A dual-purpose trolley for sliding formwork initial lining excavation and support and its application
The sliding form primary lining excavation and support dual-purpose trolley solves the problems of safety and quality hazards and low construction efficiency in the initial tunnel support construction, and realizes that the trolley mast can also be used as a support platform, shortening the construction time. Improved concrete quality and construction efficiency, ensuring the tightness of the joint surface.
Patent Information
- Application Number
- CN201811591077.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-12-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2038-12-25
AI Technical Summary
In the existing technology, there are potential safety and quality risks in the initial support mold concrete construction of tunnels. The procedures are complicated and the construction progress is slow. Moreover, the excavation support and support trolleys conflict with each other and cannot be used at the same time, resulting in low construction efficiency and increased safety risks. .
A sliding form primary lining excavation support dual-purpose trolley is designed. It uses a slide rail and roller system to realize the sliding of the upper step formwork. The trolley mast also serves as a support bench, which reduces assembly complexity and manual workload. The position of the formwork is adjusted by jacks and screw rods to separate the formwork from the platform, reducing the waiting time for concrete strength.
It improves the construction progress and quality of the initial lining concrete of the tunnel, shortens the support time, reduces the labor intensity of workers, solves the conflict problem between the support platform and the trolley, ensures the quality of the concrete joint surface, and avoids voids and collapse. .
Smart Images

Figure CN109519197B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of initial tunnel support, and in particular relates to a dual-purpose trolley for sliding form initial lining excavation support and application thereof. Background Art
[0002] In the prior art, the initial support formwork concrete has always been assembled into the outline of the initial support of the tunnel by small steel molds, and then concrete is poured to form the initial support-lining. This method has many safety and quality risks. First, there is a lot of preparation work, and it is necessary to prepare small steel molds, steel support and other machines; second, the process is cumbersome. During construction, the steel support is supported according to the outline of the designed tunnel, and then the small steel molds are assembled, connected and fixed piece by piece. After the pouring is completed, the small steel molds need to be knocked off piece by piece when the mold is removed; third, the safety and quality are difficult to control. On the one hand, the assembly of small steel molds will inevitably lead to problems such as joints and unreliable fixation. On the other hand, there are many construction workers, the assembly time is long, and the workers stay at the face for a long time, which increases the safety risk. Finally, the construction progress is slow. The tunnel face is constructed in a limited space. Before the initial support-lining formwork concrete is completed, the next process cannot be entered, and the support frame used for excavation support conflicts with the excavation trolley and cannot be used on the face at the same time. Summary of the invention
[0003] The purpose of the present invention is to provide a dual-purpose trolley for slipform initial lining excavation support, to realize the slipform process of initial lining concrete construction, and the trolley portal frame also serves as a support gantry, which reduces manual workload, shortens the construction personnel's stay time at the face, and improves safety assurance.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a dual-purpose trolley for sliding formwork initial lining excavation support, including a trolley, the trolley including a gantry and rubber walking wheels connected to the gantry, the upper surface of the gantry is provided with a slide rail along the length direction of the trolley, a support plate is provided on the slide rail, and rollers cooperating with the slide rail are provided under the support plate, the two ends of the support plate are connected to the inner arc surface of the semicircular upper step formwork, and the two ends of the arc length direction of the upper step formwork are located on the outside of the two side edges in the length direction of the trolley.
[0005] The gantry comprises a main longitudinal beam horizontally arranged along the length direction of the trolley, the rubber walking wheel is connected to the main longitudinal beam, a vertical beam is vertically connected to the main longitudinal beam, the upper end of the vertical beam is connected to the top plate, and the slide rail is arranged on the top plate.
[0006] A reinforcing beam is connected between the vertical beams, a main lifting cylinder is arranged between the reinforcing beam and the main longitudinal beam, a supporting seat is connected to the outer side of the vertical beam, and a secondary lifting cylinder is arranged between the supporting seat and the main longitudinal beam.
[0007] Supporting feet are arranged between the main longitudinal beam and the ground.
[0008] A jack / screw rod is arranged between the vertical beam and the inner arc surface of the upper step template, and two ends of the jack / screw rod are respectively hinged to the vertical beam and the inner arc surface of the upper step template.
