix; and determining soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain the soil deformation result of the foundation pit.

[0040] Figure 1 The illustration shows an application scenario of the method, apparatus, equipment, medium, and program products for determining soil deformation in foundation pits according to embodiments of the present invention.

[0041] like Figure 1 As shown, the application scenario according to this embodiment may include a first terminal device 101, a second terminal device 102, a third terminal device 103, a network 104, a server 105, and a monitoring device 106. The network 104 serves as a medium for providing a communication link between the first terminal device 101, the second terminal device 102, the third terminal device 103, and the server 105. The network 104 may include various connection types, such as wired or wireless communication links, or fiber optic cables, etc.

[0042] Monitoring device 106 can be used to monitor the horizontal displacement of the foundation pit wall (retaining wall), including but not limited to level instruments, inclinometers, displacement sensors, and deformation monitoring instruments. Monitoring device 106 can be installed inside the borehole of the retaining wall and can transmit monitoring data to server 105 at predetermined time intervals. Monitoring device 106 and server 105 can communicate via network 104 to meet data transmission requirements. It is understood that the type of monitoring device 106 can be determined according to actual circumstances, and is not specifically limited here.

[0043] Users can use the first terminal device 101, the second terminal device 102, and the third terminal device 103 to interact with the server 105 via the network 104 to receive or send messages, etc. Various communication client applications can be installed on the first terminal device 101, the second terminal device 102, and the third terminal device 103, such as shopping applications, web browser applications, search applications, instant messaging tools, email clients, social media platform software, etc. (for example only).

[0044] The first terminal device 101, the second terminal device 102, and the third terminal device 103 can be various electronic devices with displays and support web browsing, including but not limited to smartphones, tablets, laptops, and desktop computers.

[0045] Server 105 can be a server that provides various services, such as a backend management server that supports websites browsed by users using the first terminal device 101, the second terminal device 102, and the third terminal device 103 (this is just an example). The backend management server can analyze and process data such as received user requests, and feed back the processing results (such as web pages, information, or data obtained or generated according to user requests) to the terminal devices.

[0046] It should be noted that the method for determining the soil deformation of the foundation pit provided in this embodiment of the invention can generally be executed by server 105. Correspondingly, the device for determining the soil deformation of the foundation pit provided in this embodiment of the invention can generally be installed in server 105. The method for determining the soil deformation of the foundation pit provided in this embodiment of the invention can also be executed by a server or server cluster that is different from server 105 and capable of communicating with the first terminal device 101, the second terminal device 102, the third terminal device 103, and / or server 105. Correspondingly, the device for determining the soil deformation of the foundation pit provided in this embodiment of the invention can also be installed in a server or server cluster that is different from server 105 and capable of communicating with the first terminal device 101, the second terminal device 102, the third terminal device 103, and / or server 105.

[0047] It should be understood that Figure 1 The number of terminal devices, networks, monitoring devices, and servers shown is merely illustrative. Depending on implementation needs, any number of terminal devices, monitoring devices, networks, and servers can be included.

[0048] Figure 2 A flowchart of a method for determining soil deformation in a foundation pit according to an embodiment of the present invention is shown.

[0049] like Figure 2 As shown, the method for determining the deformation of the foundation pit soil in this embodiment includes operations S210 to S240.

[0050] In operation S210, based on the horizontal displacement data of the foundation pit wall, the deformation data corresponding to the wall is determined. The deformation data includes rotation data, translation data, and hinge data.

[0051] According to embodiments of the present invention, horizontal displacement data can characterize the horizontal displacement of the foundation pit wall (retaining wall) caused by external forces. Deformation data can be categorized into rotational data, translational data, and hinge data based on different types of wall deformation. It is understood that in engineering monitoring, when the retaining wall is subjected to external soil pressure, a preset range of wall deformation is permissible.

[0052] In embodiments of the present invention, the wall can be considered a rigid body. Rotation data can characterize the deformation data generated when the bottom of the wall is fixed and other parts of the wall rotate clockwise or counterclockwise along the bottom. Translation data can characterize the horizontal movement of the wall in different directions when the wall is considered a rigid body. Hinge data can characterize the deformation data generated when the top and bottom of the wall are used as pin-connected members and other wall parts (including the upper and lower sides) are used as two straight line segments for deflection.

[0053] It is understandable that hinge data can be viewed as deformation data generated by the rotational deformation produced by multiple hinge mechanisms. This hinge mechanism can be equivalent to superimposed wall rotation mechanisms in two different directions: the lower segment is pinned at the bottom and rotates around the bottom, while the upper segment rotates in the opposite direction around the hinge. The superposition of the two wall rotation mechanisms in different directions fixes the top of the wall.

[0054] In operation S220, soil strain data is determined using rotation data, translation data, and hinge data, which includes horizontal strain data and vertical strain data.

[0055] According to embodiments of the present invention, soil strain data can characterize the strain data of the foundation pit soil in multiple directions corresponding to the process of rotational deformation, translational deformation, or hinge deformation of the wall. Horizontal strain data may include horizontal strain data corresponding to the rotational deformation, translational deformation, and hinge deformation of the wall, which can be respectively denoted as first horizontal strain data, second horizontal strain data, and third horizontal strain data; vertical strain data may include vertical strain data corresponding to the rotational deformation, translational deformation, and hinge deformation of the wall, which can be respectively denoted as first vertical strain data, second vertical strain data, and third vertical strain data.

[0056] In operation S230, the horizontal strain data and vertical strain data are mapped to their respective initial matrices to obtain the horizontal strain increment matrix and the vertical strain increment matrix.

