A support structure for a tunnel passing through a water-rich filled cave and a construction method thereof

By using support structures and grouting measures for synchronous construction on both sides of the tunnel in the water-rich filling cave, the problem of difficulty in forming arches on a single-sided pipe shed is solved, the safety and efficiency of construction is improved, and the project cost is reduced and duration.

CN109812270BActive Publication Date: 2024-11-12CHONGQING JIAMI SOFTWARE DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910220984.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-03-22
Publication Date
2024-11-12
Estimated Expiration
2039-03-22

AI Technical Summary

Technical Problem

The prior art lacks effective support methods when dealing with large and medium-sized water-rich filling caves, and the construction of a single-sided pipe shed is difficult, and the method of using a water diversion tunnel is long, the construction cost is high, and it is not universally applicable.

Method used

The supporting structure is constructed simultaneously on both sides of the tunnel, including the inlet and outlet support structure. It is set up mirror symmetrically with the center of the tunnel cave as the axis, and uses secondary lining, initial support, pipe shed, and oblique grouting small conduits. With the temporary arches of the first branch, a whole concrete arch structure is formed, and the cave is gradually approached by the double-sided wall pit guide method and gravel backfilling backfilling, and a large pipe shed and oblique grouting small conduits are set up for support.

Benefits of technology

It effectively solves the problem that one-sided pipe shed is difficult to form arches, reduces the time for tunnel arches, reduces the risk of construction deformation, and ensures construction safety and project quality through double-sided grouting and drainage measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109812270B_ABST
    Figure CN109812270B_ABST
Patent Text Reader

Abstract

The invention relates to the field of tunnel engineering, and discloses a support structure for a tunnel passing through a water-rich filled karst cave and a construction method thereof. The support structure comprises a tunnel entrance support structure and a tunnel exit support structure, wherein the tunnel entrance support structure and the tunnel exit support structure are arranged in a mirror-image symmetry with the tunnel karst cave center as an axis, and the support structure comprises secondary lining, initial support, a pipe shed, a small oblique grouting conduit and a temporary primary support arch from the inside to the outside of the tunnel face. In terms of the construction method, large pipe sheds are constructed on both sides of the tunnel at the same time, and the pipe sheds are cross-lapped in the middle of the filled karst cave to form an arch frame. The pipe shed has sufficient rigidity, thereby solving the problem that the pipe shed on one side of the water-rich filled karst cave is difficult to form an arch; simultaneous grouting on both sides of the pipe shed reduces the working time of tunnel arching and effectively reduces the deformation of the pipe shed; after the construction of the pipe shed is completed, grouting with a small oblique grouting conduit is used to further expand the range of the tunnel grouting ring, thereby more effectively ensuring the safe construction of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel engineering, in particular to a supporting structure for a tunnel passing through a water-rich filled karst cave and a construction method thereof. Background Art

[0002] The existing support technology for tunnels crossing karst caves mainly adopts bridge-type spanning or single-side pipe shed grouting, making tunnel top arches, backfilling karst caves, etc. to cross or support through karst caves. However, when encountering large and medium-sized vertical water-rich filled karst caves during tunnel excavation projects, the existing literature only conducts preliminary research and discussion on the support technology of large and medium-sized water-rich filled karst caves, and there are no targeted technical means and support technology.

[0003] CN 102383806 A invents a construction process for a tunnel to pass through an extra-large karst cave, which adopts a bridge-type span.

[0004] CN 107542470 A invented a construction method for a karst fractured shallow buried tunnel under an existing railway operating line, which mainly adopts pile foundation and beam to cross the existing railway.

[0005] CN203130109U discloses a large-section karst tunnel support device, which mainly adopts a combination of anchor rods and steel frames to treat the karst cave.

[0006] CN206707721U discloses a processing method for penetrating a vertical cave group structure, which is mainly suitable for cavity-type caves.

[0007] CN 109026020 A A method for treating and excavating a water-rich tunnel karst cave is invented. The method mainly adopts excavating a water diversion tunnel to remove the water flow in the karst cave, and then treats the existing karst cave after the original soil is consolidated.

[0008] Since the soil of water-rich filled caves is in a soft plastic or fluid plastic state, the existing technology does not provide an effective and reliable support method; the existing problems are: 1. The existing support technology of water-rich filled caves adopts single-sided support, which is difficult to construct and the existing equipment is difficult to meet the design requirements; 2. The method of setting up a water diversion tunnel to consolidate the original water-rich cave has a long construction period, high project cost, and is greatly affected by the environment, and is not generally applicable. Summary of the invention

[0009] The purpose of the present invention is to provide a support structure and a construction method for a tunnel passing through a water-rich filled cave, so as to solve the problem that a single-sided pipe shed in a water-rich filled cave is difficult to form an arch, and to provide an effective support method for treating large and medium-sized water-rich filled caves.