[0009] The above technical scheme has the following technical effects: 1. The present invention replaces the traditional small steel plate assembly process with a sliding formwork initial lining excavation support dual-purpose trolley, which greatly improves the quality of the tunnel initial lining concrete construction progress, shortens the support time, and reduces the labor intensity of workers. 2. The sliding formwork initial lining excavation support dual-purpose trolley of the present invention realizes that the trolley door frame also serves as a support stand through the sliding of the upper step template, which solves the conflict between the first lining trolley and the support stand when the first lining trolley is in place, and there is no need to set up a temporary stand when supporting the steel arch frame and hanging the steel mesh. 3. The sliding formwork initial lining excavation support dual-purpose trolley of the present invention realizes the detachability between the upper step template and the stand, reduces the time for the first lining concrete to wait for the concrete strength, and improves the construction efficiency of the face. Generally, the formwork can be removed only when the concrete strength of the initial support first lining formwork reaches more than 70% of the design strength. By separating the upper step template from the stand, the upper step template is retained on the initial support surface to provide concrete force, which greatly saves the time for the stand to block the machinery from entering the face.
[0010] The present invention also aims to provide an application of a dual-purpose trolley for sliding formwork initial lining excavation support to improve the concrete quality at the joint surface of the upper and lower steps and ensure the quality of the initial lining concrete of the tunnel.
[0011] In order to achieve the above object, the present invention adopts the following technical scheme: application of a dual-purpose trolley for sliding form initial lining excavation support, the trolley is applied to the initial lining concrete construction method of the tunnel, and the construction method comprises the following steps:
[0012] A. First, use water and high-pressure air to clean the dust, loose rocks and debris on the tunnel rock surface, and keep the rock surface at a certain humidity. Use C25 shotcrete to seal the heading face and excavation rough surface to form the initial spraying surface;
[0013] B. The trolley drives into the tunnel, and the trolley is loaded with the semi-finished upper step arch frame and the steel mesh to be installed. At this time, the upper step template is arranged at the tail end of the top plate through the support plate, and the front end of the top plate is used as a support gantry to install the upper step arch frame and steel mesh;
[0014] C. In order to facilitate the connection between the lower step arch frame and the upper step arch frame, a 50cm height is reserved for the arch foot of the upper step arch frame. An artificial groove is dug on the face corresponding to the position of the arch foot of the upper step arch frame. When installing the upper step arch frame, the arch foot of the upper step arch frame is placed in the artificial groove and a pad is placed at the arch foot. At the same time, a locking anchor rod is applied to the arch foot. Sandbags are used to backfill and stack the artificial groove to form an inclined foundation with a height difference of 30cm. The inclined side close to the rock surface is low and the side close to the trolley is high. The installed upper step arch frame is connected together with longitudinal connecting bars, and a steel mesh is covered between the initial spraying surface and the upper step arch frame;
[0015] D. After all the processes are completed, slide the upper step formwork to the front end of the top plate, lift the vertical beam upward with the main lifting cylinder and the auxiliary lifting cylinder, and adjust the telescopic length of the jack / screw accordingly to ensure that the upper step formwork is in place relative to the upper step arch frame, close the plugging plate and pour concrete. After the upper step concrete is poured, wait for 6 hours, remove the connection between the upper step formwork and the jack / screw, and the support plate, and exit the trolley. At this time, the upper step formwork is separated from the gantry, and the upper step formwork is still on the concrete surface to provide the arch force at this time. The excavation machinery enters the face and continues the excavation operation.
[0016] The construction method further comprises the following steps:
[0017] E. After the upper step concrete construction is completed, the lower step concrete construction is carried out. When the face is a certain distance away from the lower step, excavation support is carried out on the left and right sides. When the lower step is excavated, the stacked sandbags at the arch foot of the upper step arch frame are taken out to form a reserved wedge-shaped opening so that the upper end of the lower step arch frame is connected to the arch foot of the upper step arch frame. The lower step formwork is constructed with a fixed formwork. The bottom of the arch foot of the lower step arch frame is designed with an open plane formwork to form a concrete fracture on the normal surface. The upper end of the lower step formwork is provided with an angular concrete chute opening, and the concrete chute opening is 20cm higher than the bottom surface of the upper step concrete.
