A monitoring device for preventing blockage during shaft blasting and excavation
By designing an anti-blocking monitoring device for shaft blasting excavation, using the filtration and vibration system to accelerate slag discharge, and preventing blockage through wind speed monitoring, the problem of clogging of the slag discharge well in shaft blasting excavation is solved, and construction efficiency and safety are improved. sex.
Patent Information
- Application Number
- CN201911413046.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-12-31
AI Technical Summary
In the construction of the raise shaft method, due to the problem of blockage of the slag discharge well during the shaft blasting and excavation process, it is difficult to effectively monitor and prevent blockage with the existing technology, resulting in increased construction costs and difficulty in clearing.
Design a shaft blasting and excavation anti-blocking monitoring device that includes a fixed device, a filtration system, a vibration system and a monitoring system. It filters large objects through the slag inlet hole and the slag discharge hole, uses the vibration system to accelerate slag discharge, and uses the wind speed measuring instrument to Monitor airflow changes to determine blockage and issue alarms to prevent blockage.
It effectively prevents shaft clogging, improves slag discharge efficiency, protects construction workers, reduces construction costs, and can quickly determine and solve slag discharge well blockage problems.
Smart Images

Figure CN110986714B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a monitoring device for preventing and monitoring shaft blasting excavation. Background Art
[0002] The use of the reverse shaft method to construct tunnel ventilation shafts is a new type of shaft construction technology. Its construction method can be briefly described as "three in and three out", that is, using a reverse shaft drilling rig to drill from the top of the shaft to the bottom of the shaft to form a pilot hole, and then expand from the bottom of the shaft to form a slag well, and then blast excavation from the top of the shaft to form a shaft. The slag well is used to remove blasting slag and rock stratum water. When slag is discharged, the slag well is often blocked due to excessive slag discharge or excessive rock block rate. It is difficult to determine whether the slag well is blocked during construction. Once blocked, the blocked section is usually long and difficult to clear. At present, the common method to solve the blockage of the shaft is to adjust the blasting parameters. By adjusting the blasting unit consumption, explosive amount, hole spacing, hole depth and other parameters, the block size after blasting is as small as possible to prevent the blockage of the slag well. However, the relationship between blasting parameters and blasting block size is complicated. Current research can only conduct qualitative analysis, and is limited by the actual construction conditions on site and the operating level of construction personnel. The results are relatively small and the construction costs are greatly increased.
[0003] In view of the above technical problems, improvements need to be made. Summary of the invention
[0004] The present invention aims to overcome the defects in the above-mentioned prior art and provides a monitoring device for preventing blockage in shaft blasting excavation, which integrates slag discharge prevention and shaft blockage monitoring, is suitable for mechanical and manual slag discharge, and has a wide range of applications; it can not only effectively prevent shaft blockage, calculate the slag discharge amount, and control the slag discharge speed, but also monitor the slag discharge status of the shaft.
[0005] In order to achieve the above objectives, the technical solution adopted by the present invention is: a monitoring device for preventing blockage in shaft blasting excavation, comprising a main body, a fixing device mounted on the main body, a filtering system, a vibration system, a sliding system and a monitoring system; the fixing device comprises a fixing ring, which is fixedly arranged circumferentially on the outer side of the main body; the filtering system comprises a plurality of slag inlet holes respectively located on the side of the main body and a slag discharge hole located at the bottom of the main body; the slag inlet hole is located on the fixing ring, the vibration system is symmetrically arranged on both sides of the slag discharge hole, and the sliding system is mounted on the vibration system.
[0006] As a preferred embodiment of the present invention, six slag inlet holes are provided, which are arranged in an annular manner and equidistantly on the side wall of the main body, and the inner diameter of the slag inlet holes is 1 / 3 of the inner diameter of the main body.
[0007] As a preferred embodiment of the present invention, the vibration system includes a motor fixed at the bottom of the main body, an eccentric block is provided at the end of the motor to form eccentric vibration, a vibration block is connected to the eccentric block, and the top of the vibration block is connected to the sliding system to provide vibration for the sliding system.
