32results about How to "Improve road quality" patented technology

System and operating method for level regulation of a driver's cab of a commercial vehicle relative to the chassis of the vehicle

A system for level regulation of a driver's cab of a commercial vehicle relative to a chassis of the vehicle includes a spring-loaded bearing in order to support the driver's cab in a sprung manner on the chassis of the vehicle; a distance sensor device arranged to record relative movements and / or a distance between the driver's cab and the chassis of the vehicle; and a control device that is arranged for variable control of the spring-loaded bearing, wherein signals of the distance sensor device are used to control the spring-loaded bearing. The spring-loaded bearing can be adjusted to a first height position (h1), so that the distance between the driver's cab and the chassis of the vehicle is controlled by the control device to a first target distance. The spring-loaded bearing can be adjusted to at least one second height position (h2), so that the distance between the driver's cab and the chassis of the vehicle is controlled by the control means to a second target distance. The control means device adjusts the spring-loaded bearing to the first height position (h1) or to the at least one second height position (h2) depending at least on a parameter relating to a driving route and / or a vehicle state.
Owner:MAN TRUCK & BUS AG

Joint cutting and filling integrated machine for road building

The invention discloses a joint cutting and filling integrated machine for road building. The joint cutting and filling integrated machine comprises a cutting blade, a water tank, a bearing base plate and a mixing burdening tank. Four corners at the bottom end of the bearing base plate are each provided with a roller, the water tank is installed at one end of the top of the bearing base plate, and the mixing burdening tank is installed at the other end of the top of the bearing base plate; a pressurization device is installed between the mixing burdening tank and the water tank, a connecting frame is installed on the bearing base plate of the side, away from the pressurization device, of the water tank, and a fixing block is installed at the top end of the side, away from the water tank, of the connecting frame; and a booster pump is installed on the bearing base plate of the side, away from the pressurization device, of the mixing burdening tank, and a jetting gun is installed on the side, away from the mixing burdening tank, of the booster pump. The joint cutting and filling integrated machine for road building can achieve the road joint cutting and filling integrated automatic operating function and has the advantages that joint cutting and filling do not need labor, joint cutting precision is high, joint cutting quality is high, road quality is good, and working efficiency is high.
Owner:福建省龙祥建设集团有限公司

Novel composite polyester felt and manufacturing method of novel composite polyester felt

The invention discloses a novel composite polyester felt, the main components of the novel composite polyester felt comprise alkali-free glass fibers, polyester fibers and mixed fibers of other auxiliary fibers; the alkali-free glass fibers are 11-14 mum in diameter and 15-20 mm in length; the diameter of the polyester fibers is 4-8 mum; the auxiliary fibers accounts for 5 % of the mixed fibers; during the production of the polyester felt, the final forming of the polyester felt is realized by using an adhesive; the adhesive comprises the following parameters: 30-40 % of acrylic acid series, 20-35 % of unsaturated resin, 20-40 % of vinyl acetate series and 0.3-0.6 % of coupling agent. The novel composite polyester felt has performances such as stiffness and has good fracture-resistant and tear-resistant strengths. The novel composite polyester felt is mainly applied to projects such as thin asphalt concrete overlays of asphalt pavements and repairing and repair construction of steel bridges paved with asphalt surface layers and road stones. The quality of pavements can be improved, the service life of roads can be prolonged, the tracks and the uneven pavement, resulting from pavement canalization and strong pressure can be prevented.
Owner:JIANGSU CHANGHAI COMPOSITE MATERIALS CO LTD

High-viscosity modified asphalt-adopted white and black pavement structure

The invention discloses a high-viscosity modified asphalt-adopted white and black pavement structure. The structure comprises an original cement concrete pavement, a high-viscosity modified emulsifiedasphalt adhesion layer and a modified asphalt thin overlay layer; the upper surface of the original cement concrete pavement undergoes disease treatment and milling/planing treatment; the high-viscosity modified emulsified asphalt adhesion layer is paved on the upper surface, undergoing the disease treatment and milling/planing treatment, of the original cement concrete asphalt; and the modifiedasphalt thin overlay layer is paved on the upper surface of the high-viscosity modified emulsified asphalt adhesion layer. Compared with the prior art, the structure has the beneficial effect of sufficiently utilizing the existing road edge stones and manhole covers without enhancing the elevations of the road edge stones and manhole covers, has the advantages of saving the raw materials, decreasing the working procedures, reducing the cost, improving the environment, improving the road quality, prolonging the road life and improving the driving comfort, and is capable of decreasing the bridgeload when using white and black asphalt concrete pavements on the bridge surfaces so as to prolong the service life of the bridge surface.
Owner:深圳市海绵城市科学研究院