[0018] F. When excavating the lower step, it must be located between the two consecutive upper step concretes and must not cross the construction joints of two or more upper step concretes.
[0019] In the above technical solution, a wedge-shaped interface is set at the arch frame of the upper step, and combined with the design of the lower step formwork, the common quality problem of loose concrete and voids at the concrete interface of the upper and lower steps is effectively solved. At the same time, a special formwork is set at the arch foot of the lower step to ensure the normal direction of the joint surface between the lower step and the inverted arch concrete, so as to ensure that the inverted arch is subjected to reasonable force. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The main view of the trolley and the upper step template;
[0021] Figure 2 It is the side view of the trolley;
[0022] Figure 3 This is the main view of the upper step concrete, lower step arch frame, and lower step formwork;
[0023] Figure 4 It is the side view of the upper step concrete, lower step arch frame and lower step formwork;
[0024] Figure 5 This is the AA section view of the lower step template;
[0025] Figure 6 This is the position relationship diagram of the lower step concrete and the upper step concrete;
[0026] Figure 7 This is the overall schematic diagram of the initial lining concrete of the tunnel;
[0027] Figure 8 Schematic diagram of the overall division of the initial lining concrete of the tunnel. DETAILED DESCRIPTION
[0028] Combination Figures 1 to 8 The present invention is further described as follows:
[0029] A dual-purpose trolley for sliding formwork primary lining excavation support includes a trolley 10. The trolley 10 includes a gantry 11 and rubber walking wheels 12 connected to the gantry 11. A slide rail 13 is arranged on the upper surface of the gantry 11 along the length direction of the trolley 10. A support plate 14 is arranged on the slide rail 13. A roller 15 cooperating with the slide rail 13 is arranged below the support plate 14. Both ends of the support plate 14 are connected to the inner arc surface of a semicircular upper step template 22. The two ends of the upper step template 22 in the arc length direction are located on the outside of the two side edges in the length direction of the trolley 10. The trolley 10 plays two roles in the initial lining concrete construction of the tunnel. One is to transport the upper step arch frame 21, steel mesh and other construction tools, and the front end of the portal frame 11 can be used as a support platform for the workers to install the upper step arch frame 21 and the steel mesh. The other is used to fix the upper step formwork 22. After the arch frame is installed, the upper step formwork 22 can be moved to the front end of the portal frame 11 through the cooperation of the roller 15 and the slide rail 13, and then the upper step formwork 22 is installed, replacing the traditional small steel plate assembly process, realizing the trolley portal frame as a support platform, solving the contradiction between the conflict between the lining trolley and the support platform when it is in place, and there is no need to set up a temporary platform when supporting the steel arch frame and hanging the steel mesh, which shortens the support time and reduces the labor intensity of the workers.
[0030] The main structure of the gantry 11 is as follows: the gantry 11 includes a main longitudinal beam 111 horizontally arranged along the length direction of the trolley 10, the rubber walking wheel 12 is connected to the main longitudinal beam 111, the main longitudinal beam 111 is vertically connected with a vertical beam 112, the upper end of the vertical beam 112 is connected to the top plate 113, and the slide rail 13 is arranged on the top plate 113. The top plate 113 serves as a working surface for supporting the gantry, which is convenient for arranging the slide rail 13 for moving the upper step template 22.
[0031] A reinforcing beam 114 is connected between the vertical beams 112, a main lifting cylinder 16 is provided between the reinforcing beam 114 and the main longitudinal beam 111, a support seat 115 is connected to the outer side of the vertical beam 112, and a secondary lifting cylinder 17 is provided between the support seat 115 and the main longitudinal beam 111. The main lifting cylinder 16 and the secondary lifting cylinder 17 are provided to lift the upper step formwork 22 so that it is close to the installed upper step arch frame 21, so as to facilitate the molding of the upper step concrete 20 and then pour the concrete.
[0032] A support foot 116 is provided between the main longitudinal beam 111 and the ground. The support foot 116 further increases the stability of the trolley 10 during construction.
