A drainage gallery structure for pressure pipes of a hydropower station

By designing a closed annular circular drainage gallery and a deep drainage hole system, the problems of complex construction and insufficient safety during TBM excavation of hydropower station pressure pipes were solved, achieving fast and safe drainage effects and reducing the risk around the pressure pipes. water table.

CN110284470BActive Publication Date: 2024-10-01POWERCHINA BEIJING ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910501349.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-11
Publication Date
2024-10-01
Estimated Expiration
2039-06-11

AI Technical Summary

Technical Problem

The existing hydropower station pressure pipe drainage corridor is complicated to construct and lacks safety during the new TBM excavation construction, making it difficult to meet the needs of rapid construction and efficient drainage.

Method used

Design a closed annular circular drainage corridor with drainage ditches and multiple deep drainage holes inside. The outlet of the deep drainage holes is connected to the drainage flower tube. The flower tube is wrapped with non-woven fabric for reverse filtration, and the water is directed to the drainage ditch at the bottom of the drainage corridor. A drainage corridor with a diameter of not less than 3m is formed through TBM excavation construction. Deep drainage holes are arranged along the axial direction, and the holes are inclined upward. The hole diameter and spacing are determined to be 76~110mm and 2~4m. The drainage flower tube is close to the inner wall of the corridor to divert water to outside the mountain.

Benefits of technology

It has achieved the requirements of adapting to the new TBM excavation construction, improved the structural stress conditions, has a wide range of applications, fast construction speed, high safety, and effectively reduced the groundwater level around the pressure pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110284470B_ABST
    Figure CN110284470B_ABST
Patent Text Reader

Abstract

The present invention discloses a drainage gallery structure for a pressure pipeline of a hydropower station. A closed annular drainage gallery is excavated in the pressure pipeline area. The drainage gallery adopts a circular cross-section. A drainage ditch is arranged at the bottom of the drainage gallery. A plurality of deep drainage holes communicating with the interior of the drainage gallery are arranged outside the drainage gallery. A drainage flower pipe is arranged at the outlet of the deep drainage hole. The drainage flower pipe is covered with a non-woven fabric filter. The end of the drainage flower pipe is inserted into the interior of the drainage gallery and connected with a drainage pipe. The drainage pipe leads water to the drainage ditch at the bottom of the drainage gallery. When groundwater is collected in the structure of the present invention, it is drained away by leading it to the drainage ditch at the bottom of the gallery through the drainage pipe. The structure has good stress conditions and is suitable for TBM excavation methods. It greatly improves the construction speed, is conducive to accelerating the construction progress, and reduces the groundwater around the pressure pipeline as soon as possible, which is beneficial to the safety of the pressure pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a drainage gallery of a hydropower station, in particular to a pressure pipeline drainage gallery structure of a hydropower station suitable for a high water pressure outside the pressure pipeline. Background Art

[0002] In the design of hydropower station pressure pipes, drainage corridors are usually set up in the pressure pipe area to reduce external water pressure and reduce pipe thickness. Drainage corridors are usually constructed by drilling and blasting, and the cross-section is generally in the shape of a city gate, and the corridor layout is generally not closed. In recent years, with the rapid development of tunnel excavation technology, the use of new TBM excavation methods has not only reduced the difficulty of excavation, accelerated the construction progress, but also improved construction safety. In order to adapt to this excavation method, a new type of drainage corridor layout is needed. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a hydropower station pressure pipeline drainage gallery structure, which has simple construction, advanced technology, wide applicability, can speed up the construction progress of the pressure pipeline drainage gallery, and improve construction safety.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a hydropower station pressure pipeline drainage corridor structure, a closed ring-shaped drainage corridor is excavated in the pressure pipeline area, the drainage corridor adopts a circular cross-section, a drainage ditch is arranged at the bottom of the drainage corridor, a plurality of deep drainage holes connected to the interior of the drainage corridor are arranged on the outside of the drainage corridor, a drainage flower pipe is arranged at the outlet of the deep drainage hole, the drainage flower pipe is wrapped with a non-woven fabric filter, the end of the drainage flower pipe is inserted into the drainage corridor and connected to a drainage pipe, and the drainage pipe leads water to the drainage ditch at the bottom of the drainage corridor.

