A quick tightening device and tower assembly method for helicopter transverse docking and assembly of angle steel towers

By designing a quick tightening device for the helicopter's transverse docking assembly of the angle steel tower, and using the combined structure of the screw, anti-cantilever arm and hand crank, the main materials of the tower body and cross arm can be quickly put into place, solving the problem of long hovering time of the helicopter. , improving construction efficiency and safety.

CN109779380BActive Publication Date: 2024-10-15ZHEJIANG ELECTRIC TRANSMISSION & TRANSFORMATION ENG CO +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910063497.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-01-23
Publication Date
2024-10-15
Estimated Expiration
2039-01-23

AI Technical Summary

Technical Problem

When a helicopter assembles an angle steel tower on an overhead transmission line, the hovering time for hoisting into place is limited. How to reduce the hovering operation time of the helicopter and quickly achieve the cross arm placement becomes a difficulty.

Method used

A quick tightening device for helicopter transverse docking assembly angle steel towers is designed, including a screw, a cantilever stop, a top sleeve and a round nut of a hand crank. By rotating the cantilever stop and the screw rod, insert into the bolt holes of the cross arm and the tower body, and use the hand The crank handle rotates the round nut to push the top sleeve to tighten, realizing the rapid positioning of the main materials of the tower body and cross arm.

Benefits of technology

It effectively reduces the hovering operation time of the helicopter, improves the operation efficiency and safety, simplifies the operation process, and reduces the operation difficulty and manufacturing cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109779380B_ABST
    Figure CN109779380B_ABST
Patent Text Reader

Abstract

The present invention discloses a quick tightening device for assembling angle steel towers by horizontal docking of helicopters and a tower assembly method thereof, and relates to the field of overhead power transmission line construction. When a helicopter assembles an angle steel tower for an overhead power transmission line, and the helicopter is hoisting the cross arm of the angle steel tower, it is difficult to reduce the hovering operation time of the helicopter and quickly realize the cross arm in place because the hovering time of the helicopter is limited. The present invention comprises a screw rod, a cantilever stop arm rotatably connected to the left end of the screw rod, and a round nut with a hand crank screwed into the right end of the screw rod. When the helicopter hoists the cross arm, the quick tightening device is inserted into the bolt hole of the main material of the cross arm and the bolt hole of the main material of the tower body, and then the cantilever stop arm is pulled up 90 degrees, and the hand crank is rotated to tighten, so that the cross arm of the tower is conveniently quickly placed on the tower body, and the hovering operation time of the helicopter can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of overhead power transmission line construction, and in particular to a quick tightening device for assembling angle steel towers with helicopter transverse docking and a tower assembly method thereof. Background Art

[0002] At present, in the face of large-scale construction of overhead power transmission lines, helicopters have become an important choice for solving extreme construction problems in engineering construction and coping with outstanding issues such as environmental protection, construction safety, and construction period pressure. It is very necessary to promote the in-depth application of helicopters in the construction of overhead power transmission lines. In recent years, State Grid Corporation of China has explored and tested the construction of helicopters in the demonstration projects of overhead power transmission lines, and has achieved phased results. It has the technical and material basis for promoting the in-depth application of helicopters.

[0003] When a helicopter assembles an angle steel tower for an overhead power transmission line, it is difficult to quickly hoist the cross arm into place. When a helicopter hoists the cross arm of an angle steel tower, due to the limited hovering time of the helicopter, how to shorten the hovering time of the helicopter and quickly put the cross arm into place becomes a difficulty. Summary of the invention

[0004] The technical problem to be solved and the technical task proposed by the present invention are to improve and perfect the existing technical solutions, and provide a quick tightening device for assembling angle steel towers for helicopters in transverse docking and a tower assembly method thereof, so as to reduce the hovering operation time of the helicopter and quickly realize the cross arm in place. To this end, the present invention adopts the following technical solutions.

