Foundation pit dewatering structure for water tank of sewage treatment plant
By setting up a seepage guide layer and blind seepage guide groove in the foundation pit of the sewage treatment plant, combined with the precipitation well structure, the existing foundation pit precipitation method affects the construction period and cost, and effectively reduces the groundwater level and foundation treatment are achieved. Ensures the efficiency and quality of construction.
Patent Information
- Application Number
- CN202323666314.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-29
AI Technical Summary
The existing foundation pit precipitation methods have the risk of temporary precipitation wells affecting the construction period, high cost, high sealing technical requirements and water leakage, and require separate foundation treatment and anti-floating measures to affect construction efficiency and quality.
The foundation pit precipitation system is adopted that includes a seepage guide layer, a seepage guide blind groove, a support structure and a precipitation well structure. The seepage guide blind groove is arranged vertically and crisscrossed to form a network structure, connecting the precipitation wells, and collecting and discharge groundwater through drainage holes. Combined with the seepage guide layer and precipitation well structure, foundation treatment and anti-floating to lower groundwater levels.
The groundwater level in the foundation pit is effectively reduced, and the pool structure is constructed simultaneously, which reduces foundation treatment and anti-float design, shortens the construction period and reduces the cost, ensuring the integrity and quality of the construction.
Smart Images

Figure CN221956763U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction, in particular to a foundation pit dewatering structure used for a water tank in a sewage treatment plant. Background Art
[0002] With the development of urban construction, the construction of sewage treatment plants has become more and more extensive. In the construction of sewage treatment plant pools, groundwater will affect the foundation, pool structure and construction safety. Efficient foundation pit dewatering is particularly important. At present, the conventional method of foundation pit dewatering is: set up a number of temporary dewatering wells in the foundation pit, pump water to the outside of the foundation pit through the dewatering wells to lower the groundwater level, carry out foundation treatment and anti-floating construction after excavation to the base, and seal the dewatering wells after the structural construction is completed. Problems with this method: the dewatering well is a temporary structure and needs to be abolished later, which affects the construction period and has high cost; the temporary dewatering well must be sealed after the pool bottom plate structure is completed, which affects the integrity of the structural bottom plate, and has high requirements for sealing technology. There is a risk of leakage at the location of the dewatering well; the foundation treatment needs to be carried out separately. After the temporary dewatering well is sealed, the groundwater level will rise, which will produce buoyancy on the pool. Correspondingly, anti-floating measures need to be added before the structural construction, which affects the construction period and increases the cost. Therefore, in order to ensure the progress, quality and cost of the project, a more economical and reasonable foundation pit dewatering method is needed. Utility Model Content
[0003] In view of the above-mentioned defects of the prior art, a foundation pit dewatering structure for a sewage treatment plant pool is provided, which can effectively lower the groundwater level in the foundation pit. During the construction process, it is carried out simultaneously with the construction of the pool structure, taking into account both foundation treatment and anti-floating effects, thereby improving construction efficiency and reducing construction costs.
[0004] The technical solution adopted by the utility model to solve the above technical problems is:
[0005] A foundation pit dewatering structure for a water pool in a sewage treatment plant includes a water pool structure, which is characterized in that it also includes a seepage guiding layer located below the water pool structure, a seepage guiding blind ditch arranged in the seepage guiding layer, a supporting structure surrounding the outside of the water pool structure, and a dewatering well structure located between the water pool structure and the supporting structure; the seepage guiding blind ditches are arranged in a criss-cross pattern and at intervals to form a mesh structure; there is at least one seepage guiding blind ditch extending to the outer wall of the dewatering well structure to connect the mesh structure formed by the seepage guiding blind ditches with the dewatering well structure; and a plurality of drainage holes are provided on the dewatering well structure, and the drainage holes connect the mesh structure and the inner side of the dewatering well structure.
[0006] According to the above technical scheme, 0, 1 or 2 precipitation well structures are set at both ends of each seepage blind ditch; if the precipitation well structure is set at the end of the seepage blind ditch, the end of the seepage blind ditch located on the precipitation well structure side needs to extend between the pool structure and the supporting structure, and be connected to the inner side of the precipitation well structure through a drainage hole.
