Vertical cold box for load test
By integrating low-temperature components on the upper flange of the load test vertical cold box and fixing it longitudinally, the inconvenience of existing cold box during installation and disassembly is solved, and a more compact structure and convenient installation and disassembly are achieved, reducing heat leakage inside the cold box.
Patent Information
- Application Number
- CN202421243094.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing cold box is inconvenient during installation and disassembly, and the structure is not compact, making it difficult to meet the needs of low-temperature testing.
A load test vertical cold box is designed, and a more compact structure and convenient installation and disassembly are achieved by integrating a first heater, a second heater, a liquid helium pool and a first heat exchanger on the upper flange and fixing it longitudinally through the connecting frame.
It realizes compact integration of cold box components, simplifies the installation and disassembly process, improves the overall compactness and convenience of use of cold box, and reduces heat leakage inside the cold box.
Smart Images

Figure CN222646753U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of low-temperature testing, in particular to a load testing vertical cold box. Background Art
[0002] With the development of technology and scene requirements, scientific research equipment and testing technology need to control helium at a specific temperature, such as between 4.5K-75K, and produce a certain amount of 2K superfluid helium to meet the needs of test load conditions and scientific research experiments.
[0003] This test is generally carried out through a cold box. Currently, ultra-low temperature cold boxes are mainly horizontal cold boxes, which are mostly used in logistics chains, refrigeration, etc. Since 2K liquid helium is at an ultra-low temperature, it is necessary to match more sophisticated cryogenic components and a more reasonable cold box structure layout to adapt to low temperature scenarios to ensure structural stability.
[0004] In view of this, the utility model proposes a load test vertical cold box which has a more compact structure and is easier to install and disassemble. Utility Model Content
[0005] In order to solve the problem that the existing cold box is not conducive to disassembly and installation, the utility model provides a load test vertical cold box.
[0006] The utility model is realized by the following technical solutions:
[0007] The utility model proposes a load test vertical cold box comprising a cylinder and an upper flange, wherein:
[0008] A first heater, a second heater, a liquid helium pool and a first heat exchanger are arranged inside the cylinder. The first heater, the top of the second heater, the liquid helium pool and the first heat exchanger are longitudinally fixed to the bottom of the upper flange near the center side through a connecting frame. The upper flange is fixedly connected to the top of the cylinder to form a closed space and the first heater, the second heater, the liquid helium pool and the first heat exchanger are enclosed in the sealed space. The first heater, the second heater, the liquid helium pool and the first heat exchanger are not in contact with the cylinder.
[0009] The upper flange is provided with a pressure-inducing pipe helium protection component and a safety valve helium protection component, and the pressure-inducing pipe helium protection component and the safety valve helium protection component are arranged on the top of the upper flange.
[0010] Furthermore, a plurality of neck tube structures are provided on the top of the upper flange. The neck tube structures are provided on the top of the upper flange and are used to connect components of different specifications.
[0011] Furthermore, a plurality of transition flanges are provided on the top of the upper flange, and the plurality of transition flanges are fixed to the top of the upper flange, and the transition flanges are used to connect valves of different specifications.
[0012] Furthermore, a plurality of wire holes for wiring are provided on the top of the upper flange, and welding flanges are provided on the wire holes, and the welding flanges are used to seal the wire holes after wiring.
[0013] Furthermore, the first heat exchanger is a 2K-4.5K heat exchanger, and the bottom of the first heat exchanger is connected to the liquid hydrogen pool through a throttle valve.
[0014] Furthermore, the first heater is a 4.5K-75K heater.
[0015] Furthermore, the second heater is a 50-75K heater.
[0016] Furthermore, at least four lifting ears are provided on the top of the upper flange, and the four lifting ears are respectively fixed on four sides of the top of the upper flange.
[0017] Furthermore, a vacuum evacuation component is provided on one side of the bottom of the side wall of the cylinder, and the vacuum evacuation component is fixed on the side wall of the cylinder and connects the inside and the outside of the cylinder.
[0018] Furthermore, the cylinder interlayer adopts a single layer of liquid nitrogen aluminum cold screen.
[0019] Beneficial effects of the utility model:
[0020] (1) The load test vertical cold box proposed by the utility model compactly integrates and fixes various low-temperature components on the upper flange. Each low-temperature component does not contact the cylinder. When installing or disassembling, it is only necessary to install the upper flange integrating various components on the cylinder or separate it from the cylinder in advance, which is faster and more compact.
[0021] (2) The upper flange of the load test vertical cold box proposed by the utility model is also provided with different neck tube structures for connecting components of different specifications and multiple transition flanges for connecting low-temperature valves to meet 2K super helium flow and 4.5K helium.
