A testing device and method for permeability of Marshall specimen of asphalt mixture
By designing the test device of water storage cylinder, air press and adjustable bracket, the problem of the inability to measure the permeability of asphalt mixture with the existing technology is solved, and the accurate measurement of the permeability of asphalt mixture under dynamic water pressure and slope conditions is achieved. The simulation improves the accuracy and applicability of measurement.
Patent Information
- Application Number
- CN201911136604.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technology cannot effectively measure the permeability of asphalt mixtures, especially under dynamic water pressure and slope conditions, with large errors and cannot simulate the hydraulic gradient and dynamic water pressure of actual roads.
A testing device including a water storage cylinder, an air press, a specimen placement cylinder and an adjustable bracket was designed. By simulating the permeability performance under different dynamic water conditions and slopes, the liquid level gauge and valves were used to control the water flow and calculate the water permeability coefficient. Achieve accurate measurement of the permeability of asphalt mixtures.
It achieves accurate measurement of the permeability of asphalt mixtures, can simulate dynamic water pressure and road conditions at different slopes, reduces measurement errors, and is suitable for indoor and field testing.
Smart Images

Figure CN110763608B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of detection and evaluation of road performance of asphalt mixtures, and in particular relates to a testing device and method for the permeability of a Marshall specimen of an asphalt mixture. Background Art
[0002] Every year, highways and urban roads across the country encounter varying degrees of rain. Rainwater forms dynamic water pressure under the pressure of automobile tires at high speeds, which has a great scouring and erosion effect on asphalt concrete pavements. Moreover, the "water drift" formed by the dynamic water pressure on the pavement when driving on rainy days is the main cause of steering wheel failure and brake failure on rainy days. Therefore, in the design of pavement structure, the measurement and control of the permeability of asphalt concrete on the pavement is particularly important. At present, the domestic testing technology for the water permeability of asphalt mixtures is mainly pavement permeability instruments. The test of the permeability of indoor asphalt mixtures is not only time-consuming but also has large errors. For on-site asphalt mixture pavements, it can only measure the speed of water infiltration, and cannot simulate the permeability under the action of dynamic water pressure. It is difficult to implement detection on sloped sections, and the size of the hydraulic gradient cannot be controlled, which limits the measurement of pavement permeability. In view of the above problems, it is necessary to improve the pavement permeability measurement method. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a testing device and method for the permeability of asphalt mixture Marshall specimens, which are used to simulate the permeability performance of asphalt mixture pavements under different dynamic water states, and simulate the permeability performance of asphalt mixture pavements under different slopes.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is a testing device for the permeability of a Marshall specimen of an asphalt mixture, comprising a water storage cylinder, an air compressor, a specimen placing cylinder and an adjustable bracket; a water inlet and an air inlet are arranged on the top of the water storage cylinder; wherein the water inlet is connected to a water source, and the air inlet is connected to a compressed gas outlet of the air compressor; the water storage cylinder is arranged at the top of the specimen placing cylinder, the water storage cylinder and the specimen placing cylinder are sealed and connected, a water flow channel is arranged between the water storage cylinder and the specimen placing cylinder, and a first drain outlet is arranged at the bottom of the water storage cylinder; a first liquid level gauge is arranged on the side of the water storage cylinder, the first liquid level gauge is connected to the bottom of the water storage cylinder, a second liquid level gauge is arranged on the side of the specimen placing cylinder, the second liquid level gauge is connected to the bottom of the specimen placing cylinder; a partition is arranged in the middle of the specimen placing cylinder, a water flow channel is arranged at the partition, and a second drain outlet is arranged at the bottom of the specimen placing cylinder; the adjustable bracket is arranged below the specimen placing cylinder, one side of the adjustable bracket is fixed in height, and the other side is provided with a foot screw.
[0005] A first water outlet and a first drain are provided at the bottom of the water storage cylinder, a first valve is provided at the first water outlet, a second water outlet is provided at the partition, the first water outlet is a water flow channel between the water storage cylinder and the specimen placement cylinder; a second valve is provided at the second water outlet, and the second water outlet is a water flow channel at the partition.
[0006] A sealing ring is arranged at the bottom of the water storage cylinder.
