A treatment process and treatment system for municipal sludge

By drying and pre-firing sludge in cement plants, combined with heat exchange of cement raw materials, the problems of high storage capacity, large environmental impact and high investment costs in municipal sludge disposal technology are solved, and the harmlessness of sludge is achieved and resource utilization reduce costs and management requirements.

CN111268888BActive Publication Date: 2024-11-22GUANGZHOU LVTAI ENVIRONMENTAL TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010213288.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-24
Publication Date
2024-11-22
Estimated Expiration
2040-03-24

AI Technical Summary

Technical Problem

The existing municipal sludge disposal technology has problems such as high storage capacity, large environmental impact, high investment costs, high operation and management requirements, and difficulty in achieving large-scale disposal.

Method used

The sludge drying system is used to dry and pre-fire the sludge in the cement plant, the water is evaporated by a steam dryer, and the organic matter is incinerated at high temperature through the pre-firing system outside the furnace, forming a uniform temperature gas flow into the decomposition furnace, combined with cement The raw materials are heat exchanged to achieve harmless and resource-based utilization of sludge.

Benefits of technology

It realizes harmless disposal and resource utilization of sludge, reduces investment and operation costs, is suitable for cement plants with small decomposition furnace capacity, and simplifies management requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111268888B_ABST
    Figure CN111268888B_ABST
Patent Text Reader

Abstract

The invention discloses a treatment process and a treatment system for municipal sludge. The treatment system is arranged outside a decomposition furnace and connected with the decomposition furnace and cement plant equipment, and comprises a sludge drying system, an off-furnace pre-burning system and a steam generating system. The steam generating system is connected with the sludge drying system, and the off-furnace pre-burning system is respectively connected with the sludge drying system and the steam generating system. The treatment process moves the processes of sludge heating, water evaporation, organic matter incineration, etc. to the pre-burning furnace for completion, does not occupy the furnace capacity of the decomposition furnace, creates conditions for large-scale coordinated treatment of sludge by cement kilns, realizes resource utilization of sludge, and also realizes final treatment of sludge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sludge disposal in the field of environmental protection, and in particular relates to a disposal process and a disposal system for municipal sludge. Background Art

[0002] Municipal sludge is an extremely complex heterogeneous body composed of organic debris, bacterial cells, inorganic particles, colloids, etc. It contains a large number of pathogens and parasites (eggs), heavy metals such as copper, zinc, chromium, salts such as nitrogen and phosphorus, and toxic and harmful substances that are difficult to degrade, such as polychlorinated biphenyls and dioxins. Sludge also contains a high amount of attached water and bound water. Municipal sludge not only has huge pollution potential, but also has obvious resource potential. Municipal sludge is rich in organic matter (dry basis mass fraction of about 30-70%), plant nutrients (dry basis mass fraction of about 5-10%) and chemical energy (dry basis calorific value of about 10-16MJ / kg). A perfect sludge management technology system can not only effectively control the environmental pollution hazards of sludge, but also provide certain resources for industrial development and agricultural production processes (such as agricultural fertilizers, industrial fuels and building materials, etc.). Whether the municipal sludge treatment and utilization technology system in the city is perfect is a key issue related to the entire sewage treatment and even environmental pollution control.

[0003] At present, the main disposal methods of municipal sludge are: sanitary landfill, land utilization, direct incineration, building materials application, cement kiln spraying, etc.

[0004] 1. Sanitary landfill. Use lime and other inorganic agents to condition the sludge and then landfill it. This disposal method is simple and easy, but the main problem is that it occupies a large amount of landfill capacity, which greatly reduces the utilization efficiency of the landfill. If the investment in landfill capacity is taken into account, the treatment cost is also high, and it cannot achieve the disposal goals of stabilization, harmlessness and reduction of sludge.

