Anchor bolt group assembly and installation mold and method

By designing anchor bolt cluster integrated assembly and installation molds, the precise positioning of anchor bolts is achieved by using the design of positioning holes and ribs, the problems of low installation efficiency and low accuracy in the prior art are solved, and construction efficiency and installation accuracy are improved.

CN110409854BActive Publication Date: 2024-11-22SHANXI WUJIAN GRP CO LTD
View PDF 16 Cites 0 Cited by

Patent Information

Application Number
CN201910811676.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-30
Publication Date
2024-11-22
Estimated Expiration
2039-08-30

AI Technical Summary

Technical Problem

In the prior art, anchor bolt installation has problems of low installation efficiency and low accuracy, which affects the installation accuracy of subsequent steel structures.

Method used

A anchor bolt cluster integrated assembly and installation mold is designed, including a rectangular frame, upper formwork and combined formwork. The precise positioning and fixing of anchor bolts is achieved through the design of positioning holes and ribs. The integrated control assembly and installation process is adopted to simplify vertical control process.

Benefits of technology

The installation accuracy and construction efficiency of anchor bolts are improved, time costs are reduced, and favorable conditions are created for the subsequent precise installation of steel structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110409854B_ABST
    Figure CN110409854B_ABST
Patent Text Reader

Abstract

The present invention relates to an integrated assembly and installation mold for a group of anchor bolts, wherein a threaded section is arranged on the anchor bolt, and the mold comprises a rectangular frame, an upper template and a combined template, wherein the combined template comprises a middle template, a rib plate and a lower template, wherein the rib plate is vertically connected between the middle template and the lower template so that the middle template and the lower template are parallel to each other, and the upper template, the middle template and the lower template are provided with a plurality of corresponding positioning holes according to the design position of the anchor bolt, wherein the diameter of the positioning hole is greater than the outer diameter of the threaded section of the anchor bolt by 0.5 mm, and the combined template is fixed on the frame according to the height of the threaded section of the anchor bolt. The present invention adopts an integrated control assembly and installation process, and simplifies the cumbersome verticality control process by pre-positioning the anchor bolt group, improves the construction speed, reduces the time cost investment, creates favorable conditions for the subsequent precise installation of the steel structure, improves the construction efficiency, and saves the construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of construction, and in particular relates to an assembly and installation mold for a group of anchor bolts. Background Art

[0002] At present, there are two methods for installing anchor bolts in steel structures: one is single-layer template bulk installation, and the other is double-layer template installation. These methods have the disadvantages of low installation efficiency and low installation accuracy. Single-layer template bulk installation requires positioning and correction of each bolt in turn, which is cumbersome to construct, and it is not easy to ensure the installation quality and the installation accuracy is low; double-layer steel plate mold assembly is relatively convenient, but the two-layer template has one layer on the processed screw thread segment and the other layer on the unprocessed rough surface screw segment. Due to the different straightness of each bolt, there are different degrees of deviation. After the steel bar is welded and assembled, the relative size deviation and verticality deviation of the bolt screw segment and the thread segment are difficult to control, and the assembly accuracy is relatively low, which directly affects the installation positioning accuracy of the bolt, making the installation accuracy of subsequent steel columns and other structures low, and even worse, treatment measures need to be taken when installing steel components.

[0003] During on-site installation, it is necessary to measure and correct the verticality of the control bolts and perform elevation control operations. Since the verticality deviation of each bolt is large and the deviation after the bolt is positioned is large, when the installation requires precision, it is necessary to measure multiple bolts and use the leveling method to solve the problem. Then, steel bars are used to reinforce and stabilize them. The process is relatively cumbersome and the installation efficiency is low. Summary of the invention

[0004] The invention provides an anchor bolt group assembly and installation mold, aiming to solve the technical problem that the installation accuracy of the anchor bolts is low and the subsequent construction is affected.

[0005] To solve the above problems, according to one aspect of the present invention, there is provided an assembly and installation mold for a group of anchor bolts, wherein a threaded section is arranged on the anchor bolt, the mold comprises a rectangular frame, an upper template and a combined template, the combined template comprises a middle template, a rib plate and a lower template, the upper template, the middle template and the lower template are provided with a number of corresponding positioning holes according to the design position of the anchor bolt, the diameter of the positioning hole is larger than the outer diameter of the threaded section of the anchor bolt by 0.5 mm; the rib plates are vertically connected between the middle template and the lower template so that the middle template and the lower template are parallel to each other, the center lines of the corresponding positioning holes coincide, and the combined template is fixed on the frame according to the height of the threaded section of the anchor bolt.

