Fireproof cable structure and manufacturing method thereof
By using a combination of high-temperature resistant anchor material and buffer material in the cable anchor cup, the problem of easy damage of anchor material in the fire environment is solved, the fire resistance and fatigue resistance of the cable are improved, and the reliability of anchoring is ensured and security.
Patent Information
- Application Number
- CN201710420257.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-06-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing cable anchoring materials are susceptible to damage in fire environments, resulting in a reduced anchoring capacity, affecting the fire resistance and safety of the cable. The folding angle at the small end outlet of the anchor cup leads to stress concentration and reduces fatigue resistance.
Using high-temperature resistant anchoring material and buffering material, the conical structure is formed by evenly distributing the steel wire tows in the anchor cup and using epoxy resin-bonded iron sand as buffering material to form a conical structure, which improves the high-temperature and fatigue resistance of anchoring, and through specific The casting and curing process enhances the reliability of anchoring.
It improves the fire resistance of the cable and its ability to deal with fire environments, reduces the fatigue performance of high-temperature anchoring materials, avoids stress concentration, and enhances the reliability and fatigue resistance of anchoring.
Smart Images

Figure CN108999084B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of anchoring structural components, in particular to a fireproof cable structure and a manufacturing method thereof. Background Art
[0002] Cables are unique components of cable-stayed bridges, suspension bridges, arch bridges and building structures. They are the main load-bearing parts of bridges. They are arranged outside the beam of the bridge and are in direct contact with the external environment. They are easily affected by fires caused by vehicle accidents. Therefore, it is of great significance to improve the fire resistance and protection technology of cables.
[0003] As an important part of the cable assembly, the anchoring material in the cable anchor cup plays a very important role in the entire cable system. It bears the weight of the bridge body and the load weight on the bridge deck, and the anchoring material of the cable is the most vulnerable part of the cable to fire. In a fire environment, the anchoring capacity of the cable is reduced, causing the steel wire to be pulled out of the anchor cup. Therefore, the high temperature resistance of the cable anchoring material is improved. It plays a vital role in ensuring the fire resistance and safe use of the cable.
[0004] There will be a fold angle at the junction of the steel wire and the high-strength and high-temperature resistant material at the outlet of the small end of the anchor cup. Stress will concentrate at this position. During the use of the cable, this fold angle will repeatedly damage the steel wire during its long growth period, causing the fatigue resistance of the cable to gradually decrease. Summary of the invention
[0005] In order to overcome the defects of the prior art and provide an anchor with simple structure, convenient use, high temperature resistance, strong fatigue resistance and high reliability, the present invention discloses a fireproof cable structure and a manufacturing method thereof.
[0006] The present invention achieves the purpose of the invention through the following technical solutions:
[0007] A fireproof cable structure includes an anchor cup and a steel wire bundle. The steel wires at both ends of the steel wire bundle are spread out and inserted into the anchor cup from the front end face of one anchor cup respectively. The structure is characterized in that it also includes a high-temperature resistant anchoring material, a buffer material and a cable body. The steel wires at both ends of the steel wire bundle are evenly distributed in the anchor cup in a cone shape. Both ends of the steel wire bundle are bonded to the anchor cup by the high-temperature resistant anchoring material. The buffer material is lined between the steel wire bundle and the front end face of the anchor cup. The steel wires of the steel wire bundle between the two anchor cups are intertwined to form a cable body. The high-temperature resistant anchoring material is made of high-strength low-anchoring material refractory castable material, and the buffer material is made of iron sand bonded with epoxy resin.
[0008] The fireproof cable structure is characterized in that the number of steel wires in the steel wire bundle is a positive integer within [7,649]; and the steel wire bundle spreads out in the anchor cup to form a cone with a taper of 1 / 7 to 1 / 5.
