A construction method without formwork removal based on concrete box formwork

Through the method of dismantling-free modeling based on concrete box molding, the problems of low construction efficiency and complex connection of traditional concrete structures are solved, rapid and high-quality construction and shortened construction periods are achieved, and integrated construction and decoration integration are supported.

CN110843095BActive Publication Date: 2024-11-29CHINA STATE CONSTR HAILONG TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201911202524.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-29
Publication Date
2024-11-29
Estimated Expiration
2039-11-29

AI Technical Summary

Technical Problem

The construction of traditional concrete structure buildings consumes a lot of manpower and material resources, has a long construction cycle, and the concrete box buildings have problems such as large weight, complex connections and low decoration integration.

Method used

Using the method of disassembly-free modeling based on concrete box molds, the prefabricated wall molds, beam molds, partition walls and overlapping roof plates, the pre-embedded and connecting parts of steel bars and steel plates are used to achieve rapid assembly and casting. The box mold is designed as a hexahedral structure. Simplify connections and realize industrial assembly line production.

Benefits of technology

It has achieved fast construction speed, high quality, energy conservation and emission reduction, shortened the construction period, and supported integrated construction of interior decoration and water and electricity pipelines, simplified the connection of load-bearing components, and realized mold-free construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110843095B_ABST
    Figure CN110843095B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method based on a concrete box formwork without demoulding, wherein the concrete box formwork comprises a horizontal member and a vertical member, wherein the horizontal member comprises a bottom plate, a beam formwork and a superimposed top plate, wherein the vertical member comprises a wall formwork, a partition wall and a structural column, wherein the wall formwork, the partition wall and the structural column are respectively located above the bottom plate and vertically connected to the bottom plate, wherein the wall formwork and the partition wall are connected through the structural column, wherein the beam formwork is located above the partition wall and the structural column, wherein the lower end surface of the beam formwork is vertically connected to the partition wall or the structural column, wherein the upper end surface of the beam formwork is in the same horizontal plane as the upper end surface of the wall formwork, and wherein the superimposed top plate is vertically connected to the top of the beam formwork and the wall formwork, respectively. The various components of the box formwork can be prefabricated and then transported to a designated work station for assembly, wherein the production speed is fast, the quality is high, and the energy saving, emission reduction and green environmental protection are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of prefabricated buildings, and more specifically to a formwork-free construction method based on concrete box formwork. Background Art

[0002] Traditional cast-in-place concrete structure buildings require loading and unloading of formwork during on-site construction, which consumes a lot of manpower and material resources and increases the construction period.

[0003] Now concrete structure buildings are also gradually moving towards assembly. The initial simple prefabricated composite beams, composite slabs, prefabricated columns and other parts have developed into prefabricated concrete box buildings, which significantly improves the factory prefabrication rate and construction speed of concrete structure buildings. However, there are also many problems with concrete box buildings. At present, most common concrete box buildings are tetrahedrons or pentahedrons, not hexahedrons, resulting in low integration of decoration; in addition, the walls and top and bottom plates of concrete boxes are mostly of conventional thickness, resulting in heavy boxes and inconvenient hoisting. The connections between boxes are mostly post-grouting or steel node connections, and the connection nodes are complex, which is not conducive to construction. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a construction method based on concrete box formwork without formwork removal.

[0005] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a formwork-free construction method based on a concrete box formwork, wherein the concrete box formwork comprises a horizontal member and a vertical member, wherein the horizontal member comprises a bottom plate, a beam formwork and a superimposed top plate, wherein the vertical member comprises a wall formwork, a partition wall and a structural column, wherein the wall formwork, the partition wall and the structural column are respectively located above the bottom plate and vertically connected to the bottom plate, wherein the wall formwork and the partition wall are connected through the structural column, wherein the beam formwork is located above the partition wall and the structural column, wherein the lower end surface of the beam formwork is vertically connected to the partition wall or the structural column, wherein the upper end surface of the beam formwork is at the same horizontal plane as the upper end surface of the wall formwork, and wherein the superimposed top plate is vertically connected to the top of the beam formwork and the top of the wall formwork respectively;