[0022] (3) The low-temperature components of the load test vertical cold box proposed by the utility model do not contact the cylinder. The liquid nitrogen aluminum cold screen interlayer of the cylinder and the vacuum insulation material covering the outside of each component, together with the welding flange to seal the wire holes, can minimize the heat leakage inside the cold box. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is the overall structural diagram of the load test vertical cold box of the utility model;
[0024] Figure 2 This is the internal structure diagram of the load test vertical cold box of the utility model;
[0025] In the figure: upper flange 1, cylinder 2, first heater 3, second heater 4, first heat exchanger 5, liquid helium pool 6, helium protection assembly of pressure pipe 7, helium protection assembly of safety valve 8, neck pipe structure 9, transition flange 10, welding flange 11, lifting ear 12, vacuum evacuation assembly 13;
[0026] The realization of the purpose, functional features and advantages of the present invention will be further described in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0027] In order to more clearly and completely illustrate the technical solution of the present invention, the present invention is further described below in conjunction with the accompanying drawings.
[0028] Please refer to Figure 1-Figure 2 The utility model provides a load test vertical cold box including a cylinder 2 and an upper flange 1, wherein:
[0029] The first heater 3, the second heater 4, the liquid helium pool 6 and the first heat exchanger 5 are arranged inside the cylinder 2. The first heater 3, the top of the second heater 4, the liquid helium pool 6 and the first heat exchanger 5 are longitudinally fixed to the bottom of the upper flange 1 near the center side through a connecting frame. The upper flange 1 is fixedly connected to the top of the cylinder 2 to form a closed space and the first heater 3, the second heater 4, the liquid helium pool 6 and the first heat exchanger 5 are enclosed in the sealed space. The first heater 3, the second heater 4, the liquid helium pool 6 and the first heat exchanger 5 do not contact the cylinder 2.
[0030] The upper flange 1 is provided with a pressure-inducing pipe helium protection component 7 and a safety valve helium protection component 8 , and the pressure-inducing pipe helium protection component 7 and the safety valve helium protection component 8 are arranged on the top of the upper flange 1 .
[0031] In this embodiment:
[0032] The first heat exchanger 5 is used to cool the hydrogen;
[0033] The first heater 3 and the second heater 4 are used to heat the hydrogen;
[0034] The liquid hydrogen pool is used to store liquid hydrogen for subsequent testing;
[0035] The upper flange 1 is used to connect various components;
[0036] Cylinder 2 is used for heat insulation from the outside;
[0037] In a specific embodiment, the first heater 3, the second heater 4, the liquid hydrogen pool and the first heat exchanger 5 are longitudinally arranged in the cylinder 2, and the first heater 3, the second heater 4, the liquid hydrogen pool and the first heat exchanger 5 are provided with connecting frames in front, behind, left and right, and the connecting frames connect these components to the bottom of the upper flange 1, and the sides, tops or bottoms of the first heater 3, the second heater 4, the liquid hydrogen pool and the first heat exchanger 5 are connected to form a cooling circuit and a heating circuit through pipelines, and finally connected to the outside through the upper flange 1. The first heater 3, the second heater 4, the liquid hydrogen pool and the first heat exchanger 5 are longitudinally arranged in the cylinder 2 without contacting each other, and are compactly fixed at the bottom of the upper flange 1, which is more convenient when wiring. Since these structures are integrated on the upper flange 1, when installing, it is only necessary to pre-install all the components on the upper flange 1, and then fix them to the cylinder 2 through the upper flange 1 to complete the installation of the entire cold box. When repairing, it is only necessary to separate the cylinder 2 to replace or repair the corresponding damaged components.
[0038] In one embodiment, most existing cold boxes integrate various components inside the cylinder 2. The utility model uses the upper flange 1 to integrate various components, which is more convenient for installation, maintenance, disassembly, and wiring. Compared with the horizontal cold box or the cold box used for logistics chain, refrigeration, etc. in the prior art, there is no need to remove the various components from the cold box for maintenance separately, and there is no need to install each component in the cylinder 2 one by one during installation.
[0039] Furthermore, a plurality of neck tube structures 9 are provided on the top of the upper flange 1 . The neck tube structures 9 are provided on the top of the upper flange 1 . The neck tube structures 9 are used to connect components of different specifications.
[0040] In a specific implementation, the neck tube structure 9 can be connected to components of various specifications. When testing, components of different specifications can be connected to meet the test requirements, so as to complete different tests such as 2K super helium flow and 4.5K-75K helium.
[0041] Furthermore, a plurality of wire holes for wiring are provided on the top of the upper flange 1, and welding flanges 11 are provided on the wire holes. The welding flanges 11 are used to seal the wire holes after wiring.
[0042] In a specific embodiment, the wire holes are used for wiring of internal components, and the wiring of valves and other components is connected to the outside of the cold box through the wire holes. Since the inside of the cold box needs to be kept sealed, a welding flange 11 needs to be set to seal the wiring part to prevent heat leakage.
[0043] Furthermore, a plurality of transition flanges 10 are provided on the top of the upper flange 1 , and the plurality of transition flanges 10 are fixed on the top of the upper flange 1 , and the transition flanges 10 are used to connect valves of different specifications.