[0007] According to the above technical scheme, the seepage blind ditch and the seepage layer are compacted in layers with crushed stone. The crushed stone particle size is 8mm~40mm, the compaction coefficient is not less than 0.97, the cross-section of the seepage blind ditch is not less than 500mm×500mm, the distance between adjacent seepage blind ditches is 20m~40m, and the thickness of the seepage layer is not less than 300mm.
[0008] According to the above technical scheme, the drainage well structure includes a well seat, a well wall arranged on the well seat, a cover plate and a support located on the top of the well wall, and steps and allowable water level marks arranged on the inner side of the well wall; the drainage hole is arranged on the well wall.
[0009] According to the above technical plan, the well seat is made of cast-in-place concrete with a strength grade of not less than C30. The top surface of the well seat should be more than 500mm lower than the excavation surface of the pool foundation pit, with a thickness of more than 250mm and a width of 100mm on each side exceeding the outside of the protective layer. The distance between adjacent well seats is 20m to 40m.
[0010] According to the above technical solution, the shaft wall is cast in situ with reinforced concrete, the strength grade is not less than C30, the shaft wall thickness is 150mm~300mm, and the internal clearance is not less than 1000mm;
[0011] The water level mark is allowed to be a φ20mm stainless steel rod, with two buried in each pumping well, and the buried height is the same as the top surface elevation of the pool bottom plate;
[0012] The steps are installed at the full height of the well wall.
[0013] According to the above technical solution, drainage holes are set every 20° to 40° along the circumferential direction of the well wall, with a vertical spacing of no more than 200mm. The upper and lower holes are arranged in a plum blossom shape with a hole diameter of 100mm to 200mm. The setting height range is between the top surface of the well seat and the top surface of the pool bottom plate.
[0014] According to the above technical scheme, a protective layer and a filter layer are arranged around the precipitation well structure, and the protective layer, the filter layer and the seepage blind ditch are wrapped with a permeable fabric; the protective layer is tightly attached to a certain height range around the outer side of the bottom of the well wall, and the filter layer is tightly attached to the protective layer around it; groundwater passes through the filter layer, the protective layer and the drainage hole in turn from the seepage blind ditch into the inner side of the precipitation well structure.
[0015] According to the above technical solution, the protective layer is dry-laid with autoclaved lime sand bricks with a strength grade of MU25, with a thickness of more than 100 mm and a height set from the top surface of the well seat to the top surface of the bottom plate of the pool structure.
[0016] According to the above technical solution, the filter layer is made of crushed stone with a width of 500 to 600 mm and a thickness equal to the height difference between the top surface of the well seat and the top surface of the pool bottom plate.
[0017] The utility model has the following beneficial effects:
[0018] 1. By setting a seepage layer and a seepage blind ditch at the bottom of the pool structure, groundwater infiltrates into the seepage layer and converges to the outer wall of the precipitation well structure through the criss-crossed seepage blind ditches. The groundwater enters the inner side of the precipitation well structure through the drainage holes on the precipitation well structure, and then is discharged from the precipitation well structure through the pumping mechanism, thereby achieving the purpose of lowering the groundwater level.
[0019] While collecting and discharging groundwater in the foundation pit by using the seepage layer, the seepage blind ditch, and the precipitation well structure, it also plays a role in foundation treatment, without the need for separate foundation treatment design and construction. Secondly, when the pool structure is emptied, the precipitation well structure can also be used as a groundwater level observation well, without the need to set up a separate water level observation well. In addition, the precipitation well structure controls the groundwater level to eliminate the buoyancy of groundwater on the pool structure, and also serves as an anti-floating measure, so there is no need to carry out separate anti-floating design and construction, shortening the construction period and reducing the project cost. Finally, the precipitation well structure can effectively lower the groundwater level in the pool foundation pit to a certain depth below the excavation surface and discharge it outside the foundation pit, ensuring that the foundation pit is in a dry environment during the construction of the pool structure, facilitating construction, reducing the drag buoyancy of the pressure head on the pool bottom plate, and preventing sudden surges at the bottom of the pit.
[0020] Based on the above structure, the arrangement of temporary dewatering wells in the foundation pit is cancelled, and there is no need to carry out dewatering operations before excavation of the foundation pit. The dewatering wells of this structure are arranged around the outside of the pool structure, and there is no dewatering well sealing operation, which does not affect the construction of the pool structure, thus ensuring the integrity and construction quality of the pool bottom plate structure, shortening the construction period, and reducing the cost.