[0005] A quick tightening device for assembling an angle steel tower for a helicopter transverse docking comprises a screw rod, a cantilever stop arm, a top sleeve and a round nut with a hand crank, wherein the cantilever stop arm is rotatably connected to the left end of the screw rod, the round nut is screwed in from the right end of the screw rod, the top sleeve is sleeved on the screw rod position between the cantilever stop arm and the round nut, the cantilever stop arm is on the same axis with the screw rod after being straightened, and the cantilever stop arm and the screw rod can be inserted into the bolt holes of the main material of the cross arm and the main material of the tower body of the angle steel tower for transverse docking with a gap. When in use, after the helicopter hoists the tower crossarm to the position, the operator straightens the anti-cantilever arm to make it in the same straight line with the screw rod, and then inserts the anti-cantilever arm and the screw rod into the bolt hole of the crossarm main material and the bolt hole of the tower body main material in turn, and then rotates the passed anti-cantilever arm 90 degrees, and then pushes the top sleeve forward by rotating the nut with the hand crank to tighten the tower body connection part and the crossarm main material. After tightening, the anti-cantilever arm, the crossarm main material and the tower body connection part are adjacent to each other in sequence, which conveniently realizes the rapid positioning of the tower crossarm on the tower body, and can effectively reduce the helicopter hovering operation time.

[0006] As a further improvement and supplement to the above technical solution, the present invention also includes the following additional technical features.

[0007] The cantilever stop arm is a round rod with a diameter less than or equal to the outer diameter of the screw rod, and the cantilever stop arm is connected to the screw rod by rivets. The rivets can conveniently realize a rotatable connection, and the diameter of the cantilever stop arm is less than or equal to the outer diameter of the screw rod, so that it is easy to pass through the bolt holes of the cross arm main material and the bolt holes of the tower body main material.

[0008] The left end of the screw is provided with a flat connection part, the middle of the right end of the cantilever arm is a connection groove that penetrates up and down, and the front and rear sides of the cantilever arm at the connection groove are cut flat. When connecting, the flat connection part of the screw is inserted into the connection groove of the cantilever arm, and the rivet penetrates forward and backward to connect. The connection structure is simple and reliable, and it is convenient to use rivets.

[0009] The right end of the cantilever stop arm is a flat end face, and the left end of the cantilever stop arm is an arc chamfer. After the main material of the cross arm and the main material of the tower body are tightened, the flat end face of the cantilever stop arm connection end can effectively realize the rotation limit of the cantilever stop arm, prevent the cantilever stop arm from rotating and tipping over, and reduce the use of cantilever stop arm materials. The arc chamfer on the left end helps to ensure safety when holding and touching.

[0010] The hand crank comprises a handle and a rocker arm, the left end of the handle is provided with a thread, which passes through the through hole at the upper end of the rocker arm and is fastened with a cap nut, and the lower end of the rocker arm is welded and connected with a round nut. The connection structure is simple and reliable, which reduces the manufacturing difficulty and the manufacturing cost.

[0011] The tower assembly method of the helicopter transverse docking assembly angle steel tower quick tightening device comprises the following steps:

[0012] 1) Pre-process the tower crossarms: tie a set of crossarm diagonal materials on the upper and lower planes of the tower crossarms close to the tower body to the crossarm main material with wires, and connect the crossarm diagonal materials to the bolt holes on the crossarm main material away from the tower body for fixing;

[0013] 2) Hanging the cross arm of the tower: When the helicopter hangs the cross arm of the tower, the cross arm hoisting posture should be 5-10° with the horizontal plane depression angle, that is, the end of the cross arm should be 5-10° lower than the root of the cross arm;

[0014] 3) Position the lower plane of the tower crossarm: When the helicopter hoists the tower crossarm, first position the two crossarm main materials on the lower plane of the tower crossarm. The specific operation steps are to insert the two crossarm main materials on the lower plane of the crossarm into the inner side of the tower body, close to the bolt holes where the tower body main materials are positioned, and avoid the upper plane angle steel from touching the tower body;

[0015] 4) Rapid tightening of the tower cross arm: The high-altitude workers on the tower quickly tighten the two positions on the lower plane of the tower section through the rapid tightening device. During this process, the helicopter always remains in a hovering state;

[0016] 5) Rotation and lifting of the tower crossarm: After the lower plane of the tower crossarm is inserted into the quick tightening device and tightened and fixed, the helicopter slowly lifts the hoisted tower crossarm upward with this as the axis, so that the main material of the upper plane of the tower crossarm is inserted into the inner side of the tower body;