Coal gangue roadbed material and preparation method

The invention discloses a coal gangue roadbed material. The coal gangue roadbed material is prepared from the following ingredients in parts by weight: 40 to 50 parts of coal gangue, 30 to 40 parts ofcoal gangue powder, 20 to 30 parts of sand, 10 to 20 parts of lime, 20 to 30 parts of Portland cement, 15 to 25 parts of asphalt and 35 to 45 parts of water. The invention further discloses a preparation method for the coal gangue roadbed material. The method comprises the following steps: (1) sorting the coal gangue so as to obtain the coal gangue with the grain size of 5mm to 15mm and the coalgangue powder with the grain size of 0.02mm to 0.5mm; (2) weighing the coal gangue and the coal gangue powder obtained in the step (1), adding the sand, the Portland cement and the water, carrying outmixing, and then, carrying out stirring for 20 to 30 minutes; (3) adding the lime, and then, carrying out stirring for 10 to 20 minutes; and (4) heating the temperature of the mixture to 50 DEG C to60 DEG C, adding the asphalt, and carrying out stirring for 20 to 30 minutes, thereby obtaining the coal gangue roadbed material. According to the roadbed material disclosed by the invention, the problem of pollution caused by the coal gangue is effectively solved, wastes are recycled, the method is easy and feasible, and the roadbed material is low in cost and good in pavement quality.
Owner:徐州金盛贸易有限公司

Foamed asphalt integrated foaming beam for foamed asphalt cold-recycling plant mixing equipment

PendingCN111576142AFinished material quality is stableImprove road qualityRoads maintainenceProcess engineeringAsphalt
The invention discloses a foamed asphalt integrated foaming beam for foamed asphalt cold-recycling plant mixing equipment. The beam comprises a foamed asphalt spraying beam connected with an asphalt conveying pipeline, and a plurality of asphalt foaming devices are equidistantly and uniformly distributed on the foamed asphalt spraying beam; an inlet end of a matrix hot asphalt nozzle is connectedwith the foamed asphalt spraying beam, and an outlet end of the matrix hot asphalt nozzle is connected with a top end of the asphalt foaming cavity; a gas nozzle and a water nozzle are arranged on a group of opposite side surfaces of the asphalt foaming cavity; a foamed asphalt nozzle is arranged at a bottom end of the asphalt foaming cavity; an air cylinder is arranged on the asphalt foaming device; the output end of the air cylinder is contacted with the matrix hot asphalt nozzle; and the air cylinder, the air nozzle and the water nozzle are connected with an electromagnetic valve. The air cylinder timely switches on and switches off asphalt, and the foaming cavity with a high-pressure air and high-pressure water opposite blowing function effectively forms foamed asphalt. And the asphaltfoaming device continuously sprays foamed asphalt into a stirrer and fully stirs the foamed asphalt with a cold-wet premixed mixture to form a high-quality cold-mixed foamed asphalt mixture.
Owner:XUZHOU XCMG MAINTENANCE MACHINERY CO LTD

Quick vibration and tamping mechanism of asphalt for road and bridge construction, using method and asphalt paver of same

The invention discloses a quick vibration and tamping mechanism of asphalt for road and bridge construction, and a using method and an asphalt paver of the same, and relates to the technical field of road construction. The quick vibration and tamping mechanism comprises a support seat, a vibration and tamping plate, a lug and a driving wheel. The vibration and tamping plate is arranged on the lower part of the support seat and moves vertically, and the driving wheel is rotatably connected with the support seat. The lug is arranged on the lower part of the driving wheel, and the bottom of the lug is connected with the upper part of the vibration and tamping plate. The driving wheel drives the vibration and tamping plate to perform vibration of different strengths through the lug. The vibration and tamping plate tend to move upward in the absence of external force. The quick vibration and tamping mechanism of the asphalt for the road and bridge construction is capable of performing vibration of different strengths on a same asphalt layer, further performs vibrating and tamping on the asphalt layer, facilitates exhausting of air from the asphalt layer and further facilitates quick tamping of the asphalt layer, thereby avoiding over-vibration and damages to edges of surface pellet materials. The quality of an asphalt pavement is guaranteed and the life cycle of the asphalt pavement is prolonged. The quick vibration and tamping mechanism of the asphalt for the road and bridge construction has the advantages of being simple in structure, reasonable in design and easy to manufacture.
Owner:陈洁