[0057] According to an embodiment of the present invention, the initial matrix can characterize the deformation matrix of the soil inside the foundation pit before excavation, and can be set as an n-order all-zero square matrix. The strain increment matrix can characterize the change (increment) between the strain data of the foundation pit soil in its original state and the strain data of the soil in its construction state. After obtaining the horizontal strain data and the vertical strain data, the first horizontal strain data, the second horizontal strain data, the third horizontal strain data, the first vertical strain data, the second vertical strain data, and the third vertical strain data can be mapped to the initial matrix in the corresponding direction, respectively, to obtain the horizontal strain increment matrix and the vertical strain increment matrix of the soil.

[0058] According to an embodiment of the present invention, after mapping the first horizontal strain data, the second horizontal strain data, and the third horizontal strain data to an initial matrix, a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix can be obtained, respectively. After mapping the first vertical strain data, the second vertical strain data, and the third vertical strain data to the initial matrix, a first vertical strain increment matrix (rotational vertical strain increment matrix), a second vertical strain increment matrix (translational vertical strain increment matrix), and a third vertical strain increment matrix (hinge vertical strain increment matrix) can be obtained, respectively.

[0059] In operation S240, the soil deformation vector data is determined based on the horizontal strain increment matrix and the vertical strain increment matrix, and the soil deformation results of the foundation pit are obtained.

[0060] According to an embodiment of the present invention, after determining the horizontal strain increment matrix and the vertical strain increment matrix, the horizontal strain increment matrix and the vertical strain increment matrix can be superimposed and mapped to the initial soil mesh to obtain soil deformation vector data. The initial soil mesh is the initial mesh corresponding to the initial matrix.

[0061] According to embodiments of the present invention, soil strain data may include horizontal strain data and vertical strain data. The horizontal strain data may include first horizontal strain data (rotational horizontal strain data), second horizontal strain data (translational horizontal strain data), and third horizontal strain data (hinge horizontal strain data). The vertical strain data may include first vertical strain data (rotational vertical strain data), second vertical strain data (translational vertical strain data), and third vertical strain data (hinge vertical strain data).

[0062] In one feasible embodiment, the rotational horizontal strain data can characterize the increment of soil horizontal strain corresponding to the rigid rotation of the wall around its base, and can be denoted as... Rotational vertical strain data can characterize the increase in vertical strain of the soil corresponding to the rigid rotation of the wall around its base, and can be denoted as... ,in, The angular increment representing the rigid rotation of the wall around its base, in radians, where r represents the rigid rotation of the wall around its base, h represents the horizontal change, and v represents the vertical change; the translational horizontal strain data can characterize the increment of the soil's horizontal strain corresponding to the rigid translation of the wall, and can be denoted as... Translational vertical strain data can characterize the increase in vertical strain of the soil corresponding to the rigid translation of the wall, and can be denoted as... ,in, Let t represent the rigid translation of the wall, and l represent the length of the wall. The hinge horizontal strain data can include the superposition of two different wall rotation mechanisms. The horizontal strain increment of the soil corresponding to the upper line segment can be denoted as... The vertical strain increment of the soil corresponding to the upper line segment can be denoted as... ,in, , Let be the included angle of the i-th hinge component, in radians. The upper side line strain increment is generally marked with a "-" sign to indicate reverse rotation; the soil horizontal strain increment corresponding to the lower side line segment can be denoted as . The vertical strain increment of the soil corresponding to the lower line segment can be denoted as... ,in, X can represent the vertical distance from the top of the wall to the i-th hinge.

[0063] According to embodiments of the present invention, the deformation data of the foundation pit wall can be directly determined based on the horizontal displacement data of the foundation pit wall. Then, the horizontal and vertical strain data of the soil can be determined using the rotational, translational, and hinge data within the deformation data. Furthermore, the soil deformation data of the foundation pit can be obtained based on the horizontal and vertical strain data. Since the soil deformation results of the foundation pit can be obtained simply by processing the deformation data of the foundation pit wall, the drawbacks of traditional techniques—such as the difficulty, low efficiency, and low accuracy of obtaining deformation data through internal soil monitoring—are avoided. This allows for real-time and efficient monitoring of the soil deformation in the foundation pit, further improving the safety and economy of foundation pit engineering.

[0064] As you can understand, the above text has provided an example of how to determine the deformation results of the foundation pit soil. The following text will further explain how to determine the soil deformation vector data.

[0065] According to an embodiment of the present invention, determining soil deformation vector data based on a horizontal strain increment matrix and a vertical strain increment matrix includes: processing the horizontal strain increment matrix and the vertical strain increment matrix to obtain soil deformation data; and determining soil deformation vector data based on the soil deformation data.

[0066] According to embodiments of the present invention, the method of obtaining soil deformation data by superimposing and mapping the horizontal strain increment matrix and the vertical strain increment matrix may include: horizontally superimposing the product of the elements of the horizontal strain increment matrix of the soil with the length of a single grid in the initial matrix to obtain the horizontal deformation vector data of the soil; vertically accumulating the product of the elements of the vertical strain increment matrix of the soil with the length of a single grid in the initial matrix to obtain the vertical deformation vector data of the soil; and then obtaining the soil deformation result of the foundation pit based on the horizontal deformation vector data and the vertical deformation vector data of the soil.

[0067] According to embodiments of the present invention, soil deformation data can be obtained by superimposing the horizontal strain increment matrix and the vertical strain increment matrix and mapping them to soil mesh data. The soil deformation data can include horizontal soil deformation data and vertical soil deformation data. The soil mesh data can represent an initial n×n mesh, where the length of a single mesh can be l / n-1, where l is the length of the wall. The methods for obtaining soil deformation data can include: horizontally accumulating the product of the elements of the horizontal strain increment matrix and the length of a single mesh to obtain horizontal soil deformation data; and vertically accumulating the product of the elements of the vertical strain increment matrix and the length of a single mesh to obtain vertical soil deformation data.