[0017] 6) Positioning of the upper plane of the tower crossarm: After the two crossarm main materials of the upper plane of the tower crossarm are inserted into the inner side of the tower body, close to the bolt holes of the tower body main materials, the high-altitude workers on the tower quickly tighten the two positioning points on the upper plane of the tower section through the quick tightening device. During this process, the helicopter always remains in a hovering state;

[0018] 7) Helicopter unhooking and bolt reinstallation: When the upper plane of the tower crossarm is positioned and tightened with the quick tightening device, the ground commander issues a command to the helicopter pilot, and the helicopter unhooks and returns to the take-off and landing point. Subsequently, the high-altitude workers on the tower connect 3-5 bolts in series at the positioning point, remove the quick tightening device and reinstall the remaining tower bolts.

[0019] The operation method is fast, rigorous and reliable, which can greatly reduce the operation difficulty, improve the operation speed and reduce the helicopter hovering operation time.

[0020] In steps 4) and 6), the quick tightening device is inserted into the bolt holes of the main material of the tower body and the main material of the cross arm from the outside of the tower body, and then the cantilever arm of the quick tightening device is rotated. When the cantilever arm and the screw rod of the quick tightening device are at a 90° angle and are stable, the hand crank of the quick tightening device is rotated clockwise to make the round nut push the top sleeve to tighten the distance between the main material of the tower body and the main material of the cross arm until the main material of the tower body and the main material of the cross arm are close together. The tightening operation is simple, convenient, safe and reliable.

[0021] Beneficial effects: The quick tightening device has a simple structure and is easy to operate. It can easily realize the rapid positioning of the tower crossarm on the tower body, greatly improving the operating efficiency, effectively reducing the helicopter hovering operation time, and improving the safety and reliability of the operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the main structure of the quick tightening device of the present invention.

[0023] Figure 2 It is a bottom view structural schematic diagram of the quick tightening device of the present invention.

[0024] Figure 3 It is a schematic diagram of inserting the quick tightening device of the present invention into the bolt holes of the cross arm main material and the bolt holes of the tower body main material.

[0025] Figure 4 It is a schematic diagram of the cantilever stop arm of the quick tightening device of the present invention being raised 90 degrees.

[0026] Figure 5It is a schematic diagram of the tightening operation of the quick tightening device of the present invention.

[0027] Figure 6 It is a schematic diagram of the state of the quick tightening device of the present invention after tightening.

[0028] Figure 7 It is a plan view of the iron tower cross arm before pretreatment of the present invention.

[0029] Figure 8 It is a plan view of the cross arm of the iron tower after pretreatment of the present invention.

[0030] Fig. 9 It is a schematic diagram of the cross arm of the helicopter hanging iron tower of the present invention.

[0031] Fig.10 It is a schematic diagram of the lower plane positioning of the cross arm of the iron tower of the present invention.

[0032] Fig.11 It is a schematic diagram of the rotation and lifting of the cross arm of the iron tower of the present invention.

[0033] Fig.12 It is a schematic diagram of the plane positioning on the cross arm of the iron tower of the present invention and the helicopter unhooking.

[0034] In the figure: 1- quick tightening device; 2- iron tower cross arm; 3- helicopter; 4- main material of tower body; 5-; 101- screw rod; 102- cantilever stop arm; 103- top sleeve; 104- round nut; 105- rocker arm; 106- handle; 107- cap nut; 201- main material of cross arm; 202- cross arm diagonal material; 203- end of cross arm; 204- root of cross arm. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings.

[0036] like Figure 1-6 As shown, a quick tightening device for assembling an angle steel tower for transverse docking of a helicopter comprises a screw rod 101, a cantilever stop arm 102, a top sleeve 103 and a round nut 104 with a hand crank, the cantilever stop arm 102 is rotatably connected to the left end of the screw rod 101, the round nut 104 is screwed in from the right end of the screw rod 101, the top sleeve 103 is sleeved on the position of the screw rod 101 between the cantilever stop arm 102 and the round nut 104, the cantilever stop arm 102 is on the same axis as the screw rod 101 after being straightened, and the cantilever stop arm 102 and the screw rod 101 can be inserted into the bolt holes 201 of the cross arm main material 201 of the transverse docking of the angle steel tower and the bolt holes 4 of the tower body main material with clearance.