[0006] The concrete box mold making method comprises the following steps:

[0007] Prefabricate wall formwork, beam formwork, partition wall and composite top slab and embed steel plates or steel bars in corresponding positions; pre-fix wall formwork and partition wall at the position where the bottom slab is cast;

[0008] Cast the bottom plate so that the embedded steel bars at the lower end of the wall formwork and partition wall extend into the bottom plate, and reserve steel bars for overlapping with the structural columns;

[0009] Cast the structural column at the overlapped reinforcement of the structural column reserved in the bottom plate, and at the same time, make the reinforcement at one end of the partition wall and the wall formwork connected to the structural column extend into the structural column;

[0010] Connect the beam formwork to the partition wall or structural column;

[0011] Connect the box formwork composite top plate to the wall formwork and beam formwork;

[0012] The formwork-free construction method comprises the following steps:

[0013] The prefabricated box formwork is used with a detachable steel frame to vertically reinforce and support the composite top plate and beam formwork with a larger span;

[0014] Assemble the prefabricated box formwork layer by layer to the designated area according to the building structure layout;

[0015] Lay shear wall reinforcement between the wall forms of horizontally adjacent concrete box forms, lay beam reinforcement between beam forms, and lay post-cast slab reinforcement above the composite top slab;

[0016] Casting shear walls between wall forms of horizontally adjacent concrete box forms;

[0017] Casting load-bearing beams between beam forms of horizontally adjacent concrete box forms;

[0018] Cast the back slab.

[0019] Its further technical solution is: the wall formwork is a reinforced concrete slab, a fiber concrete slab or a reinforced truss slab, the cross-sectional shape of the wall formwork is a straight line, an L shape, a Z shape or a U shape, and the cross-sectional shape of the beam formwork is an L shape or a U shape.

[0020] A further technical solution is as follows: the upper end surfaces of the horizontal members and / or vertical members are provided with pre-buried hooks, nails or rings, and the wall formwork is also provided with pull members or support members.

[0021] A further technical solution is as follows: the wall formwork and the side edges of the partition walls are both provided with embedded connectors, and the embedded connectors of the wall formwork and the side edges of the partition walls are steel bars for connecting to the structural columns.

[0022] Its further technical solution is: embedded steel plates are provided above the structural columns, above the partition walls and below the beam molds, and the embedded steel plates below the beam molds are respectively connected and fixed to the embedded steel plates above the partition walls and the embedded steel plates above the structural columns by welding or bolts.

[0023] Its further technical solution is: the composite top plate is a reinforced truss composite top plate or a prestressed composite top plate, and embedded steel plates are provided below the composite top plate, above the wall formwork and above the beam formwork, and the embedded steel plates below the composite top plate are respectively connected and fixed to the embedded steel plates above the wall formwork and the embedded steel plates above the beam formwork by welding or bolts.

[0024] Its further technical solution is: structural column lap steel bars are pre-installed on the bottom plate, the partition wall is provided with steel bars extending into the bottom plate, the wall formwork is provided with steel bars extending into the bottom plate, and the wall formwork and the partition wall are respectively anchored into corresponding areas of the bottom plate casting.

[0025] A further technical solution is that when pouring the shear wall, adjacent wall molds are fixed by means of pull members or support members.

[0026] A further technical solution is that the post-cast slab is effectively connected to the composite top slab through the truss reinforcement above the composite top slab to form a floor slab for normal use.