[0009] The fireproof cable structure is characterized in that: the number of steel wire layers in the steel wire bundle is 2n+1, n is a positive integer in the interval [2,15], the number of steel wires in the steel wire bundle is k, then k=3n 2 +3n+1, when arranging the steel wires, the number of steel wires in the middle layer is 2n+1, and the steel wires are arranged from the middle layer to both sides of the middle layer in sequence, and the number of steel wires decreases by one each time outward until the number of steel wires on the outermost side is n+1; after the steel wire bundle is spread out in the anchor cup, it forms a cone with a taper of 1 / 7 to 1 / 5.
[0010] The manufacturing method of the fireproof cable structure is characterized by being implemented in sequence according to the following steps:
[0011] a. Cutting: Cut the wire bundle wound with steel wires at a mark without stress. The cutting length should not exceed 2000m. Make a mark at the distance L from the end of the wire bundle. L is 100mm to 1000mm.
[0012] b. Anchoring: Control the distance between the mark of the steel wire bundle and the rear end face of the anchor cup to be L1, L1∈[1 / 3L,4 / 5L]. Make a mark as the final reference point for controlling the penetration length, i.e. the clamping point of the anchoring fixture, so as to control the length of the steel wire bundle extending into the anchor cup to be L-L1. Tie a 80mm~100mm strapping tape at the mark of the steel wire bundle. The strapping tape is made of soft steel wire, and it is necessary to ensure that the tying part can penetrate into the anchor cup;
[0013] c. Wire separation: Remove the binding tape from the wire bundle, use cleaning fluid (such as banana water) to clean the surface of each wire of the wire bundle to remove oil stains, evenly spread the wires of the wire bundle in the anchor cup, control the length of the wires penetrating into the anchor cup, and prevent the wires from contacting the anchor cup. Use the anchoring fixture to control the verticality between the wire bundle and the anchor cup. The joint surface between the anchoring fixture and the small end face of the anchor cup and the gap between the anchoring fixture and the wire bundle are sealed with cement to prevent leakage of the anchoring slurry;
[0014] d. Pouring: Pour no more than 5kg of high temperature resistant anchoring material into each anchor cup. The preparation method of high temperature resistant anchoring material is as follows: take 5kg of anchoring material and 6mL of water and stir evenly. The pH value of the water used is 6-7. Use special concrete mixing equipment for stirring. The stirring time is 5min-10min and the stirring temperature is 15ºC-30ºC. If the room temperature is lower than the stirring temperature, external heating measures should be taken to increase the construction environment temperature during stirring.
[0015] e. Anchor pouring: fix the steel wire bundle with the anchor cup on the anchor making platform, turn on the vibrator and touch the vibrator head to the surface of the steel wire rope to make the steel wire rope resonate. The vibrating device during mixing is an inserted concrete vibrator. At the same time, use a putty shovel to gradually put the stirred high-temperature resistant anchor material into the anchor cup. Observe the injection of the high-temperature resistant anchor material and adjust the position of the concrete vibrator. After reaching the pouring position, use the pouring material to cover the surface;
[0016] f. Curing: After the cast anchor cup is left to stand for 48 hours, put it down, and then heat it to 110℃ in a heating furnace for 1 hour to cure. After the curing is completed, take out the anchor cup and let it cool naturally.
[0017] When the present invention is in use, the cable body is anchored on the component that needs to be subjected to force through the anchor cups at both ends. The high-temperature resistant anchor material plays a role of heat insulation and fire prevention. The buffer material can prevent the steel wires of the steel wire bundle located inside the anchor cup from impacting the high-temperature resistant anchor material when diverging, thereby reducing the fatigue performance of the high-temperature resistant anchor material and avoiding stress concentration, thereby improving the anchoring reliability and fatigue resistance of the present invention, and also improving the fire resistance and ability of the present invention to cope with fire environments.
[0018] The invention has the following beneficial effects: simple structure, convenient use, high temperature resistance, strong fatigue resistance and high reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION
[0020] The present invention is further described below by means of specific examples.