[0021] 2. The precipitation well structure is surrounded by filter layers and protective layers to block and filter water carrying a small amount of sediment, reducing the possibility of drainage holes being blocked during water collection and water pumps being blocked during water pumping. In addition, the structure uses low-cost materials, simple processes and structural forms, and easy construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a plan view of an embodiment provided by the utility model without including a pool structure;
[0023] Figure 2 is Figure 1 On the basis of the above, add the AA cross-section of the pool structure;
[0024] Figure 3 is Figure 1 On the basis of the above, add the cross-section diagram of the BB of the pool structure;
[0025] In the figure, 1. pool structure; 2. seepage layer; 3. seepage blind ditch; 4. support structure; 5. precipitation well structure; 5-1. well seat; 5-2. well wall; 5-3. cover plate and support; 5-4. step; 5-5. allowable water level mark; 5-6. well ring; 6. drainage hole; 7. protective layer; 8. filter layer; 9. permeable fabric. DETAILED DESCRIPTION
[0026] The utility model is described in detail below with reference to the accompanying drawings and embodiments.
[0027] Reference Figure 1 to Figure 3 As shown, the utility model provides a foundation pit dewatering structure for a water pool in a sewage treatment plant.
[0028] Example 1
[0029] The invention comprises a pool structure 1, a seepage guiding layer 2 located below the pool structure, a seepage guiding blind ditch 3 arranged in the seepage guiding layer, a supporting structure 4 surrounding the outside of the pool structure, and a precipitation well structure 5 located between the pool structure and the supporting structure; the seepage guiding blind ditches are arranged in a criss-cross pattern and at intervals to form a mesh structure; at least one seepage guiding blind ditch extends to the outer wall of the precipitation well structure to connect the mesh structure formed by the seepage guiding blind ditch with the precipitation well structure; and a plurality of drainage holes 6 are arranged on the precipitation well structure to connect the mesh structure and the inner side of the precipitation well structure.
[0030] In this embodiment, a seepage layer and a seepage blind ditch are set at the bottom of the pool structure, and groundwater penetrates into the seepage layer, and is gathered to the outer wall of the precipitation well structure by the criss-crossed seepage blind ditches. The groundwater enters the inner side of the precipitation well structure through the drainage holes on the precipitation well structure, and then is discharged from the precipitation well structure through a pumping mechanism, thereby achieving the purpose of lowering the groundwater level.
[0031] While collecting and discharging groundwater in the foundation pit by using the seepage layer, the seepage blind ditch, and the precipitation well structure, it also plays a role in foundation treatment, without the need for separate foundation treatment design and construction. Secondly, when the pool structure is emptied, the precipitation well structure can also be used as a groundwater level observation well, without the need to set up a separate water level observation well. In addition, the precipitation well structure controls the groundwater level to eliminate the buoyancy of groundwater on the pool structure, and also serves as an anti-floating measure, so there is no need to carry out separate anti-floating design and construction, shortening the construction period and reducing the project cost. Finally, the precipitation well structure can effectively lower the groundwater level in the pool foundation pit to a certain depth below the excavation surface and discharge it outside the foundation pit, ensuring that the foundation pit is in a dry environment during the construction of the pool structure, facilitating construction, reducing the drag buoyancy of the pressure head on the pool bottom plate, and preventing sudden surges at the bottom of the pit.
[0032] Based on the above structure, the arrangement of temporary dewatering wells in the foundation pit is cancelled, and there is no need to carry out dewatering operations before excavation of the foundation pit. The dewatering wells of this structure are arranged around the outside of the pool structure, and there is no dewatering well sealing operation, which does not affect the construction of the pool structure, thus ensuring the integrity and construction quality of the pool bottom plate structure, shortening the construction period, and reducing the cost.
[0033] Example 2
[0034] The structure and principle of Example 2 are similar to those of Example 1, except that: a preferred arrangement of a precipitation well structure and a seepage blind ditch is provided. 0, 1 or 2 precipitation well structures are arranged at both ends of each seepage blind ditch; if a precipitation well structure is arranged at the end of the seepage blind ditch, the end of the seepage blind ditch on the precipitation well structure side needs to extend between the pool structure and the support structure, and be connected to the inner side of the precipitation well structure through a drainage hole.
[0035] In Example 2, preferably, the seepage blind ditch and the seepage layer are compacted in layers with crushed stone, the crushed stone particle size is 8mm~40mm, the compaction coefficient is not less than 0.97, the cross-section of the seepage blind ditch is not less than 500mm×500mm, the spacing between adjacent seepage blind ditches is 20m~40m, and the thickness of the seepage layer is not less than 300mm.