[0037] In order to conveniently realize the rotatable connection, the cantilever arm 102 is in the shape of a round rod, and its diameter is less than or equal to the outer diameter of the screw rod 101. The cantilever arm 102 is connected to the screw rod 101 by rivets. The rotatable connection can be conveniently realized by rivets. The diameter of the cantilever arm 102 is less than or equal to the outer diameter of the screw rod 101, which is convenient for passing through the bolt holes of the cross arm main material 201 and the bolt holes of the main material 4 of the tower body.

[0038] In order to facilitate the use of rivets, a flat connection portion is provided at the left end of the screw rod 101, and a connection groove is provided in the middle of the right end of the cantilever arm 102, which penetrates vertically, and the front and rear sides of the cantilever arm 102 at the connection groove are cut flat. When connecting, the flat connection portion of the screw rod 101 is inserted into the connection groove of the cantilever arm 102, and the rivet penetrates forward and backward to connect. The connection structure is simple and reliable, and it is convenient to use rivets.

[0039] In order to prevent the cantilever arm 102 from rotating again after the cross arm main material 201 and the tower body main material 4 are tightened, the right end of the cantilever arm 102 is a flat end face, and the left end of the cantilever arm 102 is a circular arc chamfer. After the cross arm main material 201 and the tower body main material 4 are tightened, the flat end face of the connecting end of the cantilever arm 102 can effectively realize the rotation limit of the cantilever arm 102, prevent the cantilever arm 102 from rotating and tipping over, and reduce the use of the cantilever arm 102 material. The circular arc chamfer at the left end helps the safety when the hand is holding it.

[0040] In order to simplify the structure, the hand crank includes a handle 106 and a rocker arm 105. The left end of the handle 106 is provided with a thread, which passes through the through hole at the upper end of the rocker arm 105 and is fastened with a cap nut 107. The lower end of the rocker arm 105 is welded to the round nut 104. The connection structure is simple and reliable, which reduces the manufacturing difficulty and the manufacturing cost.

[0041] The tower assembly method of the helicopter transverse docking assembly angle steel tower quick tightening device comprises the following steps:

[0042] 1 Pre-process the tower cross arm 2: Figure 7-8 As shown, a group of cross arm diagonal materials 202 on the upper and lower planes of the tower cross arm 2 are tied to the cross arm main material 201 with wires, and the cross arm diagonal materials 202 are connected to the bolt holes of the cross arm main material 201 away from the tower side for fixing;

[0043] 2 Hang the tower crossarm 2: Fig. 9 As shown, when the helicopter 3 is hanging the tower cross arm 2, the cross arm hoisting posture should be at an angle of 10° with the horizontal plane, that is, the cross arm end 203 should be 10° lower than the cross arm root 204;

[0044] 3. Position the lower plane of the tower cross arm 2: Fig.10As shown, the helicopter 3 hoists the tower crossarm 2 and first places the two crossarm main materials 201 on the lower plane of the tower crossarm 2. The specific operation steps are to insert the two crossarm main materials 201 on the lower plane of the crossarm into the inner side of the tower body, close to the bolt holes of the tower body main material 4, and avoid the upper plane angle steel from touching the tower body.

[0045] 4. Rapid tightening of the tower cross arm 2 in place: The high-altitude workers on the tower quickly tighten the two positioning points on the lower plane of the tower section in place through the rapid tightening device 1. During this process, the helicopter 3 always remains in a hovering state;

[0046] 5. The tower cross arm 2 is rotated and lifted: Fig.11 As shown, after the lower plane of the tower crossarm 2 is inserted into the quick tightening device 1 and tightened and fixed, the helicopter 3 slowly lifts the hoisted tower crossarm 2 upward with this as the axis, so that the upper plane crossarm main material 201 of the tower crossarm 2 is inserted into the inner side of the tower body;