[0021] Example 1
[0022] A fireproof cable structure comprises an anchor cup 1, a high temperature resistant anchor material 2, a steel wire bundle 3, a buffer material 4 and a cable body 5, such as Figure 1 As shown, the specific structure is:
[0023] After the steel wires at both ends of the steel wire bundle 3 are spread out, they are respectively inserted into the anchor cup 1 from the front end face of an anchor cup 1. The steel wires at both ends of the steel wire bundle 3 are evenly distributed in the anchor cup 1 in a cone shape. Both ends of the steel wire bundle 3 are bonded to the anchor cup 1 through the high temperature resistant anchoring material 2. The front end face of the steel wire bundle 3 and the anchor cup 1 are lined with a buffer material 4. The steel wires of the steel wire bundle 3 between the two anchor cups 1 are intertwined to form a cable body 5; the high temperature resistant anchoring material 2 is made of high strength low anchoring material refractory castable (Note: the anchoring material content of the traditional ordinary refractory castable is as high as 10% to 30%, while the matrix of the low anchoring material and the ultra-low anchoring material is replaced by microsilica powder with a particle size of less than 5μm with the same or similar chemical composition as the main material of the castable to replace part or most of the anchoring material, and a trace amount of dispersant and a certain amount of delayed setting retarder are added to prepare it. Its advantages are: i. The calcium oxide content in the castable is low, which can reduce the low eutectic phase generated in the material, thereby improving the refractoriness, high temperature strength and slag resistance; ii. The anchor material hydrate generated after molding and curing is small, and there is no problem of a large number of hydration bonds being destroyed during heating and baking, which causes the medium temperature strength to decrease. Instead, it gradually sintered with the increase of heat treatment temperature, and the strength gradually increased; iii. The water demand of the castable is greatly reduced, so the porosity is low and the volume density is high. ), buffer material 4 uses iron sand bonded with epoxy resin. The following is a ratio of buffer material 4:
[0024] Component mass percentage %
[0025] Resin 5~10
[0026] Curing agent 5~10
[0027] Plasticizer 1~5
[0028] Diluent 1~5
[0029] Filler 10~25
[0030] Iron sand residue.
[0031] In this embodiment, the number of steel wire layers in the steel wire bundle 3 is 2n+1, n is a positive integer in the interval [2,15], and the number of steel wires in the steel wire bundle 3 is k, then k=3n 2 +3n+1, when the steel wires are arranged, the number of steel wires in the middle layer is 2n+1, and the steel wires are arranged from the middle layer to both sides of the middle layer in sequence, and the number of steel wires decreases by one each time the steel wires are arranged outwards, until the number of steel wires on the outermost side is n+1; n is usually a positive integer in the interval [1,15], and the corresponding number of steel wires k is 7, 19, 37, 61, 91, 127, 169, 217, 271, 331, 397, 469, 547, 631 and 721, respectively, and the cross section of the steel wire bundle 3 is a regular hexagon;
[0032] After the steel wire bundle 3 is spread out in the anchor cup 1, it forms a cone with a taper of 1 / 7 to 1 / 5.
[0033] The number of steel wires in the steel wire bundle 3 can also be a positive integer within [7,649], and the cross-section of the steel wire bundle 3 is hexagonal or rectangular.