[0033] A jack / screw 18 is provided between the vertical beam 112 and the inner arc surface of the upper step template 22, and the two ends of the jack / screw 18 are respectively hinged with the vertical beam 112 and the inner arc surface of the upper step template 22. The jack / screw 18 is used to better adjust the upper step template 22. The jack is used to lift the upper step template 22, and the screw 18 further telescopes and fixes the upper step template 22.
[0034] An application of a sliding form primary lining excavation support dual-purpose trolley, the trolley is used in a tunnel initial lining concrete construction method, the construction method comprises the following steps:
[0035] A. First, use water and high-pressure air to clean the dust, loose rocks and debris on the tunnel rock surface, and keep the rock surface at a certain humidity. Use C25 shotcrete to seal the heading face and excavation rough surface to form the initial spraying surface;
[0036] B. The trolley 10 drives into the tunnel, and the trolley 10 loads the semi-finished upper step arch frame 21 to be installed and the steel mesh in place. At this time, the upper step template 22 is arranged at the rear end of the top plate 113 through the support plate 14, and the front end of the top plate 113 is used as a supporting gantry to install the upper step arch frame 21 and the steel mesh;
[0037] C. In order to facilitate the connection between the lower step arch frame 31 and the upper step arch frame 21, the excavation height of the arch foot 23 of the upper step arch frame is reserved at 50 cm, and an artificial groove is dug on the face corresponding to the position of the arch foot 23 of the upper step arch frame. When installing the upper step arch frame 21, the arch foot 23 of the upper step arch frame is placed in the artificial groove and a pad is placed at the arch foot. At the same time, a locking anchor rod is applied to the arch foot, and sandbags are used to backfill and stack the artificial groove to form an oblique foundation with a height difference of 30 cm. The oblique mouth is low on the side close to the rock surface and high on the side close to the trolley 10. The installed upper step arch frame 21 is connected as a whole with longitudinal connecting bars, and a steel mesh is covered between the initial spraying surface and the upper step arch frame 21;
[0038] D. After all the processes are completed, the upper step template 22 is slid to the front end of the top plate 113, and the main lifting cylinder 16 and the auxiliary lifting cylinder 17 lift the vertical beam 112 upward, and at the same time, the telescopic length of the jack / screw 18 is adjusted accordingly to ensure that the upper step template 22 is in place relative to the upper step arch frame 21, and the plugging plate is closed to cast concrete. After the upper step concrete 20 is cast, wait for 6 hours. This time is obtained by experiment. The time can be extended or shortened according to the actual situation to test the concrete strength, remove the connection between the upper step template 22 and the jack / screw 18 and the support plate 14, and exit the trolley 10. At this time, the upper step template 22 is separated from the door frame 11, and the upper step template 22 is still on the concrete surface to provide the arch force at this time. The excavation machinery enters the face and continues the excavation operation;
[0039] E. After the construction of the upper step concrete 20 is completed, the lower step concrete 30 is constructed. When the face is a certain distance away from the lower step, excavation support is carried out on the left and right sides. When the lower step is excavated, the stacked sandbags at the arch foot 23 of the upper step arch frame are taken out to form a reserved wedge-shaped opening, so that the upper end of the lower step arch frame 31 is connected to the arch foot 23 of the upper step arch frame. The lower step formwork 32 is constructed using a fixed formwork. The bottom of the arch foot 33 of the lower step arch frame is designed with an open plane formwork 35 to form a concrete fracture of the normal surface. The upper end of the lower step formwork 32 is provided with an angular concrete chute opening 34, and the concrete chute opening 34 is 20 cm higher than the bottom surface of the upper step concrete 20;
[0040] F. When excavating the lower step, it must be located between two consecutive upper step concrete 20 and must not cross the construction joints of two or more upper step concrete 20.