[0007] The air compressor is provided with a control switch and a pressure gauge, the air outlet of the air compressor is connected with the air inlet through a pipeline; the water inlet is connected with a water source through a pipeline, and a valve is provided on the pipeline.
[0008] One side of the specimen placement cylinder and the water storage cylinder is hinged by a hinge shaft, and the other side is fastened by a buckle during the test.
[0009] The adjustable bracket comprises a supporting plate and three supporting legs, wherein one fixed supporting leg is hinged to the supporting plate, and the other two supporting legs adopt foot screws, and a base is arranged under the supporting legs.
[0010] The test method for the permeability of the Marshall specimen of asphalt mixture includes the following steps:
[0011] Step 1, sealing the side of the asphalt mixture Marshall specimen and installing it in the specimen placement cylinder;
[0012] Step 2, adjust the adjustable bracket to simulate the slope of the asphalt pavement so that the angle of the asphalt mixture Marshall specimen is consistent with the slope of the pavement; adjust the adjustable bracket so that its slope is consistent with the slope of the asphalt pavement, close the first drain outlet, the second drain outlet, the first water outlet and the second water outlet, open the valve of the water inlet, add water until the first liquid level gauge shows that the volume of water in the water storage cylinder is greater than twice the volume of the space above the partition in the specimen placement cylinder excluding the volume of the specimen, the scale of the first liquid level gauge is L, close the water inlet valve, open the valve of the first water outlet, and start timing at the same time, and read the reading of the first liquid level gauge after the liquid level stabilizes L 1 , record the time t when the liquid level stabilizes 1 ; According to the rainfall conditions of the geographical location of the asphalt pavement, open the valve of the water inlet or open the first drainage outlet, and adjust the water inlet until the first liquid level meter shows L 2 , after the adjustment is completed, close the water inlet valve or the first drain port accordingly; turn on the air compressor and adjust the air pressure to simulate the dynamic water pressure at different vehicle speeds; open the second valve and start timing at the same time, recording the scale reading every Δt; when the liquid level displayed by the second level gauge is stable or the observation time exceeds 5 minutes, stop reading and read the reading of the second level gauge L 3 , record the time t when the liquid level stabilizes 2 ;
[0013] Step 3, calculate the water permeability coefficient of the asphalt mixture Marshall specimen,
[0014] V 1 =π·R 2 ·(L+L 2 -L 1 ) (1)
[0015] V 2 =π·R 2 ·L 3 (2)
[0016] V 3 =V 1 -V 2 =π·R 2 ·(L+L 2 -L 1 -L 3 ) (3)
[0017]
[0018]
[0019]
[0020] Where: V 1 —Cumulative amount of water added,
[0021] V 2 —The second level gauge measures the water volume;
[0022] V 3 ——Water content of Marshall specimen;
[0023] L 1 ——The first level gauge reading after the liquid level stabilizes;
[0024] L 2 ——The first liquid level gauge reading after the second filling / draining;
[0025] L 3 ——Final second level gauge reading;
[0026] t 1 ——The time after the liquid level of the first liquid level gauge stabilizes;
[0027] t 2 ——The time after the second liquid level gauge liquid level stabilizes;
[0028] C w1 ——Initial pavement water permeability coefficient;
[0029] C w2 ——Average pavement water permeability coefficient;
[0030] C w3——Pavement permeability coefficient under dynamic water pressure;
[0031] L i ——water level at the i-th timing;
[0032] L j ——water level at the jth timing;
[0033] t i ——The time of the i-th timing;
[0034] t j ——The time of the jth timing;
[0035] Formula (4) is used to calculate the initial pavement permeability coefficient; Formula (5) is used to calculate the pavement permeability coefficient of adjacent intervals and finally determine the permeability coefficient change trend; L in Formula (6) i and L j , using the reading of the second liquid level gauge.
[0036] In step 1, a layer of melted sealing material is rolled on the side of the asphalt mixture Marshall specimen, and the side of the asphalt mixture Marshall specimen is sealed with a rubber ring, and the rubber ring that exceeds the specimen height is cut off.