[0034] When manufacturing this embodiment, the following steps are performed in sequence:
[0035] a. Cutting: The wire bundle 3 wound with steel wire is cut off without stress, and the cutting length is not more than 2000m. A mark is made at the distance L from the end of the wire bundle (3), L is 100mm~1000mm; L is 500mm in this embodiment;
[0036] b. Anchoring: Control the distance between the mark of the steel wire bundle (3) and the rear end face of the anchor cup (1) to be L1, L1∈[1 / 3L,4 / 5L], make a mark as the final control depth reference point, that is, the clamping point of the anchoring fixture, so as to control the length of the steel wire bundle (3) extending into the anchor cup (1) to be L-L1, and tie a 80mm~100mm strapping tape at the mark of the steel wire bundle (3). The strapping tape is made of soft steel wire, and it is necessary to ensure that the strapping part can penetrate the anchor cup (1); in this embodiment, L1 is 235mm, that is, the length of the steel wire bundle 3 extending into the anchor cup 1 is 265mm. This size is determined by considering that the steel wire bundle 3 will have an elongation of 15mm after being loosened;
[0037] c. Wire separation: remove the binding tape from the steel wire bundle 3, use cleaning liquid (such as banana water) to clean the surface of each steel wire of the steel wire bundle 3 to remove oil stains, evenly spread the steel wires of the steel wire bundle 3 in the anchor cup 1, control the length of the steel wires penetrating into the anchor cup 1, and prevent the steel wires from contacting the anchor cup 1. Use the anchoring fixture to control the verticality between the steel wire bundle 3 and the anchor cup 1. The joint surface between the anchoring fixture and the small end face of the anchor cup 1 and the gap between the anchoring fixture and the steel wire bundle 3 are sealed with cement to prevent leakage of the anchoring slurry;
[0038] d. Pouring: Pour no more than 4.83kg to 5kg of high temperature resistant anchor material 2 ALU-FLO80 into each anchor cup 1. The preparation method of high temperature resistant anchor material 2 is as follows: take 5kg of anchor material and 6mL of water and stir evenly. The pH value of the water used is 6 to 7. Use a special concrete mixing equipment for stirring. The stirring time is 5min to 10min and the stirring temperature is 15ºC to 30ºC. If the room temperature is lower than the stirring temperature, external heating measures should be taken to increase the construction environment temperature during stirring.
[0039] e. Anchor pouring: fix the steel wire bundle 3 with the anchor cup 1 on the anchoring platform, turn on the vibrator and touch the vibrator head to the surface of the steel wire rope to make the steel wire rope resonate. The vibrating device during mixing is an inserted concrete vibrator. At the same time, use a putty shovel to gradually put the stirred high-temperature resistant anchor material 2 into the anchor cup 1, observe the injection of the high-temperature resistant anchor material 2 and adjust the position of the concrete vibrator. After reaching the pouring position, use the pouring material to cover the surface;
[0040] f. Curing: After the cast anchor cup 1 is left to stand for 48 hours, it is put down, and then heated to 110°C in a heating furnace for 1 hour to cure. After the curing is completed, the anchor cup 1 is taken out and cooled naturally.
[0041] When this embodiment is in use, the cable body 5 is anchored on the component that needs to be subjected to force through the anchor cups 1 at both ends. The high-temperature resistant anchor material 2 plays a role of heat insulation and fire prevention. The buffer material 4 can prevent the steel wires of the steel wire bundle 3 located inside the anchor cup 1 from impacting the high-temperature resistant anchor material 2 when diverging, thereby reducing the fatigue performance of the high-temperature resistant anchor material 2 and avoiding stress concentration, thereby improving the anchoring reliability and fatigue resistance of this embodiment, and also improving the fire resistance and ability to cope with fire environments of this embodiment.