[0005] The drainage gallery is arranged in a location where the groundwater level is high in the pressure pipeline area and is adjacent to the construction channel.

[0006] The drainage corridor is formed by TBM excavation and construction, and has a diameter of no less than 3m.

[0007] The deep drainage holes are arranged in at least one row along the axial direction of the drainage gallery, symmetrically arranged at a position of 110 to 130 degrees on the top arch of the drainage gallery, the deep drainage holes are inclined upward, the hole inclination is 20 to 30 degrees, the hole diameter is 76 to 110 mm, the depth is 30 to 50 m, and the spacing between two axially adjacent deep drainage holes is 2 to 4 m.

[0008] The drainage flower pipe has a diameter of 50 to 100 mm and a length of 0.2 to 0.5 m.

[0009] The drainage pipe is arranged close to the inner wall of the drainage gallery, and guides water to the drainage ditch at the bottom of the drainage gallery, and then drains it to the outside of the mountain, thereby lowering the groundwater level around the pressure pipe.

[0010] The deep drainage holes are in two rows, symmetrically arranged along the axial direction of the drainage gallery at positions of 110 to 130 degrees from the top arch.

[0011] The beneficial effects of the present invention are: the structure is adapted to the requirements of new TBM excavation construction, the structural stress condition is good, the adaptability is wide, the construction speed is fast, the construction safety is high, and it has the characteristics of high efficiency and safety in lowering the groundwater level around the pressure pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a plan view of the drainage gallery structure of the pressure pipeline of the hydropower station according to the present invention.

[0013] Figure 2 for Figure 1 AA section longitudinal section view (along the direction of the pressure pipe).

[0014] Figure 3 for Figure 1 BB cross-sectional view (perpendicular to the direction of the pressure pipe).

[0015] Figure 4 This is a typical cross-sectional view of the drainage gallery of the hydropower station pressure pipeline of the present invention.

[0016] Figure 5 This is a large-scale drawing of the drainage pipe. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments:

[0018] like Figure 1-5 As shown, the hydropower station pressure pipeline drainage gallery structure of the present invention excavates a closed annular drainage gallery 1 in the pressure pipeline 2 area, the drainage gallery 1 adopts a circular cross-section, a drainage ditch 6 is arranged at the bottom of the drainage gallery, a plurality of deep drainage holes 3 connected to the interior of the drainage gallery are arranged on the outside of the drainage gallery 1, a drainage flower pipe 4 is arranged at the outlet of the deep drainage hole 3, the drainage flower pipe 4 is wrapped with a non-woven fabric filter (not shown in the figure), the end of the drainage flower pipe 4 is inserted into the drainage gallery 2 and connected to a drainage pipe 5, and the drainage pipe 5 leads water to the drainage ditch 6 at the bottom of the drainage gallery.

[0019] The drainage gallery 1 is arranged in a location where the groundwater level is high in the pressure pipeline area and is close to the construction channel.

[0020] The drainage corridor 1 is formed by TBM excavation and construction, and has a diameter of not less than 3m.

[0021] The deep drainage holes 3 are arranged in at least one row along the axial direction of the drainage gallery 1, symmetrically arranged at the position of 110 to 130 degrees of the top arch of the drainage gallery 1, the deep drainage holes are inclined upward, the hole inclination is 20 to 30 degrees, the hole diameter is 76 to 110 mm, the depth is 30 to 50 m, and the spacing between two axially adjacent deep drainage holes is 2 to 4 m.

[0022] The drainage flower pipe 4 has a diameter of 50-100 mm and a length of 0.2-0.5 m.

[0023] The drainage pipe 5 is arranged close to the inner wall of the drainage gallery 1, and guides water to the drainage ditch 6 at the bottom of the drainage gallery, and then drains it to the outside of the mountain, thereby lowering the groundwater level around the pressure pipe.

[0024] Preferably, the deep drainage holes 3 are in two rows, symmetrically arranged along the axial direction of the drainage gallery 1 at positions of 110 to 130 degrees of the top arch.

