A glass fiber reinforced center hole pile for front maintenance and cleaning of shield machine cutter head and construction method
Through the design of glass fiber reinforced medium-hole piles, a method without opening a warehouse is provided to solve the wear and paste problems of shield machine cutting boards in different formations, achieving low-cost and low-risk cutting board maintenance and Cleaning avoids the risk of soil layer disturbance and the risk of people entering the soil pressed warehouse.
Patent Information
- Application Number
- CN201811470952.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-12-04
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2038-12-04
AI Technical Summary
The shield machine cutter plate wears or gets stuck in the sand and pebbles, and is pasted in the clay layer. The existing solutions are costly and have a long construction period and are at risk of operators entering the pressed soil warehouse.
Glass fiber reinforced mesoporous piles are used to build mesoporous piles by drilling and pouring concrete. Longitudinal holes and side wall construction work ports are provided, allowing maintenance personnel to go directly to the cutting board position for cleaning to avoid stool opening and soil layer disturbance.
The maintenance and cleaning of the shield machine cutter plate without opening the warehouse has been achieved, reducing construction costs and construction periods, reducing risks to workers, and improving construction safety and economicality.
Smart Images

Figure CN109403993B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield tunnel design and construction, and in particular to a glass fiber reinforced mid-hole pile used for front maintenance and cleaning of a shield machine cutter head and a construction method thereof. Background Art
[0002] The shield construction method has become the preferred and main construction method for urban rail transit construction due to its advantages such as being unaffected by ground traffic, high safety, and short construction period. However, due to the uncertainty of the strata, various problems often occur with the shield machine cutterhead during the excavation process, resulting in the shield machine being unable to excavate normally. During the shield excavation process, the shield machine cutterhead mainly exhibits the following two types of problems:
[0003] Question 1: When a shield machine is excavating in a sandy and gravel formation, especially one containing large-size boulders, the cutterhead will often be severely worn or stuck. At this time, the cutterhead of the shield machine needs to be repaired to ensure normal excavation of the shield machine.
[0004] Question 2: When the shield machine is excavating in a clay layer, clay particles can easily adhere to the cutterhead under high pressure, causing the cutterhead to become blocked. The tool cannot cut the soil, and the excavation parameters become abnormal, requiring the cutterhead of the shield machine to be cleaned.
[0005] The usual solutions to the two problems that often occur in the shield machine cutter head during the shield tunneling process are:
[0006] For problem 1, the commonly used solution is to open the ground and break it, that is, to construct a shaft from the ground to the cutterhead position, and then the construction personnel go directly to the cutterhead position to inspect or replace the shield cutterhead. However, this method requires a large investment and a long construction period. The construction of the shaft destroys the stability of the original soil layer in front of the shield. When the shield is pushed again, it is necessary to backfill the earth and break the main structure, and the construction quality cannot be guaranteed. In general, the construction process is cumbersome and the economic efficiency is poor.
[0007] For the second problem, the commonly used solution is to open the warehouse. The main steps of this method are: first, carry out dewatering operations to lower the water level to at least 0.5m below the bottom of the shield, and then use the configured mud to grout to reinforce the soil layer in front of the shield to ensure the stability of the face after the shield is opened. The operators enter the soil warehouse and clean the "mud cake" in front of the shield machine cutter head. This method requires special reinforcement and treatment of the soil in front of the shield, with a long construction period and high construction cost, and requires operators to enter the pressurized soil warehouse, which is high-risk.
[0008] In summary, the current methods for dealing with shield machine cutter head failure and "mud cake" phenomenon during shield excavation are: on the one hand, the construction cost is high and the construction period is long; on the other hand, workers are required to enter the pressurized soil bin, which has a high construction risk. Especially under water-rich geological conditions, the investment in construction measures and the construction risk will be greater. Summary of the invention
[0009] The present invention provides a glass fiber reinforced center-hole pile for front inspection and cleaning of a shield machine cutter disc and a construction method thereof, which can inspect or clean the shield machine cutter disc without opening the bin, does not require operators to enter the soil bin, and has little disturbance to the soil layer, thereby reducing construction costs and shortening construction period, and can also greatly reduce construction risks for operators.
[0010] The technical solution adopted by the present invention to solve its technical problem is:
[0011] A fiberglass reinforced center-hole pile for front inspection and cleaning of a shield machine cutter disc comprises a center-hole pile skeleton formed by an external fiberglass reinforcement cage and a center-hole pile core formed by internally poured concrete; the concrete is provided with a longitudinal hole, and a side wall of the longitudinal hole is provided with a construction operation opening corresponding to the position of the shield machine cutter disc; the central axis of the longitudinal hole deviates from the central axis of the center-hole pile and deviates toward one side of the shield machine cutter disc.
