A bottom-seat inserted pile type single pile stabilizing frame and pile sinking method
Through the design of a single pile stabilization frame for base-mounted pile insertion, high-precision single pile verticality control is achieved using pile stabilization truss and guide rollers, which solves the shortcomings in verticality and maintenance of offshore wind power single pile stabilization platform. Improve construction efficiency and result rate and reduce maintenance costs.
Patent Information
- Application Number
- CN202010069364.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-21
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2040-01-21
AI Technical Summary
The existing offshore wind power single-pile pile stabilization platform has shortcomings in verticality control and maintenance, and the construction efficiency and accuracy are difficult to meet the requirements, and the maintenance costs are high.
A single pile stabilization frame with a base-mounted pile insertion type is designed, including a pile stabilization truss, a pile holding mechanism and a guide roller. It is fixed to the seabed by positioning piles, and verticality adjustment and pile sinking are used to adjust and pile sink by telescopic adjustment device and hydraulic hammer. , reduce the impact of sea currents and sea breeze on pile stabilization trusses, and a balanced floating box is set up on the platform to reduce uneven self-subduing depth.
High-precision single pile verticality control is achieved, maintenance costs are reduced, construction efficiency and pile sinking result rate are improved, and design requirements for pile top elevation and verticality are ensured.
Smart Images

Figure CN111139830B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a pile stabilizing platform, in particular to a bottom-seat-inserted-pile-type single-pile stabilizing frame. The present invention also relates to a pile sinking method of the bottom-seat-inserted-pile-type single-pile stabilizing frame. Background Art
[0002] Wind energy is a renewable and clean energy source. In the prior art, wind turbines are usually used to collect wind energy. Due to the large amount of available space in the sea and the strong wind, more and more wind farms are being built at sea. The wind turbines in the prior art mostly use a single pile structure. The single pile foundation structure is the mainstream offshore wind power foundation structure type in the world and China. However, the domestic single pile foundation mostly uses a non-transition flange structure, which has extremely high requirements for the verticality of the single pile. Therefore, when installing the single pile, a pile stabilizing device is required to assist in sinking the pile to meet the verticality requirements of the pile. There are many different types of pile stabilization platforms in the prior art. For example, a Chinese patent document with publication number CN207829001U discloses a pile stabilization positioning platform for an offshore wind power single pile foundation, which includes: a main platform, a pile feeding port is arranged at its bow; a pile holding mechanism is arranged at the bow of the main platform and is connected with the single pile foundation; four platform pile legs, each of which is provided with a pile punching system; four lifting systems, each of which is correspondingly installed at the junction of a platform pile leg and the main platform; two rudder propeller systems, which are arranged at the stern of the main platform; and four sets of anchor winches, which are symmetrically arranged at the bow / stern of the left and right sides of the main platform. The pile stabilizing positioning platform positions the single pile through the pile feeding opening on the main platform. Since there is only one main platform, when the lower part of the single pile is cut and tilted due to the impact of water flow and other factors, the single pile feeding opening is difficult to effectively limit the position, thereby affecting the verticality of the single pile installation; and it is also troublesome to take and place the single pile through the pile feeding opening; at the same time, the pile stabilizing positioning platform is equipped with many other mechanisms. Due to the corrosiveness of seawater, the pile stabilizing positioning platform needs to be maintained frequently, and the maintenance cost is high.
[0003] In the existing technology, deepwater underwater wind turbine conductor frames are mostly used to build offshore wind turbines. The steel pipe piles of the underwater conductor frame wind turbine foundation are constructed by hydraulic hammer pile driving, and the pile top elevation control deviation is relatively large. The deeper the water depth and the worse the sea conditions, the greater the pile position deviation of the hydraulic hammer pile driving. In the offshore piling process, due to the wide construction area, large working surface, poor construction environment and climatic conditions, the pile position deviation control cannot meet the requirements according to the conventional measurement and positioning method. If special construction technology and control measures are not adopted, the relative position error of the pile top cannot meet the design requirements. In order to ensure that the underwater steel pipe pile driving accuracy meets the requirements, a complete set of pile driving control technology must be developed to control the steel pipe pile driving. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a single pile stabilizing frame with a bottom-seat inserted pile, which is simple and reliable in structure, easy to use, has high control accuracy and is easy to maintain, in view of the deficiencies in the prior art.
