A device and method for manufacturing prestressed steel-framed concrete beams
By applying pre-compressed stress to steel-reinforced concrete beams, the problem of low tensile strength of concrete is solved, the crack resistance is improved and the service life is extended.
Patent Information
- Application Number
- CN201911312612.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-18
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-12-18
AI Technical Summary
The concrete in steel-reinforced concrete beams is prone to cracking due to its low tensile strength, affecting the appearance of the structure and shortening its service life.
A device and method are used to apply pre-pressure stress on the long steel beam, use the end upward force mechanism and the middle downward force mechanism to cause the steel beam to bend and deform, and then release the external force after pouring the concrete, so that The lower surface of the concrete is pre-stressed, thereby improving crack resistance.
It effectively improves the crack resistance of concrete and extends the service life of steel-reinforced concrete beams, and the method is simple and easy to operate.
Smart Images

Figure CN111015938B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of civil engineering, and more particularly to a device and method for manufacturing prestressed steel-frame concrete beams. Background Art
[0002] Steel-reinforced concrete beam refers to a structure in which steel bars are arranged around the steel beam and concrete is poured. It can give full play to the characteristics of both steel and concrete. The specific advantages are as follows: Compared with steel structures, the outer concrete of steel-reinforced concrete structural components can prevent the local curved surface of steel components, improve the overall stiffness of steel components, significantly improve the plane torsional buckling performance of steel components, and give full play to the strength of steel. At the same time, concrete protects steel and effectively prevents fire and corrosion. Since steel-reinforced concrete is configured with steel sections in the cross section, the bearing capacity and stiffness of the components can be greatly improved, thereby greatly reducing the cross-sectional size of the components and increasing the effective use area of the house. Therefore, steel-reinforced concrete beams have the advantages of good seismic performance, saving steel, improving the utilization coefficient of concrete, and convenient construction, and are widely used in engineering construction.
[0003] The concrete in steel-reinforced concrete beams is a brittle material with high compressive strength, but its tensile strength is only 1 / 10 to 1 / 20 of the compressive strength. Therefore, concrete structures often crack due to the tensile strength of the concrete, which affects the appearance of the structure. In addition, the steel bars and steel beams are easily exposed in the cracks, making them easy to rust and reducing their service life.
[0004] Therefore, how to provide a device and method for making prestressed steel-framed concrete beams to apply prestress to concrete, improve the crack resistance of concrete, and extend the service life of steel-framed concrete beams is an urgent problem that technical personnel in this field need to solve. Summary of the invention
[0005] In view of this, the present invention provides a device and method for manufacturing a prestressed steel-framed concrete beam, so as to apply prestress to concrete, improve the crack resistance of concrete, and extend the service life of the steel-framed concrete beam.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] The present invention provides a device for manufacturing a prestressed steel-framed concrete beam, comprising:
[0008] A long strip production platform frame, on which a long strip template box with an open top is placed along its length direction, wherein a long strip template box is internally provided with a long strip steel beam, and a plurality of bolts are welded and fixed on the upper and lower surfaces of the long strip steel beam;
[0009] An end upward force-applying mechanism, wherein there are two end upward force-applying mechanisms, and the two end upward force-applying mechanisms are symmetrically arranged at positions close to both sides of the long strip production platform frame, and the bottom ends of the two end upward force-applying mechanisms extend through the open sides of the long strip template box to the inside of the long strip template box and are fixedly connected to the upper surface close to the two ends of the long strip steel frame beam;
[0010] A middle downward force-adding mechanism, wherein the middle downward force-adding mechanism is arranged at a position close to the middle of the long strip production platform frame, and the top end of the middle downward force-adding mechanism passes through the bottom of the long strip template box and extends to the inside of the long strip template box and is fixedly connected to the lower surface close to the middle of the long strip steel frame beam;
[0011] The long strip formwork box is filled with concrete for wrapping the long strip steel beam, and steel bars and stirrups are embedded in the concrete.