Device for adjusting camber of ratchet wheel of paver screed

The invention discloses a device for adjusting the camber of a ratchet wheel of a paver screed and belongs to the technical field of adjustment of the camber of a paver. The device comprises a left frame, a right frame, two left-handed screws, two right-handed screws, a circular tube, a rear ratchet wheel, a control pin and a rocking bar. The left frame is hinged to the right frame by a pin II. One end of one of the two left-handed screws is connected to a left side of the circular tube by threads and one end of the other one of the two left-handed screws is connected to a left side of the rear ratchet wheel by threads. The other end of one of the two left-handed screws is connected to a front installation base of the left frame and the other end of the other one of the two left-handed screws is connected to a rear installation base of the left frame. One end of one of the two right-handed screws is connected to a right side of the circular tube by threads and one end of the other of the two right-handed screws is connected to a right side of the rear ratchet wheel by threads. The other end of one of the two right-handed screws is connected to a front installation base of the right frame and the other end of the other one of the two right-handed screws is connected to a rear installation base of the right frame. A front chain wheel is connected to the circular tube. A rear chain wheel is connected to the rear ratchet wheel. The front chain wheel and the rear chain wheel are connected by a chain. The rear ratchet wheel and the rocking bar are connected by the control pin. The device can fast and conveniently adjust the camber of a screed, can save time and a labor force, is accurate and reliable and can greatly improve work efficiency and pavement quality.
Owner:XUZHOU CAMEL HEAVY ENG TECH

Road water stain dense position distinguishing method based on density peak value method

The invention discloses a road water stain dense position distinguishing method based on a density peak value method, which comprises the following steps: (1) carrying out data acquisition on an asphalt pavement to obtain the distribution condition of water stains in an asphalt pavement structure; (2) obtaining X-axis and Y-axis values of water stain dense points which are not detected by using an interpolation method; (3) calculating the obtained complete data to obtain the distance dij between the water spot dense points; (4) obtaining the distribution density rho i of the water stain dense points in the local range based on the distance dij between the water stain dense points and a density formula; (5) calculating the distance delta i between the dense point i of the water spots and the dense points j of the other water spots; and (6) based on the obtained distribution density rho i and distance delta i of the water spot dense points, selecting i sample data serial numbers as codes, and drawing a scatter diagram with rho as a horizontal coordinate and delta as a vertical coordinate, the road maintenance efficiency can be improved, the road maintenance cost can be reduced, and the method has profound significance for preventive maintenance of roads.
Owner:SHANGHAI INST OF TECH

A fast vibrating mechanism for road and bridge construction asphalt, its use method and its asphalt paver

The invention discloses a quick vibration and tamping mechanism of asphalt for road and bridge construction, and a using method and an asphalt paver of the same, and relates to the technical field of road construction. The quick vibration and tamping mechanism comprises a support seat, a vibration and tamping plate, a lug and a driving wheel. The vibration and tamping plate is arranged on the lower part of the support seat and moves vertically, and the driving wheel is rotatably connected with the support seat. The lug is arranged on the lower part of the driving wheel, and the bottom of the lug is connected with the upper part of the vibration and tamping plate. The driving wheel drives the vibration and tamping plate to perform vibration of different strengths through the lug. The vibration and tamping plate tend to move upward in the absence of external force. The quick vibration and tamping mechanism of the asphalt for the road and bridge construction is capable of performing vibration of different strengths on a same asphalt layer, further performs vibrating and tamping on the asphalt layer, facilitates exhausting of air from the asphalt layer and further facilitates quick tamping of the asphalt layer, thereby avoiding over-vibration and damages to edges of surface pellet materials. The quality of an asphalt pavement is guaranteed and the life cycle of the asphalt pavement is prolonged. The quick vibration and tamping mechanism of the asphalt for the road and bridge construction has the advantages of being simple in structure, reasonable in design and easy to manufacture.
Owner:陈洁