[0008] As a preferred embodiment of the present invention, the sliding system includes a sliding block having a sliding surface formed on the sliding block, the bottom of the sliding block is connected to a T-shaped support block, a plurality of elastic supports are arranged under the support block, and a sliding track is provided at the connection between the sliding block and the inner wall of the body.
[0009] As a preferred embodiment of the present invention, the inclination angle of the sliding block is 120° to 140°.
[0010] As a preferred embodiment of the present invention, four elastic supports are provided and are equidistantly arranged at the lower end of the support block.
[0011] As a preferred embodiment of the present invention, a limiting sliding track is provided at the connection between the support block and the inner wall of the body.
[0012] As a preferred embodiment of the present invention, the monitoring system is symmetrically distributed on both sides of the slag discharge hole of the main body, and a ventilation hole is formed at the bottom of the main body.
[0013] As a preferred embodiment of the present invention, the monitoring system includes a wind speed measuring instrument located above the ventilation hole and connected to the inner wall of the main body, and the wind speed measuring instrument is connected to an alarm device.
[0014] As a preferred embodiment of the present invention, it further comprises a lifting and transporting device, wherein the lifting and transporting device comprises two lifting rings fixedly mounted on the top of the main body, and the two lifting rings are symmetrically arranged on the main body.
[0015] The method of using the present invention is as follows: after the blasting operation is completed, the device is placed on the vertical shaft slag discharge well through the lifting ring, and the slag is piled on the fixed ring and then the device is powered on and started. The slag enters the device through the slag inlet on the side of the device, enters the slag outlet along the sliding surface, and then is discharged into the slag discharge well; during slag discharge, if the slag discharge well is blocked, the device will sound an alarm, and the slag discharge should be stopped at this time, the cause of the blockage should be found out, and the blockage should be cleared before slag discharge. After all the slag is removed, it is transported away from the construction site through the lifting ring.
[0016] The beneficial effects of the present invention are:
[0017] 1. This device is a cylindrical barrel-shaped vibration filter device. The barrel diameter is slightly smaller than the diameter of the slag discharge well. Before slag discharge, the device is fixed to the slag discharge well mouth, and the slag is discharged into the barrel through six circular holes on the side of the barrel. The diameter of the circular hole is 1 / 3 of the diameter of the slag discharge well, which can play a role in filtering large pieces. There is a vibration device in the barrel, which can quickly discharge the slag discharged into the barrel through the slag discharge holes in the barrel, thereby improving construction efficiency;
[0018] 2. The well bucket is a closed device, which can protect the construction workers from falling into the well during slag discharge construction, thus playing a role in protecting the construction workers;
[0019] 3. The present invention monitors the airflow changes in the pilot shaft through the airflow monitoring device symmetrically distributed at the bottom, which can be used to judge the slag discharge status of the vertical shaft. If the shaft is blocked, an alarm can be issued to stop the construction;
[0020] 4. A lifting and transportation device is installed on the top of the device to facilitate the lifting and transportation of the device. When slag blockage occurs at the face of the tunnel, the device can be lifted to eliminate the blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the structure of an embodiment of the present invention;
[0022] Figure 2 is a top view of an embodiment of the present invention;
[0023] Figure 3 is a side view of an embodiment of the present invention;
[0024] The reference numerals in the figure are: fixed ring 1, slag inlet hole 2, sliding block 3, slag discharge hole 4, motor 5, alarm device 6, wind speed measuring instrument 7, sliding track 8, elastic support 9, limited sliding track 10, lifting ring 11, support block 12, ventilation hole 13, main body 20. DETAILED DESCRIPTION
[0025] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0026] Example: Figure 1-3 As shown, a monitoring device for preventing and blocking vertical shaft blasting excavation comprises a main body 20, a fixing device, a filtering system, a vibration system, a sliding system and a monitoring system mounted on the main body 20; the fixing device comprises a fixing ring 1, which is fixedly arranged on the outer side of the main body 20 and arranged circumferentially; the filtering system comprises a plurality of slag inlet holes 2 respectively located on the side of the main body 20 and a slag discharge hole 4 located at the bottom of the main body 20; the slag inlet holes 2 are located on the fixing ring 1, the vibration system is symmetrically arranged on both sides of the slag discharge hole 4, and the sliding system is mounted on the vibration system; the device is a cylindrical barrel-shaped vibration filtering device, the diameter of the barrel body is slightly smaller than the diameter of the slag discharge well, before slag discharge, the device is fixed to the slag discharge well mouth, and the slag is discharged into the barrel through six circular holes on the side of the barrel body, the diameter of the circular holes is 1 / 3 of the diameter of the slag discharge well, which can play a role in filtering large pieces, and there is a vibration device in the barrel, which can quickly discharge the slag discharged into the barrel through the slag discharge holes in the barrel, thereby improving construction efficiency.