[0037] In step 3, the reading of the first level gauge is read at the beginning of the measurement. The reading of the second level gauge does not change significantly, and it is difficult to read the accurate reading. At this time, the reading of the first level gauge is read and recorded for calculation. In the later stage of the test, the water level drops below the minimum scale line of the level gauge. At this time, the reading of the second level gauge is read and recorded for calculation; in the middle stage of the test, the readings of the first level gauge and the second level gauge are read at the same time, and the comparison (L Ai -L Aj ) and (L Bi -L Bj ), if the difference between the two does not exceed 5%, then take the average value for calculation, otherwise, retest; where L Ai The i-th reading of the first level gauge, L Bi The i-th reading of the second level gauge, L Aj is the jth reading of the first level gauge, L Bj The jth reading of the second level gauge.
[0038] Compared with the prior art, the present invention has at least the following beneficial effects: a water storage cylinder is arranged on the top of the specimen placing cylinder, the water storage cylinder and the specimen placing cylinder are sealed and connected, a water flow channel is arranged between the water storage cylinder and the specimen placing cylinder, a first drain port is arranged at the bottom of the water storage cylinder, and a water inlet and an air inlet are arranged at the top of the water storage cylinder; wherein, the water inlet is connected to a water source, and the air inlet is connected to a compressed gas outlet of an air compressor; the air compressor outputs gas higher than normal pressure to apply pressure to the specimen placing cylinder, so as to simulate the permeability of the road surface under the action of dynamic water pressure, and the size of the hydraulic gradient can be controlled by combining the water intake of the water inlet, controlling the water flow channel between the water storage cylinder and the specimen placing cylinder and the first drain port; the adjustable bracket below the specimen placing cylinder can be adjusted more accurately, and the inclination angle of the adjustable bracket can be changed, so that the specimen in the specimen placing cylinder has an angle with the horizontal direction, so as to realize the simulation test of the permeability of various road surfaces with different slopes.
[0039] Furthermore, a first water outlet and a first valve are provided, and a second valve is provided at the second water outlet, which can flexibly control the amount of water entering the test piece placement cylinder from the water storage cylinder, and can provide accurate simulation conditions under different precipitation amounts.
[0040] Furthermore, a sealing ring is provided at the bottom of the water storage cylinder, which can be used to seal the water storage cylinder and the specimen placement cylinder on the one hand, and on the other hand, the upper part of the device can be conveniently placed on the actual road surface for local simulation tests; it can be used for indoor Marshall specimen testing as well as for on-site permeability testing.
[0041] Furthermore, an air compressor is used to pressurize the water storage cylinder and the test piece placement cylinder to simulate the dynamic water environment under different pressures.
[0042] Furthermore, the specimen placement cylinder is hinged to one side of the water storage cylinder through a hinge shaft, which is convenient for placing the specimen.
[0043] Furthermore, the adjustable bracket includes a support plate and three legs, one of which is a fixed leg hinged to the support plate, and the other two legs are foot screws. By adjusting the foot screw legs and changing the height of one of them, the slope can be changed.
[0044] According to the method of the present invention, the angle of the Marshall specimen is first adjusted to simulate different slopes; a set amount of water is then injected into the water storage cylinder to simulate different total precipitation amounts; the water is then transported to the specimen placement cylinder, and an air compressor is used to change the surface pressure of the specimen to simulate water seepage performance under variable pressure conditions; the amount of water in the specimen placement cylinder is further controlled, and data of the water amount change process is read from a liquid level meter. The water seepage coefficient of the specimen is calculated using the data obtained in the simulation test, and can be used to reflect the water seepage performance of the road surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1It is a schematic diagram of the overall structure of the present invention;
[0046] Figure 2 A top view of the water storage cylinder of the present invention;
[0047] Figure 3 It is a top view of the test piece placement tube, bottom plate, adjustable bracket and base of the present invention.
[0048] Figure 4 Schematic diagram of the valve.
[0049] Among them, 1-water storage cylinder, 2-air press, 3-specimen placing cylinder, 4-bottom plate, 5-adjustable bracket, 6-base, 7-water inlet, 8-air inlet, 9-first water outlet, 10-first drain outlet, 11-first liquid level gauge, 12-rubber gasket, 13-control switch, 14-pressure gauge, 15-first valve, 16-hinge shaft, 17-buckle, 18-second water outlet, 19 second valve, 20-second drain outlet, 21-rubber plug, 22-second liquid level gauge, 23-foot screw. DETAILED DESCRIPTION
[0050] The present invention is further described below in conjunction with the accompanying drawings.
