An underground structure, prefabricated technology, applied in underwater structures, infrastructure engineering, water conservancy engineering and other directions, can solve the problems of high requirements for surrounding environment control, poor vision of underground space, and increased depth of foundation pits, etc. Realize the effect of industrialization promotion and application, improve waterproof performance and overall stress performance, and save construction period
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2019-08-02
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of underground engineering construction, and in particular relates to an assembled flat-roofed large-span column-free underground structure. Background technique
[0002] At present, the open excavation method is used to construct the underground structure with internal support foundation pit using the traditional cast-in-place reinforced concrete structure construction technology, the design process is complicated, and the workload is large; the on-site construction process requires a lot of labor of various types, and the construction environment is poor. , The construction process is complicated, the construction speed is slow, and it is greatly affected by various weather and climate, so the construction quality is difficult to guarantee. At the same time, a lot of abandoned construction waste will be generated during the construction process, which not only wastes resources but also pollutes the environ...
Examples
Embodiment 1
[0045] like Figure 1-2 As shown, this embodiment provides a prefabricated flat-roofed large-span column-free underground structure, including two enclosure structures 1, a flat-roof layer, a first layer and a first side wall prefabricated part 12, and the two enclosures Structure 1 is provided with a flat top floor and a first floor, both sides of the first floor are provided with first side walls, and the two ends of the flat top floor are respectively arranged on the two first side walls on both sides ; The first side wall comprises a first side wall prefabricated part 12, and the first side wall prefabricated part 12 comprises a vertical section 13, a horizontal section 14 and an oblique support section 15, and the bottom of the vertical section 13 is connected with the first laminate, and the vertical The top of the straight section 13 is connected with one end of the horizontal section 14, and the other end of the horizontal section 14 is connected with one end of the ob...
Embodiment 2
[0059] Such as Figure 4-6 As shown, this embodiment provides a connection structure between the prefabricated part and the cast-in-place concrete layer, which can be used when the first side wall in the first embodiment adopts a laminated structure, and the first layer adopts a fully cast-in-place or laminated structure The connection between the first side wall prefabricated part 12 and the first cast-in-place layer 11 or the first cast-in-place laminate can also be used for the second side wall to adopt a laminated structure, and the second laminate to adopt a fully cast-in-place or laminated structure. The connection between the second side wall prefabricated part 8 and the second layer slab cast-in-place layer or the reinforced concrete cast-in-place layer 5 during structure; For example, the connection structure between the first side wall prefabricated part 12 and the first cast-in-place laminate, the connection structure between the second side wall prefabricated part ...
Embodiment 3
[0068] This embodiment provides a prefabricated part-to-prefabricated connection structure, which can be used for the connection between the first ply prefabricated part 10 and the first ply prefabricated part 10 when the first ply board adopts a superimposed structure in the first embodiment. Connection, the connection between the second layer prefabricated part and the second layer prefabricated part when the second layer adopts the superimposed structure, the flat top layer prefabricated part 16 and the flat top layer prefabricated part 16 when the flat top layer adopts the superimposed structure The connection between; now take the connection structure of two first layer prefabricated parts 10 when the first layer board adopts a superimposed structure as an example to illustrate, the connection structure of two second layer board prefabricated parts, two flat top layer boards The connection structure of the prefabricated part 16 is the same as it, and will not be described ...