Construction method for anti-skid groove of cold branch pipe structure layer in skiing road snow covering area of indoor skiing field

By adopting the stage construction and extruded polystyrene foam board fixing technology on the cold branch pipe structural layer of the indoor ski slope, the problem of displacement caused by vibration during construction and the chisel removal of anti-slip chutes is solved, the construction efficiency and quality are improved, and the structural performance is ensured.

CN119531211APending Publication Date: 2025-02-28SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411806406.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

In the construction of the cold branch pipe structure layer of indoor ski slopes, the cold branch pipe displacement caused by vibration, and the cold branch pipe is easily damaged when the anti-slip chute is chiseled, affecting the structural performance. At the same time, the construction efficiency is low, the quality is poor, the cycle is long, and the labor intensity is high.

Method used

The method of partial construction is adopted, first lay cold branch pipes on the isolation layer, then cover the lower layer of concrete, and buried the cold branch pipes in the lower layer of concrete. Then, an extruded polystyrene foam board is laid on the lower layer of concrete and fixed it by steel wire and self-tapping screws. Finally, the foam board is removed after the upper layer of concrete reaches hardness to form an anti-slip chute.

Benefits of technology

It effectively avoids the displacement caused by vibration during the construction process of the cold branch pipe, reduces the risk of damage to the cold branch pipe by the chisel removal anti-slip chute, improves construction efficiency and quality, shortens the construction cycle, reduces labor intensity, and ensures the structural performance of the cold branch pipe structural layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119531211A_ABST
    Figure CN119531211A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for an anti-skid groove of a cold branch pipe structure layer in a skiing road snow covering area of an indoor skiing field. The construction method comprises the steps that cold branch pipes are arranged on an isolating layer with a certain gradient; covering the cold branch pipe to construct lower-layer concrete, and burying the cold branch pipe in the lower-layer concrete; arranging and constructing an extruded polystyrene foam board on the lower layer concrete through a concrete dock; covering the concrete dock weighbridge, exposing the extruded polystyrene foam board construction upper-layer concrete, and enabling the upper surface of the upper-layer concrete to be flush with the upper surface of the extruded polystyrene foam board to form a cold branch pipe structure layer; and after the upper-layer concrete reaches the hardness condition, all the extruded polystyrene foam plates are removed, so that anti-skid grooves are formed in the cold branch pipe structure layer. According to the method, the difficulty of constructing the anti-skid groove in the cold branch pipe structure layer is reduced, the construction efficiency is improved, the construction period is shortened, the construction quality is improved, the labor intensity of workers is reduced, the problem of damage to the cold branch pipe is avoided, the structural performance of the cold branch pipe structure layer is guaranteed, and the precision of the burying position of the cold branch pipe is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a method for constructing an anti-skid groove of a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort. Background Art

[0002] With the promotion of ice and snow sports, ice and snow athletes in southern regions can play ice and snow sports in indoor ice and snow sports venues. Indoor ice and snow sports venues are generally large spaces with internal temperatures controlled below zero all year round. Due to the needs of building performance, a variety of thermal insulation layers such as hot branch pipe layers, vapor barriers, thermal insulation layers, isolation layers, cold branch pipe structure layers and snow layers are added to the beginner, intermediate and advanced ski slopes in the venue. Among them, anti-skid grooves need to be set in areas with a slope of more than 8° on the ski slope to facilitate subsequent snow covering. The current conventional anti-skid groove construction method not only poses a hidden danger of displacement of the cold branch pipe in the cold branch pipe structure layer due to vibration during concrete pouring, but also easily damages the cold branch pipe when the anti-skid groove is chiseled out after the concrete pouring of the cold branch pipe structure layer, and the structural performance of the cold branch pipe structure layer of the subsequent ski resort cannot be guaranteed. At the same time, the anti-skid grooves on the ski slopes are widely distributed and the number of construction areas is large. The conventional construction method leads to long construction time and consumes a lot of labor. Summary of the invention

[0003] The purpose of the present invention is to provide a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, so as to solve the problems of displacement of arranged cold branch pipes due to vibration during concrete pouring of the cold branch pipe structure layer, damage to the cold branch pipes during the construction of chiseling the anti-skid groove on the concrete structure of the cold branch pipe structure layer, which affects the structural performance of the cold branch pipe structure layer, as well as the problems of low construction efficiency, poor quality, long cycle and high labor intensity of traditional methods.