[0047] 6 The upper plane of the tower cross arm 2 is in place: Fig.12 As shown, after the two cross arm main materials 201 on the upper plane of the tower cross arm 2 are inserted into the inner side of the tower body, close to the bolt holes of the tower body main material 4, the high-altitude workers on the tower quickly tighten the two upper plane positions of the tower section through the quick tightening device 1. During this process, the helicopter 3 always maintains a hovering state;

[0048] 7 Helicopter 3 is unhooked and bolts are reinstalled: When the upper plane of the tower crossarm 2 is positioned and tightened by the quick tightening device 1, the ground commander issues a command to the helicopter 3 driver, and the helicopter 3 is unhooked and returns to the take-off and landing point. Subsequently, the high-altitude workers on the tower connect 5 bolts in series at the positioning point, remove the quick tightening device 1 and reinstall the remaining tower material bolts.

[0049] The operation method is fast, rigorous and reliable, which can greatly reduce the difficulty of operation, improve the operation speed, and reduce the hovering operation time of the helicopter 3.

[0050] In steps 4 and 6, if Figure 3-6 As shown, the quick tightening device 1 is inserted into the bolt holes of the main material 4 of the iron tower body and the bolt holes of the cross arm main material 201 from the outside of the tower body, and then the cantilever arm 102 of the quick tightening device 1 is rotated. When the cantilever arm 102 and the screw rod 101 of the quick tightening device 1 are at a 90° angle and are stable, the hand crank of the quick tightening device 1 is rotated clockwise to make the round nut 104 push the top sleeve 103 to tighten the distance between the main material 4 of the iron tower body and the cross arm main material 201 until the main material 4 of the iron tower body and the cross arm main material 201 are close to each other. The tightening operation is simple and convenient, safe and reliable, and it is convenient to realize the rapid positioning of the iron tower cross arm 2 on the iron tower body, which can effectively reduce the hovering operation time of the helicopter 3.

[0051] above Figure 1-12The helicopter transverse docking assembly angle steel tower quick tightening device and tower assembly method shown are specific embodiments of the present invention, which have embodied the outstanding substantial features and significant progress of the present invention. According to actual use needs and under the guidance of the present invention, equivalent modifications in shape, structure, etc. can be made to the device, which are all within the protection scope of this scheme.

Claims

1. Helicopter horizontal docking assembly angle steel tower quick tightening device, Features: The invention comprises a screw rod (101), a cantilever stop arm (102), a top sleeve (103) and a round nut (104) with a hand crank, wherein the cantilever stop arm (102) is rotatably connected to the left end of the screw rod (101), the round nut (104) is screwed in from the right end of the screw rod (101), the top sleeve (103) is sleeved on the screw rod (101) between the cantilever stop arm (102) and the round nut (104), the cantilever stop arm (102) is coaxial with the screw rod (101) after being straightened, and the cantilever stop arm (102) and the screw rod (101) can be inserted into the bolt holes of the cross arm main material (201) and the bolt holes of the tower body main material (4) of the angle steel tower with clearance; The quick tightening device (1) is inserted from the outside of the tower body into the bolt holes of the tower body main material (4) and the bolt holes of the cross arm main material (201), and then the cantilever stop arm (102) of the quick tightening device (1) is rotated. When the cantilever stop arm (102) and the screw rod (101) of the quick tightening device (1) form a 90° angle and are stable, the hand crank of the quick tightening device (1) is rotated clockwise to make the round nut (104) push the top sleeve (103) to tighten the distance between the tower body main material (4) and the cross arm main material (201), until the tower body main material (4) and the cross arm main material (201) are close to each other; The hand crank comprises a handle (106) and a rocker arm (105), the lower end of the rocker arm (105) being welded to a round nut (104); The left end of the screw rod (101) is provided with a flat connection portion, and the middle of the right end of the cantilever arm (102) is a connection groove that penetrates vertically. When connected, the flat connection portion of the screw rod (101) is inserted into the connection groove of the cantilever arm (102), and the rivet penetrates forward and backward to connect.

