A special purge system suitable for online repair of multi-diameter assembled cold insulation structures

Through the combination of nitrogen purge system and atomization device, the problem of frosting on the surface of the pipeline in online repair of LNG pipelines is solved, and the effect of zero icing and zero frost is achieved, which improves the safety and economicality of the repair. It is suitable for multiple Repair of low-temperature pipelines of type pipe diameter.

CN110630904BActive Publication Date: 2024-11-05CNOOC GAS & POWER GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910973004.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-14
Publication Date
2024-11-05
Estimated Expiration
2039-10-14

AI Technical Summary

Technical Problem

During the online repair of LNG pipes, the surface of the pipe is prone to frosting after the old cold-insulating material is removed, resulting in loss of cold volume and difficulty in installation. Existing methods such as rag wiping and pouring organic solvents have safety hazards and insufficient economicality, making it difficult to achieve large-scale online repair. .

Method used

Using a nitrogen purge system, the purge assembly connected by a metal hose and a shunt is used to continuously purge the pipe surface using a nitrogen source, and the organic solvent is introduced in combination with the atomization device to achieve the effect of "zero icing" and "zero frost". .

Benefits of technology

It realizes zero icing and zero frost on the surface of LNG pipelines without stopping, improves the safety and economy of online repair, and is suitable for low-temperature pipeline repair of multiple pipe diameters, and is suitable for large-scale engineering applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110630904B_ABST
    Figure CN110630904B_ABST
Patent Text Reader

Abstract

The present invention discloses a special purging system suitable for online repair of multi-diameter assembled cold-insulation structures. The purging system includes a purging tool; the purging tool includes several groups of purging components; each group of purging components includes an arc-shaped pipe fitting formed by a metal hose, and several diverters are provided on the arc-shaped pipe fitting, and the branches of the diverter are respectively connected to the metal connecting hose, and the other end of the metal connecting hose is connected to the purging nozzle; after the several arc-shaped pipe fittings are connected, they are connected to a pipeline through a handle, and the pipeline is connected to the gas source. The present invention is easy to assemble, flexible to adjust, and easy to control. It is suitable for pipelines to be repaired with various diameters, improves the convenience of tool operation, and is equipped with an integrated atomizing device to introduce organic solvents, so as to achieve thorough and rapid defrosting and deicing during the purging process; the present invention is not only suitable for LNG pipelines, but also other low-temperature pipelines and devices, and can be promoted and used in other low-temperature and deep-cold fields.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a special purge system suitable for online repair of a multi-diameter assembled cold-insulation structure, belonging to the technical field of low-temperature deep-cold. Background Art

[0002] my country's LNG industry is developing rapidly. The LNG pipeline insulation layers of many LNG receiving stations that have been put into operation in China have been damaged to varying degrees. Some equipment and pipelines have been frosted, frozen, deformed, and cracked, which has increased energy consumption and increased corrosion of equipment and pipelines, and urgently needs to be repaired and replaced. Scientifically diagnosing and evaluating the insulation performance of the LNG pipeline insulation layer and repairing the insulation structure on the existing basis, especially online repair technology without stopping production, is particularly critical.

[0003] During the online repair process of LNG pipelines, after the old cold insulation material is removed, in a natural state, if no operation is performed, a layer of frost will appear on the exposed pipeline surface within 1 minute, forming a cold bridge between the exposed pipeline and the new cold insulation material, causing cold loss. What's more, too thick frost is not conducive to the installation of new cold insulation materials, resulting in gaps, and the cold insulation effect is worse than before the repair. Therefore, how to control the zero frost on the surface of the LNG pipeline during the entire repair process, especially during the interval between the removal of the old cold insulation material and the installation of the new cold insulation material on the inner layer of the pipeline, is a technical key point in the online repair of the cold insulation structure.

[0004] At present, the commonly used methods at receiving stations mainly use simple rag wiping or pouring or wiping organic solvents such as anhydrous ethanol on the pipeline surface, but there are many disadvantages, such as poor rag wiping effect, ice particles solidified on the pipeline surface cannot be wiped off, and the effect of defrosting cannot be achieved; organic solvents are volatile, harmful to the human body, flammable, and have safety hazards. They are expensive and are not suitable for repairing and replacing large sections of pipeline cold insulation structures. These methods can only be used for local repairs of pipelines. In terms of safety, reliability and economy, they cannot be applied in large-scale engineering projects at receiving stations.