[0051] like Figures 1 to 3 As shown, a testing device for the permeability of a Marshall specimen of an asphalt mixture comprises a water storage cylinder 1, an air press 2, a specimen placement cylinder 3, a bottom plate 4, an adjustable bracket 5 and a base 6; a water inlet 7 and an air inlet 8 are provided on the top of the water storage cylinder 1; wherein the water inlet 7 is connected to a water source, and the air inlet 8 is connected to the compressed gas outlet of the air press 2; a first water outlet 9 and a first drain 10 are provided at the bottom of the water storage cylinder 1, a first liquid level gauge 11 is further provided on the side of the water storage cylinder 1, and a rubber gasket is provided at the bottom of the water storage cylinder 1 as a sealing ring 12.
[0052] A control switch 13 and a pressure gauge 14 are provided on the air compressor 2. The air compressor 2 has a rubber pipe connected to the air inlet 8. The water inlet 7 is connected to the water source through a rubber water pipe. The water inlet amount and the water inlet speed of the water inlet 7 can be controlled by a valve. A first valve 15 is installed at the first water outlet 9. The liquid level gauge 11 is outside one side of the water storage cylinder 1, and the bottom end of the first liquid level gauge 11 is connected to the bottom of the water storage cylinder 1.
[0053] The specimen placing tube 3 is arranged below the water storage tube 1. One side of the specimen placing tube 3 and the water storage tube 1 is hinged by a hinge shaft 16, and the other side is fixed by a buckle 17 during the test to play a sealing role. The bottom plate 4 is integrated with the specimen placing tube 3. A second water outlet 18 is provided below the specimen placing tube 3. A second valve 19 is provided at the second water outlet 18, and the water inlet and outlet are controlled by the second valve 19; a second drain port 20 is reserved below the bottom plate 4, and the second drain port 20 is blocked by a rubber plug 21, and a second liquid level meter 22 is installed on the other side.
[0054] Optionally, the first valve 15 and then the second valve 19 both adopt valves in the "Test Procedures for Asphalt and Asphalt Mixtures in Highway Engineering" T0730-2011.
[0055] Optionally, a first water outlet is opened on the bottom plate of the water storage cylinder 1, and a blind hole is opened along the horizontal direction of the bottom plate of the water storage cylinder 1, the blind hole is connected with the water outlet, a sealing column is arranged in the blind hole, and a hole that can be connected with the water outlet is opened at one end of the sealing column extending into the blind hole, forming a first valve 15, and rotating the sealing column can realize the change of the flow area of the first water outlet and control the switch of the first water outlet; the second valve 19 is implemented with the same structure as the first valve 15.
[0056] The cross-sectional shape and size of the water storage cylinder 1 and the test piece placement cylinder 3 are the same.
[0057] The adjustable bracket 5 includes a support plate and three legs, one of which is a fixed leg hinged to the support plate, and the other two legs use foot screws 23. By adjusting the height of the foot screws 23, the inclination angle of the support plate can be changed to simulate different road slopes; a base 6 is provided under the legs.
[0058] Optionally, four legs may be provided below the support plate, two of which are fixed legs coaxially hinged to the support plate, and the other two legs are provided with foot screws 23 .
[0059] Embodiment: The permeability of a Marshall specimen of an asphalt mixture is tested using the method of the present invention as follows:
[0060] Step 1: Wrap a rubber ring around the side of the compacted asphalt mixture Marshall specimen, then place the Marshall specimen in the specimen placement tube 3, and then apply melted beeswax to the gap between the specimen and the specimen placement tube 3 to ensure that water does not seep out from the contact position between the asphalt mixture Marshall specimen and the specimen placement tube. After the beeswax cools and solidifies, cover the water storage tube 1 and lock the buckle; roll a layer of melted sealing material on the side of the asphalt mixture Marshall specimen. The present invention uses vaseline, and cut off the rubber ring that exceeds the specimen height.