[0004] In order to solve the above technical problems, the present invention provides a method for constructing an anti-skid groove in a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, comprising:

[0005] Lay out cold branch pipes on an isolation layer of a certain slope;

[0006] Cover the cold branch pipe with the lower concrete layer, make the slope of the lower concrete layer the same as the slope of the isolation layer, and bury the cold branch pipe in the lower concrete layer;

[0007] On the lower concrete layer, extruded polystyrene foam boards are laid out through the concrete dock according to the planned position of the anti-skid groove, so that the slope of the connecting line of each extruded polystyrene foam board is the same as the slope of the lower concrete layer;

[0008] The concrete dock is covered, and the extruded polystyrene foam board is exposed to construct the upper concrete layer, so that the slope of the upper concrete layer is the same as the slope of the upper concrete layer and the upper surface of the upper concrete layer is flush with the upper surface of the extruded polystyrene foam board to form a cold branch pipe structure layer;

[0009] After the upper layer of concrete reaches the hardness condition, each extruded polystyrene foam board is removed to form an anti-skid groove of the cold branch pipe structure layer at each position where the extruded polystyrene foam board is removed from the upper layer of concrete.

[0010] Furthermore, the present invention provides a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort. Before the construction of the upper concrete layer, each extruded polystyrene foam board is fixed to the lower concrete layer by means of steel wires and self-tapping screws wound around their two ends.

[0011] Furthermore, the present invention provides a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, wherein concrete docks are arranged at intervals of 1000 mm along the width of the ski slope, and a single concrete dock has a length of 1000 mm, a width of 100 mm, and a height of 45 mm.

[0012] Furthermore, the present invention provides a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, in which corresponding steel wires on each extruded polystyrene foam board are arranged at intervals of 250 mm along the length direction of the concrete dock.

[0013] Furthermore, the present invention provides a method for constructing an anti-skid groove in a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, which removes the extruded polystyrene foam board from the upper concrete layer by cutting off the steel wire that fixes the extruded polystyrene foam board.

[0014] Furthermore, the present invention provides a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, which removes the extruded polystyrene foam board from the upper concrete layer by cutting the steel wire that fixes the extruded polystyrene foam board and chiseling off the extruded polystyrene foam board.

[0015] Furthermore, in the anti-skid groove construction method of the cold branch pipe structure layer in the snow-covered area of ​​the ski slope of the indoor ski resort provided by the present invention, the thickness of the lower layer of concrete is 60 mm, and the thickness of the upper layer of concrete is 60 mm.

[0016] Furthermore, in the anti-skid groove construction method of the cold branch pipe structure layer in the snow-covered area of ​​the ski slope of an indoor ski resort provided by the present invention, the width of the extruded polystyrene foam board is 30 mm and the height is 30 mm.

[0017] Furthermore, in the anti-skid groove construction method of the cold branch pipe structure layer in the snow-covered area of ​​the ski slope of an indoor ski resort provided by the present invention, the interval between adjacent extruded polystyrene foam boards is 200 mm.