[0068] As you can understand, the above text has provided an example of how to determine soil deformation vector data. The following text will provide a further explanation of how to determine soil deformation vector data.

[0069] According to an embodiment of the present invention, determining soil deformation vector data based on a horizontal strain increment matrix and a vertical strain increment matrix includes: superimposing the horizontal strain increment matrix and the vertical strain increment matrix respectively to obtain a target horizontal matrix and a target vertical matrix; mapping the target horizontal matrix and the target vertical matrix to soil grid data respectively to generate soil horizontal deformation data and soil vertical deformation data; and determining soil deformation vector data based on the soil horizontal deformation data and soil vertical deformation data.

[0070] According to an embodiment of the present invention, after determining the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, and the hinge horizontal strain increment matrix, the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, and the hinge horizontal strain increment matrix can be superimposed to obtain the target horizontal matrix. At the same time, the first vertical strain increment matrix, the second vertical strain increment matrix, and the third vertical strain increment matrix can be superimposed to obtain the target vertical matrix. Then, the target horizontal matrix and the target vertical matrix can be mapped to soil mesh data respectively to obtain soil horizontal deformation data and soil vertical deformation data.

[0071] In embodiments of the present invention, soil deformation vector data can also be referred to as soil deformation vector field. The soil deformation vector field characterizes the displacement of each point in the soil, with each point's displacement consisting of two components: horizontal displacement and vertical displacement. The soil deformation vector field can be obtained by superimposing the horizontal and vertical deformation data of the soil. For example, determining the horizontal displacement m1 and vertical displacement m2 of the soil can be represented by vectors or matrices; adding m1 and m2 yields the soil deformation vector field M.

[0072] According to embodiments of the present invention, by analyzing deformation data (deformation field), potential deformation risk areas can be identified, thereby optimizing the design of the foundation pit support structure and improving its stability and safety. At the same time, by determining the soil deformation vector data (vector field), the deformation direction and amplitude of the soil can be visually observed, helping to assess the impact of foundation pit excavation on the surrounding environment. By analyzing the evolution of the deformation field, a reasonable monitoring plan can be formulated, abnormal deformation can be detected in a timely manner, and measures can be taken to prevent further displacement of the foundation pit soil. This allows for a better assessment of the impact of foundation pit construction on surrounding buildings, infrastructure, and underground pipelines, thereby enabling the formulation of corresponding risk management measures to reduce construction risks and economic losses.

[0073] As you can understand, the above text has provided an example of how to determine soil deformation vector data. The following text will explain how to determine the horizontal strain increment matrix and the vertical strain increment matrix.

[0074] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix; the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix. Mapping the horizontal strain data and vertical strain data to their respective initial matrices to obtain the horizontal strain increment matrix and vertical strain increment matrix includes: mapping the horizontal strain data to the initial matrices to obtain the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, and the hinge horizontal strain increment matrix; and mapping the vertical strain data to the initial matrices to obtain the rotational vertical strain increment matrix, the translational vertical strain increment matrix, and the hinge vertical strain increment matrix. The horizontal strain increment matrix and vertical strain increment matrix include their respective element data and mesh length data. The element data includes rotational element data, translational element data, and hinge element data, and the hinge element data includes multiple hinge element sub-data.

[0075] According to an embodiment of the present invention, before the excavation of the foundation pit, the initial soil deformation matrix can be preset as an n-order all-zero square matrix. n can be determined according to actual needs, satisfying n > 1 and n is a positive integer, for example, n = 50. After defining the initial matrix and obtaining the horizontal and vertical strain data, the horizontal and vertical strain data can be mapped to the initial matrix respectively, thereby obtaining the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix and the hinge horizontal increment matrix, as well as the rotational vertical strain increment matrix, the translational vertical strain increment matrix and the hinge vertical increment matrix.

[0076] In one feasible embodiment, the rotational horizontal strain increment matrix and the rotational vertical strain increment matrix can be strictly upper triangular matrices of order n; the translational horizontal strain increment matrix and the translational vertical strain increment matrix can be square matrices of order n; in the hinge strain increment matrix, the hinge horizontal increment matrix and the hinge vertical increment matrix corresponding to the deformation of the lower segment of the i-th hinge mechanism can be strictly upper triangular matrices of order n, and the hinge horizontal increment matrix and the hinge vertical increment matrix corresponding to the deformation of the upper segment can be upper triangular matrices of order n containing diagonal offset terms ki.

[0077] According to embodiments of the present invention, the horizontal and vertical strain increments are systematically expressed in matrix form, enabling systematic strain analysis, facilitating overall analysis and processing, and enhancing the readability and operability of the model. The matrix method simplifies the calculation process, enabling convenient numerical simulation, especially in large-scale soil data analysis, effectively improving computational efficiency. Integrating strain data from different directions into a unified matrix enhances data integration capabilities, facilitating multi-dimensional data analysis and comparison, and improving information usability. Mapping to the initial matrix in the corresponding direction helps identify deformation modes, allowing for clearer identification of soil deformation modes under different working conditions, providing a basis for engineering design.

[0078] As can be understood, the above text has provided an example of how to determine the horizontal strain increment matrix and the vertical strain increment matrix. The following text will explain the rotation data, translation data, and hinge data.

[0079] According to an embodiment of the present invention, rotation data represents the data corresponding to the rotational deformation of the wall other than the bottom of the wall when the bottom of the wall is fixed; translation data represents the data corresponding to the wall moving in a preset direction; and hinge data represents the deformation data of the remaining wall in multiple directions when the bottom and top of the wall are fixed.

[0080] Figure 3 Schematic diagrams of different types of wall deformation according to embodiments of the present invention are shown.

