High-altitude cantilever structure erecting platform

By setting up support brackets on the sides of high-rise buildings to form a triangular support structure, the problems of large usage, high cost and low efficiency of supporting formwork components in the construction of cantilever structures of high-rise buildings are solved, and the construction cost is reduced and construction efficiency is improved. The effect of the construction safety is improved.

CN222456818UActive Publication Date: 2025-02-11THE FIRST CONSTR CO LTD OF CHINA CONSTR FIRST GRP +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421148108.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-02-11
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

The construction of cantilever structures in high-rise buildings has problems such as large suspended height, large span, and large self-weight, resulting in huge use of components of floor-standing formwork frames, which are high cost, difficult and low efficiency.

Method used

Design a high-altitude cantilever structure erecting platform. By setting up multiple groups of support brackets on the side of the building, the support brackets are composed of support steel, oblique brace steel, vertical steel and diagonal steel to form a triangular support structure to reduce support The amount of use of mold frame components.

Benefits of technology

This technical solution can significantly reduce the use of component components of the supporting mold frame, reduce construction costs and difficulty, improve construction efficiency, and improve construction safety by setting up protective poles and wire ropes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456818U_ABST
    Figure CN222456818U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of cantilever structure construction design, and provides a high-altitude cantilever structure erecting platform which comprises multiple sets of supporting frames arranged on the outer side face of a building structure at intervals in the horizontal direction, and each supporting frame comprises bearing profile steel, vertical profile steel, diagonal profile steel and diagonal profile steel. The other end extends outwards; one end of the diagonal bracing profile steel is fixedly connected to a building structure, the other end of the diagonal bracing profile steel is fixedly connected to the bottom of the bearing profile steel, and an included angle is formed between the diagonal bracing profile steel and the bearing profile steel; a first connecting piece is fixed on the diagonal section steel, and the vertical section steel and the diagonal section steel are jointly connected to the first connecting piece; the end, away from the inclined strut profile steel, of the vertical profile steel is perpendicularly fixed to the bearing profile steel through a second connecting piece, and the end, away from the inclined strut profile steel, of the diagonal profile steel is fixedly connected to the connecting position of the bearing profile steel and the building structure through a third connecting piece. On the basis, the use amount of components of the formwork support can be reduced, the construction cost and difficulty are reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of cantilever structure construction design, and in particular to a high-altitude cantilever structure erection platform. Background Art

[0002] A cantilever structure is a suspended structure that extends outward from a building, usually set on the outer edge of the building's roof; the cantilever structure construction of a low-rise building usually involves building a ground-based formwork frame from the ground to support the steel skeleton, and then pouring concrete on the steel skeleton to form a cantilever structure. However, the roof cantilever structure of a high-rise building has problems such as large suspended height, large span, and heavy weight. If it is built with a ground-based formwork frame, the number of components used in the formwork frame is huge, and there are problems such as high cost, difficulty, and low efficiency, which need to be improved. Utility Model Content

[0003] Based on this, the present application provides a high-altitude cantilever structure erection platform that can be fixed on the side of a building to provide support for the formwork frame, reduce the use of components of the formwork frame, reduce construction costs and difficulty, and improve construction efficiency.

[0004] The high-altitude cantilever structure erection platform provided in this application adopts the following technical solution:

[0005] A high-altitude cantilever structure erection platform, comprising a plurality of support frames arranged at intervals along the horizontal direction on the outer side of a building structure, the support frames comprising supporting steel, vertical steel, diagonal bracing steel and diagonal steel, one end of the supporting steel is vertically fixed to the side of the building structure, and the other end extends outward; one end of the diagonal bracing steel is fixedly connected to the building structure, and the other end is fixedly connected to the bottom of the supporting steel, and the diagonal bracing steel and the supporting steel are arranged at an angle;

[0006] The diagonal bracing steel is fixed with a first connecting piece, and the vertical steel and the diagonal steel are commonly connected to the first connecting piece; one end of the vertical steel away from the diagonal bracing steel is vertically fixed to the supporting steel through the second connecting piece, and one end of the diagonal steel away from the diagonal bracing steel is fixedly connected to the connection position between the supporting steel and the building structure through the third connecting piece.