[0018] Furthermore, in the anti-skid groove construction method of the cold branch pipe structure layer in the snow-covered area of ​​the ski slope of an indoor ski resort provided by the present invention, the casting angle of the concrete dock on both sides of the extruded polystyrene foam board is 45 degrees.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] The invention provides a method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort. The method comprises the following steps: constructing the cold branch pipe structure layer in stages through upper and lower layers of concrete, and laying out an extruded polystyrene foam board on the lower concrete layer according to the planned position of the anti-skid groove through a concrete dock. After constructing the upper concrete layer, the extruded polystyrene foam board is removed, thereby forming an anti-skid groove for the cold branch pipe structure layer at the position where the extruded polystyrene foam board is removed from the upper concrete layer. The planned position of the anti-skid groove is positioned by constructing the extruded polystyrene foam board and the extruded polystyrene foam board is fixed through the concrete dock. After the upper concrete layer is constructed, the extruded polystyrene foam board is removed. The construction process of directly chiseling anti-skid grooves on the concrete structure of the cold branch pipe structure layer according to the traditional method reduces the difficulty of constructing anti-skid grooves on the concrete structure of the cold branch pipe structure layer, improves the construction efficiency of the anti-skid grooves, shortens the construction period of the anti-skid grooves, improves the construction quality of the anti-skid grooves, reduces the labor intensity of manual labor, avoids the problem of traditional chiseling of anti-skid grooves that easily causes damage to the cold branch pipes, and ensures the structural performance of the cold branch pipe structure layer. Since the lower layer of concrete has reached the strength condition and the cold branch pipe is buried therein, the vibration during the pouring and vibration of the upper layer of concrete will not cause displacement of the buried position of the cold branch pipe, thereby improving the accuracy of the buried position of the cold branch pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a flow chart of the anti-skid groove construction method for the cold branch pipe structure layer in the snow-covered area of ​​the ski slope in an indoor ski resort;

[0022] Figure 2 It is a structural schematic diagram of constructing the lower layer of concrete on the isolation layer;

[0023] Figure 3 It is a schematic diagram of the structure of constructing an extruded polystyrene foam board on the lower concrete layer through a concrete dock;

[0024] Figure 4 It is a schematic diagram of the structure of fixing the extruded polystyrene foam board by steel wire and self-tapping screws;

[0025] Figure 5 It is a schematic diagram of the structure of constructing the upper concrete layer on the extruded polystyrene foam board;

[0026] Figure 6 It is a schematic diagram of a structure in which an anti-skid groove is formed on a cold branch pipe structure layer by removing an extruded polystyrene foam board;

[0027] As shown in the figure:

[0028] 0. Isolation layer, 1. Lower concrete layer, 2. Cold branch pipe, 3. Concrete dock, 4. Extruded polystyrene foam board, 5. Steel wire, 6. Self-tapping screws, 7. Upper concrete layer, 8. Cold branch pipe structure layer, 81. Anti-slip groove. DETAILED DESCRIPTION

[0029] The present invention is described in detail below in conjunction with the accompanying drawings: The advantages and features of the present invention will become more apparent from the following description. It should be noted that the accompanying drawings are in very simplified form and in non-precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0030] Please refer to Figures 1 to 6 The embodiment of the present invention provides a method for constructing an anti-skid groove in a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, which may include the following steps:

[0031] Step S101, laying out the cold branch pipe 2 on the isolation layer 0 of a certain slope, such as Figure 2 As shown. The slope of the isolation layer 0 is greater than or equal to 8 degrees. The layout intervals of the cold branch pipes 2 can be the same.

[0032] Step S102, cover the cold branch pipe 2 to construct the lower concrete 1, make the slope of the lower concrete 1 the same as the slope of the isolation layer 0, and bury the cold branch pipe 2 in the lower concrete 1, such as Figure 2 The thickness of the lower concrete layer 1 can be 60 mm, which needs to be greater than the diameter of the cold branch pipe 2 so that the cold branch pipe 2 can be buried in the lower concrete layer 1 .

