Rapid repair construction method of concrete panel sunken platform for expressway
A technology for concrete slabs and highways, applied in road repair, roads, roads, etc., can solve the problems of inability to level the pavement slab, inconvenient construction, long construction time, etc., and achieve the benefits of safe use and pavement quality, construction process Safe and reliable, simple and fast construction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0047] Somewhere on the highway, the staggered platform is inclined from the outside to the inside. The staggered amount of the inner platform corner is the largest, 8mm, and the staggered amount of the outer platform corner is the smallest, 2mm. The length L of the staggered platform (the distance between the inner and outer corners, that is, the length of the staggered platform) is 4m, and it is required to repair and reinforce the staggered platform so that the slope i of the staggered platform is 1%. Therefore, it is calculated that
[0048] Average misalignment h=(8-2) / 2+2=5mm
[0049] Repair average width w=h / i=5 / 0.01=500mm
[0050] The volume to be filled V=L×w×h=4000×500×5=10,000,000mm 3 =10L Ann Street
[0051] The weight of the required mislipping G=V×p=10×2.17=21.7kg
[0052] According to the design step by step batching and construction according to the above method, it takes a total of 20 minutes, and after another 30 minutes of maintenance, the traffic sign c...
Embodiment 2
[0054] In a continuous section of an expressway, there are 20 staggered platforms (including 7 uplinks and 13 downlinks), the average staggered amount is 5mm, the average filling width is 45cm, and the total consumption of staggered lipping is 190kg. According to the above The whole construction was completed within two days, and it was opened to traffic immediately after the completion of the construction. The traffic has been stable for several months without any abnormality.
[0055] The rapid repair construction method for the dislocation of expressway panels provided by the present invention is safe and reliable in the whole construction process and does not generate waste materials and slag. All materials are non-toxic or low-toxic items, which is a green and environmentally friendly construction method. In addition to highways, it will also be used in cement concrete maintenance projects for airstrips, large squares, and water conservancy and hydropower.
PUM
Property | Measurement | Unit |
---|---|---|
Compressive strength | aaaaa | aaaaa |
Compressive strength | aaaaa | aaaaa |
Flexural strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com