[0005] Another problem to be solved by the present invention is to provide a pile driving method of a bottom-mounted single pile stabilizing frame with high construction efficiency and convenient and precise control. The pile driving method can effectively control the sinking of foundation steel pipe piles through the single pile stabilizing frame to ensure that the center of the wind turbine position, the elevation of the top of the steel pipe pile, the verticality, the pile position deviation, etc. meet the design requirements.
[0006] The technical problem to be solved by the present invention is achieved by the following technical solution. The present invention is a bottom-mounted single-pile stabilizing frame, which is characterized by: comprising a stabilizing truss, which is mainly composed of a plurality of vertical supporting cylinders, the supporting cylinders are connected by reinforcing braces to form the main part of the stabilizing truss, and a hollow cylinder cavity is provided in the supporting cylinder, which is used for the matching positioning pile to be installed, the positioning pile is installed in the hollow cylinder cavity and the bottom of the positioning pile is fixed in the seabed;
[0007] A plurality of pile stabilizing platforms are arranged in an upper and lower arrangement at the middle and upper part of the pile stabilizing truss, and an anti-sinking plate is fixedly installed at the lower part of the pile stabilizing truss. The pile stabilizing platform includes a platform body fixedly arranged on the pile stabilizing truss, and a pile holding mechanism is arranged at the front part of the platform body. The pile holding mechanism includes a single pile clamping slot provided on the platform body, and arms are hinged at both sides of the single pile clamping slot. Both arms are connected to a matching driving device to form a swing structure, and a matching movable connection structure is installed at the front end of the two arms. A pile feeding port for single pile installation is formed between the arms and the single pile clamping slot, and the pile feeding ports are arranged correspondingly up and down;
[0008] A plurality of single pile guiding mechanisms are arranged along the circumferential direction in the pile feeding opening. The single pile guiding mechanisms include guiding rollers and telescopic adjustment devices for driving the guiding rollers to move. The telescopic adjustment devices are fixedly mounted on the arm and / or the platform body, and the moving direction of the telescopic adjustment devices points to the center of the pile feeding opening. The guiding rollers are used to overlap on the single pile to adjust the position of the single pile.
[0009] The above-mentioned single pile stabilizing frame with bottom-inserted piles of the present invention has a further preferred technical solution or technical feature as follows: at least two pile stabilizing platforms are provided.
[0010] The above-mentioned single pile stabilizing frame with a bottom-inserted pile of the present invention has a further preferred technical solution or technical feature that at least three guide rollers are provided, and the guide rollers are evenly spaced and arranged along the circumferential direction.
[0011] The above-mentioned single pile stabilizing frame with a bottom-inserted pile of the present invention has a further preferred technical solution or technical feature as follows: four guide rollers are provided.
[0012] The above-mentioned single pile stabilizing frame with bottom-inserted piles of the present invention has a further preferred technical solution or technical feature as follows: the pile stabilizing truss comprises four supporting cylinders, which are arranged in a rectangular structure.
[0013] The above-mentioned single pile stabilizing frame with a bottom-inserted pile of the present invention has a further preferred technical solution or technical feature: a plurality of sleeves matching the supporting cylinder are fixedly provided on the pile stabilizing platform, and the pile stabilizing platform is sleeved on the supporting cylinder through the sleeve and fixedly connected.
[0014] The above-mentioned single pile stabilizing frame with bottom-seat inserted piles of the present invention has a further preferred technical solution or technical feature that a plurality of balancing buoys are fixedly provided on the pile stabilizing truss below the pile holding mechanism.
[0015] The present invention also provides a pile sinking method using the above-mentioned bottom-seat inserted pile type single pile stabilizing frame, which is characterized by comprising the following steps:
[0016] (1) Ship transportation of single pile stabilizing frame: transport the single pile stabilizing frame to the designated sea area by ship;
[0017] (2) Lifting, turning over and sinking of the single pile stabilizing frame: The single pile stabilizing frame in step (1) is lifted and turned over by a lifting tool so that the single pile stabilizing frame is sunk into the seabed at the designed position. During the turning over process, the stabilizing platforms on the single pile stabilizing frame are all located above the sea level. After the single pile stabilizing frame has sunk the pile, the stabilizing platforms are parallel to the sea level. Subsequently, the positioning columns are respectively inserted into the supporting cylinders at the four corners of the single pile stabilizing frame, and the positioning piles are driven into the seabed so that the single pile stabilizing frame is fixed on the seabed.