[0027] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a formwork-free construction method based on a concrete box formwork, wherein the concrete box formwork is respectively located above the bottom plate through a wall formwork, a partition wall and a structural column and is vertically connected to the bottom plate, the wall formwork and the partition wall are connected through the structural column, the beam formwork is located above the partition wall and the structural column, the lower end surface of the beam formwork is vertically connected to the partition wall or the structural column, the upper end surface of the beam formwork is on the same horizontal plane as the upper end surface of the wall formwork, and the superimposed top plate is respectively vertically connected to the top of the beam formwork and the wall formwork, thereby realizing industrialized assembly line production, and the various components of the box formwork can be prefabricated and then transported to a designated workstation for assembly, with fast production speed and high quality, and energy saving, emission reduction and green environmental protection, and the box formwork can be integrated with interior decoration, water and electricity pipelines and other integrated factory construction, which can greatly shorten the construction period of building decoration. Multiple concrete box molds can be connected to each other and assembled to the designated area layer by layer according to the building structure layout. Each box mold comes with its own load-bearing component template, which can promote the construction of the building without demoulding, greatly shortening the construction period. The load-bearing components of the building are still constructed in place, and the connection nodes of the load-bearing components are equivalent to cast-in-place, which is simple, safe and reliable.

[0028] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the following preferred embodiments are specifically cited and described in detail as follows. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic diagram of the structure of the concrete box mold.

[0030] Figure 2 It is a flow chart of the method of making a concrete box form;

[0031] Figure 3 Flow chart of the construction method without formwork removal;

[0032] Figure 4 It is a structural schematic diagram of assembling multiple box molds in a specific embodiment.

[0033] Reference numerals

[0034] 10. Box formwork; 11. Bottom plate; 12. Wall formwork; 13. Partition wall; 14. Structural column; 15. Beam formwork; 16. Composite top plate; 21. Wall formwork gap; 22. Beam formwork gap. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0037] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0038] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0039] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be connected, detachably connected, or integrated; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0041] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms should not be understood as necessarily referring to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification.

[0042] like Figure 1As shown, a concrete box formwork 10 includes horizontal members and vertical members, the horizontal members include a bottom plate 11, a beam formwork 15 and a composite top plate 16, the vertical members include a wall formwork 12, a partition wall 13 and a structural column 14, the wall formwork 12, the partition wall 13 and the structural column 14 are respectively located above the bottom plate 11 and vertically connected to the bottom plate 11, the wall formwork 12 and the partition wall 13 are connected through the structural column 14, the beam formwork 15 is located above the partition wall 13 and the structural column 14, the lower end surface of the beam formwork 15 is vertically connected to the partition wall 13 or the structural column 14, the upper end surface of the beam formwork 15 is on the same horizontal plane as the upper end surface of the wall formwork 12, and the composite top plate 16 is vertically connected to the top of the beam formwork 15 and the wall formwork 12, respectively. Multiple concrete box molds 10 can be connected to each other, and the box molds 10 can be assembled layer by layer to the designated area according to the building structure layout. The box-shaped modules can be produced on an industrial assembly line. The various components of the module can be prefabricated and then transported to the designated workstation for assembly. The production speed is fast, the quality is high, and it is energy-saving, emission-reducing and green. The box mold 10 can be integrated with interior decoration, water and electricity pipelines and other integrated factory construction, which can greatly shorten the construction period of building decoration.

[0043] Specifically, the wall form 12 is a reinforced concrete slab, a fiber concrete slab or a reinforced truss slab, and the cross-sectional shape of the wall form 12 is a straight line, an L-shape, a Z-shape or a U-shape.

[0044] Specifically, the thickness of the wall form 12 is less than or equal to 100 mm.

[0045] Specifically, the beam form 15 is made of reinforced concrete, and the cross-sectional shape of the beam form 15 is L-shaped or U-shaped.

[0046] Specifically, the thickness of the beam mold 15 is less than or equal to 100 mm.

[0047] Specifically, the upper end surfaces of the transverse members and / or vertical members are provided with pre-buried hooks, nails or rings, and the wall formwork 12 is also provided with a pull piece or a support piece. Adjacent wall formworks 12 are fixed by the pull piece or the support piece.

[0048] Specifically, the sides of the wall formwork 12 and the partition wall 13 are provided with embedded connectors, and the embedded connectors on the sides of the wall formwork 12 and the partition wall 13 are steel bars for connecting with the structural columns 14 .

[0049] Specifically, embedded steel plates are provided above the structural column 14, above the partition wall 13 and below the beam form 15. The embedded steel plates below the beam form 15 are respectively connected and fixed to the embedded steel plates above the partition wall 13 and the embedded steel plates above the structural column 14 by welding or bolting. The connection by welding or bolting is simple, fast and firm.