[0007] By adopting the above technical solution, when constructing the cantilever structure of a high-rise building, by setting embedded parts on the outer side of the building structure to fix the supporting steel and the diagonal steel, the end of the diagonal bracing steel is connected to the end of the supporting steel, and a triangular support structure with good stability can be formed between the supporting steel, the diagonal bracing steel and the building wall; in addition, by adding vertical steel and diagonal steel between the supporting steel and the diagonal bracing steel, a stable triangular support structure can be further formed, so that the entire support frame has good structural strength. After the support frame is built, it can be used as a platform for the formwork frame to be supported and fixed, without the need to build it from the ground up, which can greatly reduce the use of components of the formwork frame, reduce construction costs and difficulty, and thus improve the construction efficiency of high-altitude cantilever structures.

[0008] Optionally, the support frame also includes a protective pole arranged at an end of the supporting steel away from the building structure, the protective pole is vertically arranged, and all the protective poles are commonly connected to a first steel wire rope.

[0009] By adopting the above-mentioned technical scheme, by erecting a protective pole at the end of the supporting steel section, the connection of the first steel wire rope can be facilitated; by setting up the first steel wire rope, the construction safety can be improved when the workers are setting up the supporting formwork on the erection platform, and the safety rope hook of the construction workers can be hooked firmly to ensure personal safety.

[0010] Optionally, all protective poles are fixed with hooks, and the first steel wire rope is wound around each hook in turn; both ends of the first steel wire rope are respectively connected with first hook buckles, and the two first hook buckles are respectively hooked and fixed to the two outermost hook buckles.

[0011] By adopting the above-mentioned technical scheme, the two ends of the first steel wire rope are respectively connected to the two protective poles by hooking and fixing, which has the advantage of easy installation; and the first steel wire rope is sequentially wound around each hook and hanger, which is beneficial to improve the stability of the first steel wire rope after it is erected and ensure construction safety.

[0012] Optionally, the number of hooks fixed to a protective pole is set to two, and the two hooks are spaced apart in the height direction; the two hooks are respectively set to be a first hook and a second hook, and a second steel wire rope is hooked and fixed between the first hook and the second hook of the adjacent protective pole.

[0013] By adopting the above-mentioned technical solution, the second steel wire rope can be conveniently hooked and fixed between the first hook hanger and the second hook hanger, and the number of second steel wire ropes between two adjacent protective poles is two, which are cross-arranged with each other, which can further improve the safety of construction workers on the erection platform and eliminate the risk of accidental falling of construction workers.

[0014] Optionally, the first connecting member includes a steel sleeve portion movably sleeved on the diagonal bracing steel and two insertion portions arranged on the outside of the steel sleeve portion, the vertical steel and the diagonal steel are respectively inserted into the two insertion portions, and the vertical steel and the diagonal steel are respectively fixedly connected to the insertion portions by fasteners.

[0015] By adopting the above technical solution, before the diagonal bracing steel is fixed to the building structure, the steel sleeve of the first connecting member is sleeved on the diagonal bracing steel; after the diagonal bracing steel is fixed, the first connecting member is moved to a specific position, and the vertical steel and the diagonal steel are respectively connected to the corresponding insertion parts, so that the first connecting member can be kept fixed, which is conducive to the rapid assembly and stable support of the support bracket. In addition, the steel sleeve sleeved on the diagonal bracing steel itself has the ability to resist bending deformation. When used in conjunction with the diagonal bracing steel, it can further reduce the possibility of deformation of the diagonal bracing steel under stress and improve the support stability of the erected platform.

[0016] Optionally, a first magnetic component is embedded in the inner wall of the steel sleeve, and a second magnetic component is partially fixed to the diagonal steel support. When the first magnetic component is magnetically attracted to the second magnetic component, the two insertion parts are respectively opposite to the second connecting component and the third connecting component.

[0017] By adopting the above technical solution, through the cooperation of the first magnetic part and the second magnetic part, the steel sleeve can automatically stay at a specific position of the diagonal bracing steel through magnetic attraction, so as to facilitate the installation and fixation of vertical steel and diagonal steel during high-altitude operations.

[0018] Optionally, the high-altitude cantilever structure erection platform also includes a plurality of connecting beams arranged between every two adjacent support brackets, and a mounting portion is arranged on the side of the steel sleeve portion close to the adjacent first connecting member, and both ends of the connecting beam are respectively fixed to the two mounting portions by fasteners.