[0081] In embodiments of the present invention, after the foundation pit is excavated, monitoring equipment can be used to monitor the deformation of the wall. The acquired detection data is used to analyze the horizontal deflection of the wall after the foundation pit excavation, thereby determining the wall deformation data. Figure 3 As shown, rotation data 310 can characterize the data generated by the rotational deformation of the wall based on the fixed bottom of the wall and the rotation of other wall parts. Translation data 320 can be regarded as the wall as a whole, including the data formed by the overall movement along the horizontal or vertical direction. Hinge data 330 can include the deformation data of the remaining wall in multiple directions (e.g., clockwise or counterclockwise). By combining and superimposing rotation data 310, translation data 320 and multiple hinge data 330, the overall deformation data 300 of the wall can be obtained.

[0082] As we have explained the rotational, translational, and hinge data above, we will now further explain how to determine these data.

[0083] According to an embodiment of the present invention, the method further includes: determining horizontal strain data and vertical strain data corresponding to rotational data, translational data and hinge data respectively from soil strain data, to obtain rotational strain data, translational strain data and hinge strain data.

[0084] In embodiments of the present invention, rotational strain data can be determined by superimposing the horizontal and vertical strain data corresponding to the rotational data. Translational strain data can be determined by superimposing the horizontal and vertical strain data corresponding to the translational data. Hinge strain data can be obtained by superimposing the horizontal and vertical strain data corresponding to the hinge data. Rotational strain data, translational strain data, and hinge strain data are important factors in analyzing the stability and bearing capacity of soil, affecting the safety and economy of foundation pit construction.

[0085] As we have already explained above, this section provides examples of how to determine rotational strain data, translational strain data, and hinge strain data. The following section will further explain how to determine the horizontal strain increment matrix and the vertical strain increment matrix.

[0086] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix, and the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix. Mapping the horizontal strain data and vertical strain data to their respective initial matrices to obtain the horizontal strain increment matrix and vertical strain increment matrix includes: mapping the rotational strain data to the initial matrix to obtain the rotational horizontal strain increment matrix and the rotational vertical strain increment matrix; mapping the translational strain data to the initial matrix to obtain the translational horizontal strain increment matrix and the translational vertical strain increment matrix; and mapping the hinge strain data to the initial matrix to obtain the hinge horizontal strain increment matrix and the hinge vertical strain increment matrix.

[0088] According to an embodiment of the present invention, the rotational horizontal strain increment matrix and the rotational vertical strain increment matrix can be strictly upper triangular matrices of order n, with matrix element values ​​as follows: and The translational horizontal strain increment matrix and the translational vertical strain increment matrix can be n-order square matrices, with the matrix element values ​​being respectively... and In the hinge strain increment matrix, the hinge horizontal increment matrix and hinge vertical increment matrix corresponding to the deformation of the lower segment of the i-th hinge mechanism can be strictly upper triangular matrices of order n, with matrix element values ​​as follows: and The hinge horizontal increment matrix and hinge vertical increment matrix corresponding to the deformation of the upper line segment can be n-order upper triangular matrices containing diagonal offset terms ki, with the matrix element values ​​being respectively and , where ki represents the starting position of the diagonal, and is the vertical distance from the i-th hinge to the bottom of the wall.

[0089] In embodiments of the present invention, hinge element sub-data can characterize the sub-data corresponding to each of multiple hinge components in the hinge mechanism. The matrix element values ​​of the hinge horizontal increment matrix and the hinge vertical increment matrix of the multiple hinge components can be respectively... and , where N is the total number of multiple hinge components.

[0090] According to an embodiment of the present invention, after determining the rotational horizontal strain increment matrix, the rotational vertical strain increment matrix, the translational horizontal strain increment matrix, the translational vertical strain increment matrix, the hinge horizontal increment matrix, and the hinge vertical increment matrix, the element values ​​of the total horizontal strain increment matrix and the vertical strain increment matrix of the foundation pit soil can be determined as follows: and .

[0091] As you can understand, the above text has provided an example of how to determine the horizontal strain increment matrix and the vertical strain increment matrix. The following text will further explain how to determine the horizontal strain data and the vertical strain data.

[0092] According to an embodiment of the present invention, soil strain data is determined using rotational data, translational data, and hinge data, including: determining a deformation strategy corresponding to each of the rotational data, translational data, and hinge data; and determining horizontal strain data and vertical strain data based on the deformation strategy, rotational data, translational data, and hinge data.

[0093] According to an embodiment of the present invention, after determining the wall deformation data, the wall deformation data can be decomposed into rigid wall rotation data around the bottom (rotation data), rigid wall translation data (translation data), and deformation data of multiple hinge mechanisms (hinge data). The rigid wall rotation data around the bottom characterizes the data corresponding to clockwise or counterclockwise rotation with the wall considered a rigid body and its bottom fixed. The rigid wall translation data characterizes the data corresponding to horizontal left or right movement with the wall considered a rigid body. The deformation data of multiple hinge mechanisms characterizes the wall top and bottom being pinned together, with the wall deflected as two straight segments connected by hinges. This is equivalent to superimposing two different wall rotation mechanisms: the lower segment is pinned at the bottom and rotates around the bottom, while the upper segment rotates in the opposite direction around the hinge. The superposition of these two different wall rotation mechanisms fixes the top of the wall. After determining the rotation data, translation data, and hinge data, the corresponding horizontal strain increment and vertical strain increment of the soil can be calculated based on the rotation, translation, and hinge deformation strategies, respectively.