[0050] Specifically, the composite top plate 16 is a steel truss composite top plate 16 or a prestressed composite top plate 16, and embedded steel plates are provided below the composite top plate 16, above the wall form 12, and above the beam form 15. The embedded steel plates below the composite top plate 16 are respectively connected and fixed to the embedded steel plates above the wall form 12 and the embedded steel plates above the beam form 15 by welding or bolting. The connection by welding or bolting is simple, fast, and firm.

[0051] Specifically, the bottom plate 11 is pre-installed with structural columns 14 lapped steel bars, the partition wall 13 is provided with steel bars extending into the bottom plate 11, the wall formwork 12 is provided with steel bars extending into the bottom plate 11, and the wall formwork 12 and the partition wall 13 are respectively anchored into the corresponding areas of the bottom plate 11. The box formwork 10 only provides a template for pouring concrete for the load-bearing structure of the building, and the load-bearing components of the building are still cast-in-place. The connection nodes of the load-bearing components are equivalent to cast-in-place, which is simple, safe and reliable.

[0052] like Figure 2 As shown, a method for making a concrete box mold is based on Figure 1 The concrete box mold 10 shown comprises the following steps:

[0053] S11, prefabricated wall formwork 12, beam formwork 15, partition wall 13 and composite top plate 16 and pre-embedded steel plates or steel bars at corresponding positions;

[0054] S12, pre-fix the wall form 12 and the partition wall 13 at the position where the bottom plate 11 is poured;

[0055] S13, pouring the bottom plate 11, so that the pre-buried steel bars at the lower ends of the wall formwork 12 and the partition wall 13 extend into the bottom plate 11, and at the same time, reserving steel bars for overlapping with the structural column 14;

[0056] S14, pouring the structural column 14, pouring the structural column 14 at the overlapped steel bars of the structural column 14 reserved in the bottom plate 11, and at the same time making the steel bars at one end of the partition wall 13 and the wall form 12 connected to the structural column 14 extend into the structural column 14;

[0057] S15, connecting the beam mold 15 with the partition wall 13 or the structural column 14;

[0058] S16, connect the box mold 10 with the superimposed top plate 16, the wall mold 12 and the beam mold 15. The box mold 10 obtained by this manufacturing method is a hexahedral structure. Since it has its own load-bearing component template, it can promote the construction of the building without demoulding, greatly shortening the construction period. It is also lighter than the general conventional box building, has good integrity, and is highly integrated for interior decoration. The prepared box mold 10 provides a template for pouring concrete for the building's load-bearing structure, and the building's load-bearing components still adopt a cast-in-place construction method. The connection nodes of the load-bearing components are equivalent to cast-in-place, which is simple, safe and reliable. The prepared box mold 10 can be integrated with interior decoration, water and electricity pipelines and other integrated factory construction, which can greatly shorten the construction period of the building.

[0059] Specifically, the beam formwork 15 is fixed by welding or bolting a pre-buried steel plate below the beam formwork 15 to a pre-buried steel plate above the partition wall 13 or the structural column 14 .

[0060] Specifically, the composite top plate 16 is fixed by welding or bolting the embedded steel plate at the lower end of the composite top plate 16 to the embedded steel plates above the wall form 12 and the beam form 15 .

[0061] like Figure 3 As shown, a construction method without formwork removal is based on Figure 1 The concrete box form shown includes the following steps:

[0062] S21, using a detachable steel frame to vertically reinforce and support the prefabricated box formwork 10 for the composite top plate 16 and beam formwork 15 of a larger span;

[0063] S22, assembling the prefabricated box molds 10 layer by layer to the designated area according to the building structure layout;

[0064] S23, laying shear wall reinforcement between the wall molds 12 of the horizontally adjacent concrete box molds 10, laying beam reinforcement between the beam molds 15, and laying post-cast slab reinforcement above the superimposed top plate 16;

[0065] S24, pouring a shear wall between the wall forms 12 of the horizontally adjacent concrete box forms 10;