[0018] (3) Installation and fixation of single piles: Open the arm on the pile stabilization platform, vertically lift the single pile to be fixed into the pile feeding port, then close the arm, and adjust the verticality of the single pile through the guide roller on the single pile guide mechanism, so that the verticality deviation of the single pile does not exceed 1.0‰;
[0019] After the single pile is adjusted, it is first sunk into the seabed by its own weight. After it is stable, it is driven by a hydraulic hammer. After the pile is sunk, the verticality deviation of the single pile shall not exceed 3.0‰.
[0020] (4) Dismantling of the single pile stabilizing frame: Open the arm and remove the guide roller from the single pile, lift and pull out the positioning pile, and then lift the single pile stabilizing frame onto the ship and transport it to the next location.
[0021] The above-mentioned method for sinking a single pile stabilizing frame with a bottom-inserted pile of the present invention has a further preferred technical solution or technical feature that: in step (2), the single pile stabilizing frame is lifted and turned over by using a main lifting ship and an auxiliary lifting ship at the same time, the main lifting ship lifts the top of the single pile stabilizing frame by a lifting hook, and the auxiliary lifting ship lifts the tail of the single pile stabilizing frame by a lifting hook;
[0022] The main hoisting vessel and the auxiliary hoisting vessel cooperate to lift the single pile stabilizing frame horizontally to the sea surface, start the auxiliary hoisting vessel to lower the tail of the single pile stabilizing frame to 4m~5m from the seabed mud surface, and keep the tail of the single pile stabilizing frame stable. At this time, start the main hoisting vessel to lift the single pile stabilizing frame so that the stabilizing platform on the single pile stabilizing frame rotates to a horizontal state;
[0023] Then the main hoisting vessel continues to lift the monopile stabilizing frame upwards, so that the tail of the monopile stabilizing frame rises to a position 2m to 3m above the water surface, and at this time the hook of the auxiliary hoisting vessel is removed from the tail of the monopile stabilizing frame;
[0024] Then the placement angle of the single pile stabilizing frame is adjusted to the designed position, the main crane drops the hook to immerse the single pile stabilizing frame in the sea water and seat it on the bottom, and the pile stabilizing platforms are all located above the sea level. The position of the single pile stabilizing frame is then adjusted. After the position of the single pile stabilizing frame is adjusted, the positioning columns are respectively inserted into the supporting cylinder columns at the four corners of the single pile stabilizing frame, and the positioning piles are driven into the seabed, thereby fixing the single pile stabilizing frame on the seabed.
[0025] The above-mentioned method for sinking a pile of a bottom-inserted pile-stabilizing single-pile frame of the present invention has a further preferred technical solution or technical feature: in step (3), after the single pile is hoisted into the pile feeding port, the hook is not released, and the single pile sinks to the seabed mud surface under the action of its own weight. When the single pile is confirmed to be stable, a certain length of cable is continued to be lowered so that the single pile is in a state of being unstressed and not unhooked. After observing for 15 minutes, the hook on the single pile is released after confirming that the single pile is stable, thereby completing the preliminary fixation of the single pile;
[0026] Subsequently, the single pile is sunk by hydraulic hammer, and the hydraulic hammer and the single pile are coaxially arranged; after the hydraulic hammer contacts the single pile for the first time, the hydraulic hammer is gradually lowered to increase the weight of the hydraulic hammer on the single pile gradually. If the verticality of the single pile does not change, the single pile is continuously sunk by hydraulic hammer with a small equivalent hydraulic hammer. The verticality of the single pile is observed and the pile is observed and adjusted every time it sinks 1m~2m. If the verticality of the single pile still does not change after repeated 3~4 times, the hydraulic hammer is changed to continuous hydraulic hammer to sink the pile.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] (1) The single pile stabilizing frame of the present invention cooperates with the pile stabilizing truss and the positioning piles. The positioning piles enable the pile stabilizing truss to be accurately fixed at the specified position on the seabed, which reduces the influence of ocean currents and sea breezes on the pile stabilizing truss, making the positioning accuracy of the pile stabilizing truss higher; and on the pile stabilizing platforms arranged in an upper and lower arrangement, the position of the guide roller is adjusted by the telescopic adjustment device, so that the verticality of the single pile can be effectively controlled to ensure the quality of pile sinking, and the control is convenient and the verticality adjustment accuracy is high. In summary, the present invention has the advantages of stable and reliable structure, high positioning accuracy, convenient adjustment and control, and high verticality adjustment accuracy.