[0019] By adopting the above technical solution, the setting of the installation part can facilitate the installation of the connecting beam between adjacent support frames, so that the various support frames are connected to each other to form a stable erection platform, which is conducive to the safe implementation of the cantilever construction.

[0020] Optionally, the supporting steel is fixed with supporting steel for supporting the formwork frame, and the number of supporting steel is multiple, and all the supporting steels are arranged at intervals along the extension direction of the supporting steel.

[0021] By adopting the above technical solution, by fixing the supporting steel on the top of the supporting steel, it is possible to facilitate the erection of the formwork frame, thereby facilitating the construction and forming of the cantilever structure.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. The triangular support structure formed between the supporting steel, the diagonal bracing steel and the building wall, as well as the installation of vertical steel and diagonal steel, can make the entire support frame have good structural strength and stability, so as to serve as a platform for the formwork frame, reduce the use of the components of the formwork frame, reduce the construction cost and difficulty, and improve the construction efficiency;

[0024] 2. By setting up a protective pole to fix the first steel wire rope, the safety of the workers when setting up the platform for construction can be improved, and the first steel wire rope can be hooked firmly by the safety rope hook of the construction workers to ensure personal safety;

[0025] 3. By making the steel sleeve of the first connecting member be sleeved on the diagonal bracing steel, and then connecting the vertical steel and the diagonal steel to the corresponding insertion parts respectively, it is beneficial to the rapid assembly and stable support of the support frame. The steel sleeve itself has the ability to resist bending deformation. When used in conjunction with the diagonal bracing steel, it can further reduce the possibility of stress deformation of the diagonal bracing steel and improve the support stability of the erected platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the overall structure of the platform set up in Example 1;

[0027] Figure 2 is a schematic structural diagram of the support bracket in Example 1;

[0028] Figure 3 is a schematic diagram of the structure in which the first steel wire rope is connected to the protective pole in Example 1;

[0029] Figure 4 is a schematic diagram of the structure in which the first steel wire rope and the second steel wire rope are connected to the protective pole in Example 2;

[0030] Figure 5 is a schematic structural diagram of the first connecting member in Example 3;

[0031] Figure 6 It is a schematic diagram of the installation of vertical steel sections, diagonal steel sections and connecting beams in Example 3.

[0032] Explanation of the reference numerals in the accompanying drawings: 1. Support bracket; 11. Supporting steel; 12. Vertical steel; 13. Bracing steel; 14. Diagonal steel; 15. Protective pole; 151. Hook; 152. First hook; 153. Second hook; 16. Supporting steel; 2. Connecting beam; 21. Extension plate; 3. First steel wire rope; 31. First hook; 4. Second steel wire rope; 41. Second hook; 5. First connecting member; 51. Steel sleeve; 52. Installation part; 53. Insertion part; 54. First magnetic member; 6. Second connecting member; 7. Third connecting member; 8. Fourth connecting member; 9. Building structure; 91. First embedded member; 92. Second embedded member. DETAILED DESCRIPTION

[0033] The following is combined with Figure 1-6 This application is described in further detail.

[0034] Embodiment 1:

[0035] The embodiment of the present application discloses a high-altitude cantilever structure erection platform.

[0036] Reference Figure 1 A high-altitude cantilever structure erection platform includes a support frame 1 and a connecting beam 2 arranged between adjacent support frames 1, wherein the support frame 1 is fixed to the outer side of a building structure 9, and all support frames 1 are arranged at intervals in the horizontal direction; the spacing between each group of support frames 1 can be obtained during actual construction according to the actual force analysis.

[0037] Reference Figure 2 The support frame 1 includes a supporting steel 11, a vertical steel 12, a diagonal bracing steel 13, a diagonal steel 14 and a protective upright 15; a first embedded part 91 and a second embedded part 92 are arranged inside the wall of the building structure 9, the first embedded part 91 is located above the second embedded part 92, the first embedded part 91 is used to fix the third connecting part 7, and one end of the supporting steel 11 is fixedly connected to the third connecting part 7 by a fastener, thereby realizing the fixation between the supporting steel 11 and the building structure 9; the other end of the supporting steel 11 extends outward, and the whole is arranged horizontally.