[0012] Furthermore, the glass fiber reinforcement cage is a cylindrical cage body composed of glass fiber reinforcement main reinforcements, spiral glass fiber stirrups, and circular glass fiber reinforcement stirrups.
[0013] Furthermore, the diameter of the center-hole pile is not less than 1.5 m, the diameter of the longitudinal hole is not less than 0.8 m, and the center axis of the longitudinal hole deviates from the center axis of the center-hole pile by 10 to 30 cm.
[0014] Furthermore, the depth of the longitudinal hole opening is located below the transverse center line of the shield machine cutter head; the length of the center hole pile exceeds the transverse center line of the shield machine cutter head by at least 2m.
[0015] Furthermore, the construction operation opening is formed by the shield machine cutter head cutting into the side wall of the center hole pile 30 to 50 cm.
[0016] Furthermore, the concrete strength should be between C25 and C30.
[0017] A construction method for front inspection and cleaning of a shield machine cutterhead, by constructing the glass fiber reinforced hole pile, the maintenance personnel can directly go down to the shield machine cutterhead position through the longitudinal hole, and use the construction operation opening on the side wall to inspect and clean the shield machine cutterhead.
[0018] The specific construction steps include the following:
[0019] 1) Construction of glass fiber reinforced concrete piles: Drill holes at the pre-selected shield stop position, then tie multiple glass fiber reinforcements into a glass fiber reinforcement cage, lower it into the drill hole, and pour concrete;
[0020] 2) Drilling longitudinal holes: After the concrete reaches initial setting, use a rotary drill to drill the longitudinal holes in the glass fiber reinforced concrete pile, with the hole position biased towards the shield machine side;
[0021] 3) Opening a construction opening: The cutting shield advances forward and cuts the longitudinal hole side wall to open a side wall construction opening, thereby completing the production of the fiberglass reinforced hole pile;
[0022] 4) Maintenance: Maintenance personnel can directly go down to the shield machine cutterhead through the longitudinal hole and use the construction opening on the side wall to inspect and clean the shield machine cutterhead. During the inspection and cleaning process, the shield machine cutterhead can be rotated to perform comprehensive inspection and cleaning of the shield machine cutterhead.
[0023] Furthermore, in step 2), the rotary drill drills holes after the initial setting and before the final setting of the glass fiber reinforced concrete to form longitudinal holes.
[0024] The beneficial effects of the present invention are:
[0025] The invention provides a medium-hole pile device which does not require opening of the soil bin and has little disturbance to the soil layer, and can directly inspect and clean the cutter head of a shield machine. On the one hand, it does not require construction personnel to enter the soil bin, thus avoiding the risk of opening the bin; on the other hand, it can shorten the construction period, save construction costs, and has good economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0027] Figure 1 It is a schematic diagram of the position relationship and structure of the bored pile and shield machine in the present invention.
[0028] Figure 2 It is a schematic diagram of the hole pile structure of the present invention.
[0029] Figure 3 It is a top view of the hole pile in the present invention.
[0030] Figure 4 It is a diagram of a glass fiber reinforced cage component of the present invention.
[0031] Figure 5 It is a longitudinal cross-sectional view of the connection between the bored pile and the shield machine in the present invention.
[0032] Description of the drawings: 1. Concrete, 2. Glass fiber reinforcement cage (201. Glass fiber main reinforcement, 202. Spiral glass fiber stirrups, 203. Circular glass fiber reinforcement stirrups), 3. Longitudinal hole, 4. Shield machine cutter head, 5. Side wall construction opening, 6. Shield machine. DETAILED DESCRIPTION
[0033] Example 1
[0034] like Figures 1 to 5 As shown, a glass fiber reinforced center hole pile used for front inspection and cleaning of a shield machine cutter head comprises a center hole pile skeleton composed of an external glass fiber reinforcement cage 2 and a center hole pile core composed of internally poured concrete 1; the concrete 1 is provided with a longitudinal hole 3, and the side wall of the longitudinal hole 3 is provided with a construction operation opening 5 corresponding to the position of the shield machine cutter head 4; the central axis of the longitudinal hole 3 deviates from the central axis of the center hole pile and deviates to the side of the shield machine cutter head 4.
[0035] In this embodiment, the glass fiber reinforcement cage 2 is a cylindrical cage body composed of glass fiber reinforcement main reinforcement 201, spiral glass fiber stirrups 202, and circular glass fiber reinforcement stirrups 203.
[0036] The diameter of the center hole pile is not less than 1.5m, the diameter of the longitudinal hole 3 is not less than 0.8m, and the central axis of the longitudinal hole 3 deviates from the central axis of the center hole pile by 10-30cm to meet the force requirements of the center hole pile itself.