[0044] In a specific implementation, the transition flanges 10 are distributed at various positions on the top of the upper flange 1 , and each transition flange 10 has a different size. The cryogenic valve can be welded to the upper flange 1 through the transition flange 10 .
[0045] Further, the first heat exchanger 5 is a 2K-4.5K heat exchanger, and the bottom of the first heat exchanger 5 is connected to the liquid hydrogen pool through a throttle valve;
[0046] The first heater 3 is a 4.5K-75K heater;
[0047] The second heater 4 is a 50-75K heater.
[0048] In a specific implementation, after 4.5K helium is cooled and heated by a heat exchanger, 2K superfluid helium is generated from the rear throttle valve and enters the liquid hydrogen pool to facilitate superhelium flow testing, and the first heater 3 and the second heater 4 can heat the helium to meet the helium test requirements at a specific temperature.
[0049] Furthermore, at least four lifting ears 12 are provided on the top of the upper flange 1 , and the four lifting ears 12 are respectively fixed on four sides of the top of the upper flange 1 .
[0050] In a specific implementation, the number of lifting ears 12 can be selected according to actual conditions. Taking four as an example, four lifting ears 12 are set at the four corners of the top of the upper flange 1. The lifting equipment drives the upper flange 1 to lift the upper flange 1 through the lifting ears 12, so as to place the structure and components integrated in the upper flange 1 inside the cylinder 2.
[0051] Furthermore, a vacuum evacuation component 13 is provided on one side of the bottom of the side wall of the cylinder 2. The vacuum evacuation component 13 is fixed on the side wall of the cylinder 2 and connects the inside and outside of the cylinder 2.
[0052] The interlayer of cylinder 2 adopts a single layer of liquid nitrogen aluminum cold screen.
[0053] In a specific implementation, the first heat exchanger 5 , the first heater 3 , the second heater 4 and the liquid helium pool 6 are not in direct contact with the cylinder 2 , and the air in the cylinder 2 is evacuated by the vacuum evacuation component 13 , which can reduce heat leakage of internal parts of the cylinder 2 .
[0054] In one embodiment, the outside of each component connected to the upper flange 1, the bottom surface of the upper flange 1 and the inner wall of the cylinder are all covered with vacuum insulation material, and the vacuum insulation material is combined with the vacuum evacuation component 13 to minimize heat leakage inside the entire cold box.
[0055] Of course, the present utility model may have many other implementations. Based on the present implementation, other implementations obtained by ordinary technicians in this field without any creative work are all within the scope of protection of the present utility model.
Claims
1. A load test vertical cold box, characterized in that: It includes a cylinder and an upper flange, wherein: A first heater, a second heater, a liquid helium pool and a first heat exchanger are arranged inside the cylinder. The first heater, the top of the second heater, the liquid helium pool and the first heat exchanger are longitudinally fixed to the bottom of the upper flange near the center side through a connecting frame. The upper flange is fixedly connected to the top of the cylinder to form a closed space and the first heater, the second heater, the liquid helium pool and the first heat exchanger are enclosed in the sealed space. The first heater, the second heater, the liquid helium pool and the first heat exchanger are not in contact with the cylinder. The upper flange is provided with a pressure-inducing pipe helium protection component and a safety valve helium protection component, and the pressure-inducing pipe helium protection component and the safety valve helium protection component are arranged on the top of the upper flange.
2. The load test vertical cold box according to claim 1, characterized in that: A plurality of neck tube structures are arranged on the top of the upper flange. The neck tube structures are arranged on the top of the upper flange and are used to connect components of different specifications.
3. The load test vertical cold box according to claim 1, characterized in that: A plurality of transition flanges are also provided on the top of the upper flange. The plurality of transition flanges are fixed on the top of the upper flange. The transition flanges are used to connect valves of different specifications.
4. The load test vertical cold box according to claim 1, characterized in that: The top of the upper flange is provided with a plurality of wire holes for wiring, and the wire holes are provided with welding flanges, and the welding flanges are used to seal the wire holes after wiring.
5. The load test vertical cold box according to claim 1, characterized in that: The first heat exchanger is a 2K-4.5K heat exchanger, and the bottom of the first heat exchanger is connected to the liquid hydrogen pool through a throttle valve.
6. The load test vertical cold box according to claim 1, characterized in that: The first heater is a 4.5K-75K heater.
7. The load test vertical cold box according to claim 1, characterized in that: The second heater is a 50-75K heater.
8. The load test vertical cold box according to claim 1, characterized in that: At least four lifting ears are arranged on the top of the upper flange, and the four lifting ears are respectively fixed on the four sides of the top of the upper flange.
9. The load test vertical cold box according to claim 1, characterized in that: A vacuum evacuation component is also provided on one side of the bottom of the side wall of the cylinder. The vacuum evacuation component is fixed on the side wall of the cylinder and connects the inside and the outside of the cylinder.
10. The load test vertical cold box according to claim 1, characterized in that: The cylinder interlayer adopts a single layer of liquid nitrogen aluminum cold screen.