[0033] Step S103, on the lower concrete layer 1, the concrete dock 3 is used to lay out the extruded polystyrene foam board (i.e., XPS board) 4 according to the planned position of the anti-skid groove, so that the slope of the connecting line of each extruded polystyrene foam board 4 is the same as the slope of the lower concrete layer, such as Figure 3 As shown. The XPS board 4 can be replaced by other foam boards or wooden blocks. The concrete docks 3 can be arranged at intervals of 1000mm along the width direction of the primary, intermediate and advanced ski slopes. The length of a single concrete dock 3 can be 1000mm, the width can be 100mm, and the height can be 45mm. The width of the extruded polystyrene foam board 4 can be 30mm, and the height can be 30mm. The interval between adjacent extruded polystyrene foam boards 4 can be 200mm. In order to ensure the fixing effect of the extruded polystyrene foam board 4, the casting angle of the concrete dock 3 on both sides of the extruded polystyrene foam board 4 can be 45 degrees.

[0034] Step S104, each extruded polystyrene foam board 4 can be fixed on the lower concrete 1 by using the steel wire 5 and the self-tapping screws 6 wound around its two ends. Figure 4As shown. Specifically, each extruded polystyrene foam board 4 is arranged on the lower concrete 1 along the concrete dock 3 on both sides thereof by means of a steel wire 5, and the two ends of the steel wire 5 at the corresponding position of each extruded polystyrene foam board 4 are fixed on the lower concrete 1 by means of a wound self-tapping screw 6. In order to effectively fix each extruded polystyrene foam board 4, the corresponding steel wire 5 on each extruded polystyrene foam board 4 can be arranged in a row along the length direction of the concrete dock 3 at a spacing of 250 mm. The length of the steel wire 5 used to fix each extruded polystyrene foam board 4 can be 230 mm.

[0035] Step S105, cover the concrete dock 3, expose the extruded polystyrene foam board 4, construct the upper concrete 7, make the slope of the upper concrete 7 the same as the slope of the upper concrete 7 and make the upper surface of the upper concrete 7 flush with the upper surface of the extruded polystyrene foam board 4 to form a cold branch pipe structure layer 8. The thickness of the upper concrete 7 can be 60mm. The cold branch pipe structure layer 8 mainly includes the lower concrete 1 and the cold branch pipe 2 buried therein, the concrete dock 3 and the upper concrete 7. In order to ensure the stability of the concrete structure and the reliability of the connection and to be suitable for low temperature environment, the lower concrete 1, the concrete dock 3 and the upper concrete 7 are all made of antifreeze concrete.

[0036] Step S106, after the upper concrete layer 7 reaches the hardness condition, each extruded polystyrene foam board 4 is removed to form an anti-skid groove 81 of the cold branch pipe structure layer 8 at each position where the extruded polystyrene foam board 4 is removed from the upper concrete layer 7, such as Figure 6 In order to remove the extruded polystyrene foam board 4, the steel wire 5 fixing the extruded polystyrene foam board 4 can be cut by a cutting tool, and the extruded polystyrene foam board 4 can be cut to remove it from the upper concrete 7. Alternatively, the steel wire 5 fixing the extruded polystyrene foam board 4 can be cut by a hydraulic shearing tool, and the extruded polystyrene foam board 4 can be chiseled or dug out to remove it from the upper concrete 7. When the height and width of the extruded polystyrene foam board 4 are both 30 mm, the depth and width of the anti-skid groove 81 formed at this time are both 30 mm.

[0037] The steel wire 5 and the self-tapping screws 6 wound around its two ends fix each extruded polystyrene foam board 4 on the lower concrete layer 1, which can ensure that the position of the extruded polystyrene foam board 4 does not deviate during the construction of the upper concrete layer 7, thereby improving the position accuracy of the subsequent formation of the anti-slip groove 81.