[0005] Therefore, it is particularly important to develop a dedicated repair device to achieve online control and form a control method that is safe, reliable, economical and suitable for large-scale online repair at the receiving station. Summary of the invention

[0006] The purpose of the present invention is to provide a special purging system suitable for online repair of multi-diameter assembled cold-insulation structures. In a non-stop state, nitrogen is used as a gas source to continuously purge the pipeline to be repaired, so that no frost forms on the surface of the low-temperature pipeline during the entire repair process, thereby achieving the purpose of "zero ice" and "zero frost" in the entire online disassembly and repair process.

[0007] The present invention provides a special purge system suitable for online repair of a multi-diameter assembled cold-insulation structure, including a purge tool;

[0008] The purge tool includes several groups of purge components;

[0009] Each group of the purge components comprises an arc-shaped pipe formed by a metal hose, and a plurality of flow dividers are arranged on the arc-shaped pipe, and the branches of the flow dividers are respectively connected to metal connecting hoses, and the other end of the metal connecting hose is connected to the purge nozzle;

[0010] After being connected, a plurality of arc-shaped pipes are connected to a pipeline through a handle, and the pipeline is connected to a gas source.

[0011] In the above-mentioned online repair dedicated purge system, a plurality of the arc-shaped pipes are connected by short joints and then connected to the handle.

[0012] In the above-mentioned online repair dedicated purge system, the diverter includes two branches, each of which is provided with a switch valve, which can realize single-channel independent control, so that the number of the purge nozzles actually working can be flexibly adjusted.

[0013] In the above-mentioned online repair dedicated purge system, the pipeline is a hose.

[0014] In the above-mentioned online repair dedicated purge system, a valve is provided on the handle for adjusting the purge gas volume.

[0015] In the above-mentioned online repair dedicated purge system, the gas source is a nitrogen gas source, which is used to block the contact between humid air and the pipeline to be repaired in a short period of time, to prevent the air from condensing into frost quickly on the surface of the LNG pipeline due to heavy moisture, to further protect the surface of the pipeline to be repaired, and to enhance the purge effect.

[0016] In the above-mentioned online repair dedicated purge system, the diverters are evenly arranged.

[0017] In the above-mentioned online repair dedicated purge system, the purge nozzle is made of an organic composite material or an aluminum alloy material;

[0018] The purge nozzle is flat, and has 1 to 3 air outlets at the bottom, and each row of the air outlets includes 5 to 15 air outlets.

[0019] In the above-mentioned online repair dedicated purge system, the central angle corresponding to the arc-shaped pipe fitting is 270-360 degrees.

[0020] In the dedicated online repair purging system of the present invention, the arc-shaped pipe fitting is formed by a metal hose, is resistant to bending, and can be shaped. The diameter of the circular ring can be adjusted according to the size of the pipeline to be repaired, thereby adjusting the annular size of the purging assembly to match pipelines to be repaired with various diameters.

[0021] In the dedicated purge system for online repair of the present invention, the number of groups of the purge components can be increased or decreased according to the single repair length of the pipeline to be repaired.

[0022] In the online repair special purge system of the present invention, the metal connecting hose can be replaced with different length specifications according to actual needs. Generally speaking, during the purge process of removing the original cold insulation structure, the frost and ice at the bottom of the pipeline are more serious than other parts, and the length of the metal connecting hose at the bottom can be appropriately increased.

[0023] The metal connecting hose has certain flexibility, which is convenient for temporarily adjusting the blowing distance and the air outlet direction, so that it can be matched with pipelines to be repaired with different diameters.

[0024] The dedicated purge system for online repair of the present invention further comprises an atomizing device;

[0025] The atomizing device comprises a solvent storage tank, the solvent storage tank is connected to the handle, and a solvent regulating valve is arranged on the connected pipeline to control the injection amount of the organic solvent;

[0026] A nitrogen booster valve is provided on the upper portion of the solvent storage tank;

[0027] The solvent storage tank is connected to the handle through the nitrogen boost valve and the boost ventilation hose (nitrogen is introduced into the solvent storage tank through the boost ventilation hose to boost the solvent storage tank).

[0028] The atomizing device uses an organic solvent as a medium, and the organic solvent is injected into the purge assembly through a differential pressure filling device, and then sprayed on the pipe surface after atomization. The organic solvent is volatile, and absorbs moisture from the air and the pipe surface during evaporation, accelerating the elimination of moisture or frost particles on the surface of the pipe to be repaired, while reducing the humidity of the surrounding air and enhancing the purge effect.