[0094] In one feasible embodiment, the prediction of soil deformation results is illustrated by taking the horizontal displacement of the wall measured by a measuring plane in the open-cut deep foundation pit at the end of Port A tunnel. The basic information of the foundation pit and the support load information are shown in Table 1. Table 1 shows the basic information of the foundation pit and the support load information according to the embodiment of the present invention.

[0095] Table 1

[0096]

[0097] in, Strain data characterizing half of the peak undrained shear strength when mobilized.

[0098] As can be understood, Table 1 above explained the basic information and support load information of the foundation pit. The following will... Figure 4 Table 2 further illustrates the wall horizontal displacement, hinge mechanism, rotation angle data, and strain increment matrix of the present invention.

[0099] Figure 4 A schematic diagram of the measured horizontal displacement of a wall according to an embodiment of the present invention is shown.

[0100] like Figure 4 As shown, the inclinometer did not extend to the bottom of the retaining wall, but terminated at a depth of 18 meters, resulting in a lack of certainty regarding lateral displacement data. When plotting the field data, it was assumed that the lateral displacement from the 18-meter depth to the bottom of the retaining wall was zero. This assumption is reasonable in the absence of contradictory data. Meanwhile, the horizontal displacement value at the top of the wall was missing. Multinomial regression was used to fit the measured horizontal displacement of the wall. A total of 49 measuring points were fitted, of which 38 points were measured values, the horizontal displacement at the top of the wall was the fitted value (0.430 mm), and the horizontal displacement at the remaining measuring points was 0.

[0101] Based on the information from each measuring point, the wall deformation can be decomposed into rotational data, translational data, and hinge data. Among these, the rotational data includes the angular increment. for displacement increment of translation data The value is 0. The wall deformation is decomposed into 47 hinge mechanisms sequentially downwards from the top of the wall, as detailed in Table 2. Table 2 shows the hinge mechanisms and rotation data according to an embodiment of the present invention.

[0102] Table 2

[0103]

[0104] Based on the increment of horizontal soil strain corresponding to the rigid rotation of the wall around its base The obtained soil horizontal strain increment matrix (square matrix) and soil vertical strain increment The obtained vertical strain increment matrices (square matrices) of the soil are as follows:

[0105]

[0106] Due to the displacement increment of rigid translation of the wall The value is 0, representing the increase in horizontal soil strain corresponding to the rigid translation of the wall. The obtained soil horizontal strain increment matrix and soil vertical strain increment The obtained vertical strain increment matrices of the soil are all zero matrices (square matrices) with n=50.

[0107] In an embodiment of the present invention, the soil horizontal and vertical strain increment matrices corresponding to the deformation of multiple hinge mechanisms can be the superposition of the soil horizontal and vertical strain increment matrices corresponding to 47 hinge mechanisms respectively. Here, the hinge mechanism is used as an example. ( Taking the calculation of the horizontal and vertical strain increment matrices of soil as an example: it can be seen that... as well as The horizontal strain increment of the soil corresponding to the lower line segment The vertical strain increment of the soil corresponding to the lower line segment The increment of horizontal strain in the soil corresponding to the upper line segment The vertical strain increment of the soil corresponding to the upper line segment diagonal offset term Therefore, the increment of horizontal soil strain corresponding to the third hinge mechanism. The obtained soil horizontal strain increment matrix (square matrix) and soil vertical strain increment The obtained vertical strain increment matrices (square matrices) of the soil are as follows:

[0108] and

[0109] In embodiments of the present invention, the calculation methods for the soil horizontal strain increment matrix and soil vertical strain increment matrix corresponding to the deformation of the remaining hinge mechanisms can be the same as described above. After obtaining the soil horizontal strain increment matrix and vertical strain increment matrix, the soil horizontal strain increment matrix and vertical strain increment matrix of the deformation mechanisms of rigid wall rotation around the bottom, rigid wall translation, and multiple hinge mechanisms can be superimposed respectively, mapped to the initial soil mesh, and the soil horizontal deformation data and soil vertical deformation data can be obtained.

[0110] It is understandable that the above text uses... Figure 4 Table 2 describes the horizontal displacement of the wall, the hinge mechanism, the rotation angle data, and the strain increment matrix of the present invention. The following will explain... Figure 5 The method for determining the soil deformation data and soil deformation vector data of the present invention will be further explained.

[0111] Figure 5 A schematic diagram of soil deformation data and soil deformation vector data according to an embodiment of the present invention is shown.

[0112] In this embodiment of the invention, the initial soil mesh can represent a 50×50 initial mesh, with a single mesh length of [missing information]. .like Figure 5 As shown in Figure (a), the horizontal deformation data of the soil can be obtained by multiplying the elements of the horizontal strain increment matrix of the soil by the length of a single grid; as shown in Figure (a). Figure 5 As shown in Figure (b), the vertical deformation data of the soil can be obtained by multiplying the elements of the vertical strain increment matrix of the soil vertically with the length of a single grid. Figure 5 As shown in Figure (c), the soil deformation vector field can be obtained by superimposing the soil horizontal deformation data and the soil vertical deformation data.

[0113] It is understandable that the above text uses... Figure 5The method for determining soil deformation data and soil deformation vector data in this invention has been explained. The following will describe the process... Figure 6 The process for determining the deformation of the foundation pit soil according to the present invention will be further explained.

[0114] Figure 6 A schematic diagram of the process for determining the deformation of the foundation pit soil according to an embodiment of the present invention is shown.