[0038] The method for constructing an anti-skid groove of a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort provided by the present invention comprises the following steps: constructing the cold branch pipe structure layer 8 in stages through the upper and lower concrete layers 1, and laying out the extruded polystyrene foam board 4 on the lower concrete layer 1 through the concrete dock 3 according to the planned position of the anti-skid groove 81, and removing the extruded polystyrene foam board 4 after constructing the upper concrete layer 7, thereby forming the anti-skid groove 81 of the cold branch pipe structure layer 8 at the position where the extruded polystyrene foam board 4 is removed from the upper concrete layer 7, positioning the planned position of the anti-skid groove 81 by constructing the extruded polystyrene foam board 4 and fixing the extruded polystyrene foam board 4 through the concrete dock 3, and removing the extruded polystyrene foam board 4 after the upper concrete layer 7 is constructed. The construction process of directly chiseling the anti-skid groove 81 on the concrete structure of the cold branch pipe structure layer 8 according to the traditional method reduces the difficulty of constructing the anti-skid groove 81 on the concrete structure of the cold branch pipe structure layer 8, improves the construction efficiency of the anti-skid groove 81, shortens the construction period of the anti-skid groove 81, improves the construction quality of the anti-skid groove 81, reduces the labor intensity of manual labor, avoids the problem of traditional chiseling of the anti-skid groove 81 easily causing damage to the cold branch pipe 2, and ensures the structural performance of the cold branch pipe structure layer 8. Since the lower layer concrete 1 has reached the strength condition and the cold branch pipe 2 is buried therein, the vibration during the pouring and vibration of the upper layer concrete 7 will not cause displacement of the buried position of the cold branch pipe 2, thereby improving the accuracy of the buried position of the cold branch pipe 2.

[0039] The method for constructing an anti-skid groove on a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort provided by the present invention is suitable for constructing an anti-skid groove 81 on a cold branch pipe structure layer 8 with a slope of more than 8 degrees, and has quickness and flexibility in construction.

[0040] The present invention is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the embodiments of the present invention, but not all embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.

Claims

1. A method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort, characterized in that: include: Lay out cold branch pipes on an isolation layer of a certain slope; Cover the cold branch pipe with the lower concrete layer, make the slope of the lower concrete layer the same as the slope of the isolation layer, and bury the cold branch pipe in the lower concrete layer; On the lower concrete layer, extruded polystyrene foam boards are laid out through the concrete dock according to the planned position of the anti-skid groove, so that the slope of the connecting line of each extruded polystyrene foam board is the same as the slope of the lower concrete layer; The concrete dock is covered, and the extruded polystyrene foam board is exposed to construct the upper concrete layer, so that the slope of the upper concrete layer is the same as the slope of the upper concrete layer and the upper surface of the upper concrete layer is flush with the upper surface of the extruded polystyrene foam board to form a cold branch pipe structure layer; After the upper layer of concrete reaches the hardness condition, each extruded polystyrene foam board is removed to form an anti-skid groove of the cold branch pipe structure layer at each position where the extruded polystyrene foam board is removed from the upper layer of concrete.

2. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: Before the construction of the upper concrete layer, each extruded polystyrene foam board is fixed to the lower concrete layer by means of steel wires and self-tapping screws wound around their two ends.

3. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 2, characterized in that: The concrete docks are arranged at intervals of 1000mm along the width of the ski slope. The length of a single concrete dock is 1000mm, the width is 100mm and the height is 45mm.

4. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 3, characterized in that: The corresponding steel wires on each extruded polystyrene foam board are arranged at intervals of 250mm along the length of the concrete dock.

5. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: The extruded polystyrene foam board is cut and removed from the upper concrete layer by severing the steel wires that secure the extruded polystyrene foam board.

6. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: The extruded polystyrene foam board is removed from the upper concrete layer by cutting the steel wires that secure it and chiseling it off.

7. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: The thickness of the lower concrete layer is 60mm, and the thickness of the upper concrete layer is 60mm.

8. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 7, characterized in that: The extruded polystyrene foam board has a width of 30 mm and a height of 30 mm.

9. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: The spacing between adjacent extruded polystyrene foam boards is 200 mm.

10. The method for constructing an anti-skid groove for a cold branch pipe structure layer in a snow-covered area of ​​a ski slope in an indoor ski resort according to claim 1, characterized in that: The pouring angle of the concrete dock on both sides of the extruded polystyrene foam board is 45 degrees.