[0036] Example 3
[0037] The structure and principle of Example 3 are similar to those of Example 1 or 2, except that a preferred structural form of a precipitation well structure is provided.
[0038] The dewatering well structure includes a well seat 5-1, a well wall 5-2 arranged on the well seat, a cover plate and a support 5-3 located on the top of the well wall, and a step 5-4 and an allowable water level mark 5-5 arranged on the inner side of the well wall; drainage holes are arranged on the well wall; the cover plate and the support are fixed to the top of the well wall through a well ring 5-6.
[0039] In Example 3, preferably, in this embodiment, two precipitation well structures are set at both ends of each seepage blind ditch, the well seat is made of cast-in-place concrete with a strength grade of not less than C30, the top surface of the well seat should be more than 500mm lower than the excavation surface of the pool foundation pit, the thickness is more than 250mm (300mm is used in the embodiment in the figure), the width is 100mm beyond the outside of the protective layer on each side, and the distance between adjacent well seats is 20m to 40m.
[0040] In Example 3, preferably, the well wall is cast-in-place reinforced concrete with a strength grade not less than C30, the well wall thickness is 150 mm to 300 mm, and the internal clearance is not less than 1000 mm;
[0041] It is permitted that the water level mark be a φ20mm stainless steel rod, with two buried in each pumping well, with the buried height being the same as the elevation of the top surface of the pool bottom plate; it is permitted that the water level mark be buried in the well wall at the prescribed height and protrude a certain length.
[0042] The step is installed at the full height of the well wall. During the well wall construction process, the step is buried on one side of the well wall and exposed to the outside for a certain length.
[0043] In Example 3, preferably, a drainage hole is arranged every 20° to 40° along the circumferential direction of the well wall (30° is adopted in the embodiment in the figure), the vertical spacing is not more than 200mm, the upper and lower holes are arranged in a plum blossom shape, the hole diameter is 100mm to 200mm, and the height range is between the top surface of the well seat and the top surface of the bottom plate of the pool.
[0044] Example 4
[0045] The structure and principle of Example 4 are similar to those of Examples 1-3, except that: a protective layer 7 and a filter layer 8 are arranged around the precipitation well structure, and the protective layer, the filter layer and the infiltration blind ditch are wrapped with a permeable fabric 9; the protective layer is tightly attached to the outer side of the bottom of the well wall within a certain height range, and the filter layer is tightly attached to the protective layer on all sides; groundwater passes through the filter layer, the protective layer and the drainage hole in turn from the infiltration blind ditch into the inner side of the precipitation well structure.
[0046] The precipitation well structure is surrounded by filter layers and protective layers to block and filter water carrying a small amount of sediment, reducing the possibility of drainage holes being blocked during water collection and water pumps being blocked during water pumping. In addition, the structure uses low-cost materials, simple processes and structural forms, and easy construction.
[0047] In Example 4, the protective layer is dry-laid using autoclaved lime sand bricks with a strength grade of MU25, with a thickness of more than 100 mm (120 mm is used in the example in the figure), and the height is set from the top surface of the well seat to the top surface of the bottom plate of the pool structure.
[0048] In Example 4, the filter layer is made of crushed stone with a width of 500-600 mm and a thickness equal to the height difference between the top surface of the well seat and the top surface of the pool bottom plate.
[0049] The working process of the utility model is:
[0050] First, excavate the earthwork in the foundation pit. After excavating to the designed elevation, locate and lay out the well seat, and pour the concrete well seat on the soil foundation at the location. Carry out well wall construction on the well seat. During the well wall construction, install steps, allowable water level marks, and drainage holes simultaneously. The steps are installed at the full height of the well wall. The installation height of the allowable water level mark is the same as the top surface of the bottom plate of the pool structure. The installation height range of the drainage hole is from the top surface of the well seat to the top surface of the bottom plate of the pool structure. Then pour the concrete well ring on the top of the well wall. Install Cover plate and support; at the bottom of the well wall, close to the outside of the well wall, use autoclaved lime sand bricks to build a protective layer, the height of which is from the top of the well seat to the top of the bottom plate of the pool structure, and the protective layer is wrapped with geotextile as a whole; a crushed stone filter layer is set close to the protective layer and wrapped with geotextile; a crushed stone seepage blind ditch is set at a certain interval in the vertical and horizontal directions at the bottom of the foundation pit within the range of the pool structure, and geotextile is wrapped around it, and the seepage blind ditch is connected to the filter layer; the bottom of the foundation pit within the range of the pool structure is fully covered with a crushed stone seepage layer, and the seepage layer is connected to the seepage blind ditch.