[0027] Specifically, six slag inlet holes 2 are provided, which are arranged in a circular shape and at equal intervals on the side wall of the main body 20 , and the inner diameter of the slag inlet hole 2 is 1 / 3 of the inner diameter of the main body 20 .
[0028] The vibration system includes a motor 5 fixed at the bottom of the main body 20, an eccentric block is provided at the end of the motor 5 to form eccentric vibration, the eccentric block is connected to the vibration block, and the top of the vibration block is connected to the sliding system to provide vibration for the sliding system; the sliding system includes a sliding block 3, a sliding surface is formed on the sliding block, the bottom of the sliding block is connected to a support block 12 distributed in a T shape, a number of elastic supports 9 are arranged under the support block 12, and 4 elastic supports 9 are provided, which are equidistantly arranged at the lower end of the support block 12; a sliding track 8 is provided at the connection between the sliding block and the inner wall of the main body 20; a limit sliding track 10 is provided at the connection between the support block 12 and the inner wall of the main body 20; the sliding track 8 and the limit sliding track 10 can limit the sliding distance of the sliding block 3, and high-frequency up and down movement forms vibration, and the inclination angle of the sliding block 3 is 135°.
[0029] The monitoring system is symmetrically distributed on both sides of the slag discharge hole 4 of the main body 20, and a ventilation hole 13 is formed at the bottom of the main body 20; the monitoring system includes a wind speed measuring instrument 7 located above the ventilation hole 13 and connected to the inner wall of the main body 20, and the wind speed measuring instrument 7 is connected to an alarm device 6; the present invention monitors the airflow changes in the pilot shaft through the airflow monitoring device symmetrically distributed at the bottom, which can be used to determine the slag discharge status of the vertical shaft. If the shaft is blocked, an alarm can be given to stop the construction.
[0030] A monitoring device for preventing and monitoring shaft blasting excavation also includes a lifting and transporting device, which includes two lifting rings 11 fixed to the top of a main body 20 , and the two lifting rings 11 are symmetrically arranged on the main body 20 .
[0031] The above technical solution is adopted to facilitate the lifting and transportation of the device. When slag blockage occurs at the tunnel face, the device can be lifted to eliminate the blockage.
[0032] The working process of the present invention is as follows: after the blasting operation is completed, the device is placed directly above the slag discharge well through the lifting ring. At this time, the part below the fixed ring of the device is in the slag discharge well. Fill the fixed ring 1 with slag, fix the device above the slag discharge well, and turn on the power to start the device. The slag after blasting is discharged into the equipment through the six slag inlet holes 2 on the side of the device along the blasting slope surface manually or mechanically. The diameter of the slag inlet is 1 / 3 of the diameter of the slag discharge well and is the same as the diameter of the slag discharge port 4. If there are large pieces larger than 1 / 3 of the diameter of the slag discharge well, the slag discharge hole will be blocked and needs to be removed manually or mechanically. After being crushed separately, it is put into the slag discharge, which can prevent large pieces from entering the slag discharge well and play a role in screening large pieces. The slag enters the slag discharge hole 4 along the sliding surface 3 and enters the slag discharge well. The motor 5 transmits the vibration to the T-shaped support through the eccentric block, and then to the sliding surface on the sliding block 3. The sliding surface moves up and down in a small amplitude and at a high frequency under the action of the sliding rails 8 and 10 to form vibration, which can accelerate the rock blocks entering the device to slide into the slag discharge port 4, improve the slag discharge efficiency, and prevent the internal blockage of the instrument. There is an upward airflow inside the slag discharge well. The change of the airflow can determine whether the slag discharge well is blocked. The wind speed measuring device 7 arranged symmetrically at the bottom of the device monitors the wind speed in the slag discharge well. 7 is connected to the programmed blockage alarm device 6. When the wind speed drops significantly, 6 sounds an alarm to indicate that the slag discharge well is blocked. At this time, construction is stopped, the cause of the blockage is found, and the slag is discharged after the blocking rock is removed. After the slag discharge construction is completed, the device is lifted away from the construction site through the lifting ring 11 on the top of the device.