[0005] 2. Land utilization. Land utilization mainly includes composting, land improvement, etc. After the sludge is treated by anaerobic digestion, high-temperature aerobic fermentation and other treatment measures, it can be made into organic fertilizer and used for land improvement and landscaping. The characteristics of the composting disposal method are small project investment, low operating cost and large land area. The main problem is that it has a great impact on the surrounding environment during the sludge disposal process, and is subject to great restrictions on the scale of treatment and subsequent utilization. That is, after it is made into organic fertilizer, it is greatly affected by the utilization site and market demand when it is used in land or as agricultural fertilizer, resulting in the treatment scale of this disposal method being generally small and generally scattered. When land use is carried out, the nutrient and organic matter content of the sludge should meet the requirements of relevant national standards, and toxic and harmful substances such as heavy metals and organic pollutants need to be strictly controlled.

[0006] 3. Direct incineration. The characteristics of the comprehensive utilization of dry incineration are small footprint, thorough disposal, and significant reduction effect. The main problems are: the flue gas emitted during the incineration process must be treated, the ash after incineration needs to find a way out, the localization rate of equipment is low, the project investment is large, the operating cost is high, and the operation management level is high.

[0007] 4. Building materials application. Common building materials applications include brick making and lightweight aggregate making. Building materials application can achieve the final disposal of sludge. However, when burning building materials, the flue gas emitted must be strictly treated. The project investment is large, the operating cost is high, and the operation management level is required to be high.

[0008] 5. Cement kiln spraying. The sludge with a moisture content of about 80% is sprayed into the decomposition furnace or the tail smoke chamber of the kiln by a screw pump under pressure. The strong temperature field and material field in the cement production process are used to evaporate the moisture and burn the organic matter. Finally, the ash is mixed with the cement raw material. After being calcined in the cement kiln, it becomes a component of cement clinker, realizing the final disposal of the sludge. The disadvantage is that the sludge has a large amount of moisture, and its calorific value is almost zero or even negative. The sludge temperature rises and the evaporation of moisture occupies part of the furnace capacity of the decomposition furnace, which indirectly or directly affects the production of cement clinker. Therefore, it is difficult to achieve large-scale disposal of sludge by cement kiln spraying. Summary of the invention

[0009] In order to overcome the deficiencies of the prior art, an object of the present invention is to provide a disposal process and a disposal system for municipal sludge.

[0010] The innovation of the present invention relative to the prior art is:

[0011] A process for treating municipal sludge comprises the following steps:

[0012] Step 1: After the sludge is treated by plate and frame filter pressing in the sewage treatment plant, it is transported to the cement plant by truck, and the raw material device sends the sludge to the dryer of the sludge drying system;

[0013] Step 2: The steam from the steam generation system enters the dryer of the sludge drying system, and the heat of the steam is transferred to the sludge, which absorbs the heat and evaporates the water;

[0014] Step 3: The water vapor evaporated from the sludge is discharged from the dryer to the sludge drying system, and is sent to the condenser by the dehumidification fan. The cooling water from the cooling water circulation system enters the condenser, condenses the water vapor into liquid water and then is discharged from the condenser and sent back to the cooling water circulation system for cooling treatment. The condensed water condensed by the cooling water is discharged from the condenser, and the remaining small amount of non-condensable gas enters the pre-burning system outside the furnace for incineration and purification;

[0015] Step 4: The dried sludge is discharged from the dryer and enters the pre-burning furnace of the pre-burning system outside the furnace through the output device. The dust from the steam generation system is returned to the pre-burning furnace. The non-condensable gas from the sludge drying system enters the pre-burning furnace and mixes with the gas in the furnace to form a gas flow and material flow with uniform temperature, which enters the decomposition furnace through the connecting pipe of the pre-burning furnace.

[0016] Step 5: The high-temperature gas exchanges heat with the cement raw meal in the cyclone preheater. After transferring part of the heat to the cement raw meal, it is extracted by the exhaust fan and enters the cyclone dust collector to remove most of the cement raw meal dust. The gas after dust removal enters the boiler to heat the water working medium in the steam boiler. The cement raw meal dust separated from the gas is discharged into the preburning furnace and returned to the cement clinker production system.