[0006] Furthermore, the upper template and the lower template are located at the threaded section of the anchor bolts, and the middle template and the lower template are connected and fixed by two ribs according to the arrangement of the positioning holes.

[0007] Furthermore, a support with bolt holes is provided on the frame, and the middle layer formwork and the lower layer formwork are fixed to the support bolts through the corresponding bolt holes.

[0008] Furthermore, the frame includes two side vertical brackets made of square steel pipes and a bottom horizontal tie rod made of angle steel.

[0009] Furthermore, the ribs, middle formwork and lower formwork are made of 6 mm thick steel plates.

[0010] Furthermore, the upper formwork is made of flat bamboo plywood.

[0011] Furthermore, a cross control line is arranged on the upper template.

[0012] According to another aspect of the present invention, a method for assembling and installing a group of anchor bolts is also provided, and the above-mentioned assembly and installation mold for the group of anchor bolts is used for construction, and the construction steps include: S1: inserting each threaded section of the anchor bolt into the positioning hole of the mold and screwing a nut on the part that passes through the upper plane of the middle template; S2: adjusting the nut to control the length of the threaded section of the anchor bolt exposed on the upper plane of the upper template, so that the tops of the anchor bolt group are in the same plane; S3: spot welding the fixed steel bars to the upper and lower layers of each anchor bolt, so that the anchor bolt group forms an overall non-deformable structure; S4: Unscrew the nuts and remove the anchor bolts; S5: transport the anchor bolts to the construction work surface, and hoist the assembled anchor bolts and the upper formwork with a cross control line as a whole onto the foundation; S6: use the installation cross control line of the upper formwork to position the anchor bolts, control the elevation, level the upper surface, and level the top of the bolts; S7: use steel bar spot welding to support the vertical support steel bars, and then support four oblique support steel bars on the four sides, and then lay and tie the bottom plate steel bars, and spot weld them to the bottom plate steel bars firmly; S8: fill the concrete, and after the concrete solidifies and passes the inspection, proceed with the subsequent steel column installation.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] The present invention adopts an integrated control assembly and installation process, and by pre-positioning the anchor bolt group, simplifies the cumbersome verticality control process, improves the construction speed, reduces the investment in time cost, creates favorable conditions for the subsequent precise installation of the steel structure, improves construction efficiency, and saves construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a top view of the mold provided by the present invention.

[0016] Figure 2 The mold main view provided by the present invention Figure 1 .

[0017] Figure 3 The mold main view provided by the present invention Figure 2 .

[0018] Figure 4 The supporting structure provided by the present invention Figure 1 .

[0019] Figure 5 The supporting structure provided by the present invention Figure 2 .

[0020] Figure 6 This is a structural diagram of the upper template provided by the present invention.

[0021] Figure 7 This is an installation diagram of the anchor bolt group provided by the present invention.

[0022] 1-anchor bolts, 2-frame, 3-upper formwork, 4-combined formwork, 5-positioning holes, 6-vertical supporting steel bars, 7-inclined supporting steel bars, 8-bottom plate steel bars, 9-fixed steel bars, 11-threaded sections, 21-supports, 22-vertical brackets, 23-pull rods, 31-cross control lines, 41-middle formwork, 42-ribs, 43-lower formwork. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0024] A typical embodiment of the present invention provides an assembly and installation mold for anchor bolt clusters. A threaded section 11 is provided on the anchor bolt 1. The assembly and installation mold for anchor bolt clusters includes a rectangular frame 2, an upper template 3 and a combined template 4. The combined template 4 includes a middle template 41, a rib 42 and a lower template 43. The upper template 3, the middle template 41 and the lower template 43 are provided with a number of corresponding positioning holes 5 according to the design position of the anchor bolt 1. The diameter of the positioning hole 5 is 0.5 mm larger than the outer diameter of the threaded section 11 of the anchor bolt. The rib 42 is vertically connected between the middle template 41 and the lower template 43 so that the middle template 41 and the lower template 43 are parallel to each other, and the center lines of the corresponding positioning holes 5 coincide. The combined template 4 is fixed on the frame 2 according to the height of the threaded section 11 of the anchor bolt. Figure 1 , 2As shown in Figure 3, in a specific embodiment, the anchor bolt 1 is a machined part, and the bolt thread section 11 has coaxiality during the processing, while the part below the thread section 11 is raw material and has not been processed and corrected for straightness. According to the design position of the anchor bolt 1 hole at the bottom of the steel column to be fixed, the anchor bolts 1 are arranged and fixed in order according to the above design position to form an anchor bolt group. The integrated installation of the anchor bolt group can reduce construction time and improve construction efficiency. According to the design plane layout and spacing requirements of the anchor bolt group, the templates used for the upper template 3 and the combined template 4 are drilled uniformly, and the diameter of the positioning hole 5 is 0.5mm larger than the outer diameter of the anchor bolt thread section 11. For example, the M24 anchor bolt 1 is drilled with a 24.5 drill bit, and the processing accuracy deviation of any hole spacing of the control template is controlled to be no more than 1mm. When assembling the bolts, the upper template 3 and the combined template 4 are placed on the top of the frame 2 in parallel with each other at a certain distance, using the principle that the position of the threaded section 11 of the anchor bolt 1 during the processing is the coaxiality of the machining, and the corresponding positioning holes 5 at the same position are respectively inserted into the threaded sections 11 of the anchor bolts 1, and the threaded sections 11 passing through the upper plane of the middle template 41 are inserted into the matching nuts. The positions of the anchor bolts 1 are adjusted by the nuts so that the tops of the bolt groups are in the same plane. After the anchor bolts 1 in the anchor bolt group meet the designed positions, the bottom of the anchor bolt group is welded and fixed as a whole. By pre-positioning the anchor bolt group, the verticality and relative position of the anchor bolt group can be guaranteed, thereby improving the overall construction quality, improving the construction efficiency, and saving the construction cost.