[0029] The circular arc pipe of the online repair special purge system of the present invention can flexibly adjust the diameter of the circular ring, thereby adjusting the annular size of the purge component to match the pipelines to be repaired with various diameters.

[0030] The number of groups of purge components in the online repair dedicated purge system of the present invention can be increased or decreased according to the single repair length of the pipeline to be repaired.

[0031] The metal connecting hose in the online repair special purge system of the present invention can be replaced with different length specifications according to actual needs. The metal connecting hose has a certain flexibility, which is convenient for temporarily adjusting the purge distance and the air outlet direction, so that it can be used in conjunction with pipelines to be repaired with different diameters.

[0032] The atomizing device in the special purge system for online repair of the present invention can be removed or replaced as needed.

[0033] The present invention has the following beneficial effects:

[0034] 1. The special purge system for online repair of multi-diameter assembled flexible cold-insulation structures provided by the present invention has good purge effect, achieving the goals of "zero ice" and "zero frost" during online disassembly and repair, making the online repair technology of cold-insulation structures feasible;

[0035] 2. The invention is easy to assemble, flexible to adjust, and convenient to control. It is applicable to pipelines to be repaired with various diameters, improves the convenience of tool operation, and is equipped with an integrated atomizing device to introduce organic solvents, so as to achieve thorough and rapid defrosting and deicing during the purging process;

[0036] 3. The present invention is not only applicable to LNG pipelines, but also to other cryogenic pipelines and devices, and can be promoted and used in other cryogenic and deep-refrigeration fields. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is an overall schematic diagram of the special purge system for online repair of the present invention;

[0038] Figure 2 Schematic diagram of a purge assembly of a dedicated purge system for online repair of the present invention;

[0039] Figure 3 It is a schematic diagram of the structure of a metal hose of a special purge system for online repair of the present invention;

[0040] Figure 4 It is a schematic diagram of the structure of the purge nozzle of the online repair special purge system of the present invention;

[0041] Figure 5 The present invention is a flowchart of using the dedicated online repair purge system to repair the cold insulation structure of the LNG pipeline.

[0042] The marks in the figure are as follows:

[0043] 1 Purge tool; 2 Hose; 3 Nitrogen gas source; 4 Pipeline to be repaired; 5 Purge device; 6 Atomizer; 7 Main control valve; 8 Handle; 9 Short pipe; 10 Tee; 11 Purge assembly; 12 Metal hose; 13 Diverter; 14 Metal connecting hose; 15 Purge nozzle; 16 Switch valve; 17 Solvent storage tank; 18 Nitrogen booster valve; 19 Solvent regulating valve; 20 Pressurized ventilation hose. DETAILED DESCRIPTION

[0044] The present invention will be further described below with reference to the accompanying drawings, taking a DN150 pipeline to be repaired as an example.

[0045] like Figure 1 As shown, the present invention provides a special purge system suitable for online repair of a multi-diameter assembled flexible cold-insulating structure, including a purge tool 1, a hose 2, a nitrogen gas source 3 and other structures.

[0046] The purging tool 1 includes a purging device 5, an atomizing device 6, a main control valve 7, and a handle 8. The purging device 5 includes three groups of purging components 11, which are connected by a short pipe 9. In this embodiment, the distance between two adjacent groups of purging components 11 is 200 mm, and the number of purging components can be appropriately increased or decreased according to the single repair length of the pipe section to be repaired.

[0047] like Figure 2 As shown, each group of purge components 11 is an arc-shaped pipe formed by a metal hose 12, on which 5 groups of two-way flow dividers 13 with switches are evenly arranged, and each group of flow dividers 13 is connected to two purge nozzles 15 through two metal connecting hoses 14. Figure 3 As shown, the length of the metal hose 12 is 1440 mm, the diameter of the ring is 550 mm, and the curvature is 270°. The metal hose 12 is resistant to bending and can be shaped. Its diameter and curvature can be flexibly adjusted according to the diameter of the pipeline 4 to be repaired. Each diverter 13 is divided into two branches, and both branches are equipped with independent switch valves 16, which can realize single-way independent control, thereby flexibly adjusting the number of purge nozzles 15 actually working.