[0037] The opening depth of the longitudinal hole 3 is located below the transverse center line of the shield machine cutter head 4; the length of the middle hole pile exceeds the transverse center line of the shield machine cutter head 4 by at least 2m.
[0038] The construction opening 5 is formed by the shield machine cutter head 4 cutting into the side wall of the middle hole pile by 30 to 50 cm.
[0039] The strength of concrete 1 should be between C25 and C30.
[0040] Glass fiber reinforcement should be configured within the cutting range of the cutter disc of the medium-hole pile shield machine, and ordinary steel bars can be configured outside the cutting range to replace the glass fiber reinforcement.
[0041] Example 2
[0042] A construction method for front inspection and cleaning of a shield machine cutter head, constructing the glass fiber reinforced hole pile described in Example 1, the maintenance personnel can directly go down to the shield machine cutter head 4 through the longitudinal hole 3, and use the construction operation opening 5 on the side wall to inspect and clean the shield machine cutter head 4.
[0043] The specific construction steps include the following:
[0044] 1) Construction of glass fiber reinforced concrete piles: Drill holes at the pre-selected shield stop position, then tie multiple glass fiber reinforcements into a glass fiber reinforcement cage 2, lower it into the drill hole, and pour concrete 1;
[0045] 2) Drilling longitudinal holes: After the concrete reaches initial setting and before final setting, use a rotary drill to drill the longitudinal holes 3 in the glass fiber reinforced concrete pile, with the hole position biased towards one side of the shield machine;
[0046] 3) Opening a construction opening: The cutting shield advances forward and cuts the side wall of the longitudinal hole 3 to open a side wall construction opening 5, thereby completing the production of the glass fiber reinforced hole pile described in Example 1; Figure 5 As shown;
[0047] 4) Maintenance: Maintenance personnel can directly go down to the shield machine cutter head 4) through the longitudinal hole 3, and use the construction operation opening 5 on the side wall to inspect and clean the shield machine cutter head 4; during the inspection and cleaning process, the shield machine cutter head can be rotated to perform comprehensive inspection and cleaning of the shield machine cutter head.
[0048] The above description is only to illustrate some principles and preferred parameters of the glass fiber reinforced hole pile for front inspection and cleaning of the shield machine cutter head of the present invention, and is not to limit the present invention to the specific structure and scope of application shown and described. Therefore, all corresponding modifications and equivalents that may be used are within the scope of the patent applied for by the present invention.
Claims
1. A construction method for a glass fiber reinforced center hole pile for front inspection and cleaning of a shield machine cutter head, the method using the following center hole pile, comprising a center hole pile skeleton composed of an external glass fiber reinforced cage (2) and a center hole pile core composed of internally poured concrete (1); the concrete (1) is provided with a longitudinal hole (3), the side wall of the longitudinal hole (3) is provided with a construction operation opening (5) corresponding to the position of the shield machine cutter head (4); the central axis of the longitudinal hole (3) deviates from the central axis of the center hole pile and deviates to one side of the shield machine cutter head (4), It is characterized in that The construction method is as follows: 1) Construction of glass fiber reinforced concrete piles: drilling a hole at a pre-selected shield machine stop position, then tying a plurality of glass fiber reinforced bars into a glass fiber reinforced cage (2), lowering the cage into the hole, and pouring concrete (1), wherein the strength of the concrete (1) is preferably between C25 and C30; the glass fiber reinforced cage (2) is a cylindrical cage body composed of glass fiber reinforced main bars (201), spiral glass fiber stirrups (202), and circular glass fiber reinforced stirrups (203); 2) Drilling a longitudinal hole: After the concrete reaches initial setting and before final setting, the longitudinal hole (3) is drilled in the glass fiber reinforced concrete pile using a rotary drill, the hole position is biased towards one side of the shield machine, the center axis of the longitudinal hole (3) deviates from the center axis of the middle hole pile by 10 to 30 cm, and the drilling depth of the longitudinal hole (3) is located below the transverse center line of the shield machine cutter head (4); the length of the middle hole pile exceeds 2 m below the transverse center line of the shield machine cutter head (4), the diameter of the middle hole pile is 1.5 m, and the diameter of the longitudinal hole (3) is 0.8 m; 3) Opening a construction opening: the cutting shield advances forward and cuts the side wall of the longitudinal hole (3), opening a side wall construction opening (5), thereby completing the production of the glass fiber reinforced hole pile, the construction opening (5) being formed by the shield machine cutter head (4) cutting into the side wall of the hole pile by 30 to 50 cm; 4) Maintenance: Maintenance personnel can directly go down to the shield machine cutterhead (4) through the longitudinal hole (3) and use the construction operation opening (5) on the side wall to inspect and clean the shield machine cutterhead (4). During the inspection and cleaning process, the shield machine cutterhead is rotated to perform comprehensive inspection and cleaning of the shield machine cutterhead.