[0025] In a preferred embodiment, the upper template 3 and the lower template 43 are located at the threaded section of the anchor bolts.

[0026] The middle template 41 and the lower template 43 are connected and fixed by two ribs 42 according to the arrangement of the positioning holes 5. The ribs 42 are made of 6mm thick flat steel plates. The middle template 41 and the lower template 43 are connected by two ribs 42, which can prevent the middle template 41 and the lower template 43 from deflecting, and form a stable structural system, which also acts as a crossbeam. It can also improve the overall stability of the combined template 4, thereby improving the overall positioning accuracy of the mold to the anchor bolt group.

[0027] In a preferred embodiment, a support 21 with bolt holes is provided on the frame 2, and the middle template 41 and the lower template 43 are bolted to the support 21 through corresponding bolt holes. Figure 4 , 5 As shown, the support 21 is used for fixing, so the mold as a whole can be easily installed and disassembled, which improves the construction efficiency, and the material turnover rate is high, which can save construction costs.

[0028] In a preferred embodiment, the frame 2 includes two vertical brackets 22 made of square steel pipes and a bottom horizontal tie rod 23 made of angle steel. When the frame 2 is manufactured, the installation welding position and size of the connectors must be accurate. The use of square steel pipes to manufacture the two vertical brackets 22 can improve the overall stability and reliability of the frame 2. The use of angle steel to manufacture the bottom horizontal tie rod 23 can further improve the overall firmness of the mold, thereby improving the positioning accuracy of the anchor bolt group.

[0029] In a preferred embodiment, the ribs 42, the middle template 41 and the lower template 43 are made of 6 mm thick steel plates.

[0030] In a preferred embodiment, the upper template 3 is made of flat bamboo plywood. Bamboo plywood of different thicknesses is selected according to the size of the template. If the distance between the outermost ends of the bolt group to be assembled is large and the template area needs to be large, a thicker bamboo plywood is selected. Otherwise, a thinner bamboo plywood is selected. Common thickness specifications include 10mm, 12mm, and 15mm. The selection is reasonable according to the needs to ensure that the rigidity of the bamboo plywood meets the use requirements and the board surface is flat. At the same time, when the board is installed as a whole on the anchor bolt group at the construction site, it is easy to carry, the labor intensity of the construction operation is low, and the operation is convenient.

[0031] In a preferred embodiment, a cross control line 31 is provided on the upper template 3. Figure 6 As shown, by using the installation cross control line 31 of the upper template 3, the anchor bolt group can be positioned, the elevation can be controlled, the upper surface can be leveled, and the top of the bolt can be leveled in the subsequent construction.