[0012] It can be seen from the above technical scheme that, compared with the prior art, the present invention discloses a device for manufacturing prestressed steel-framed concrete beams, wherein the mid-span position of the long steel-framed beam is fixed by a downward force-applying mechanism in the middle, and then an upward pulling force is applied to both ends of the long steel-framed beam by upward force-applying mechanisms at both ends, so that the long steel-framed beam is bent downwardly, that is, the upper surface of the steel-framed beam is subjected to compressive stress, and the lower surface of the steel-framed beam is subjected to tensile stress. Then, concrete is poured. After the concrete strength reaches a predetermined value, the external force is released. When the long steel-framed beam returns to its initial state, the prestressed concrete on the lower surface of the long steel-framed beam is subjected to precompressive stress. Thus, the crack resistance of the concrete can be improved and the service life of the steel-framed concrete beam can be extended.
[0013] Furthermore, the long strip production platform frame includes:
[0014] A long strip support platform, wherein a plurality of legs are arranged on the lower surface of the long strip support platform, and the long strip template box is placed on the upper surface of the long strip support platform along the length direction of the long strip support platform;
[0015] Upper support frames, the number of the upper support frames being two, and the two upper support frames being fixedly mounted respectively on the upper surfaces of the two sides of the long strip support platform, and the two end upward force applying mechanisms being mounted respectively on the two upper support frames;
[0016] A lower support frame is fixedly mounted on a position close to the lower surface of the middle portion of the long strip support platform, and the middle downward force applying mechanism is mounted on the lower support frame.
[0017] Furthermore, the two upper support frames each include:
[0018] Vertical support beams, there are two vertical support beams, and the two vertical support beams are spaced apart and arranged in parallel, and one end of the two vertical support beams is respectively fixedly mounted on the upper surface close to the side end of the long strip support platform;
[0019] A first transverse support beam, wherein two ends of the lower surface of the first transverse support beam are respectively fixedly connected to the other ends of the two vertical support beams, and the end upward force application mechanism is installed on the first transverse support beam.
[0020] Furthermore, the end upward force applying mechanism comprises:
[0021] An upward force screw rod, the upward force screw rod is arranged vertically, and one end of the upward force screw rod penetrates the upper and lower surfaces of the first transverse support beam, extends through the open side of the long strip template box to the inside of the long strip template box and is fixedly connected to the upper surface near the end position of the long strip steel frame beam, and the other end of the upward force screw rod extends above the first transverse support beam;
[0022] An upward force nut is threadedly connected to the upward force screw rod and is located above the first transverse support beam.
[0023] The beneficial effect of adopting the above technical solution is that by rotating the upward force nut, the upward force screw pulls the elongated steel beam upward to produce a downward bending deformation. The structure is simple and easy to operate.
[0024] Furthermore, a first connecting nut is welded and fixed at a position on the upper surface close to the end of the long steel frame beam corresponding to one end of the upward force screw, and one end of the upward force screw is screwed and fixed to the first connecting nut.
[0025] The beneficial effect of adopting the above technical solution is that it is easy to connect and disassemble the upward force screw rod and the long steel beam.
[0026] Furthermore, the upward force screw is sleeved with a tension pressure sensor for detecting the load applied thereto, and the tension pressure sensor is placed between the first transverse support beam and the upward force nut.
[0027] The beneficial effect of adopting the above technical solution is that it is possible to determine whether the applied load has reached a predetermined value through the tension and pressure sensor, thereby ensuring the accuracy of the applied load.
[0028] Furthermore, the lower support frame comprises:
[0029] A long strip longitudinal beam, wherein there are two long strip longitudinal beams, and the two long strip longitudinal beams are arranged at intervals along the length direction of the long strip support platform, and the upper surfaces of the two long strip longitudinal beams are fixedly mounted on the lower surface of the long strip support platform;
[0030] There are two second transverse support beams, the two second transverse support beams are arranged at intervals, and their upper surfaces are fixedly connected to the lower surfaces of the two long longitudinal beams, and there are two middle downward force-applying mechanisms, and the two middle downward force-applying mechanisms are respectively installed on the two second transverse support beams.