Method for paving cement concrete pavement

The invention relates to a method for paving cement concrete pavement. The conventional cement concrete pavement is constructed by a method for constructing the cement concrete pavement through fixed templates, and the method has the defects that due to instability of the templates or negligence, the templates are expanded and non-straight,, small broken lines are formed on the templates on a curve, and geometric dimensions are irregular. The method for paving the cement concrete pavement comprises the steps of: (1) clearing and flattening a lower subbase, and controlling the elevation of thesubbase to be within the range of a design line; (2) paving cement concrete roads by using a slip-form paver along datum lines on two sides or one side, performing the construction paying off of concrete surfaces, and surveying and arranging paying-off balls by adopting longitude and latitude levels; (3) blending concrete by using a blending station; (4) performing paving by using the slip-form paver; (5) performing exact leveling and fine smoothing through artificial matching; (6) napping and cutting joint; (7) curing; and (8) filling the joint. The method is used for solving the problem of poor quality of the road surfaces in the conventional method for paving the cement concrete road surfaces.
Owner:LONGJIAN ROAD & BRIDGE

Water-based road asphalt rehabilitating agent and preparation method thereof

The invention discloses a water-based road asphalt rehabilitating agent and a preparation method thereof. The formula of the water-based road asphalt rehabilitating agent comprises the following components in percentage by weight: 20 to 30 percent of asphalt, 10 to 20 percent of water, 5 to 10 percent of solvent, 10 to 20 percent of modifier, 0.5 to 2 percent of emulsifier, 0.5 to 1 percent of adhesion promoter, 0.5 to 2 percent of antisettling agent and 25 to 40 percent of filler. The preparation method comprises the following steps of: mixing the water and the emulsifier at the temperature of between 55 and 60 DEG C uniformly; adding the asphalt and the modifier which are diluted by the solvent sequentially; emulsifying the materials in asphalt emulsifying equipment; adding the adhesionpromoter, the antisettling agent and the filler sequentially; and continuously stirring for 15 to 30 minutes under the conditions of normal temperature, normal pressure and high speed to obtain the finished product. The water-based road asphalt rehabilitating agent has high permeability, cohesive property and durability, is used for beautifying road surface and repairing early diseases such as ageing of the asphalt road surface, pitting surface, water seepage and the like, prolongs the service life of the road by 2 to 3 years, and has remarkable economic and social benefits.
Owner:CHONGQING SINCERE BOND PAVEMENT MATERIALS

Pavement asphalt surface layer crack repairing equipment

The invention discloses pavement asphalt surface layer crack repairing equipment, and belongs to the technical field of pavement repairing equipment, the pavement asphalt surface layer crack repairing equipment comprises a walking vehicle body, a lifting system is arranged on the walking vehicle body, the lifting system comprises a supporting rod capable of moving up and down, and a road vibration device is arranged at the bottom of the supporting rod; the road vibration device comprises a hydraulic cylinder and a road pressing piece arranged at the output end of the hydraulic cylinder, an asphalt discharging system is arranged on the supporting rod, and the asphalt discharging system comprises a storage device for storing asphalt and a discharging device embedded into the storage device from the bottom. The walking vehicle body drives the asphalt discharging system to move and transport asphalt, the walking vehicle body walks to drive the asphalt discharging system to cover the road crack position to gradually add the asphalt to fill the crack, the spiral conveying roller rotates to convey the asphalt into the crack and level the asphalt, the smoothness is improved, and the road vibration device continuously impacts the road surface on the two sides of the crack. Asphalt is prevented from blocking the surface layer of the gap, the asphalt filling effect is improved, and the pavement quality after asphalt filling and repairing is improved.
Owner:安徽天建建设集团有限公司

Concrete pouring device and operating method for road construction

A concrete pouring device for road construction and an operation method thereof belong to the technical field of concrete pouring equipment. The lower end surface of the pouring barrel is provided with a discharge port, and a sealing cover is slid at the discharge port. The upper end of the pouring barrel is equipped with a cap, and the cap is provided with a feed port. The middle part of the cap is equipped with a stirring mechanism along the axial direction. , the upper end of the stirring mechanism passes through the barrel cover and is fixedly connected with the three-jaw chuck, the three-jaw chuck is fixed on the stirring mechanism, the lower end of the stirring mechanism is equipped with a scrubbing mechanism, and the outer wall of the pouring barrel is fixedly connected with the retractable walking frame; The invention can continuously stir the concrete in the pouring device, avoid the occurrence of solidification or segregation of the concrete in the pouring device, ensure the normal use of the concrete, reduce the construction period, and ensure the quality of the concrete road surface. At the same time, there is a washing mechanism inside to automatically wash The inner wall of the pouring barrel can avoid excessive concrete adhering to the inner wall of the pouring barrel and the discharge port, which will affect the discharge of the discharge port.
Owner:HARBIN VOCATIONAL & TECHN COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products