[0066] S25, casting a load-bearing beam between the beam molds 15 of the horizontally adjacent concrete box molds 10;

[0067] S26, pouring the post-cast slab. For implementing this formwork-free construction method, the various components of the required modules can be prefabricated and then transported to the designated workstation for assembly, with fast production speed, high quality, energy saving, emission reduction and green environmental protection. Each box mold 10 can be integrated with interior decoration, water and electricity pipelines and other integrated factory construction, which can greatly shorten the construction period of building decoration, and each box mold 10 has its own load-bearing component template, which can promote the construction of the building without formwork removal, greatly shortening the construction period of the building, and the load-bearing components of the building still adopt the cast-in-place construction method, and the connection nodes of the load-bearing components are equivalent to cast-in-place, which is simple, safe and reliable.

[0068] Specifically, when pouring the shear wall, adjacent wall molds 12 are fixed by tension members or support members.

[0069] Specifically, the post-cast slab is effectively connected to the composite top plate 16 through the truss reinforcement above the composite top plate 16 to form a floor slab for normal use.

[0070] Specifically, Figure 4As shown, when the formwork-free construction method is used, the building is first split according to the apartment type and prefabricated into multiple box-shaped modules, such as three box molds 10. As mentioned above, the box-shaped module includes a shear wall formwork 12, a beam formwork 15, a composite top plate 16, a bottom plate 11, a partition wall 13 and a structural column 14. When the building is constructed, the box-shaped modules are first hoisted to the designated positions layer by layer according to the building construction drawings for assembly. After the assembly is completed, the load-bearing components such as shear walls, beams, and plates are cast on site. The on-site casting parts are the wall formwork gap 21 between two adjacent box molds 10, the beam formwork gap 22 between two adjacent box molds 10, and the upper post-cast plate part of the composite top plate 16. Since the non-load-bearing components of the building, such as the partition wall 13 and the structural column 14, are completed when the box-shaped modules are prefabricated, the installation of the non-load-bearing components of the building is completed after the box-shaped modules are assembled; the load-bearing components, such as the shear walls, beams and slabs, can be directly cast on site using the wall formwork 12, beam formwork 15 and composite top plate 16 provided by the box-shaped modules as formworks, without the need to load and unload the formworks, and the construction of the building can basically be realized without removing the formworks.

[0071] Compared with the prior art, the present invention provides a concrete box mold, a manufacturing method thereof, and a construction method without mold removal. The concrete box mold is located above the bottom plate through wall molds, partition walls and structural columns and is vertically connected to the bottom plate. The wall molds and partition walls are connected through structural columns. The beam mold is located above the partition wall and the structural column. The lower end surface of the beam mold is vertically connected to the partition wall or the structural column, the upper end surface of the beam mold is on the same horizontal plane as the upper end surface of the wall mold, and the overlapping top plate is vertically connected to the top of the beam mold and the wall mold, respectively, to realize industrial assembly line production. The various components of the box mold can be prefabricated and then transported to designated workstations for assembly. The production speed is fast and the quality is high. It is energy-saving, emission-reducing and green. The box mold can be integrated with interior decoration, water and electricity pipelines and other integrated factory construction, which can greatly shorten the construction period of building decoration. Multiple concrete box molds can be connected to each other and assembled to the designated area layer by layer according to the building structure layout. Each box mold comes with its own load-bearing component template, which can promote the construction of the building without demoulding, greatly shortening the construction period. The load-bearing components of the building are still constructed in place, and the connection nodes of the load-bearing components are equivalent to cast-in-place, which is simple, safe and reliable.

[0072] The above examples are only used to further illustrate the technical content of the present invention, so that readers can understand it more easily, but they do not mean that the implementation of the present invention is limited to this. Any technical extension or re-creation made according to the present invention is protected by the present invention. The protection scope of the present invention shall be subject to the claims.

