Stamping technology for motor shell of new energy automobile
A technology for new energy vehicles and motor casings, applied in the manufacture of motor generators, electrical components, electromechanical devices, etc., can solve the problems of high-strength steel stamping performance degradation, affecting process costs, large forming force, etc., to a fine level The effect of improving uniformity, enhancing surface and internal mechanical properties, and increasing strength
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-08-07
Abstract
Description
technical field
[0001] The invention belongs to the field of new energy automobile accessories, and in particular relates to a stamping process for a motor casing of a new energy automobile. Background technique
[0002] In recent years, new energy vehicles including pure electric vehicles and hybrid vehicles have emerged as the times require, and combined with high-performance drive motors and the integration of control technology, energy storage technology, and material technology, the high efficiency and high efficiency of electric vehicles in real life have been brought into play. Environmental protection, energy saving, light and so on. Electric vehicles have solved the energy crisis and environmental pollution. In the process of technological innovation, they have made great contributions to alleviating the financial crisis of the global automobile industry and energy and environmental problems.
[0003] Reducing the weight of the body and ensuring the strength are th...
Examples
Embodiment 1
[0022] A stamping process for a new energy vehicle motor casing, comprising the following steps:
[0023] (1) Billet softening: take an aluminum alloy billet, forge or cast it to form a rough billet, put it into a normalizing furnace, and heat it to a temperature of 545°C; the aluminum alloy used for the aluminum alloy billet is a heat-treated deformed aluminum alloy or cast Aluminum alloy, preferably one of aluminum alloy grades 6061, 6063, ZL101, ZL115, ZL201, ZL203;
[0024] (2) Stretching and one-time stamping: (1) the rough blank is placed in an inert hot atmosphere protection environment, maintaining a cooling rate of 7°C / min; Stretching, and then pass the rough blank between the die and the punch, and stamp the main structure of the motor casing to form a rough blank. The total operation time of this step is controlled within 8~15min;
[0025] (3) Secondary stamping: Keep the heat preservation environment at 495°C, send the rough blank to the die and punch for processi...
Embodiment 2
[0030] A stamping process for a new energy vehicle motor casing, comprising the following steps:
[0031] (1) Billet softening: take an aluminum alloy billet, forge or cast it to form a rough billet, put it into a normalizing furnace, and heat it to a temperature of 520°C; the aluminum alloy used for the aluminum alloy billet is a heat-treated deformed aluminum alloy or cast Aluminum alloy, preferably one of aluminum alloy grades 6061, 6063, ZL101, ZL115, ZL201, ZL203;
[0032] (2) Stretching and one-time stamping: (1) the rough blank is placed in an inert hot atmosphere protection environment, and the cooling rate is maintained at 8°C / min; after that, the blank is first carried out with a tractor at a speed of 45~70m / min. Stretching, and then pass the rough blank between the die and the punch, and stamp the main structure of the motor casing to form a rough blank. The total operation time of this step is controlled within 8~15min;
[0033] (3) Secondary stamping: keep the he...
Embodiment 3
[0038] A stamping process for a new energy vehicle motor casing, comprising the following steps:
[0039] (1) Billet softening: take an aluminum alloy billet, forge or cast it to form a rough billet, put it into a normalizing furnace, and heat it to a temperature of 565°C; the aluminum alloy used for the aluminum alloy billet is a heat-treated deformed aluminum alloy or cast Aluminum alloy, preferably one of aluminum alloy grades 6061, 6063, ZL101, ZL115, ZL201, ZL203;
[0040] (2) Stretching and one-time stamping: (1) the rough blank is placed in an inert hot atmosphere protection environment, and the cooling rate is maintained at 5°C / min; after that, the blank is first carried out with a tractor at a speed of 45~70m / min. Stretching, and then pass the rough blank between the die and the punch, and stamp the main structure of the motor casing to form a rough blank. The total operation time of this step is controlled within 8~15min;
[0041] (3) Secondary stamping: Keep the he...