2. According to claim 1, the helicopter transverse docking assembly angle steel tower quick tightening device, Features: The cantilever stop arm (102) is in the shape of a round rod, with a diameter less than or equal to the outer diameter of the screw rod (101), and the cantilever stop arm (102) and the screw rod (101) are connected via rivets.

3. The helicopter transverse docking assembly angle steel tower quick tightening device according to claim 2, Features: The front and rear sides of the cantilever stopper (102) at the connection groove are cut flat.

4. The helicopter transverse docking assembly angle steel tower quick tightening device according to claim 3, Features: The right end of the cantilever stop arm (102) is a flat end surface, and the left end of the cantilever stop arm (102) is a circular arc chamfer.

5. According to claim 1, the helicopter transverse docking assembly angle steel tower quick tightening device, Features: The left end of the handle (106) is provided with a thread, which passes through the through hole at the upper end of the rocker arm (105) and is fastened with a cap nut (107).

6. A tower assembly method using the helicopter transverse docking assembly angle steel tower quick tightening device as claimed in claim 1, Features The following steps are involved: 1) Pre-processing the tower cross arm (2): using wires to tie a group of cross arm diagonal materials (202) on the upper and lower planes of the tower cross arm (2) close to the tower body to the cross arm main material (201), and connecting the cross arm diagonal materials (202) to the bolt holes of the cross arm main material (201) away from the tower body for fixing; 2) Hanging the tower cross arm (2): When the helicopter (3) hangs the tower cross arm (2), the cross arm hoisting posture should be 5 to 10 degrees with the horizontal plane depression angle, that is, the cross arm end (203) should be 5 to 10 degrees lower than the cross arm root (204); 3) Positioning the lower plane of the tower crossarm (2): The helicopter (3) hoists the tower crossarm (2) and first positions the two crossarm main materials (201) of the lower plane of the tower crossarm (2). The specific operation steps are to insert the two crossarm main materials (201) of the lower plane of the crossarm into the inner side of the tower body, close to the bolt holes of the tower body main material (4), and prevent the upper plane angle steel from touching the tower body; 4) Rapid tightening of the tower cross arm (2) in place: the high-altitude workers on the tower use the rapid tightening device (1) to quickly tighten the two positioning points on the lower plane of the tower section in place, and the helicopter (3) always remains in a hovering state during this process; 5) Rotating and lifting the tower cross arm (2): After the lower plane of the tower cross arm (2) is inserted into the quick tightening device (1) and tightened and fixed, the helicopter (3) slowly lifts the hoisted tower cross arm (2) upward with this as the axis, so that the upper plane of the tower cross arm (2) The main cross arm material (201) is inserted into the inner side of the tower body; 6) Positioning the upper plane of the tower cross arm (2): After the two cross arm main materials (201) of the upper plane of the tower cross arm (2) are inserted into the inner side of the tower body, close to the bolt holes of the tower body main material (4), the high-altitude workers on the tower quickly tighten the two positioning points of the upper plane of the positioned tower section through the quick tightening device (1), and the helicopter (3) always maintains a hovering state during this process; 7) Helicopter (3) unhooking and bolting: When the upper plane of the tower crossarm (2) is positioned and tightened using the quick tightening device (1), the ground commander issues a command to the helicopter (3) driver, and the helicopter (3) unhooks and returns to the take-off and landing point. Subsequently, the high-altitude workers on the tower connect 3-5 bolts in series at the positioning point, remove the quick tightening device (1), and reinstall the remaining tower material bolts.

7. The tower assembly method of the helicopter transverse docking assembly angle steel tower quick tightening device according to claim 6, Features: In steps 4) and 6), the quick tightening device (1) is inserted from the outside of the tower body into the bolt holes of the main material (4) of the iron tower body and the bolt holes of the main material (201) of the cross arm, and then the cantilever stop arm (102) of the quick tightening device (1) is rotated. When the cantilever stop arm (102) and the screw rod (101) of the quick tightening device (1) form an angle of 90° and are stable, the hand crank of the quick tightening device (1) is rotated clockwise to make the round nut (104) push the top sleeve (103) to tighten the distance between the main material (4) of the iron tower body and the main material (201) of the cross arm, until the main material (4) of the iron tower body and the main material (201) of the cross arm are close to each other.