[0031] Furthermore, the two middle downward force-applying mechanisms each include:
[0032] A downward force screw rod, which is arranged vertically, and one end of which passes through the upper and lower surfaces of the second transverse support beam, extends through the bottom of the long strip template box to the inside of the long strip template box and is fixedly connected to the lower surface near the middle of the long strip steel frame beam, and the other end of which extends below the second transverse support beam;
[0033] A downward force nut is threadedly connected to the downward force screw rod and is located below the second transverse support beam.
[0034] The beneficial effect of adopting the above technical solution is that by rotating the downward force nut, the downward force screw can firmly fix the middle part of the long steel frame beam, so as to cooperate with the upward force screw to make the long steel frame beam produce downward bending deformation, so as to apply pre-compression stress to the concrete, improve the crack resistance of the concrete, and extend the service life of the steel frame concrete beam.
[0035] Furthermore, a second connecting nut is welded and fixed at a position on the lower surface near the middle of the long steel frame beam corresponding to one end of the downward force screw rod, and one end of the downward force screw rod is screwed and fixed to the second connecting nut.
[0036] The beneficial effect of adopting the above technical solution is that it is easy to connect and disassemble the downward force screw rod and the long steel beam.
[0037] The present invention also provides a method for manufacturing a prestressed steel-framed concrete beam, comprising the following steps:
[0038] Step 1, preparation of the long strip production platform frame: installing the upper support frame and the lower support frame at the corresponding positions of the long strip support platform according to the preset size;
[0039] Step 2, steel beam preparation: cut the long steel beam according to the designed length, and weld a plurality of bolts on the upper and lower surfaces of the long steel beam, weld and fix the first connecting nut at the position of the upper support frame on the upper surface of the long steel beam, and weld and fix the second connecting nut at the position of the lower support frame on the lower surface of the steel beam;
[0040] Step 3, preparation of the long strip formwork box: placing the long strip formwork box with an open top horizontally on the upper surface of the long strip support platform, and inserting the long strip steel beam inside, arranging steel bars on the outer sides of the upper and lower surfaces of the long strip steel beam, and placing stirrups;
[0041] Step 4: Install the upward force mechanism at the end and the downward force mechanism in the middle, and fix the long steel beam by the downward force nut and the downward force screw;
[0042] Step 5, applying external force: applying an upward pulling force to the long steel beam through the upward force nut and the upward force screw according to a preset value, and observing whether the applied pulling force value reaches a preset value through a tension and pressure sensor;
[0043] Step 6, pouring concrete: pouring concrete into the long strip formwork box according to the concrete strength requirements;
[0044] Step 7, release external force: When the concrete strength reaches 85%, loosen the upward force nut and the lower force nut to release the external force.
[0045] Step 8, remove the upward force screw, the downward force screw and the long strip formwork box to obtain a prestressed steel-framed concrete beam.
[0046] Through this manufacturing method, an external force can be applied to the long steel beam to generate a bending internal force, and then concrete is poured. After the concrete reaches a certain strength, the external force on the steel beam is released, and the steel beam elastically deforms to try to recover and a pre-compression stress is applied to the concrete on the lower surface of the steel beam, thereby forming a prestressed steel concrete beam, so that the prestressed steel concrete beam prepared by this method has good crack resistance and a long service life. In addition, the method is simple and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0048] Figure 1 The accompanying drawing is a schematic structural diagram of a device for manufacturing prestressed steel-framed concrete beams provided by the present invention.
[0049] Figure 2 The attached figure is a side view of the structure schematic diagram of the end upward force-applying mechanism installed on the long strip production platform frame.
[0050] Figure 3 The attached figure is a side view of the structure in which the central downward force-applying mechanism is installed on a long strip production platform frame.
[0051] Figure 4 The attached figure is a schematic diagram of the structure for pouring concrete into the formwork box and arranging steel bars and stirrups.
[0052] Figure 5 The attached figure is a schematic diagram of the structure of a prefabricated prestressed steel-reinforced concrete beam.