Claims

1. A construction method based on concrete box formwork without formwork removal, characterized in that: The concrete box formwork comprises horizontal members and vertical members, wherein the horizontal members comprise a bottom plate, a beam formwork and a superimposed top plate, and the vertical members comprise a wall formwork, a partition wall and a structural column, wherein the wall formwork, the partition wall and the structural column are respectively located above the bottom plate and vertically connected to the bottom plate, the wall formwork and the partition wall are connected through the structural column, the beam formwork is located above the partition wall and the structural column, the lower end surface of the beam formwork is vertically connected to the partition wall or the structural column, the upper end surface of the beam formwork is at the same horizontal plane as the upper end surface of the wall formwork, and the superimposed top plate is vertically connected to the top of the beam formwork and the wall formwork respectively; The concrete box mold manufacturing method The method comprises the following steps: prefabricating wall molds, beam molds, partition walls and composite top plates, and pre-embedding steel plates or steel bars at corresponding positions; Pre-fix the wall formwork and partition wall at the position where the base plate is poured; Cast the bottom plate so that the embedded steel bars at the lower end of the wall formwork and partition wall extend into the bottom plate, and reserve steel bars for overlapping with the structural columns; Cast the structural column at the overlapped reinforcement of the structural column reserved in the bottom plate, and at the same time, make the reinforcement at one end of the partition wall and the wall formwork connected to the structural column extend into the structural column; Connect the beam formwork to the partition wall or structural column; Connect the box formwork composite top plate to the wall formwork and beam formwork; The formwork-free construction method comprises the following steps: using a detachable steel frame to vertically reinforce and support the prefabricated box formwork for the composite top plate and beam formwork with a larger span; Assemble the prefabricated box formwork layer by layer to the designated area according to the building structure layout; Lay shear wall reinforcement between the wall forms of horizontally adjacent concrete box forms, lay beam reinforcement between beam forms, and lay post-cast slab reinforcement above the composite top slab; Casting shear walls between wall forms of horizontally adjacent concrete box forms; Casting load-bearing beams between beam forms of horizontally adjacent concrete box forms; Cast the back slab.

2. The formwork-free construction method according to claim 1, characterized in that: The wall formwork is a reinforced concrete slab, a fiber concrete slab or a reinforced truss slab, the cross-sectional shape of the wall formwork is a straight line, an L shape, a Z shape or a U shape, and the cross-sectional shape of the beam formwork is an L shape or a U shape.

3. The formwork-free construction method according to claim 1, characterized in that: The upper end surfaces of the transverse members and / or vertical members are provided with pre-buried hooks, nails or rings, and the wall formwork is also provided with pull members or support members.

4. The formwork-free construction method according to claim 1, characterized in that: The wall formwork and the side edges of the partition wall are both provided with embedded connectors, and the embedded connectors of the wall formwork and the side edges of the partition wall are steel bars for connecting with the structural columns.

5. The formwork-free construction method according to claim 1, characterized in that: Embedded steel plates are provided above the structural columns, above the partition walls and below the beam molds. The embedded steel plates below the beam molds are respectively connected and fixed to the embedded steel plates above the partition walls and the embedded steel plates above the structural columns by welding or bolts.

6. The formwork-free construction method according to claim 1, characterized in that: The composite top plate is a reinforced truss composite top plate or a prestressed composite top plate. Embedded steel plates are provided below the composite top plate, above the wall formwork and above the beam formwork. The embedded steel plates below the composite top plate are respectively connected and fixed to the embedded steel plates above the wall formwork and the embedded steel plates above the beam formwork by welding or bolts.

7. The formwork-free construction method according to claim 1, characterized in that: The bottom plate is pre-installed with structural column lap steel bars, the partition wall is provided with steel bars extending into the bottom plate, the wall formwork is provided with steel bars extending into the bottom plate, and the wall formwork and the partition wall are respectively anchored into corresponding areas of the bottom plate casting.

8. The formwork-free construction method according to claim 1, characterized in that: When pouring shear walls, adjacent wall forms are fixed by tie members or supports.

9. The formwork-free construction method according to claim 1, characterized in that: The post-cast slab is effectively connected to the composite top slab through the truss reinforcement above the composite top slab to form a floor slab for normal use.