[0038] The second embedded part 92 is used to fix the fourth connecting member 8, and one end of the diagonal bracing steel 13 is fixedly connected to the fourth connecting member 8 by a fastener, thereby achieving fixation between the diagonal bracing steel 13 and the building structure 9; one end of the diagonal bracing steel 13 away from the building structure 9 is fixedly connected to the bottom of the supporting steel 11, and the diagonal bracing steel 13 and the supporting steel 11 are arranged at an angle, which is used to form a triangular supporting structure between the supporting steel 11, the supporting steel and the wall of the building structure 9, thereby improving the supporting stability of the support frame 1 and the entire erection platform.

[0039] The angle in this embodiment is 45°. It can be understood that in other feasible implementations, the angle between the diagonal bracing steel 13 and the supporting steel 11 can also be 40° or 50°, which needs to be obtained based on the force analysis of actual conditions and is not limited to the angle adopted in this embodiment.

[0040] The middle section of the diagonal bracing steel 13 is fixed with a first connecting member 5, and the first connecting member 5 is located on the top surface of the diagonal bracing steel 13. The vertical steel 12 and the diagonal steel 14 are connected to the first connecting member 5. The end of the vertical steel 12 away from the diagonal bracing steel 13 is fixedly connected to the supporting steel 11 through the second connecting member 6, and the vertical steel 12 is vertically arranged to mainly support the vertical load. The end of the diagonal steel 14 away from the diagonal bracing steel 13 is fixedly connected to the third connecting member 7, that is, fixedly connected to the connection position of the supporting steel 11 and the building structure 9, and can also form a triangular support structure to further improve the support stability of the support frame 1.

[0041] There are multiple connecting beams 2, each connecting beam 2 is connected between two adjacent first connecting members 5 of adjacent brackets 1, and the connecting beam 2 and the first connecting member 5 are fixed by fasteners. It should be noted that in this embodiment, the fasteners used for connection are all M22 high-strength bolts, which can improve the connection strength and ensure construction safety.

[0042] A supporting steel 16 is fixed to the top of all the supporting steels 11. The supporting steel 16 is arranged horizontally, and the extension direction of the supporting steel 16 is perpendicular to the extension direction of the supporting steel 11. In addition, there are multiple supporting steels 16, and all the supporting steels 16 are arranged at intervals along the extension direction of the supporting steel 11. The supporting steels 16 are used to support the formwork frame, and can be connected. The spacing between adjacent supporting steels 16 also needs to be obtained during the actual construction process and according to the actual force analysis.

[0043] The protection pole 15 is fixedly connected to the end of the supporting steel 11 away from the building structure 9, and the protection pole 15 is located on the top of the supporting steel 11; the protection pole 15 is vertically arranged. Figure 3 All the protective poles 15 are commonly connected to the first steel wire rope 3.

[0044] In this embodiment, a hook 151 is welded and fixed to the outer circumference of each protective upright 15. The hook 151 is set as a semi-circular steel. The first steel wire rope 3 is sequentially passed through each hook and rotates around the hook 151. The two ends of the first steel wire rope 3 are respectively fixedly connected with the first hook buckle 31. The two first hook buckles 31 can be hooked and fixed with the two outermost hooks 151, thereby realizing the rapid installation of the first steel wire rope 3. At the same time, the first steel wire rope 3 can also be hooked and firmly hooked by the safety rope hook of the construction personnel to ensure personal safety. It can be understood that in order for the first hook buckle 31 to pass through the hook 151 smoothly, the size of the first hook buckle 31 needs to be smaller than the inner diameter of the hook 151.

[0045] The implementation principle of Example 1 of the present application is:

[0046] When constructing a cantilever structure of a high-rise building, a triangular support structure is formed between the supporting steel 11, the diagonal bracing steel 13 and the building wall, which has good stability; and by adding vertical steel 12 and diagonal steel 14 between the supporting steel 11 and the diagonal bracing steel 13, a stable triangular support structure can be further formed, so that the entire support frame 1 has good structural strength. After the support frame 1 is built, it can be used as a platform for the formwork frame to be supported and fixed, without the need to build it from the ground up, which can greatly reduce the use of the components of the formwork frame, reduce construction costs and difficulty, and thus improve the construction efficiency of the high-altitude cantilever structure.

[0047] Embodiment 2:

[0048] The embodiment of the present application discloses a high-altitude cantilever structure erection platform.