[0051] The above are only preferred embodiments of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the scope of the patent application of the present invention still fall within the protection scope of the present invention.
Claims
1. A foundation pit dewatering structure for a sewage treatment plant pool, including a pool structure, characterized in that: It also includes a seepage guiding layer located below the water pool structure, a seepage guiding blind ditch arranged in the seepage guiding layer, a supporting structure surrounding the outside of the water pool structure, and a precipitation well structure located between the water pool structure and the supporting structure; the seepage guiding blind ditches are arranged in a criss-cross pattern and at intervals to form a mesh structure; there is at least one seepage guiding blind ditch extending to the outer wall of the precipitation well structure to connect the mesh structure formed by the seepage guiding blind ditches with the precipitation well structure; and a number of drainage holes are provided on the precipitation well structure, and the drainage holes connect the mesh structure and the inner side of the precipitation well structure.
2. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 1, characterized in that: 0, 1 or 2 precipitation well structures are set at both ends of each seepage blind ditch; if a precipitation well structure is set at the end of the seepage blind ditch, the end of the seepage blind ditch on the precipitation well structure side needs to extend between the pool structure and the supporting structure, and be connected to the inner side of the precipitation well structure through a drainage hole.
3. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 1, characterized in that: The seepage blind ditch and the seepage layer are compacted in layers with crushed stone. The crushed stone particle size is 8mm~40mm, the compaction coefficient is not less than 0.97, the cross-section of the seepage blind ditch is not less than 500mm×500mm, the distance between adjacent seepage blind ditches is 20m~40m, and the thickness of the seepage layer is not less than 300mm.
4. The foundation pit dewatering structure for a sewage treatment plant pool according to any one of claims 1 to 3, characterized in that: The dewatering well structure includes a well seat, a well wall arranged on the well seat, a cover plate and a support located on the top of the well wall, and steps and allowable water level marks arranged on the inner side of the well wall; drainage holes are arranged on the well wall.
5. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 4 is characterized in that: The well seat is made of cast-in-place concrete with a strength grade of not less than C30. The top surface of the well seat should be at least 500mm lower than the excavation surface of the pool foundation pit, with a thickness of more than 250mm and a width of 100mm on each side exceeding the outside of the protective layer. The distance between adjacent well seats is 20m to 40m.
6. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 4, characterized in that: The shaft wall is made of cast-in-place reinforced concrete with a strength grade of no less than C30, a wall thickness of 150mm to 300mm, and an internal clearance of no less than 1000mm; The water level mark is allowed to be a φ20mm stainless steel rod, with two buried in each pumping well, and the buried height is the same as the top surface elevation of the pool bottom plate; The steps are installed at the full height of the well wall.
7. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 4, characterized in that: Drainage holes are set every 20°~40° along the circumferential direction of the well wall, with a vertical spacing of no more than 200mm. The upper and lower holes are arranged in a plum blossom shape with a hole diameter of 100mm~200mm. The setting height range is between the top surface of the well seat and the top surface of the pool bottom plate.
8. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 1, characterized in that: A protective layer and a filter layer are arranged around the precipitation well structure, and the protective layer, the filter layer and the seepage blind ditch are wrapped with a permeable fabric; the protective layer is closely attached to a certain height range around the outer side of the bottom of the well wall, and the filter layer is closely attached to the surrounding of the protective layer; groundwater passes through the filter layer, the protective layer and the drainage hole in sequence from the seepage blind ditch into the inner side of the precipitation well structure.
9. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 1, characterized in that: The protective layer is dry-laid with autoclaved lime sand bricks with a strength grade of MU25, with a thickness of more than 100mm and a height set from the top surface of the well seat to the top surface of the pool structure bottom plate.
10. The foundation pit dewatering structure for a sewage treatment plant pool according to claim 1, characterized in that: The filter layer is made of crushed stone with a width of 500 to 600 mm and a thickness equal to the height difference between the top surface of the well seat and the top surface of the pool bottom plate.