[0010] In order to achieve the above-mentioned technical purpose and the above-mentioned technical effect, the present invention discloses a support structure for a tunnel passing through a water-rich filled cave. The support structure is constructed simultaneously on both sides of the tunnel, and includes an entrance support structure and an exit support structure. The entrance support structure and the exit support structure are arranged in mirror symmetry with the center of the tunnel cave as the axis. The support structure includes secondary lining, initial support, pipe shed, oblique grouting small duct and initial support temporary arch from the inside to the outside of the tunnel heading face. The initial support temporary arch is arranged on the outside of the cave entrance, and the top is connected to the surrounding rock of the tunnel top. The initial support is arranged on the inside of the initial support temporary arch. The pipe shed and the oblique grouting small duct are arranged alternately between the initial support and the initial support temporary arch along the radial direction. The secondary lining is arranged on the inside of the initial support to form an integral concrete arch structure with the initial support temporary arch.

[0011] Among them, the initial support includes steel arch frame and double-layer steel mesh. The double-layer steel mesh is welded to the steel arch frame. The spacing between the steel arch frames is 50cm. C20 concrete with a thickness of 28cm is sprayed on the double-layer steel mesh.

[0012] Among them, the pipe rack is a large pipe rack with a pipe diameter of φ89-φ159mm, a circumferential spacing of 40cm, steel pipe sections of 4m or 6m long, connected with threads with a thread length of not less than 150mm, and the cross-lap length in the middle of the pipe rack of not less than 5m, with an elevation angle of 5°-10°.

[0013] Among them, the small oblique grouting pipe is 4.5m long, with an annular spacing of 80cm, a longitudinal spacing of 50cm, an oblique angle of 45°, and is arranged at intervals between the annular and large pipe racks.

[0014] Preferably, an annular drainage pipe is also included. The annular drainage pipe is set in the water-rich filled cave and within the range of 10m before and after. It adopts φ100 perforated corrugated pipe with a longitudinal spacing of 2m / channel and is introduced into the tunnel drainage ditch.

[0015] Preferably, a reinforced concrete slab is also included, which is arranged at the bottom of the tunnel and spans the cave area.

[0016] A construction method for a tunnel support structure comprises the following steps:

[0017] Step 1: Set up a cordon around the top of the water-rich cave to prevent people and animals from approaching, take temporary interception and drainage measures to prevent rainwater from continuing to flow into the cave and tunnel, and strengthen surface inspections and monitoring;

[0018] Step 2: The entrances and exits of the tunnel are excavated simultaneously using the double sidewall pilot method;

[0019] Step 3: After the excavation reaches the karst cave area, use slag backfill from both ends to form a construction platform to gradually approach the karst cave, and set up a temporary arch at the entrance of the karst cave;

[0020] Step 4: Excavate the pipe shed workshop and use the pipe shed trolley to build a large pipe shed as advance support;

[0021] Step 5: Grouting of pipe shed; the grouting slurry adopts 1:1 cement slurry plus appropriate amount of water glass, and the grouting pressure is about 1.0Mpa;

[0022] Step 6: After the pipe shed grouting is completed, the cave section is supplemented with oblique grouting small pipes arranged in a circular direction and spaced apart from the advanced large pipe shed;

[0023] Step 7: Use a small oblique grouting tube to perform secondary grouting on the water-rich cave area. The grouting uses a 1:1 cement slurry with an appropriate amount of water glass, and the grouting pressure is 0.5~1.0MPa;

[0024] Step 8: After each cycle of oblique grouting is completed, the excavation and replacement of each frame can be carried out one by one. During the construction, monitoring, measurement and safety management should be strengthened to ensure construction safety.

[0025] Preferably, step nine is also included, which is to strengthen tunnel drainage in the water-rich filled cave and within a range of 10m before and after, and the annular drainage pipe adopts a φ100 perforated corrugated pipe with a longitudinal spacing of 2m / channel, which is introduced into the tunnel drainage ditch.

[0026] Preferably, the method further comprises step ten, wherein a reinforced concrete slab is used at the bottom of the tunnel to span the cave to avoid settlement of the tunnel in the later stage.

[0027] The present invention has the following beneficial effects:

[0028] 1. The present invention adopts the method of constructing large pipe racks on both sides of the tunnel at the same time. The pipe racks are cross-jointed in the middle of the filled cave to form an arch frame. The pipe racks have sufficient rigidity, thereby solving the problem that it is difficult to form an arch with a pipe rack on one side of a water-rich filled cave.