Claims
1. A method for manufacturing a fireproof cable structure, the fireproof cable structure comprising an anchor cup (1), a steel wire bundle (3), a high temperature resistant anchoring material (2), a buffer material (4) and a cable body (5), The steel wires at both ends of the steel wire bundle (3) are spread out and inserted into the anchor cup (1) from the front end surface of one anchor cup (1). The steel wires at both ends of the steel wire bundle (3) are evenly distributed in the anchor cup (1) in a cone shape, and both ends of the steel wire bundle (3) are bonded to the anchor cup (1) through a high-temperature resistant anchoring material (2). A buffer material (4) is lined between the steel wire bundle (3) and the front end surface of the anchor cup (1). The steel wires of the steel wire bundle (3) between the two anchor cups (1) are intertwined to form a cable body (5); the high-temperature resistant anchoring material (2) is a high-strength low-anchoring material refractory castable, and the buffer material (4) is iron sand bonded with epoxy resin. Its characteristics are: Follow the steps below to implement: a. Cutting: The steel wire bundle (3) wound with steel wire is marked and cut under stress-free conditions. The cutting length is not more than 2000m. A mark is made at a distance L from the end of the steel wire bundle (3). L is 100mm to 1000mm. b. Anchoring: Control the distance between the mark of the steel wire bundle (3) and the rear end surface of the anchor cup (1) to be L1, L1∈[1 / 3L,4 / 5L], so as to control the length of the steel wire bundle (3) extending into the anchor cup (1) to be L-L1, and tie a 80mm to 100mm strapping tape at the mark of the steel wire bundle (3), and ensure that the tied portion can penetrate into the anchor cup (1); c. Wire separation: remove the binding tape from the steel wire bundle (3), use a cleaning liquid to clean the surface of each steel wire of the steel wire bundle (3) to remove oil stains, evenly spread the steel wires of the steel wire bundle (3) in the anchor cup (1), control the length of the steel wires penetrating into the anchor cup (1) to prevent the steel wires from contacting the anchor cup (1), use an anchoring fixture to control the verticality between the steel wire bundle (3) and the anchor cup (1), and use cement to seal the joint surface of the anchoring fixture and the small end surface of the anchor cup (1) and the gap between the anchoring fixture and the steel wire bundle (3) to prevent leakage of the anchoring slurry; d. Pouring: Pour no more than 5 kg of high temperature resistant anchoring material (2) into each anchor cup (1). The preparation method of the high temperature resistant anchoring material (2) is as follows: take 5 kg of anchoring material and 6 mL of water and stir them evenly. The pH value of the water used is 6 to 7. During stirring, a special concrete mixing equipment is used for stirring. The stirring time is 5 minutes to 10 minutes and the stirring temperature is 15°C to 30°C. e. Anchor pouring: fix the steel wire bundle (3) with the anchor cup (1) on the anchoring platform, turn on the vibrator and touch the vibrator head to the surface of the steel wire rope to make the steel wire rope resonate. The vibrating device during mixing is an inserted concrete vibrator. At the same time, use a putty shovel to gradually put the stirred high-temperature anchor material (2) into the anchor cup (1). Observe the injection of the high-temperature anchor material (2) and adjust the position of the concrete vibrator. After reaching the pouring position, use the pouring material cover treatment; f. Curing: The cast anchor cup (1) is left to stand for 48 hours and then put down. It is then heated to 110°C in a heating furnace for 1 hour to cure. After curing, the anchor cup (1) is taken out and cooled naturally.
2. The method for manufacturing the fireproof cable structure according to claim 1, Its characteristics are: In the fireproof cable structure, the number of steel wires in the steel wire bundle (3) is a positive integer within the range of [7,649]; and the steel wire bundle (3) spreads out in the anchor cup (1) to form a cone with a taper of 1 / 7 to 1 / 5.
3. The method for manufacturing the fireproof cable structure according to claim 2, Its characteristics are: In the fireproof cable structure, the number of steel wire layers in the steel wire bundle (3) is 2n+1, n is a positive integer in the interval [2,15], the number of steel wires in the steel wire bundle (3) is k, then k=3n 2 +3n+1, when arranging the steel wires, the number of steel wires in the middle layer is 2n+1, and the steel wires are arranged in sequence from the middle layer to both sides of the middle layer, and the number of steel wires decreases by one each time the steel wires are arranged outwards, until the number of steel wires on the outermost side is n+1; after the steel wire bundle (3) is spread out in the anchor cup (1), the cone is formed with a taper of 1 / 7 to 1 / 5.