[0115] like Figure 6 As shown, based on the horizontal displacement data 610 of the foundation pit wall, the corresponding deformation data 620 of the wall can be determined. The deformation data 620 can include rotation data 621, translation data 622, and hinge data 623. Using the rotation data 621, translation data 622, and hinge data 623, the soil strain data 630 can be determined. The soil strain data 630 can include horizontal strain data 631 and vertical strain data 632. Thus, the horizontal strain data 631 and vertical strain data 632 are mapped to their respective initial matrices 640 to obtain the strain. The incremental matrix 650 includes a horizontal strain increment matrix 651 and a vertical strain increment matrix 652. The horizontal strain increment matrix 651 and the vertical strain increment matrix 652 are then superimposed and mapped to obtain soil deformation data 660. Soil deformation data 660 can include horizontal soil deformation data 661 and vertical soil deformation data 662. The horizontal soil deformation data 661 and the vertical soil deformation data 662 are then superimposed to obtain soil deformation vector data 670. Finally, the soil deformation result 680 of the foundation pit is calculated.

[0116] Based on the above-mentioned method for determining the deformation of foundation pit soil, this invention also provides a device for determining the deformation of foundation pit soil. The following will be combined with... Figure 7 The device is described in detail.

[0117] Figure 7 A structural block diagram of a device for determining soil deformation in a foundation pit according to an embodiment of the present invention is shown.

[0118] like Figure 7 As shown, the foundation pit soil deformation determination device of this embodiment includes a deformation data determination module 710, a strain data determination module 720, a mapping module 730, and a vector data determination module 740.

[0119] The deformation data determination module 710 is used to determine the deformation data corresponding to the foundation pit wall based on the horizontal displacement data of the wall. The deformation data includes rotation data, translation data, and hinge data. In one embodiment, the deformation data determination module 710 can be used to perform the operation S210 described above, which will not be repeated here.

[0120] The strain data determination module 720 is used to determine soil strain data using rotation data, translation data, and hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data. In one embodiment, the strain data determination module 720 can be used to perform the operation S220 described above, which will not be repeated here.

[0121] The mapping module 730 is used to map the horizontal strain data and the vertical strain data to their respective initial matrices to obtain the horizontal strain increment matrix and the vertical strain increment matrix. In one embodiment, the mapping module 730 can be used to perform the operation S230 described above, which will not be repeated here.

[0122] The vector data determination module 740 is used to determine soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix, thereby obtaining the soil deformation results of the foundation pit. In one embodiment, the vector data determination module 740 can be used to perform the operation S240 described above, which will not be repeated here.

[0123] According to an embodiment of the present invention, the deformation data determination module 710, strain data determination module 720, mapping module 730, and vector data determination module 740 in the foundation pit soil deformation determination device can directly determine the deformation data of the wall based on the horizontal displacement data of the foundation pit wall. Then, the horizontal and vertical strain data of the soil can be determined using the rotational, translational, and hinge data in the deformation data. Based on the horizontal and vertical strain data, the soil deformation data of the foundation pit can be obtained. Since the soil deformation result of the foundation pit can be obtained simply by processing the deformation data of the foundation pit wall, the drawbacks of traditional technologies, such as the difficulty, low efficiency, and low accuracy of obtaining deformation data through internal soil monitoring, are avoided. This allows for real-time and efficient monitoring of the deformation of the foundation pit soil, further improving the safety and economy of foundation pit engineering.

[0124] According to an embodiment of the present invention, the vector data determination module 740 includes a matrix processing submodule and a vector data determination submodule. The matrix processing submodule is used to process the horizontal strain increment matrix and the vertical strain increment matrix to obtain soil deformation data. The vector data determination submodule is used to determine soil deformation vector data based on the soil deformation data.

[0125] According to an embodiment of the present invention, the vector data determination module 740 includes: a superposition submodule, a mapping submodule, and a vector data determination submodule. The superposition submodule is used to superimpose the horizontal strain increment matrix and the vertical strain increment matrix respectively to obtain a target horizontal matrix and a target vertical matrix. The mapping submodule is used to map the target horizontal matrix and the target vertical matrix to soil mesh data respectively, generating soil horizontal deformation data and soil vertical deformation data. The vector data determination submodule is used to determine soil deformation vector data based on the soil horizontal deformation data and the soil vertical deformation data.

[0126] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix; the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix; the mapping module includes a mapping submodule, used to map the horizontal strain data and the vertical strain data to the initial matrix respectively, to obtain the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, and the hinge horizontal strain increment matrix, as well as the rotational vertical strain increment matrix, the translational vertical strain increment matrix, and the hinge vertical strain increment matrix, wherein the horizontal strain increment matrix and the vertical strain increment matrix include their respective element data and mesh length data, the element data includes rotational element data, translational element data, and hinge element data, and the hinge element data includes multiple hinge element sub-data.

[0127] According to an embodiment of the present invention, rotation data represents the data corresponding to the rotational deformation of the wall other than the bottom of the wall when the bottom of the wall is fixed; translation data represents the data corresponding to the wall moving in a preset direction; and hinge data represents the deformation data of the remaining wall in multiple directions when the bottom and top of the wall are fixed.

[0128] According to an embodiment of the present invention, the apparatus further includes: a data determination module, configured to determine horizontal strain data and vertical strain data corresponding to rotational data, translational data and hinge data respectively from soil strain data, thereby obtaining rotational strain data, translational strain data and hinge strain data.

[0129] According to an embodiment of the present invention, the horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix, and a hinge horizontal strain increment matrix; the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix, and a hinge vertical strain increment matrix; the mapping module 730 includes a strain data mapping submodule, used to map the rotational strain data, translational strain data, and hinge strain data to the initial matrix respectively, to obtain the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix, the hinge horizontal strain increment matrix, the rotational vertical strain increment matrix, the translational vertical strain increment matrix, and the hinge vertical strain increment matrix.

[0130] According to an embodiment of the present invention, the strain data determination module 720 includes a strategy determination submodule and a strain data determination submodule. The strategy determination submodule is used to determine the deformation strategy corresponding to each of the rotational data, translational data, and hinge data. The strain data determination submodule is used to determine horizontal strain data and vertical strain data based on the deformation strategy, rotational data, translational data, and hinge data.