[0029] 2. The simultaneous grouting on both sides of the pipe roof reduces the working time of tunnel arch formation and effectively reduces the deformation of the pipe roof.

[0030] 3. After the pipe shed construction is completed, grouting is assisted by small grouting tubes at an angle of 45° to further expand the scope of the tunnel grouting ring and more effectively ensure the safe construction of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is an overall schematic diagram of the supporting structure of the present invention.

[0032] Figure 2 It is a cross-sectional view of the supporting structure of the present invention.

[0033] Main component symbols:

[0034] 1: secondary lining, 2: initial support, 3: pipe shed, 4: small oblique grouting conduit, 5: temporary arch for initial support, 6: reinforced concrete slab, 7: pipe shed workshop, 8: tunnel, 9: cave, 10: surrounding rock, 21: steel arch frame, 22: double-layer steel mesh. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments.

[0036] like Figure 1 , 2 As shown, the present invention discloses a support structure for a tunnel passing through a water-rich filled cave. The support structure is constructed synchronously on both sides of a tunnel 8, and includes an entrance support structure and an exit support structure. The entrance support structure and the exit support structure are arranged in mirror symmetry with the center of the tunnel karst cave 9 as the axis. The support structure includes a secondary lining 1, an initial support 2, a pipe shed 3, an oblique grouting small pipe 4 and a temporary primary support arch 5 from the inside to the outside of the tunnel face 8. The temporary primary support arch 5 is arranged outside the entrance of the karst cave 9, and the top is connected to the surrounding rock 10 at the top of the tunnel. The initial support 2 is arranged on the inside of the temporary primary support arch 5. The pipe shed 3 and the small oblique grouting pipe 4 are alternately arranged radially between the initial support 2 and the temporary primary support arch 5. The secondary lining 1 is arranged on the inside of the initial support 2 to form an integral concrete arch structure with the temporary primary support arch 5.

[0037] The initial support 2 includes a steel arch frame 21 and a double-layer steel mesh 22. The double-layer steel mesh 22 is welded to the steel arch frame 21. The spacing between the steel arch frames 21 is 50 cm. C20 concrete with a thickness of 28 cm is sprayed on the double-layer steel mesh 22. The pipe shed 3 is a large pipe shed with a pipe diameter of φ89-φ159mm and a circumferential spacing of 40cm. The steel pipe sections are 4m or 6m long and connected with threads. The thread length is not less than 150mm. The cross-lap length in the middle of the pipe shed 3 is not less than 5m, and the elevation angle is 5°-10°. The oblique grouting small guide tube 4 is 4.5m long, with a circumferential spacing of 80cm, a longitudinal spacing of 50cm, an oblique angle of 45°, and is arranged circumferentially with the pipe shed 3.

[0038] It also includes an annular drainage pipe (not shown), which is set in the water-rich filled cave 9 and within the range of 10m before and after, using a φ100 perforated corrugated pipe with a longitudinal spacing of 2m / channel, and is introduced into the drainage ditch of the tunnel 8; it also includes a reinforced concrete slab 6, which is set at the bottom of the tunnel 8 and spans the cave 9 area.

[0039] A construction method for a tunnel support structure comprises the following steps:

[0040] Step 1: Set up a cordon around the top of the water-rich cave 9 to prevent people and animals from approaching, take temporary interception and drainage measures to prevent rainwater from continuing to flow into the cave 9 and tunnel 8, and strengthen surface inspection and monitoring;

[0041] Step 2: The entrances and exits of both ends of the tunnel 8 are excavated simultaneously using the double side wall pilot method;

[0042] Step 3: After the excavation reaches the karst cave 9 area, slag backfill is used from both ends to form a construction platform to gradually approach the karst cave 9, and a temporary arch 5 is set at the entrance of the karst cave 9;

[0043] Step 4: excavate the pipe shed workshop 7, and use the pipe shed trolley to set up the large pipe shed 3 as advance support;

[0044] Step 5: Grouting of pipe shed 3; the grouting slurry adopts 1:1 cement slurry plus appropriate amount of water glass, and the grouting pressure is about 1.0Mpa;

[0045] Step 6: After the grouting of the pipe shed 3 is completed, the 9 sections of the cave are supplemented with oblique grouting small pipes 4 arranged in an annular direction and spaced apart from the leading large pipe shed 3;

[0046] Step 7: The small oblique grouting pipe 4 performs secondary grouting on the water-rich filling type cave 9 area, and the grouting adopts 1:1 cement slurry plus appropriate amount of water glass, and the grouting pressure is 0.5~1.0MPa;

[0047] Step 8: After the grouting of the small oblique grouting pipe 4 in each cycle is completed, the excavation and replacement of each frame can be carried out one by one. During the construction, monitoring, measurement and safety management should be strengthened to ensure construction safety.