[0041] like Figure 7 , 8As shown, during the initial tunnel lining concrete construction, the overall initial tunnel lining concrete 1 can be divided into three parts, an upper step concrete 20, a lower step concrete 30 and an inverted arch concrete 40, wherein the upper step concrete 20 is semicircular, and the two arc ends of the upper step concrete 20 are respectively connected to the upper end of the lower step concrete 30, and the lower end of the lower step concrete 30 is bent downward and inward, and the inverted arch concrete 40 is in an arc shape with the arc mouth facing upward, and the two ends of the inverted arch concrete 40 are connected to the lower end of the lower step concrete 30. In the prior art, when the upper step concrete 20 is poured, it is necessary to build and install an upper step arch frame 21 and an upper step formwork 22, and when the lower step concrete 30 is poured, it is necessary to build and install a lower step arch frame 31 and a lower step formwork 32. The interface between the upper step concrete 20 and the lower step concrete 30 is a horizontal interface. After the construction of the upper step concrete 20 is completed, the lower step concrete 30 is constructed. After the lower step arch frame 31 and the lower step formwork 32 are installed, concrete pouring begins. However, due to the existence of the horizontal interface, when pouring concrete from the pouring port opened at the upper end of the lower step formwork 32, it is not easy for the concrete to completely fill the interface. It is difficult for the concrete to maintain horizontal flow and completely fill the horizontal interface. Therefore, the concrete at the interface between the upper and lower step concretes 20 and 30 will always be loose, and a common quality problem of voids will occur.
[0042] The upper step arch frame 21 and the steel mesh are arranged by using the trolley 10. The arch foot 23 of the upper step arch frame is arranged in the artificial trench and fixed by the locking foot anchor rod. The depth of the artificial trench is 50 cm to reserve space for fixing the arch foot 23 of the upper step arch frame. The artificial trench is backfilled with sandbags to form a wedge-shaped bottom surface. The installed upper step arch frame 21 is connected with longitudinal connecting bars. After completing each process, the trolley 10 is used to fix the upper step formwork 22, and the plugging plate is used to seal it and then start pouring concrete. The upper step concrete 20 is formed. Due to the presence of sandbags, the upper part of the arch foot 23 of the upper step arch forms a wedge-shaped bottom surface after the upper step concrete 20 is formed. Then, the connection between the upper step formwork 22 and the portal frame 11 is removed, the trolley 10 withdraws, and the excavator starts excavating the next section of the tunnel. This cycle is repeated to complete the pouring of the upper step concrete 20. About 15 days after the construction of the upper step concrete 20 is completed, the lower step is excavated. After the excavation of the lower step, C25 sprayed concrete is used to form the initial spraying surface, and then the lower step is sprayed. The step arch frame 31 is connected to the upper step arch frame arch foot 23 exposed from the wedge-shaped bottom surface of the upper step concrete 20. The lower step arch frame arch foot 33 is fixed by the locking foot anchor rod in the same way, and then the lower step formwork 32 is fixedly installed. The perforated plane formwork 35 is convenient for the lower step arch frame arch foot 33 to extend out, forming a concrete fracture on the normal surface, which is convenient for connection with the inverted arch concrete 40. The top of the lower step formwork 32 is provided with a concrete chute 34. Because the bottom surface of the upper step concrete 20 is a wedge-shaped surface, when pouring concrete, the concrete can gradually follow the wedge-shaped surface and gradually fill up the space inside the lower step formwork 32. Compared with the horizontal interface between the interface between the upper step concrete 20 and the lower step concrete 30 in the prior art, the present invention can better ensure that the concrete at the interface between the upper and lower step concretes 20 and 30 is dense, improve the concrete quality at the joint surface, and avoid the occurrence of voids. At the same time, in order to ensure the stability when excavating the lower step, construction must be carried out between two consecutive upper step concretes 20 to avoid collapse and arch falling.
Claims
1. A dual-purpose trolley for sliding formwork, primary lining, excavation and support. Features: The trolley (10) comprises a door frame (11) and a rubber walking wheel (12) connected to the door frame (11); a slide rail (13) is arranged on the upper surface of the door frame (11) along the length direction of the trolley (10); a support plate (14) is arranged on the slide rail (13); a roller (15) cooperating with the slide rail (13) is arranged below the support plate (14); two ends of the support plate (14) are connected to the inner arc surface of a semicircular upper step template (22); and the two ends of the upper step template (22) in the arc length direction are located outside the two side edges in the length direction of the trolley (10); The gantry (11) comprises a main longitudinal beam (111) horizontally arranged along the length direction of the trolley (10), the rubber walking wheel (12) is connected to the main longitudinal beam (111), a vertical beam (112) is vertically connected to the main longitudinal beam (111), the upper end of the vertical beam (112) is connected to the top plate (113), and the slide rail (13) is arranged on the top plate (113); A reinforcing beam (114) is connected between the vertical beams (112), a main lifting cylinder (16) is arranged between the reinforcing beam (114) and the main longitudinal beam (111), a supporting seat (115) is connected to the outer side of the vertical beam (112), and a secondary lifting cylinder (17) is arranged between the supporting seat (115) and the main longitudinal beam (111); A supporting foot (116) is provided between the main longitudinal beam (111) and the ground; A jack or a screw rod (18) is arranged between the vertical beam (112) and the inner arc surface of the upper step template (22), and the two ends of the jack or the screw rod (18) are respectively hinged to the vertical beam (112) and the inner arc surface of the upper step template (22).