[0029] The present invention fixes a balancing buoy on the pile stabilizing truss below the pile holding mechanism, and provides a part of buoyancy through the balancing buoy to balance the weight of the pile holding mechanism, thereby preventing the pile stabilizing truss from self-sinking at uneven depths due to uneven gravity distribution.
[0030] (2) The single pile stabilizing frame is used in the pile sinking method of the single pile stabilizing frame of the present invention. The single pile stabilizing frame improves the vertical accuracy of the single pile sinking, making the accuracy adjustment of the single pile in the pile sinking method more convenient and efficient, thereby increasing the success rate of pile sinking, saving pile sinking time, and improving the efficiency of pile sinking.
[0031] In the pile driving method of the present invention, the pile stabilizing platforms are all located above the sea level, which avoids corrosion of the pile holding mechanism and the single pile guiding mechanism by sea water, reduces the maintenance cost of the single pile stabilizing frame, and increases the service life of the single pile stabilizing frame.
[0032] After the pile has sunk steadily under its own weight, it is observed and adjusted to improve its verticality. Before the pile is sunk with a hydraulic hammer, a test hammer is performed to further ensure the verticality of the pile during the sinking process. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 A structural schematic diagram of a bottom-seat inserted pile-type single-pile stabilizing pile frame of the present invention;
[0034] Figure 2 for Figure 1 A schematic diagram of a top view structure;
[0035] Figure 3 for Figure 2 A partial enlarged view of the middle part;
[0036] In the figure, 1 is a supporting column, 2 is a reinforcing support, 3 is a pile stabilizing platform, 4 is an anti-sinking plate, 5 is a single pile slot, 6 is an arm, 7 is a driving device, 8 is a guide roller, 9 is a telescopic adjustment device, 10 is a balancing buoy, and 11 is a single pile. DETAILED DESCRIPTION
[0037] The specific technical solutions of the present invention are further described below to help those skilled in the art further understand the present invention without limiting the rights thereof.
[0038] A bottom-inserted single-pile stabilizing frame includes a stabilizing pile truss, which is mainly composed of a plurality of vertical supporting cylinders 1, and the supporting cylinders 1 are fixedly connected by reinforcing braces 2 to form the main part of the stabilizing pile truss. A hollow cylinder cavity is provided in the supporting cylinder 1, and the hollow cylinder cavity is used for the matching positioning pile to be installed. The positioning pile is installed in the hollow cylinder cavity and the bottom of the positioning pile is fixed in the seabed;
[0039] A plurality of pile stabilizing platforms 3 are arranged in an upper and lower arrangement at the middle and upper part of the pile stabilizing truss, and an anti-sinking plate 4 is fixedly installed at the lower part of the pile stabilizing truss. The pile stabilizing platform 3 includes a platform body fixedly arranged on the pile stabilizing truss, and a pile holding mechanism is provided at the front part of the platform body. The pile holding mechanism includes a single pile clamping groove 5 provided on the platform body, and arms 6 are hinged at both sides of the single pile clamping groove 5. The two arms 6 are connected to the matching driving device 7 to form a swing structure, and the front ends of the two arms 6 are equipped with a matching movable connection structure. A pile feeding port for single pile installation is formed between the arms 6 and the single pile clamping groove 5, and the pile feeding ports are arranged correspondingly up and down;
[0040] The driving device 7 is a hydraulic cylinder, which is controlled by a matching hydraulic cylinder control system. The movable connection structure is a plug-in structure composed of a plug plate and a groove, which is fixed by a pin after buckling.