[0048] It also includes step nine, which is to strengthen the drainage of tunnel 8 in the water-rich filled cave 9 and within the range of 10m before and after. The annular drainage pipe adopts φ100 perforated corrugated pipe with a longitudinal spacing of 2m / channel, and is introduced into the drainage ditch of tunnel 8; step ten, step ten is to use reinforced concrete slab 6 at the bottom of tunnel 8 to cross the cave 9 to avoid settlement of the tunnel in the later stage.

[0049] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A support structure for a tunnel passing through a water-rich karst cave, wherein the support structure is constructed synchronously on both sides of the tunnel, and is characterized in that: The support structure includes an entrance support structure and an exit support structure. The entrance support structure and the exit support structure are arranged in mirror symmetry with the center of the tunnel karst cave as the axis. The support structure includes secondary lining, initial support, large pipe shed, small oblique grouting conduit and temporary primary support arch from the inside to the outside of the tunnel face. The temporary primary support arch is arranged outside the entrance of the karst cave, and the top is connected to the surrounding rock at the top of the tunnel. The initial support is arranged inside the temporary primary support arch. The large pipe shed and the small oblique grouting conduit are arranged alternately between the initial support and the temporary primary support arch along the radial direction. The secondary lining is arranged inside the initial support to form an integral concrete arch structure with the temporary primary support arch. The initial support includes a steel arch frame and a double-layer steel mesh. The double-layer steel mesh is welded to the steel arch frame. The spacing between the steel arch frames is 50 cm. The double-layer steel mesh is sprayed with C20 concrete with a thickness of 28 cm. The large pipe shed has a pipe diameter of The circumferential spacing is 40cm, the steel pipe sections are 4m or 6m long, connected by threads, the thread length is not less than 150mm, the cross-lap length in the middle of the large pipe shed is not less than 5m, and the elevation angle is 5°-10°; the oblique grouting small pipe is 4.5m long, the circumferential spacing is 80cm, the longitudinal spacing is 50cm, the oblique angle is 45°, and the circumferential and large pipe sheds are arranged at intervals; it also includes an annular drainage pipe, which is set in the water-rich filled cave and within 10m before and after, using The perforated corrugated pipe has a longitudinal spacing of 2m / channel and is introduced into the tunnel drainage ditch. It also includes a reinforced concrete slab, which is set at the bottom of the tunnel and spans the cave area.

2. A construction method for a supporting structure of a tunnel passing through a water-rich filled cave as claimed in claim 1, characterized in that: The following steps are included: Step 1: Set up a cordon around the top of the water-rich cave to prevent people and animals from approaching, take temporary interception and drainage measures to prevent rainwater from continuing to flow into the cave and tunnel, and strengthen surface inspections and monitoring; Step 2: The entrances and exits of the tunnel are excavated simultaneously using the double sidewall pilot method; Step 3: After the excavation reaches the karst cave area, use slag backfill from both ends to form a construction platform to gradually approach the karst cave, and set up a temporary arch at the entrance of the karst cave; Step 4: Excavate the large pipe shed workshop and use the large pipe shed trolley to set up the large pipe shed as advance support; Step 5: grouting of the large pipe shed; the grouting slurry is a 1:1 cement slurry plus an appropriate amount of water glass, and the grouting pressure is about 1.0Mpa; Step 6: After the grouting of the large pipe shed is completed, the cave section is supplemented with oblique grouting small pipes arranged in an annular direction and spaced apart from the advanced large pipe shed; Step 7: Use a small oblique grouting pipe to perform secondary grouting on the water-rich filled cave area. The grouting uses a 1:1 cement slurry with an appropriate amount of water glass, and the grouting pressure is 0.5-1.0MPa; Step 8: After each cycle of oblique grouting is completed, the excavation and replacement of each frame can be carried out one by one. During the construction, monitoring, measurement and safety management should be strengthened to ensure construction safety.

3. A construction method for a supporting structure of a tunnel passing through a water-rich filled cave as claimed in claim 2, characterized in that: The method also includes step nine, wherein the tunnel drainage is strengthened in the water-rich filled cave and within the range of 10m before and after. The annular drainage pipe adopts Perforated corrugated pipes, with a longitudinal spacing of 2m / row, are introduced into the tunnel drainage ditch.

4. A construction method for a supporting structure of a tunnel passing through a water-rich filled cave as claimed in claim 3, characterized in that: The method further comprises step ten, wherein the step ten is to use a reinforced concrete slab at the bottom of the tunnel to span the cave to avoid settlement of the tunnel in the later stage.