[0053] Among them: 1-long strip production platform frame, 11-long strip support platform, 12-support legs, 13-upper support frame, 131-vertical support beam, 132-first transverse support beam, 14-lower support frame, 141-long longitudinal beam, 14-second transverse support beam, 2-long strip formwork box, 3-long strip steel beam, 4-end upward force mechanism, 41-upward force screw, 42-upward force nut, 43-first connecting nut, 5-middle downward force mechanism, 51-downward force screw, 52-downward force nut, 53-second connecting nut, 6-concrete, 7-steel bar, 8-stirrup, 9-tension and pressure sensor. DETAILED DESCRIPTION
[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] The embodiment of the present invention discloses a device for manufacturing a prestressed steel-framed concrete beam, comprising:
[0056] A long strip production platform frame 1, on which a long strip template box 2 with an open top is placed along its length direction, and the long strip template box 2 has a long strip steel frame beam 3 built in it, and multiple bolts are welded and fixed on the upper and lower surfaces of the long strip steel frame beam 3 to effectively bond and anchor the steel frame beam to the concrete;
[0057] The end upward force adding mechanism 4 is two, and the two end upward force adding mechanisms 4 are symmetrically arranged at positions close to both sides of the long strip production platform frame 1, and the bottom ends of the two end upward force adding mechanisms 4 extend through the open side of the long strip template box 2 to the inside of the long strip template box 2 and are fixedly connected to the upper surface of the positions close to both ends of the long strip steel frame beam 3;
[0058] The middle downward force-adding mechanism 5 is arranged at a position close to the middle of the long strip production platform frame 1, and the top of the middle downward force-adding mechanism 5 passes through the bottom of the long strip template box 2 and extends to the inside of the long strip template box 2 and is fixedly connected to the lower surface close to the middle of the long strip steel frame beam 3;
[0059] The long formwork box 2 is filled with concrete 6 for wrapping the long steel beam 3, as well as steel bars 7 and stirrups 8 embedded in the concrete 6. The steel bars 7 are arranged on the upper and lower surfaces of the steel beam, and the stirrups 8 are arranged around the outside of the steel beam.
[0060] The long strip production platform frame 1 comprises:
[0061] A strip-shaped support platform 11, a plurality of legs 12 are arranged on the lower surface of the strip-shaped support platform 11, and a strip-shaped template box 2 is placed on the upper surface of the strip-shaped support platform 11 along the length direction of the strip-shaped support platform 11;
[0062] The upper support frame 13 is two, and the two upper support frames 13 are respectively fixedly installed on the upper surfaces of the two sides of the long strip support platform 11, and the two end upward force adding mechanisms 4 are respectively installed on the two upper support frames 13;
[0063] The lower support frame 14 is fixedly mounted on a position close to the lower surface of the middle portion of the long strip support platform 11 , and the middle downward force applying mechanism 5 is mounted on the lower support frame 14 .
[0064] In some embodiments of the present invention, the two upper support frames 13 each include:
[0065] Vertical support beams 131, there are two vertical support beams 131, and the two vertical support beams 131 are spaced apart and arranged in parallel, and one end of the two vertical support beams 131 is respectively fixedly mounted on the upper surface close to the side end of the long strip support platform 11;
[0066] The first transverse support beam 132 has two ends on its lower surface fixedly connected to the other ends of the two vertical support beams 131 , and an end upward force applying mechanism 4 is installed on the first transverse support beam 132 .
[0067] In some embodiments of the present invention, the end upward force applying mechanism 4 comprises:
[0068] An upward force screw 41 is arranged vertically, and one end of the upward force screw 41 passes through the upper and lower surfaces of the first transverse support beam 132, extends through the open side of the long strip template box 2 to the inside of the long strip template box 2 and is fixedly connected to the upper surface near the end of the long strip steel frame beam 3, and the other end extends above the first transverse support beam 132;
[0069] The upward force nut 42 is threadedly connected to the upward force screw rod 41 and is located above the first transverse support beam 132 .
[0070] Specifically, a first connecting nut 43 is welded and fixed at a position on the upper surface close to the end of the long steel frame beam 3 corresponding to one end of the upward force screw 41 , and one end of the upward force screw 41 is screwed and fixed to the first connecting nut 43 .