[0061] Step 2: Rotate the adjustable support foot screw according to the slope requirements of the asphalt pavement to adjust to the appropriate height. Open the valve of the water inlet 7 at the first drain outlet, the second drain outlet, the first water outlet and the second water outlet. Add water until the first liquid level gauge 11 shows the 30mm scale line. Open the valve of the first water outlet 9 and start timing at the same time. After the liquid level stabilizes, read the liquid level gauge reading L 1 , record the time t when the liquid level stabilizes 1 According to the rainfall conditions of the geographical location of the asphalt pavement, open the valve of the water inlet 7 or open the first drain 10 to adjust the water inlet to the first liquid level meter 11 shows L 2 , close the water inlet valve or the first drain port 10 after adjustment; turn on the air compressor 2 and adjust the air pressure appropriately to simulate the dynamic water pressure at different vehicle speeds. Open the valve of the water outlet B and start timing at the same time, recording the scale reading every minute; stop reading when the reading of the second liquid level gauge 22 no longer changes or the observation time exceeds 5 minutes, and read the second liquid level gauge reading L 3 , record the time t when the liquid level stabilizes 2 If the reading of the second level gauge 22 changes too quickly under the action of the dynamic water pressure, the reading of the record scale is shortened to every 30 seconds; the water storage cylinder 1 and the specimen placement cylinder 3 are both cylindrical, and the inner diameters of the water storage cylinder 1 and the specimen placement cylinder 3 are both 52 cm;
[0062] Step 3: The water permeability coefficient of the asphalt mixture Marshall specimen is calculated according to the following formula.
[0063] V 1 =π·52 2 ·(30+L 2 -L 1 ) (1)
[0064] V 2 =π·52 2 ·L 3 (2)
[0065] V 3 =V 1 -V 2 =π·52 2 ·(30+L 2 -L 1 -L 3 ) (3)
[0066]
[0067]
[0068]
[0069] Where: V 1——Cumulative amount of water added (mL);
[0070] V 2 ——Scale B measures water volume (mL);
[0071] V 3 ——Water content of Marshall specimen (mL);
[0072] L 1 ——Liquid level gauge reading after the liquid level stabilizes (mL);
[0073] L 2 ——Liquid level gauge reading after the second filling / draining (mL);
[0074] L 3 ——Final scale B reading (mL);
[0075] t 1 ——Time after the liquid level of the level gauge stabilizes (s);
[0076] t 2 ——Time after the liquid level of scale B stabilizes (s);
[0077] C w1 ——Initial pavement water permeability coefficient (mL / min);
[0078] C w2 ——Average pavement water permeability coefficient (mL / min);
[0079] C w3 ——Pavement water permeability coefficient under dynamic water pressure (mL / min);
[0080] L i ——Water level at the i-th timing (mm);
[0081] L j ——Water level at the jth timing (mm);
[0082] t i ——The time of the i-th timing (s);
[0083] t j ——The time of the jth timing (s).
[0084] Formula (4) can be used to calculate the initial pavement permeability coefficient; Formula (5) can be used to calculate the pavement permeability coefficient of adjacent intervals, and finally determine the variation trend of the permeability coefficient to study the variation of the permeability coefficient with dynamic water pressure, pavement slope and rainfall. For L in Formula (6) i and L j, use the reading of the first level gauge 11 or the second level gauge 22. For example: At the beginning of the measurement, the reading of the second level gauge 22 below does not change significantly, and it is difficult to read the accurate reading. At this time, the reading of the first level gauge 11 can be read and recorded for calculation. In the later stage of the test, the water level drops below the minimum scale line of the first level gauge 11. At this time, the reading of the second level gauge is read and recorded for calculation. In the middle of the test, the readings of the upper and lower scales can be read at the same time, and the comparison (L Ai -L Aj ) and (L Bi -L Bj ), if the difference between the two does not exceed 5%, then take the average value for calculation, otherwise, it is necessary to retest, where L Ai The i-th reading of the first liquid level gauge 11, L Bi The i-th reading of the second liquid level gauge 22, L Aj is the jth reading of the first liquid level gauge 11, L Bj The jth reading of the second liquid level gauge 22 .
[0085] After the test, turn off the air press 2, adjust the adjustable bracket 5 to restore the test device to a horizontal position; open the second drain port 20 to drain the water in the test device, and close the second drain port 20; open the buckle, open the water storage cylinder 1, take out the tested asphalt mixture Marshall specimen, and conduct a permeability test on the next Marshall specimen.