[0032] like Figure 7 As shown, another typical embodiment of the present invention provides a method for assembling and installing a group of anchor bolts, which is constructed by using the above-mentioned assembly and installation mold for the group of anchor bolts. The construction steps include: S1: inserting each anchor bolt thread segment 11 into the positioning hole 5 of the mold and screwing a nut on the flat part of the middle template 41; S2: adjusting the nut to control the length of the anchor bolt thread segment 11 exposed on the flat surface of the upper template 3, so that the tops of the anchor bolt group are in the same plane; S3: spot welding the fixing steel bars 9 to the upper and lower layers of each anchor bolt 1, so that the anchor bolt group forms an overall non-deformable structure; S4: Then unscrew the nuts and remove the anchor bolt group; S5: transport the anchor bolt group to the construction work surface, and hoist the assembled anchor bolt group and the upper formwork 3 with a cross control line 31 as a whole on the foundation; S6: use the installation cross control line 31 of the upper formwork 3 to position the anchor bolt group, control the elevation, level the upper surface, and level the top of the bolt; S7: use steel bar spot welding to support the vertical support steel bars 6, and then support four oblique support steel bars 7 on the four sides, and then lay and tie the bottom plate steel bars 8, and spot weld them to the bottom plate steel bars 8 to secure them; S8: fill the concrete, and after the concrete solidifies and passes the inspection, proceed with the subsequent steel column installation.

[0033] The idea of ​​the present invention is to design a mold-type formwork device, which is used to assemble the embedded bolts into a bolt group that meets the construction design requirements and has accurate bolt spacing dimensions, and is connected by welding with steel bars to form a stable and non-deformed integrated unit, which is transported to the installation site for positioning and installation. During installation, the cross control line 31 drawn by the upper mold is used for positioning and checking the horizontal plane and elevation of the top of the bolt group, and then vertical steel support and four-corner oblique steel support are used to reinforce and stabilize, thereby achieving the purposes of high installation accuracy, convenient construction, and high construction efficiency.

[0034] The present invention adopts an integrated control assembly and installation process. Compared with the traditional installation method, the use of the mold greatly improves the installation accuracy of the anchor bolt 1; simplifies the cumbersome verticality control process, improves the construction speed, reduces the time cost investment, and creates favorable conditions for the subsequent precise installation of the steel structure.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for assembling and installing a group of anchor bolts, characterized in that: The construction is carried out by using an anchor bolt group assembly and installation mold, and a threaded section is arranged on the anchor bolt. The anchor bolt group assembly and installation mold comprises a rectangular frame, an upper template and a combined template, and the combined template comprises a middle template, a rib plate and a lower template. The upper template, the middle template and the lower template are provided with a number of corresponding positioning holes according to the design position of the anchor bolt, and the diameter of the positioning hole is greater than the outer diameter of the threaded section of the anchor bolt by 0.5 mm; the rib plate is vertically connected between the middle template and the lower template so that the middle template and the lower template are parallel to each other, and the center lines of the corresponding positioning holes coincide, and the combined template is fixed on the frame according to the height of the threaded section of the anchor bolt; The upper template and the lower template are located at the threaded section of the anchor bolts, and the middle template and the lower template are connected and fixed by two ribs according to the arrangement of the positioning holes; The frame is provided with a support with bolt holes, and the middle layer template and the lower layer template are fixed with support bolts through corresponding bolt holes; The frame includes two vertical brackets on both sides made of square steel pipes and a bottom horizontal tie rod made of angle steel; The upper template is provided with a cross control line; The ribs, middle and lower templates are made of 6mm thick steel plates; The upper template is made of flat bamboo plywood; The construction steps include: S1: insert each threaded section of the anchor bolt into the positioning hole of the mold and screw a nut on the flat portion of the middle template; S2: Adjust the nut to control the length of the anchor bolt threaded section exposed on the upper template plane, so that the top of the anchor bolt group is in the same plane; S3: The fixed steel bar is spot welded to each of the upper and lower layers of the anchor bolts, so that the anchor bolt group forms an overall non-deformed structure; S4: Unscrew the nuts and remove the anchor bolts; S5: The anchor bolt group is transported to the construction work surface, the assembled anchor bolt group and the upper template with a cross control line are hoisted as a whole on the foundation base; S6: Use the installation cross control line of the upper template to locate the anchor bolt group, control the elevation, level the upper surface, and level the top of the bolt; S7: Use steel bar spot welding to support vertical support steel bars, and then support four oblique support steel bars on all four sides, and then lay and tie the bottom plate steel bars, and spot weld them firmly with the bottom plate steel bars; S8: Fill the concrete, and after the concrete solidifies and passes the inspection, proceed with the subsequent steel column installation.

Citation Information

Patent Citations

  • Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof

    CN103174166A

  • Steel structure building construction method for one-step pre-burying of foundation bolts

    CN104695557A

  • Construction method for raft plate basic high-precision overall pre-embedded large-diameter bolt group structure

    CN104895101A

  • Equipment foundation bolt group installation method

    CN108222056A

  • Double-layer positioning mold made of waste wooden rubber plates for embedding anchor bolt