[0071] In some embodiments of the present invention, a tension pressure sensor 9 for detecting the load applied thereto is sleeved on the upward force screw 41, and the tension pressure sensor 9 is placed between the first transverse support beam 132 and the upward force nut 42. In order to avoid friction on the tension pressure sensor when the upward force nut is screwed and thus damage the tension pressure sensor, a pad (not shown) is provided between the tension pressure sensor and the upward force nut.
[0072] In some embodiments of the present invention, the lower support frame 14 includes:
[0073] Long strip longitudinal beams 141, there are two long strip longitudinal beams 141, and the two long strip longitudinal beams 141 are arranged at intervals along the length direction of the long strip support platform 11, and the upper surfaces of the two long strip longitudinal beams 141 are fixedly installed on the lower surface of the long strip support platform 11;
[0074] There are two second transverse support beams 142 , and the two second transverse support beams 142 are arranged at intervals, and their upper surfaces are fixedly connected to the lower surfaces of the two long longitudinal beams 141 . There are two middle downward force applying mechanisms 5 , and the two middle downward force applying mechanisms 5 are respectively installed on the two second transverse support beams 142 .
[0075] In some embodiments of the present invention, the two middle downward force applying mechanisms 5 each include:
[0076] A downward force screw 51 is arranged vertically, and one end of the downward force screw 51 passes through the upper and lower surfaces of the second transverse support beam 142, extends to the inside of the long strip template box 2 through the bottom of the long strip template box 2, and is fixedly connected to the lower surface near the middle of the long strip steel frame beam 3, and the other end extends to the bottom of the second transverse support beam 142;
[0077] The downward force nut 52 is threadedly connected to the downward force screw rod 51 and is located below the second transverse support beam 142 .
[0078] Wherein, a pad (not marked) is arranged between the downward force nut and the second transverse support beam.
[0079] Specifically, a second connecting nut 53 is welded and fixed at a position on the lower surface near the middle of the long steel frame beam 3 corresponding to one end of the downward force screw 51 , and one end of the downward force screw 51 is screwed and fixed to the second connecting nut 53 .
[0080] Among them, the long steel beam can be an I-shaped steel beam, a rectangular steel beam, a T-shaped steel beam, etc.
[0081] The present invention also provides an embodiment of a method for manufacturing a prestressed steel-framed concrete beam, comprising the following steps:
[0082] Step 1, preparation of the long strip production platform frame: installing the upper support frame and the lower support frame at the corresponding positions of the long strip support platform according to the preset size;
[0083] Step 2, steel beam preparation: Cut the long steel beam according to the designed length, such as 6-20m, and weld a plurality of bolts on the upper and lower surfaces of the long steel beam, weld and fix the first connecting nut at a position 200-300mm away from the end position on the upper surface of the long steel beam and at the position corresponding to the upper support frame, and weld and fix the second connecting nut at the three-point position in the middle of the span of the lower surface of the steel beam (the length of the middle section is about 30% of the length of the steel beam, and is a multiple of 100mm, such as a 6m long beam, the length of the middle section can be 2m, and the other two sections are 2m; for a 20m long beam, the length of the middle section is 6m, and the other two sections are 7m) and at the position corresponding to the lower support frame;
[0084] Step 3, preparation of the long strip formwork box: placing the long strip formwork box with an open top horizontally on the upper surface of the long strip support platform, and inserting the long strip steel frame beam, arranging steel bars on the outer sides of the upper and lower surfaces of the long strip steel frame beam, and placing stirrups on the outer sides of the steel frame beam;
[0085] Step 4: Install the upward force mechanism at the end and the downward force mechanism in the middle, and fix the long steel beam by the downward force nut and the downward force screw;
[0086] Step 5, applying external force: applying an upward pulling force to the long steel beam through the upward force nut and the upward force screw according to the preset pulling force value (20-100KN), and observing whether the applied pulling force value reaches the preset value through the tension pressure sensor;
[0087] Step 6, pouring concrete: pouring concrete into the long strip formwork box according to the concrete strength requirements, and reserving concrete test blocks. The concrete can be drought-strength concrete to reduce the production time;
[0088] Step 7, release external force: When the strength of the concrete specimen measured by the rebound tester reaches 85%, loosen the upward force nut and the lower force nut to release the external force.