[0041] A plurality of single pile guiding mechanisms are arranged along the circumferential direction in the pile feeding mouth, and the single pile guiding mechanism comprises a guiding roller 8 and a telescopic adjustment device 9 for driving the guiding roller 7 to move forward, the telescopic adjustment device 9 is fixedly mounted on the arm 6 and / or the platform body, and the moving direction of the telescopic adjustment device 9 points to the center of the pile feeding mouth, and the guiding roller 7 is used to overlap on the single pile to adjust the position of the single pile.
[0042] The telescopic adjustment device 9 uses a hydraulic cylinder, which is controlled by a matching cylinder control system.
[0043] The pile stabilizing platforms 3 are provided with two.
[0044] There are four guide rollers 8, which are evenly spaced and arranged along the circumferential direction. The pile stabilizing truss comprises four support columns 1, which are arranged in a rectangular structure.
[0045] The pile stabilizing platform 3 is fixed with four sleeves matched with the supporting cylinder 1, and the pile stabilizing platform 3 is sleeved on the supporting cylinder 1 and fixedly connected. The four sleeves are fixed at the four corners of the pile stabilizing platform 3 respectively.
[0046] Two balancing pontoons 10 are fixed on the pile-stabilizing truss below the pile-holding mechanism. The balancing pontoons 10 are respectively fixed on the supporting cylinders 1 below the pile-holding mechanism. The balancing pontoons 10 are placed in the sea to provide buoyancy. The buoyancy of the balancing pontoons 10 is used to balance the weight of the pile-holding mechanism, so that the pile-stabilizing truss is balanced and stable.
[0047] A pile sinking method using the above-mentioned bottom-seat inserted pile type single pile stabilizing frame comprises the following steps:
[0048] (1) Ship transportation of single pile stabilizing frame: transport the single pile stabilizing frame to the designated sea area by ship;
[0049] (2) Lifting, turning over and sinking of the single pile stabilizing frame: The single pile stabilizing frame in step (1) is lifted and turned over by a lifting tool so that the single pile stabilizing frame is sunk into the seabed at the designed position. During the turning over process, the stabilizing platforms on the single pile stabilizing frame are all located above the sea level. After the single pile stabilizing frame has sunk the pile, the stabilizing platforms are parallel to the sea level. Subsequently, the positioning columns are respectively inserted into the supporting cylinders at the four corners of the single pile stabilizing frame, and the positioning piles are driven into the seabed so that the single pile stabilizing frame is fixed on the seabed.
[0050] (3) Installation and fixation of single piles: Open the arm on the pile stabilization platform, vertically lift the single pile to be fixed into the pile feeding port, then close the arm, and adjust the verticality of the single pile through the guide roller on the single pile guide mechanism, so that the verticality deviation of the single pile does not exceed 1.0‰;
[0051] After the single pile is adjusted, it is first sunk into the seabed by its own weight. After it is stable, it is driven by a hydraulic hammer. After the pile is sunk, the verticality deviation of the single pile shall not exceed 3.0‰.
[0052] (4) Dismantling of the single pile stabilizing frame: Open the arm and remove the guide roller from the single pile, lift and pull out the positioning pile, and then lift the single pile stabilizing frame onto the ship and transport it to the next location.
[0053] In step (2), the single pile stabilizing frame is lifted and turned over by using the main lifting ship and the auxiliary lifting ship at the same time, the main lifting ship lifts the top of the single pile stabilizing frame by the lifting hook, and the auxiliary lifting ship lifts the tail of the single pile stabilizing frame by the lifting hook;
[0054] The main hoisting vessel and the auxiliary hoisting vessel cooperate to lift the single pile stabilizing frame horizontally to the sea surface, start the auxiliary hoisting vessel to lower the tail of the single pile stabilizing frame to 4m~5m from the seabed mud surface, and keep the tail of the single pile stabilizing frame stable. At this time, start the main hoisting vessel to lift the single pile stabilizing frame so that the stabilizing platform on the single pile stabilizing frame rotates to a horizontal state;
[0055] Then the main hoisting vessel continues to lift the monopile stabilizing frame upwards, so that the tail of the monopile stabilizing frame rises to a position 2m to 3m above the water surface, and at this time the hook of the auxiliary hoisting vessel is removed from the tail of the monopile stabilizing frame;
[0056] Then the placement angle of the single pile stabilizing frame is adjusted to the designed position, the main crane drops the hook to immerse the single pile stabilizing frame in the sea water and seat it on the bottom, and the pile stabilizing platforms are all located above the sea level. The position of the single pile stabilizing frame is then adjusted. After the position of the single pile stabilizing frame is adjusted, the positioning columns are respectively inserted into the supporting cylinder columns at the four corners of the single pile stabilizing frame, and the positioning piles are driven into the seabed, thereby fixing the single pile stabilizing frame on the seabed.