[0131] According to embodiments of the present invention, any plurality of modules among the deformation data determination module 710, strain data determination module 720, mapping module 730, and vector data determination module 740 may be combined into one module, or any one of these modules may be split into multiple modules. Alternatively, at least part of the functionality of one or more of these modules may be combined with at least part of the functionality of other modules and implemented in one module. According to embodiments of the present invention, at least one of the deformation data determination module 710, strain data determination module 720, mapping module 730, and vector data determination module 740 may be at least partially implemented as hardware circuitry, such as a field-programmable gate array (FPGA), a programmable logic array (PLA), a system-on-a-chip, a system-on-a-substrate, a system-on-package, an application-specific integrated circuit (ASIC), or any other reasonable means of integrating or packaging circuitry, or implemented in software, hardware, or firmware, or in any suitable combination of any of these three implementation methods. Alternatively, at least one of the deformation data determination module 710, strain data determination module 720, mapping module 730, and vector data determination module 740 may be at least partially implemented as a computer program module, which can perform corresponding functions when the computer program module is run.

[0132] Figure 8 A block diagram of an electronic device suitable for implementing a method for determining soil deformation in a foundation pit, according to an embodiment of the present invention, is shown.

[0133] like Figure 8 As shown, an electronic device 800 according to an embodiment of the present invention includes a processor 801, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 802 or a program loaded from a storage portion 808 into a random access memory (RAM) 803. The processor 801 may include, for example, a general-purpose microprocessor (e.g., a CPU), an instruction set processor and / or an associated chipset and / or a special-purpose microprocessor (e.g., an application-specific integrated circuit (ASIC)), etc. The processor 801 may also include onboard memory for caching purposes. The processor 801 may include a single processing unit or multiple processing units for performing different actions of the method flow according to an embodiment of the present invention.

[0134] RAM 803 stores various programs and data required for the operation of electronic device 800. Processor 801, ROM 802, and RAM 803 are interconnected via bus 804. Processor 801 executes various operations of the method flow according to embodiments of the present invention by executing programs in ROM 802 and / or RAM 803. It should be noted that the programs may also be stored in one or more memories other than ROM 802 and RAM 803. Processor 801 may also execute various operations of the method flow according to embodiments of the present invention by executing programs stored in said one or more memories.

[0135] According to an embodiment of the present invention, the electronic device 800 may further include an input / output (I / O) interface 805, which is also connected to a bus 804. The electronic device 800 may also include one or more of the following components connected to the input / output (I / O) interface 805: an input section 806 including a keyboard, mouse, etc.; an output section 807 including a cathode ray tube (CRT), liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 808 including a hard disk, etc.; and a communication section 809 including a network interface card such as a LAN card, modem, etc. The communication section 809 performs communication processing via a network such as the Internet. A drive 810 is also connected to the input / output (I / O) interface 805 as needed. A removable medium 811, such as a disk, optical disk, magneto-optical disk, semiconductor memory, etc., is installed on the drive 810 as needed so that computer programs read from it can be installed into the storage section 808 as needed.

[0136] The present invention also provides a computer-readable storage medium, which may be included in the device / apparatus / system described in the above embodiments; or it may exist independently and not assembled into the device / apparatus / system. The computer-readable storage medium carries one or more programs, which, when executed, implement the method according to the embodiments of the present invention.

[0137] According to embodiments of the present invention, a computer-readable storage medium may be a non-volatile computer-readable storage medium, such as including, but not limited to: portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. For example, according to embodiments of the present invention, a computer-readable storage medium may include ROM 802 and / or RAM 803 and / or one or more memories other than ROM 802 and RAM 803 described above.

[0138] Embodiments of the present invention also include a computer program product comprising a computer program containing program code for performing the methods shown in the flowchart. When the computer program product is run on a computer system, the program code is used to enable the computer system to implement the method for determining the deformation of foundation pit soil provided in the embodiments of the present invention.

[0139] When the computer program is executed by the processor 801, it performs the functions defined in the system / apparatus of this invention. According to embodiments of the invention, the systems, apparatuses, modules, units, etc., described above can be implemented by computer program modules.

[0140] In one embodiment, the computer program may rely on a tangible storage medium such as an optical storage device or a magnetic storage device. In another embodiment, the computer program may also be transmitted and distributed in the form of signals over a network medium, and downloaded and installed via the communication section 808, and / or installed from a removable medium 811. The program code contained in the computer program can be transmitted using any suitable network medium, including but not limited to: wireless, wired, etc., or any suitable combination thereof.

[0141] In such an embodiment, the computer program can be downloaded and installed from a network via communication section 809, and / or installed from removable medium 811. When the computer program is executed by processor 801, it performs the functions defined in the system of this embodiment of the invention. According to embodiments of the invention, the systems, devices, apparatuses, modules, units, etc., described above can be implemented by computer program modules.

[0142] According to embodiments of the present invention, program code for executing the computer programs provided in the embodiments of the present invention can be written in any combination of one or more programming languages. Specifically, these computational programs can be implemented using high-level procedural and / or object-oriented programming languages, and / or assembly / machine languages. Programming languages ​​include, but are not limited to, languages ​​such as Java, C++, Python, "C", or similar programming languages. The program code can be executed entirely on the user's computing device, partially on the user's device, partially on a remote computing device, or entirely on a remote computing device or server. In cases involving remote computing devices, the remote computing device can be connected to the user's computing device via any type of network, including a local area network (LAN) or a wide area network (WAN), or it can be connected to an external computing device (e.g., via the Internet using an Internet service provider).