[0089] Step 8, remove the upward force screw, the downward force screw and the long strip formwork box to obtain a prestressed steel-framed concrete beam.
[0090] It should be noted that, in order to facilitate the removal of the upward force screw and the downward force screw, a protective tube can be installed outside the screw in advance, and then the concrete is poured.
[0091] By means of the device and method, when a predetermined load is applied to a steel beam to generate bending pressure, after pouring concrete, the load on the steel beam is removed, and pre-compression stress is introduced into the concrete on the lower surface of the steel beam during the process of releasing the bending pressure of the steel beam, thereby improving the crack resistance of the concrete and extending the service life of the steel beam concrete beam.
[0092] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0093] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A device for making prestressed steel-reinforced concrete beams, It is characterized in that include: A long strip production platform frame (1), wherein a long strip template box (2) with an open top is placed on the long strip production platform frame (1) along its length direction, wherein the long strip template box (2) has a long strip steel frame beam (3) built in, and a plurality of bolts are welded and fixed on the upper and lower surfaces of the long strip steel frame beam (3); An end upward force-applying mechanism (4), wherein the end upward force-applying mechanism (4) is two, and the two end upward force-applying mechanisms (4) are symmetrically arranged at positions close to both sides of the long strip production platform frame (1), and the bottom ends of the two end upward force-applying mechanisms (4) respectively extend through the open side of the long strip template box (2) to the inside of the long strip template box (2) and are fixedly connected to the upper surface of the positions close to both ends of the long strip steel frame beam (3); A middle downward force-applying mechanism (5), the middle downward force-applying mechanism (5) being arranged at a position close to the middle of the long strip production platform frame (1), and the top end of the middle downward force-applying mechanism (5) passing through the bottom of the long strip template box (2) and extending into the interior of the long strip template box (2) and being fixedly connected to the lower surface close to the middle of the long strip steel frame beam (3); The long strip formwork box (2) is filled with concrete (6) for wrapping the long strip steel beam (3), and steel bars (7) and stirrups (8) embedded in the concrete (6); The long strip production platform frame (1) comprises: A long strip support platform (11), wherein a plurality of legs (12) are provided on the lower surface of the long strip support platform (11), and the long strip template box (2) is placed on the upper surface of the long strip support platform (11) along the length direction of the long strip support platform (11); An upper support frame (13), wherein there are two upper support frames (13), and the two upper support frames (13) are respectively fixedly mounted on positions close to the upper surfaces of both sides of the long strip support platform (11), and the two end upward force applying mechanisms (4) are respectively mounted on the two upper support frames (13); A lower support frame (14), the lower support frame (14) being fixedly mounted on a position close to the lower surface of the middle portion of the long strip support platform (11), and the middle portion downward force applying mechanism (5) being mounted on the lower support frame (14); The two upper support frames (13) each comprise: A vertical support beam (131), wherein there are two vertical support beams (131), and the two vertical support beams (131) are spaced apart and arranged in parallel, and one end of the two vertical support beams (131) is respectively fixedly mounted on an upper surface close to a side end of the long strip support platform (11); a first transverse support beam (132), wherein two ends of the lower surface of the first transverse support beam (132) are respectively fixedly connected to the other ends of the two vertical support beams (131), and the end upward force applying mechanism (4) is installed on the first transverse support beam (132); The end upward force applying mechanism (4) comprises: an upward force applying screw rod (41), the upward force applying screw rod (41) being arranged vertically, and having one end penetrating through the upper and lower surfaces of the first transverse support beam (132), extending through the open side of the long strip template box (2) to the interior of the long strip template box (2) and being fixedly connected to the upper surface near the end of the long strip steel frame beam (3), and the other end extending upward from the first transverse support beam (132); An upward force nut (42), the upward force nut (42) being screwed onto the upward force screw rod (41) and being located above the first transverse support beam (132); A first connecting nut (43) is welded and fixed at a position on the upper surface close to the end of the long steel frame beam (3) corresponding to one end of the upward force screw (41), and one end of the upward force screw (41) is screwed and fixed to the first connecting nut (43); The upward force screw (41) is sleeved with a tension pressure sensor (9) for detecting the load applied thereto, and the tension pressure sensor (9) is disposed between the first transverse support beam (132) and the upward force nut (42).