[0048] like Figure 1 As shown, a main control valve 7 is installed on the handle 8 of the online repair special tool, which can adjust the purge gas volume for easy control.

[0049] like Figure 1 As shown, the atomizing device 6 includes a solvent storage tank 17, which is connected to the handle 8, and a solvent regulating valve 19 is provided on the connected pipeline to control the injection amount of the organic solvent (such as ethanol). A nitrogen booster valve 18 is provided on the upper part of the solvent storage tank 17. The solvent storage tank 17 is also connected to the three-way 10 of the handle 8 through a booster ventilation hose 20. The atomizing device 6 of the present invention can be used to introduce anhydrous ethanol, such as Figure 1As shown, the atomizing device 6 controls the nitrogen injection amount through the upper nitrogen booster valve 18 and thus controls the pressure in the solvent storage tank 17, and controls the anhydrous ethanol injection amount through the bottom manual valve solvent regulating valve 19.

[0050] like Figure 1 As shown, except for the switch valve 16, the purge nozzle 15 and mechanical parts, all other parts of the purge device 5 are made of aluminum alloy, which has low density and light structure.

[0051] like Figure 1 , Figure 2 , Figure 3 As shown, the diverter 13 and the purge nozzle 15 are connected by a metal connecting hose 14. Each metal connecting hose is 100 mm long and can be replaced with different length specifications according to needs; and it has a certain flexibility, which is convenient for temporary adjustment of the purge distance and air outlet direction, so that it can be matched with pipelines to be repaired with different diameters.

[0052] like Figure 4 As shown, the purge nozzle 15 is a purchased part, and its size, purge cross-section and purge area are different, which need to be referred to when designing the number of diverters and the number of purge component groups.

[0053] The wind force parameters of the purge nozzle can be found in Table 1. The data in the table are values ​​under 5 bar air pressure:

[0054] Table 1 Purge nozzle wind parameters

[0055]

[0056] In Table 1, AF represents the blowing distance, L represents the length of the wind curtain, W represents the width of the wind curtain, and S represents the corresponding wind speed.

[0057] Adopt the special purge system of the present invention, according to Figure 5 The flowchart shown in the figure repairs the cold insulation structure of the LNG pipeline, taking the cold insulation structure of the low-temperature pipeline with a pipe diameter of DN100 as an example:

[0058] 1. When evaluating the insulation performance of the insulation structure of the LNG pipeline to be repaired, the old insulation scheme was designed with reference to the insulation layer thickness method for preventing condensation in GB / T8174-2008 "Testing and Evaluation of Thermal Insulation Effects of Equipment and Pipelines". According to the original design parameters of the pipeline collected on site and the operating parameters such as temperature, flow, pressure of the medium transported in the pipeline to be repaired, as well as the environmental parameters around the pipeline, the measured surface temperature was converted to the surface temperature under the design conditions, which was 25.2°C, which was about 3°C ​​lower than the dew point temperature of 28.3°C under the design conditions. This indicates that the insulation performance of the insulation structure of the pipeline to be repaired no longer meets the insulation design requirements of the pipeline, and the insulation structure needs to be repaired.

[0059] 2. When redesigning the insulation for this part, refer to GB / T8175-2008 "Guidelines for Thermal Insulation Design of Equipment and Pipelines" to select insulation materials and design insulation thickness as follows:

[0060] 1) Selection of cold insulation materials: Use rigid polyurethane (PIR for short) as the cold insulation material. The thermal conductivity of PIR material is 0.029 W / (m*k)@25℃ and the use density is 50kg / m 3 , compressive strength ≥0.22MPa, oxygen index greater than 28.

[0061] 2) Design of cold insulation thickness: The cold insulation thickness is calculated using the anti-condensation cold insulation layer thickness method, as follows:

[0062] (1)

[0063] (2)

[0064] Where: D 0 —Outer diameter of the pipe, m; D 1 —Outer diameter of the cold insulation layer, m; λ—Thermal conductivity of the cold insulation material, W / (m*k); t s —Outer surface temperature of the cold insulation layer, °C; t a —ambient temperature, °C; t—medium temperature, °C; δ—thickness of cold insulation layer, m; a s —Heat exchange coefficient between the outer surface of the cold insulation layer and the atmosphere, W / (m 2 *K).