[0086] The device described in the present invention can be used for both indoor and outdoor field tests. The hinge shaft of the water storage cylinder 1 is removed, the water storage cylinder 1 is removed, and the center of the water storage cylinder 1 is aligned with the center of the measuring point. A rubber sealing ring is provided at the bottom of the water storage cylinder 1, and the outer ring is sealed with a sealing material. The first drain port 10 is closed, the first water outlet 9 is closed, and the water intake is controlled according to the environment in which the asphalt pavement is located. After the water is added, the water inlet is closed; the air compressor 2 is turned on, and the air pressure is adjusted to simulate the dynamic water pressure at different vehicle speeds; the first water outlet 10 is opened, and the liquid level count is recorded every 1 minute. When the liquid level meter reading is less than the minimum scale of 1 mm or the observation time exceeds 5 minutes, the reading is stopped. If the scale meter reading changes too quickly under the action of the dynamic water pressure, it can be shortened to reading and recording the scale meter reading every 30 seconds.
Claims
1. A test device for the permeability of a Marshall specimen of asphalt mixture, characterized in that: The invention comprises a water storage cylinder (1), an air compressor (2), a specimen placement cylinder (3) and an adjustable bracket (5); a water inlet (7) and an air inlet (8) are provided at the top of the water storage cylinder (1); the water inlet (7) is connected to a water source, and the air inlet (8) is connected to a compressed gas outlet of the air compressor (2); the water storage cylinder (1) is arranged at the top of the specimen placement cylinder (3), the water storage cylinder (1) and the specimen placement cylinder (3) are sealed and connected, a water flow channel is provided between the water storage cylinder (1) and the specimen placement cylinder (3), and a first drainage outlet is provided at the bottom of the water storage cylinder (1). (10); a first liquid level gauge (11) is arranged on the side of the water storage cylinder (1), the first liquid level gauge (11) is connected to the bottom of the water storage cylinder (1); a second liquid level gauge (22) is arranged on the side of the specimen placement cylinder (3), the second liquid level gauge (22) is connected to the bottom of the specimen placement cylinder (3); a partition is arranged in the middle of the specimen placement cylinder (3), a water flow channel is arranged on the partition, and a second drain port (20) is opened at the bottom of the specimen placement cylinder (3); an adjustable bracket (5) is arranged below the specimen placement cylinder (3), and one side of the adjustable bracket (5) is high The water storage cylinder (1) is fixed at a certain height, and a foot screw (23) is provided on the other side; a first water outlet (9) and a first drain outlet (10) are provided at the bottom of the water storage cylinder (1); a first valve (15) is provided at the first water outlet (9); a second water outlet is provided at the partition; the first water outlet (9) is a water flow channel between the water storage cylinder (1) and the specimen placement cylinder (3); a second valve (19) is provided at the second water outlet (18); the second water outlet (18) is a water flow channel at the partition; a sealing ring (12) is provided at the bottom of the water storage cylinder (1); an air compressor (2 ) is provided with a control switch (13) and a barometer (14); the air outlet of the air compressor (2) is connected to the air inlet (8) through a pipeline; the water inlet (7) is connected to the water source through a pipeline, and a valve is provided on the pipeline; the specimen placement cylinder (3) is hinged to the water storage cylinder (1) on one side through a hinge shaft (16), and the other side is fastened by a buckle (17) during the test; the adjustable bracket (5) includes a support plate and three legs, one of which is a fixed leg hinged to the support plate, and the other two legs are provided with foot screws (23), and a base (6) is provided under the legs.