[0057] In step (3), after the pile is hoisted into the pile feeding port, the hook is not released, and the pile sinks to the seabed mud surface under its own weight. When the pile is confirmed to be stable, a certain length of cable is lowered to make the pile unstressed and unhooked. After observing for 15 minutes, the hook on the pile is released after confirming that the pile is stable, thus completing the initial fixation of the pile.
[0058] Subsequently, the single pile is sunk by hydraulic hammer, and the hydraulic hammer and the single pile are coaxially arranged; after the hydraulic hammer contacts the single pile for the first time, the hydraulic hammer is gradually lowered to increase the weight of the hydraulic hammer on the single pile gradually. If the verticality of the single pile does not change, the single pile is continuously sunk by hydraulic hammer with a small equivalent hydraulic hammer. The verticality of the single pile is observed and the pile is observed and adjusted every time it sinks 1m~2m. If the verticality of the single pile still does not change after repeated 3~4 times, the hydraulic hammer is changed to continuous hydraulic hammer to sink the pile.
Claims
1. A pile sinking method for a bottom-mounted pile-inserted single-pile stabilizing frame, characterized in that: The steps include: (1) Ship transportation of single pile stabilizing frame: transport the single pile stabilizing frame to the designated sea area by ship; (2) Lifting, turning over and sinking of the single pile stabilizing frame: The single pile stabilizing frame in step (1) is lifted and turned over by a lifting tool so that the single pile stabilizing frame is sunk into the seabed at the designed position. During the turning over process, the stabilizing platforms on the single pile stabilizing frame are all located above the sea level. After the single pile stabilizing frame has sunk the pile, the stabilizing platforms are parallel to the sea level. Subsequently, the positioning columns are respectively inserted into the supporting cylinders at the four corners of the single pile stabilizing frame, and the positioning piles are driven into the seabed so that the single pile stabilizing frame is fixed on the seabed. (3) Installation and fixation of single piles: Open the arm on the pile stabilization platform, vertically lift the single pile to be fixed into the pile feeding port, then close the arm, and adjust the verticality of the single pile through the guide roller on the single pile guide mechanism, so that the verticality deviation of the single pile does not exceed 1.0‰; After the single pile is adjusted, it is first sunk into the seabed by its own weight. After it is stable, it is driven by a hydraulic hammer. After the pile is sunk, the verticality deviation of the single pile shall not exceed 3.0‰. (4) Dismantling of the single pile stabilizing frame: open the arm and remove the guide roller from the single pile, lift and pull out the positioning pile, then lift the single pile stabilizing frame onto the ship and transport it to the next location; In step (2), the single pile stabilizing frame is lifted and turned over by using the main lifting ship and the auxiliary lifting ship at the same time, the main lifting ship lifts the top of the single pile stabilizing frame by the lifting hook, and the auxiliary lifting ship lifts the tail of the single pile stabilizing frame by the lifting hook; The main hoisting vessel and the auxiliary hoisting vessel cooperate to lift the single pile stabilizing frame horizontally to the sea surface, start the auxiliary hoisting vessel to lower the tail of the single pile stabilizing frame to 4m~5m from the seabed mud surface, and keep the tail of the single pile stabilizing frame stable. At this time, start the main hoisting vessel to lift the single pile stabilizing frame so that the stabilizing platform on the single pile stabilizing frame rotates to a horizontal state; Then the main hoisting vessel continues to lift the monopile stabilizing frame upwards, so that the tail of the monopile stabilizing frame rises to a position 2m to 3m above the water surface, and at this time the hook of the auxiliary hoisting vessel is removed from the tail of the monopile stabilizing frame; Then adjust the placement angle of the single pile stabilizing frame to the designed position, and the main crane drops the hook to immerse the single pile stabilizing frame into the sea water and seat it on the bottom, and the stabilizing platforms are all located above the sea level, and then adjust the position of the single pile stabilizing frame. After the position of the single pile stabilizing frame is adjusted, insert the positioning columns into the supporting cylinders at the four corners of