[0049] Reference Figure 4 The embodiment of the present application discloses a high-altitude cantilever structure erection platform, and the remaining components are the same as those in Embodiment 1, and are not described one by one here; the difference from Embodiment 1 is that the number of hooks 151 welded and fixed to a protective pole 15 in this embodiment is set to two, and the two hooks 151 are arranged at intervals along the height direction; the two hooks 151 are respectively set to a first hook 152 and a second hook 153, and a second steel wire rope 4 is hooked and fixed between the first hook 152 and the second hook 153 of the adjacent protective pole 15.

[0050] Specifically, the two ends of the second steel wire rope 4 are respectively fixed with second hook buckles 41, and the two second hook buckles 41 are respectively hooked and fixed with the first hook hanger 152 and the second hook hanger 153. It should be noted that there are two second steel wire ropes 4 located between two adjacent protective upright poles 15, and the two second steel wire ropes 4 are arranged crosswise with each other, which can further improve the safety of construction workers on the erection platform and eliminate the risk of accidental falling of construction workers.

[0051] Embodiment 3:

[0052] The embodiment of the present application discloses a high-altitude cantilever structure erection platform.

[0053] Reference Figure 4 , Figure 5 The embodiment of the present application discloses a high-altitude cantilever structure erection platform, and the remaining components are the same as those in Embodiment 1, and are not described one by one here; the difference from Embodiment 1 is that the first connecting member 5 in this embodiment includes a steel sleeve portion 51, an installation portion 52 and two plug-in portions 53, and the steel sleeve portion 51, the installation portion 52 and the two plug-in portions 53 are integrally formed.

[0054] Among them, refer to Figure 5The steel sleeve 51 is matched and sleeved on the outer peripheral side of the diagonal brace steel 13, so that the first connecting member 5 can move along the extension direction of the diagonal brace steel 13; a through mounting hole is opened on the inner wall of the steel sleeve 51, and a first magnetic member 54, i.e., a magnet, is matched and embedded in the mounting hole; the diagonal brace steel 13 is set as an H-shaped steel, and the two opposite sides of the diagonal brace steel 13 respectively have structural cavities, and a second magnetic member (not shown in the figure) is installed inside the structural cavity, and the second magnetic member does not contact the steel sleeve 51; the second magnetic member is located in the middle section of the structural cavity, and when the steel sleeve 51 moves to the position where the first magnetic member 54 is opposite to the second magnetic member, the two insertion parts 53 can respectively face the second connecting member 6 and the third connecting member 7.

[0055] Reference Figure 6 The mounting portion 52 is arranged on the side of the steel sleeve portion 51 close to the adjacent first connecting member 5. It can be understood that for the support bracket 1 located on the outermost side, the number of mounting portions 52 of the first connecting member 5 used is only one; but for other support brackets 1, the number of mounting portions 52 of the first connecting member 5 used is two, which are symmetrically arranged on two opposite sides of the steel sleeve portion 51.

[0056] Two extension plates 21 are fixed to one end of the connecting beam 2, and the two extension plates 21 are arranged on both side edges of the connecting beam 2 in the width direction; when the connecting beam 2 is installed, the mounting portion 52 is inserted into the area between the two extension plates 21, and then fasteners are used to pass through the extension plate 21, the mounting portion 52 and the other extension plate 21 in sequence, so that the connecting beam 2 can be fixedly connected between the two first connecting members 5.

[0057] The two insertion parts 53 are located on the same side of the steel sleeve part 51, and each insertion part 53 is provided with an insertion groove. The vertical steel section 12 and the diagonal steel section 14 are respectively inserted into the insertion grooves and connected and fixed using fasteners, so that the vertical steel section 12 and the diagonal steel section 14 can be firmly connected to the first connecting member 5 respectively.

[0058] The implementation principle of Example 3 of the present application is:

[0059] Before the diagonal bracing steel 13 is fixed to the building structure 9, the steel sleeve 51 of the first connecting member 5 is sleeved on the diagonal bracing steel 13; after the diagonal bracing steel 13 is fixed, the first connecting member 5 is moved to the outside of the second magnetic member, and the first connecting member 5 is kept in position by the magnetic attraction between the first magnetic member 54 and the second magnetic member, which can facilitate the installation and fixation of the vertical steel 12 and the diagonal steel 14 during high-altitude operations; and the steel sleeve 51 sleeved on the diagonal bracing steel 13 itself has the ability to resist bending deformation, and when used in conjunction with the diagonal bracing steel 13, it can further reduce the possibility of stress deformation of the diagonal bracing steel 13 and improve the support stability of the erected platform.