2. A method for testing the permeability of an asphalt mixture Marshall specimen, characterized in that: The testing device for the permeability of the asphalt mixture Marshall specimen according to claim 1 comprises the following steps: Step 1, sealing the side of the asphalt mixture Marshall specimen and installing it in the specimen placement cylinder (3); Step 2, adjust the adjustable bracket to simulate the slope of the asphalt road surface so that the angle of the asphalt mixture Marshall specimen is consistent with the slope of the road surface; adjust the adjustable bracket so that its slope is consistent with the slope of the asphalt road surface, close the first drain port (10), the second drain port (20), the first water outlet (9) and the second water outlet (18), open the valve of the water inlet (7), add water until the first liquid level gauge (11) shows that the volume of water in the water storage cylinder (1) is greater than twice the volume of the space above the partition in the specimen placement cylinder (3) excluding the volume of the specimen, and the scale of the first liquid level gauge is L, close the water inlet valve, open the valve of the first water outlet (9), and start timing at the same time. After the liquid level stabilizes, read the first liquid level gauge. The level gauge reading is L1, and the time t1 when the liquid level is stable is recorded; according to the rainfall conditions of the geographical location of the asphalt pavement, the valve of the water inlet (7) is opened or the first drain outlet (10) is opened, and the water inlet amount is adjusted until the first liquid level gauge (11) displays L2, and after the adjustment is completed, the water inlet valve or the first drain outlet (10) is closed accordingly; the air compressor (2) is turned on, and the air pressure is adjusted to simulate the dynamic water pressure under different vehicle speeds; the second valve (19) is opened, and the timing is started at the same time, and the scale reading is recorded every Δt; when the liquid level displayed by the second liquid level gauge (22) is stable or the observation time exceeds 5 minutes, the reading is stopped, and the reading L3 of the second liquid level gauge (22) is read, and the time t2 when the liquid level is stable is recorded; Step 3, calculate the water permeability coefficient of the asphalt mixture Marshall specimen, V1=π·R 2 ·(L+L2-L1) (1) V2=π·R 2 ·L3 (2) <h2 style=";text-align:left;direction:ltr">V3 = V1 - V2 = π R<h2 style=";text-align:left;direction:ltr"> 2 <h2 style=";text-align:left;direction:ltr"> (L+L2-L1-L3) (3) In the formula: V1—the cumulative amount of water added, V2—the second level gauge measures the water volume; V3——Marshall specimen moisture content; L1——the first level gauge reading after the liquid level stabilizes; L2 – the first level gauge reading after the second filling / draining; L3 - final second level gauge reading; t1——time after the liquid level of the first level gauge stabilizes; t2——time after the second level gauge liquid level stabilizes; C w1 ——Initial pavement water permeability coefficient; C w2 ——Average pavement water permeability coefficient; C w3 ——Pavement permeability coefficient under dynamic water pressure; L i ——water level at the i-th timing; L j ——water level at the jth timing; t i ——The time of the i-th timing; t j ——The time of the jth timing; Formula (4) is used to calculate the initial pavement permeability coefficient; Formula (5) is used to calculate the pavement permeability coefficient of adjacent intervals, and finally determine the permeability coefficient change trend; L in formula (6) i and L j , using the reading of the second liquid level meter (22).
3. The method for testing the permeability of asphalt mixture Marshall specimens according to claim 2, characterized in that: In step 1, a layer of melted sealing material is rolled on the side of the asphalt mixture Marshall specimen, and the side of the asphalt mixture Marshall specimen is sealed with a rubber ring, and the rubber ring that exceeds the specimen height is cut off.
4. The method for testing the permeability of asphalt mixture Marshall specimen according to claim 2, characterized in that: In step 3, at the beginning of the measurement, the reading of the first liquid level gauge (11) is read. The reading of the second liquid level gauge does not change significantly, and it is difficult to read an accurate reading. At this time, the reading of the first liquid level gauge (11) is read and recorded for calculation. In the later stage of the test, the water level drops below the minimum scale line of the liquid level gauge. At this time, the reading of the second liquid level gauge (22) is read and recorded for calculation; in the middle stage of the test, the readings of the first liquid level gauge (11) and the second liquid level gauge (22) are read at the same time, and the readings are compared (L Ai -L Aj ) and (L Bi -L Bj ), if the difference between the two does not exceed 5%, then take the average value for calculation, otherwise, retest; where L Ai The i-th reading of the first liquid level gauge (11), L Bi The i-th reading of the second liquid level gauge (22), L Aj is the jth reading of the first liquid level gauge (11), L Bj The jth reading of the second liquid level gauge (22).
Citation Information
Patent Citations
Device for testing permeability of asphalt mixture Marshall test piece
CN211292483U
Cited By
Asphalt pavement permeability testing device
CN121917422A
An asphalt pavement permeability testing device
CN121917422B