2. A device for manufacturing prestressed steel-framed concrete beams according to claim 1, It is characterized in that The lower support frame (14) comprises: A long strip longitudinal beam (141), wherein there are two long strip longitudinal beams (141), and the two long strip longitudinal beams (141) are arranged at intervals along the length direction of the long strip support platform (11), and the upper surfaces of the two long strip longitudinal beams (141) are fixedly mounted on the lower surface of the long strip support platform (11); There are two second transverse support beams (142), the two second transverse support beams (142) are arranged at intervals, and their upper surfaces are fixedly connected to the lower surfaces of the two long longitudinal beams (141), and there are two middle downward force applying mechanisms (5), and the two middle downward force applying mechanisms (5) are respectively installed on the two second transverse support beams (142).
3. A device for manufacturing prestressed steel-framed concrete beams according to claim 2, It is characterized in that The two middle downward force applying mechanisms (5) both include: a downward force screw (51), the downward force screw (51) being arranged vertically, and having one end penetrating through the upper and lower surfaces of the second transverse support beam (142), extending through the bottom of the long strip template box (2) to the interior of the long strip template box (2) and being fixedly connected to the lower surface near the middle of the long strip steel frame beam (3), and the other end extending downwardly from the second transverse support beam (142); A downward force nut (52), the downward force nut (52) being threaded onto the downward force screw rod (51) and being located below the second transverse support beam (142).
4. A device for manufacturing prestressed steel-framed concrete beams according to claim 3, It is characterized in that A second connecting nut (53) is welded and fixed at a position on the lower surface close to the middle of the long steel frame beam (3) corresponding to one end of the downward force screw (51), and one end of the downward force screw (51) is screwed and fixed to the second connecting nut (53).
5. A method for manufacturing a prestressed steel-reinforced concrete beam, It is characterized in that The following steps are performed using the device for manufacturing a prestressed steel-framed concrete beam as described in any one of claims 1 to 4: Step 1, preparation of the long strip production platform frame: installing the upper support frame and the lower support frame at the corresponding positions of the long strip support platform according to the preset size; Step 2, steel beam preparation: cut the long steel beam according to the designed length, and weld a plurality of bolts on the upper and lower surfaces of the long steel beam, weld and fix the first connecting nut at the position of the upper support frame on the upper surface of the long steel beam, and weld and fix the second connecting nut at the position of the lower support frame on the lower surface of the steel beam; Step 3, preparation of the long strip formwork box: placing the long strip formwork box with an open top horizontally on the upper surface of the long strip support platform, and inserting the long strip steel beam inside, arranging steel bars on the outer sides of the upper and lower surfaces of the long strip steel beam, and placing stirrups; Step 4: Install the upward force mechanism at the end and the downward force mechanism in the middle, and fix the long steel beam by the downward force nut and the downward force screw; Step 5, applying external force: applying an upward pulling force to the long steel beam through the upward force nut and the upward force screw according to a preset value, and observing whether the applied pulling force value reaches a preset value through a tension and pressure sensor; Step 6, pouring concrete: pouring concrete into the long strip formwork box according to the concrete strength requirements; Step 7, release external force: When the concrete strength reaches 85%, loosen the upward force nut and the lower force nut to release the external force; Step 8, remove the upward force screw, the downward force screw and the long strip formwork box to obtain a prestressed steel-framed concrete beam.
Citation Information
Patent Citations
Prestressed H-shaped steel reinforced concrete superposed beam
CN103498533A
Anchoring structure for concrete beams and steel reinforced concrete columns and construction method
CN109667343A
Device for manufacturing prestressed steel reinforced concrete beam
CN211492173U
PC Concrete Structure of Variable section Reinforce for Increse Stiffness with Projecting Cable and Truss Structure
KR1020160119623A