[0060] The above are preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A high-altitude cantilever structure erection platform, characterized in that: The invention comprises a plurality of support frames (1) arranged at intervals along the horizontal direction on the outer side of a building structure (9), wherein the support frames (1) comprise supporting steel (11), vertical steel (12), diagonal bracing steel (13) and diagonal steel (14), wherein one end of the supporting steel (11) is vertically fixed to the side of the building structure (9) and the other end extends outward; one end of the diagonal bracing steel (13) is fixedly connected to the building structure (9) and the other end is fixedly connected to the bottom of the supporting steel (11), and the diagonal bracing steel (13) and the supporting steel (11) are arranged at an angle; The diagonal bracing steel (13) is fixed with a first connecting member (5), and the vertical steel (12) and the diagonal steel (14) are connected to the first connecting member (5); one end of the vertical steel (12) away from the diagonal bracing steel (13) is vertically fixed to the supporting steel (11) via a second connecting member (6), and one end of the diagonal steel (14) away from the diagonal bracing steel (13) is fixedly connected to a connection position between the supporting steel (11) and the building structure (9) via a third connecting member (7).

2. The high altitude cantilever structure erection platform according to claim 1 is characterized by: The support frame (1) further comprises a protective upright pole (15) arranged at an end of the supporting steel (11) away from the building structure (9), wherein the protective upright pole (15) is arranged vertically, and all the protective upright poles (15) are commonly connected to a first steel wire rope (3).

3. The high altitude cantilever structure erection platform according to claim 2 is characterized in that: All the protective upright poles (15) are fixed with hooks (151), and the first steel wire rope (3) is wound around each hook (151) in sequence; both ends of the first steel wire rope (3) are respectively connected with first hook buckles (31), and the two first hook buckles (31) are respectively hooked and fixed to the two outermost hooks (151).

4. The high altitude cantilever structure erection platform according to claim 3 is characterized by: The number of hooking members (151) fixed to one of the protective upright poles (15) is set to two, and the two hooking members (151) are arranged at intervals in the height direction; the two hooking members (151) are respectively set to be a first hooking member (152) and a second hooking member (153), and a second steel wire rope (4) is hooked and fixed between the first hooking member (152) and the second hooking member (153) of the adjacent protective upright pole (15).

5. The high altitude cantilever structure erection platform according to claim 1 is characterized by: The first connecting member (5) comprises a steel sleeve portion (51) movably sleeved on the diagonal bracing steel (13) and two insertion portions (53) arranged outside the steel sleeve portion (51), the vertical steel (12) and the diagonal steel (14) being inserted into the two insertion portions (53) respectively, and the vertical steel (12) and the diagonal steel (14) being fixedly connected to the insertion portions (53) respectively by fasteners.

6. The high altitude cantilever structure erection platform according to claim 5, characterized in that: A first magnetic component (54) is embedded in the inner wall of the steel sleeve (51), and a second magnetic component is partially fixed to the diagonal bracing steel (13); when the first magnetic component (54) and the second magnetic component are magnetically attracted to each other, the two insertion portions (53) are respectively opposite to the second connecting component (6) and the third connecting component (7).

7. The high altitude cantilever structure erection platform according to claim 5 is characterized by: It also comprises a plurality of connecting beams (2) arranged between every two adjacent support brackets (1), the steel sleeve portion (51) is provided with a mounting portion (52) on the side close to the adjacent first connecting member (5), and the two ends of the connecting beam (2) are respectively fixed to the two mounting portions (52) by fasteners.

8. The high altitude cantilever structure erection platform according to claim 1 is characterized by: The supporting steel (11) is fixed with supporting steel (16) for supporting the formwork frame. The supporting steel (16) is provided in a plurality of pieces, and all the supporting steels (16) are arranged at intervals along the extension direction of the supporting steel (11).

Citation Information

Cited By

  • Scaffold type steel-wood joint aerial mounting and fixing device and mounting method

    CN122304480A