[0025] The present invention excavates a closed annular drainage gallery in the pressure pipeline area, and the drainage gallery adopts a circular cross-section. Deep drainage holes are arranged in the drainage gallery, and drainage flower pipes are arranged at the outlets of the drainage holes. The flower pipes are covered with non-woven fabrics for anti-filtration. According to the law of groundwater seepage field, the layout of the pressure pipeline and the construction channel, it is determined that the drainage gallery in the structure of the present invention is selected in a position where the groundwater level in the pressure pipeline area is high and close to the construction channel, so as to play the role of the drainage gallery in lowering the groundwater level and ensuring the safety of the pressure pipeline. Combined with the requirements of TBM excavation construction, the pressure pipeline drainage gallery is arranged into a closed ring with a circular cross-section. The drainage gallery is formed by TBM excavation construction, and the diameter should be not less than 3m. The length of the drainage gallery and the radius of the semicircular part can be determined according to the layout of the pressure pipeline and the requirements of TBM excavation construction machinery. After the excavation and construction of the drainage gallery are completed, deep drainage holes are drilled in the drainage gallery to form a drainage system. The drainage hole is inclined upward (the hole is inclined by 20 to 30°), the hole diameter is 76 to 110mm, the depth is 30 to 50m, and the spacing between rows is 2 to 4m. A drainage flower pipe with a diameter of 50-100mm and a length of 0.2-0.5m is installed at the outlet of the drainage hole, and is covered with non-woven fabric for anti-filter. The drainage flower pipe is connected to a drainage pipe to lead the water to the drainage ditch at the bottom of the drainage corridor and then to the outside of the mountain, thereby lowering the groundwater level around the pressure pipe.

[0026] The embodiments described above are only used to illustrate the technical ideas and features of the present invention, and their purpose is to enable those skilled in the art to understand the contents of the present invention and implement them accordingly. The patent scope of the present invention cannot be limited only by this embodiment, that is, any equivalent changes or modifications made to the spirit disclosed by the present invention still fall within the patent scope of the present invention.

Claims

1. A hydropower station pressure pipeline drainage gallery structure, characterized in that: A closed annular drainage gallery (1) is excavated in the area of ​​the pressure pipeline (2). The drainage gallery (1) has a circular cross-section. A drainage ditch (6) is arranged at the bottom of the drainage gallery. A plurality of deep drainage holes (3) communicating with the interior of the drainage gallery are arranged outside the drainage gallery (1). A drainage flower pipe (4) is arranged at the outlet of the deep drainage hole (3). The drainage flower pipe (4) is wrapped with a non-woven fabric filter. The end of the drainage flower pipe (4) is inserted into the interior of the drainage gallery (1) and is connected to a drainage pipe (5). The drainage pipe (5) guides water to the drainage ditch (6) at the bottom of the drainage gallery. The drainage gallery (1) is formed by TBM excavation construction and has a diameter of not less than 3 m. The drainage pipe (5) is arranged close to the inner wall of the drainage gallery (1) to guide water to the drainage ditch (6) at the bottom of the drainage gallery and drain it to the outside of the mountain, thereby lowering the groundwater level around the pressure pipeline.

2. The hydropower station pressure pipeline drainage gallery structure according to claim 1 is characterized in that: The drainage gallery (1) is arranged at a location where the groundwater level is high in the pressure pipeline area and is close to the construction channel.

3. The hydropower station pressure pipeline drainage gallery structure according to claim 1 is characterized in that: The deep drainage holes (3) are arranged in at least one row along the axial direction of the drainage gallery (1), and are symmetrically arranged at a position of 110 to 130 degrees on the top arch of the drainage gallery (1). The deep drainage holes are inclined upwards, with a hole inclination of 20 to 30 degrees, a hole diameter of 76 to 110 mm, a depth of 30 to 50 m, and a row spacing of 2 to 4 m between two axially adjacent deep drainage holes.

4. The hydropower station pressure pipeline drainage gallery structure according to claim 1 is characterized in that: The drainage flower pipe (4) has a diameter of 50 to 100 mm and a length of 0.2 to 0.5 m.

5. The hydropower station pressure pipeline drainage gallery structure according to any one of claims 1 to 4, characterized in that: The deep drainage holes (3) are arranged in two rows, symmetrically along the axial direction of the drainage gallery (1) at positions of 110 to 130 degrees from the top arch.