[0065] The specification of the pipeline to be repaired is Φ108*4, the medium temperature is -196℃, and the surface heat dissipation coefficient is 8.141 W / (m 2 *K), the dew point temperature under design conditions is 28.3℃. According to the principle that the surface temperature under design conditions is 1.5-3℃ higher than the dew point temperature, the required PIR material thickness is calculated to be 110mm.

[0066] In order to facilitate construction, the required cold insulation material PIR is prefabricated into a tube shell shape. The cylindrical tube shell is symmetrically divided into two pieces along the center. Each section of PIR is processed into a step shape along the axial and radial directions. According to the standard requirements, cold insulation materials with a thickness greater than 100mm need to be processed in two layers. The design thickness of the cold insulation layer in the above cold insulation solution is 110mm, divided into 2 layers, and each layer is 55mm thick.

[0067] 3. When dismantling the old cold insulation structure in this area, it should be dismantled in sections, layers and in sequence; at the same time, ensure that the inner cold insulation structure is dismantled for 1-1.2 meters each time, and the outer cold insulation structure can be dismantled more to facilitate the construction of the inner PIR, and each layer of PIR is still staggered and connected.

[0068] When the old cold-insulation structure is removed, the online repair dedicated purge system provided by the present invention should be started synchronously to purge the surface of the exposed pipe to prevent frost on the pipe surface;

[0069] In the interval of purging the low-temperature pipeline, a new cold insulation structure should be prepared quickly to ensure that the inner PIR cold insulation structure is installed in the shortest time;

[0070] During the construction process of replacing new cold insulation layers, moisture-proof layers and protective layers in the repaired parts, it is necessary to strictly implement GB50126-2008 "Construction Specifications for Industrial Equipment and Pipeline Insulation Engineering".

[0071] Only after the replacement of the upper section of the cold insulation layer is completed can the next section of the cold insulation layer be removed in sequence. At the same time, the expansion joints, moisture-proof layer and protective layer must be handled properly. The entire repair process is reasonable and compact.

[0072] 4. When verifying the cooling effect of this part, the cooling effect of the repaired cooling structure was retested according to the evaluation method of step 1. The average temperature of the outer surface of the cooling structure was measured to be 30°C, which is higher than the dew point temperature of 28.3°C under the design conditions. The cooling effect was significantly improved.

[0073] The special purge system for online repair of LNG pipeline cold insulation structure provided by the present invention can be used in the online repair process of cold insulation structure of low-temperature equipment and low-temperature pipelines such as LNG stations, and achieves zero ice and zero frost on the surface of the low-temperature working pipe during the entire online replacement and repair process.

[0074] The above is only one implementation case of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the protection scope of the present invention.

Claims

1. A special purge system suitable for online repair of multi-diameter assembled cold insulation structures, including a purge tool; The purge tool includes several groups of purge components; Each group of the purge components comprises an arc-shaped pipe formed by a metal hose, and a plurality of flow dividers are arranged on the arc-shaped pipe, and the branches of the flow dividers are respectively connected to metal connecting hoses, and the other end of the metal connecting hose is connected to the purge nozzle; After being connected, a plurality of the arc-shaped pipes are connected to a pipeline through a handle, and the pipeline is connected to a gas source; The pipeline is a hose; The online repair dedicated purge system also includes an atomization device; The atomizing device comprises a solvent storage tank, the solvent storage tank is connected to the handle, and a solvent regulating valve is arranged on the connected pipeline; A nitrogen booster valve is provided on the upper portion of the solvent storage tank; The solvent storage tank is connected to the handle through the nitrogen boost valve and the boost ventilation hose.

2. The online repair dedicated purge system according to claim 1 is characterized in that: A plurality of the arc-shaped pipes are connected via short joints.

3. The dedicated purge system for online repair according to claim 1 or 2, characterized in that: The flow divider comprises two branches, and each branch is provided with a switch valve.

4. The dedicated purge system for online repair according to claim 1 or 2, characterized in that: The handle is provided with a valve.

5. The dedicated purge system for online repair according to claim 1 or 2, characterized in that: The gas source is a nitrogen gas source.

6. The dedicated purge system for online repair according to claim 1 or 2, characterized in that: The flow dividers are evenly arranged.

7. The dedicated purge system for online repair according to claim 1 or 2, characterized in that: The purge nozzle is made of an organic composite material or an aluminum alloy material; The purge nozzle is flat, and has 1 to 3 air outlets at the bottom, and each row of the air outlets includes 5 to 15 air outlets.