the single pile stabilizing frame, and drive the positioning piles into the seabed, so that the single pile stabilizing frame is fixed on the seabed; The bottom-seat inserted pile-type single pile stabilizing frame includes a stabilizing pile truss, which is composed of a plurality of vertical supporting cylinders, and the supporting cylinders are connected to each other by reinforcing braces to form the main part of the stabilizing pile truss. A hollow cylinder cavity is provided in the supporting cylinder, and the hollow cylinder cavity is used for the matching positioning pile to be installed; A plurality of pile stabilizing platforms are arranged in an upper and lower arrangement at the middle and upper part of the pile stabilizing truss, and an anti-sinking plate is fixedly installed at the lower part of the pile stabilizing truss. The pile stabilizing platform includes a platform body fixedly arranged on the pile stabilizing truss, and a pile holding mechanism is arranged at the front part of the platform body. The pile holding mechanism includes a single pile clamping slot provided on the platform body, and arms are hinged at both sides of the single pile clamping slot. Both arms are connected to a matching driving device to form a swing structure, and a matching movable connection structure is installed at the front end of the two arms. A pile feeding port for single pile installation is formed between the arms and the single pile clamping slot, and the pile feeding ports are arranged correspondingly up and down; A plurality of single pile guiding mechanisms are arranged along the circumferential direction in the pile feeding opening, and the single pile guiding mechanisms include guiding rollers and a telescopic adjustment device for driving the guiding rollers to move, the telescopic adjustment device is fixedly mounted on the arm and / or the platform body, and the moving direction of the telescopic adjustment device points to the center of the pile feeding opening, and the guiding rollers are used to overlap on the single pile to adjust the position of the single pile; the pile stabilizing platform is provided with at least two.
2. The method for sinking a pile of a bottom-seat-inserted single-pile stabilizing frame according to claim 1, characterized in that: At least three guide rollers are provided, and the guide rollers are evenly spaced and arranged along the circumferential direction.
3. The method for sinking a pile of a bottom-mounted single-pile stabilizing frame according to claim 2, characterized in that: There are four guide rollers.
4. The method for sinking a pile of a bottom-mounted single-pile stabilizing pile frame according to claim 1, characterized in that: The pile stabilizing truss comprises four supporting columns, which are arranged in a rectangular structure.
5. The method for sinking a pile of a bottom-seat-inserted single-pile stabilizing pile frame according to claim 1, characterized in that: The pile stabilizing platform is fixedly provided with a plurality of sleeves matched with the supporting cylinders, and the pile stabilizing platform is sleeved on the supporting cylinders through the sleeves and fixedly connected.
6. The method for sinking a pile of a bottom-mounted single-pile stabilizing pile frame according to claim 1, characterized in that: A plurality of balancing buoys are fixedly arranged on the pile stabilizing truss below the pile holding mechanism.
7. The method for sinking a pile of a bottom-mounted single-pile stabilizing pile frame according to claim 1, characterized in that: In step (3), after the pile is hoisted into the pile feeding port, the hook is not released, and the pile sinks to the seabed mud surface under its own weight. When the pile is confirmed to be stable, a certain length of cable is continued to be lowered so that the pile is not stressed and not unhooked. After observing for 15 minutes, the hook on the pile is released after confirming that the pile is stable, and the initial fixation of the pile is completed; then, the pile is hydraulically hammered to sink the pile, and the hydraulic hammer and the pile are coaxially arranged; after the hydraulic hammer and the pile are first contacted, the hydraulic hammer is gradually lowered so that the weight of the hydraulic hammer acting on the pile gradually increases. If the verticality of the pile does not change, the hydraulic hammer is continued to be used to hammer the pile with a small equivalent hydraulic hammer, and the verticality of the pile is observed. The pile is observed and adjusted every time the pile sinks 1m~2m. After repeating this process 3~4 times, if the verticality of the pile still does not change, the hydraulic hammer is changed to a continuous hydraulic hammer to sink the pile.