[0033] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0034] Although this article uses the following terms more frequently: fixed ring 1, slag inlet hole 2, sliding block 3, slag discharge hole 4, motor 5, alarm device 6, anemometer 7, sliding track 8, elastic support 9, limited sliding track 10, hanging ring 11, support block 12, ventilation hole 13, main body 20, etc., it does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional limitations is contrary to the spirit of the present invention.
Claims
1. A monitoring device for preventing blockage during shaft blasting and excavation. It is characterized by: The invention comprises a body (20), a fixing device mounted on the body (20), a filtering system, a vibration system, a sliding system and a monitoring system; the fixing device comprises a fixing ring (1), the fixing ring (1) being fixedly arranged on the outer side of the body (20) and arranged circumferentially; the filtering system comprises a plurality of slag inlet holes (2) respectively located on the side of the body (20) and a slag discharge hole (4) located at the bottom of the body (20); the slag inlet holes (2) are located on the fixing ring (1), the vibration system is symmetrically arranged on both sides of the slag discharge hole (4), and the sliding system is mounted on the vibration system; the vibration system comprises a motor (5) fixedly arranged at the bottom of the body (20), an eccentric block is arranged at the end of the motor (5) to form eccentric vibration, the eccentric block is connected to the vibration block, and the top of the vibration block is connected to the sliding system The invention discloses a sliding system for providing vibration for the sliding system; the sliding system comprises a sliding block (3), a sliding surface is formed on the sliding block, the bottom of the sliding block is connected to a support block (12) distributed in a T shape, a plurality of elastic supports (9) are arranged under the support block (12), a sliding track (8) is provided at the connection between the sliding block and the inner wall of the body (20), and a limit sliding track (10) is provided at the connection between the support block (12) and the inner wall of the body (20); the rock slag enters the slag discharge hole (4) along the sliding block (3) and enters the slag discharge well; the motor (5) transmits the vibration to the T-shaped support block through the eccentric block, and then transmits it to the sliding surface on the sliding block (3); the sliding surface moves up and down with a small amplitude and high frequency under the action of the sliding track (8) and the limit sliding track (10) to form vibration.
2. A monitoring device for preventing blockage in shaft blasting excavation according to claim 1, Features: The slag inlet holes (2) are provided in six numbers and are arranged in an annular manner and at equal intervals on the side wall of the body (20); the inner diameter of the slag inlet holes (2) is 1 / 3 of the inner diameter of the body (20).
3. A monitoring device for preventing blockage in shaft blasting excavation according to claim 1, Features: The inclination angle of the sliding block (3) is 120° to 140°.
4. A monitoring device for preventing blockage in shaft blasting excavation according to claim 1, Features: Four elastic supports (9) are provided and are equidistantly arranged at the lower end of the support block (12).
5. The device for monitoring the prevention of blockage in shaft blasting excavation according to claim 1, Features: The monitoring system is symmetrically distributed on both sides of the slag discharge hole (4) of the main body (20), and a ventilation hole (13) is formed at the bottom of the main body (20).
6. A monitoring device for preventing blockage in shaft blasting excavation according to claim 5, Features: The monitoring system comprises a wind speed measuring instrument (7) located above the ventilation hole (13) and connected to the inner wall of the body (20), and the wind speed measuring instrument (7) is connected to an alarm device (6).
7. A monitoring device for preventing blockage in shaft blasting excavation according to any one of claims 1 to 6, Features: It also comprises a lifting and transporting device, the lifting and transporting device comprising two lifting rings (11) fixedly arranged on the top of the main body (20), and the two lifting rings (11) are symmetrically arranged on the main body (20).
