A construction method and self-balancing technology, applied in the direction of erecting/assembling bridges, bridges, buildings, etc., can solve the lack of systematic discussion of structural measures for the closing method of arch ribs, the lack of unified calculation method for the calculation of buckle cable force, and the formation of arch ribs into bridges. The problems such as the large difference between the states can achieve the effect of simple and clear transmission path, convenient design, and reduced construction difficulty.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2013-12-25
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a construction method for vertically rotating and lifting arch ribs in bridge construction. Background technique
[0002] Because the bridge swivel construction has the characteristics of saving hoisting costs, reducing high-altitude operations, convenient and flexible construction operations, safety, reliability, and good integrity, easy adjustment and control of structural alignment and internal forces, and avoiding interference to normal traffic under the bridge, it has become a popular choice for bridges at home and abroad. It has been widely used in construction and is constantly developing. At present, there are mainly two changes in the vertical rotation technology of arch ribs. One is the vertical rotation technology formed for the special geographical conditions in mountainous areas - negative angle vertical rotation. The traditional vertical rotation is assembled at a low level, and then raised to high The negative a...
Examples
Embodiment Construction
[0063] Refer to attached picture. The arch rib self-balancing vertical rotation lifting construction method provided by the present invention adopts the arch rib self-balancing vertical rotation lifting construction method, comprising the following steps:
[0064] (1) Concrete arch feet 17 are poured at both ends of the bridge, the embedded arch ribs are buried in section 1, and arch rib embedded sections 1 protrude from the surface 18 of concrete arch feet, and the tire frame 2 is assembled on the bridge deck 100;
[0065] The lower hinged seat 11 is arranged on the upper end of the concrete arch foot 17, and the lower hinged seat 11 is embedded in the embedded section 1 of the pre-embedded arch rib. Type structure, the hinge shaft hole 13 is set on the ear plate, and the lower hinge seat is provided with 2 pairs of connection positions 14, each pair of connection positions is used for connecting wires, and the positions of the two pairs of connection positions are located at...