[0143] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in a block diagram or flowchart, and combinations of blocks in a block diagram or flowchart, may be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0144] Those skilled in the art will understand that the features described in the various embodiments of the present invention can be combined and / or combined in various ways, even if such combinations or combinations are not explicitly described in the present invention. In particular, the features described in the various embodiments of the present invention can be combined and / or combined in various ways without departing from the spirit and teachings of the present invention. All such combinations and / or combinations fall within the scope of the present invention.

[0145] The embodiments of the present invention have been described above. However, these embodiments are merely illustrative and not intended to limit the scope of the invention. Although various embodiments have been described above, this does not mean that the measures in the various embodiments cannot be used advantageously in combination. Various substitutions and modifications can be made by those skilled in the art without departing from the scope of the invention, and all such substitutions and modifications should fall within the scope of the invention.

Claims

1. A method for determining foundation pit soil deformation, characterized in that: include: Based on the horizontal displacement data of the foundation pit wall, determining deformation data corresponding to the wall, wherein the deformation data includes rotation data, translation data and hinge data; Determine soil strain data using the rotation data, the translation data and the hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data; Mapping the horizontal strain data and the vertical strain data to their respective corresponding initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix; The soil deformation vector data is determined based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain the soil deformation result of the foundation pit.

2. The method according to claim 1, characterized in that: Determining soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix includes: Processing the horizontal strain increment matrix and the vertical strain increment matrix to obtain soil deformation data; Based on the soil deformation data, the soil deformation vector data is determined.

3. The method according to claim 1, characterized in that Determining soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix includes: Superimposing the horizontal strain increment matrix and the vertical strain increment matrix respectively to obtain a target horizontal matrix and a target vertical matrix; Mapping the target horizontal matrix and the target vertical matrix to soil grid data respectively to generate soil horizontal deformation data and soil vertical deformation data; The soil deformation vector data is determined based on the soil horizontal deformation data and the soil vertical deformation data.

4. The method according to claim 1, characterized in that The horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix and a hinge horizontal increment matrix, and the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix and a hinge vertical increment matrix; Mapping the horizontal strain data and the vertical strain data to their respective corresponding initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix, including: Mapping the horizontal strain data to the initial matrix to obtain the rotational horizontal strain increment matrix, the translational horizontal strain increment matrix and the hinge horizontal increment matrix, and mapping the vertical strain data to the initial matrix to obtain the rotational vertical strain increment matrix, the translational vertical strain increment matrix and the hinge vertical increment matrix; The horizontal strain increment matrix and the vertical strain increment matrix include corresponding element data and grid length data, the element data include rotation element data, translation element data and hinge element data, and the hinge element data includes a plurality of hinge element sub-data.

5. The method according to claim 1, characterized in that: The rotation data represents the data corresponding to the rotational deformation of other walls except the bottom of the wall when the bottom of the wall is fixed; the translation data represents the data corresponding to the movement of the wall in a preset direction; and the hinge data represents the deformation data of the remaining wall in multiple directions when the bottom of the wall and the top of the wall are fixed.

6. The method according to claim 1, characterized in that The method further comprises: Horizontal strain data and vertical strain data corresponding to the rotation data, the translation data and the hinge data are determined from the soil strain data to obtain rotation strain data, translation strain data and hinge strain data.

7. The method according to claim 6, characterized in that The horizontal strain increment matrix includes a rotational horizontal strain increment matrix, a translational horizontal strain increment matrix and a hinge horizontal strain increment matrix, and the vertical strain increment matrix includes a rotational vertical strain increment matrix, a translational vertical strain increment matrix and a hinge vertical strain increment matrix; Mapping the horizontal strain data and the vertical strain data to their respective corresponding initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix, including: The rotational strain data is mapped to the initial matrix to obtain the rotational horizontal strain increment matrix and the rotational vertical strain increment matrix; the translational strain data is mapped to the initial matrix to obtain the translational horizontal strain increment matrix and the translational vertical strain increment matrix; the hinge strain data is mapped to the initial matrix to obtain the hinge horizontal strain increment matrix and the hinge vertical strain increment matrix.

8. The method according to claim 1, characterized in that: Determining soil strain data using the rotation data, the translation data, and the hinge data includes: Determine a deformation strategy corresponding to each of the rotation data, the translation data and the hinge data; The horizontal strain data and the vertical strain data are determined based on the deformation strategy, the rotation data, the translation data and the hinge data.

9. A device for determining foundation pit soil deformation, characterized in that: include: A deformation data determination module, used to determine deformation data corresponding to the wall based on the horizontal displacement data of the foundation pit wall, wherein the deformation data includes rotation data, translation data and hinge data; A strain data determination module, used to determine soil strain data using the rotation data, the translation data and the hinge data, wherein the soil strain data includes horizontal strain data and vertical strain data; A mapping module, used for mapping the horizontal strain data and the vertical strain data to their respective corresponding initial matrices to obtain a horizontal strain increment matrix and a vertical strain increment matrix; and The vector data determination module is used to determine the soil deformation vector data based on the horizontal strain increment matrix and the vertical strain increment matrix to obtain the soil deformation result of the foundation pit.

10. An electronic device, comprising: one or more processors; a memory for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Foundation pit deformation prediction method and system, electronic equipment and storage medium

    CN115659749A

  • Method for determining and evaluating stress deformation of enclosure structure of foundation pit group considering asymmetric load

    CN116306061A

  • Foundation pit high-performance mobilization strength design method and system

    CN119227191A

  • Inclination measuring equipment for retaining wall

    CN219455070U

Cited By

  • Method and device for determining safety state of soil body around foundation pit

    CN122330405A

  • Method and device for determining safety state of soil body around foundation pit

    CN122330405B