2. An application of the sliding form primary lining excavation support dual-purpose trolley as claimed in claim 1, Features: The trolley is used in the initial lining concrete construction method of the tunnel, and the construction method comprises the following steps: A. First, use water and high-pressure air to clean the dust, loose rocks and debris on the tunnel rock surface, and keep the rock surface at a certain humidity. Use C25 shotcrete to seal the heading face and excavation rough surface to form the initial spraying surface; B. The trolley (10) drives into the tunnel, and the trolley (10) is loaded with the semi-finished product of the upper step arch frame (21) to be installed and the steel mesh in place. At this time, the upper step template (22) is arranged at the rear end of the top plate (113) through the support plate (14), and the front end of the top plate (113) is used as a supporting platform to install the steel mesh of the upper step arch frame (21); C. In order to facilitate the connection between the lower step arch frame (31) and the upper step arch frame (21), the excavation height of the arch foot (23) of the upper step arch frame is reserved to be 50 cm, and an artificial groove is dug on the face corresponding to the position of the arch foot (23) of the upper step arch frame. When installing the upper step arch frame (21), the arch foot (23) of the upper step arch frame is placed in the artificial groove and a pad is placed at the arch foot. At the same time, a locking anchor rod is applied to the arch foot. Sandbags are used to backfill and stack the artificial groove to form an inclined foundation with a height difference of 30 cm. The inclined mouth is low on the side close to the rock surface and high on the side close to the trolley (10). The installed upper step arch frame (21) is connected to each other with longitudinal connecting bars, and a steel mesh is covered and arranged between the initial spraying surface and the upper step arch frame (21); D. After all the steps are completed, the upper step template (22) is slid to the front end of the top plate (113), the main lifting cylinder (16) and the auxiliary lifting cylinder (17) lift the vertical beam (112) upward, and at the same time, the telescopic length of the jack or the screw rod (18) is adjusted accordingly to ensure that the upper step template (22) is in place relative to the upper step arch frame (21), and the plug plate is closed and concrete is poured. After the upper step concrete (20) is poured, wait for 6 hours, remove the connection between the upper step template (22) and the jack or screw rod (18) and the support plate (14) 20, and exit the trolley (10). At this time, the upper step template (22) is separated from the portal frame (11), and the upper step template (22) is still located on the concrete surface to provide the arch force at this time, and the excavation machine enters the face to continue the excavation operation.
3. Application of the dual-purpose trolley for sliding formwork initial lining excavation and support according to claim 2, Features: The construction method further comprises the following steps: E. After the construction of the upper step concrete (20) is completed, the lower step concrete (30) is constructed. When the face is a certain distance away from the lower step, excavation support is carried out on the left and right sides. When the lower step is excavated, the stacked sandbags at the arch foot (23) of the upper step arch are taken out to form a reserved wedge-shaped opening so that the upper end of the lower step arch (31) is connected to the arch foot (23) of the upper step arch. The lower step formwork (32) is constructed using a fixed formwork. The bottom of the arch foot (33) of the lower step arch is designed with an open plane formwork (35) to form a concrete fracture of a normal surface. The upper end of the lower step formwork (32) is provided with an angular concrete chute opening (34). The concrete chute opening (34) is 20 cm higher than the bottom surface of the upper step concrete (20); F. When excavating the lower step, it must be located between two consecutive upper step concretes (20) and must not cross the construction joints of two or more upper step concretes (20).