[0017] Preferably, in step 2, the steam from the steam generating system enters the hollow shaft and wedge-shaped blades of the dryer, transfers heat to the sludge through the outer walls of the hollow shaft and the wedge-shaped blades, thereby increasing the temperature of the sludge and evaporating the water. After the steam transfers its own latent heat and sensible heat to the sludge, it condenses into water in the hollow shaft and the wedge-shaped blades, is discharged from the sludge drying system, and is sent back to the waste heat power generation chemical water system by the condensate pump for deoxygenation treatment.

[0018] Preferably, in step 4, the preburning furnace is independent of the decomposition furnace and connected to the decomposition furnace. The sludge is preburned in the preburning furnace before entering the decomposition furnace. The gas temperature and atmosphere entering the decomposition furnace are adjusted by the preburning furnace regulating valve, and the reducing gas is secondary burned after entering the decomposition furnace.

[0019] Preferably, the water working medium used in the steam boiler in step 5 comes from the waste heat power generation chemical water system. The water working medium is injected into the steam boiler, and after absorbing heat, it becomes saturated water vapor and is discharged from the boiler. It is introduced into the sludge drying system to dry the sludge. The gas after heat exchange leaves the boiler and enters the bag filter at the end of the kiln, and returns to the flue gas treatment system of the cement clinker production line. The extraction amount of high-temperature gas is regulated by the steam boiler regulating valve. The cement raw material dust settled during the heat exchange process is collected and discharged into the pre-burning system outside the furnace and returns to the cement clinker production system.

[0020] Preferably, the steam boiler regulating valve controls the extraction amount of high-temperature gas to be no less than the amount of gas entering the decomposition furnace from the pre-burning furnace.

[0021] A system for disposing municipal sludge is arranged outside a decomposition furnace and connected to the decomposition furnace and cement plant equipment, comprising a sludge drying system, an off-furnace pre-burning system and a steam generating system. The steam generating system is connected to the sludge drying system, and the off-furnace pre-burning system is respectively connected to the sludge drying system and the steam generating system. The steam generated by the steam generating system enters the sludge drying system. The sludge drying system transfers the heat of the steam to the sludge, and the sludge absorbs the heat and evaporates the water. The dried sludge, the non-condensable gas generated by the sludge drying system and the dust generated by the steam generating system are recycled into the off-furnace pre-burning system. The off-furnace pre-burning system incinerates organic matter. The dried sludge ash after the organic matter incineration enters the decomposition furnace and is then calcined into cement clinker.

[0022] Furthermore, the sludge drying system includes a raw material device, a dehumidification fan, a condenser, a dryer and an output device. The raw material device sends the sludge to the dryer, the dryer heats the sludge, and the water evaporated from the sludge enters the condenser for recovery through the dehumidification fan. The output device collects and transports the dried sludge.

[0023] Furthermore, the dryer includes one or more of a hollow paddle dryer and a disc continuous dryer.

[0024] Furthermore, the steam generating system includes an exhaust fan, a steam boiler regulating valve, a steam boiler, a cyclone dust collector, an ascending flue and a cyclone preheater. The steam boiler heats the water working medium in the boiler. The steam boiler regulating valve controls the amount of high-temperature gas entering the steam boiler. The exhaust fan extracts the high-temperature gas in the steam boiler into the cement plant flue gas treatment equipment. The cyclone preheater is connected to the off-furnace preburning system. The high-temperature gas generated by the off-furnace preburning system passes through the cyclone preheater and enters the cyclone dust collector through the ascending flue. The gas treated by the cyclone dust collector enters the steam boiler to heat the water working medium.

[0025] Furthermore, the pre-burning system outside the furnace includes a blower, a pre-burning furnace regulating valve, a pre-burning furnace and a cooler. The sludge dried by the sludge drying system enters the pre-burning furnace to burn and release heat, and then enters the decomposition furnace to decompose the cement raw material. The calcined cement clinker enters the cooler for cooling. The hot air generated by the cooler is drawn out by the blower into the pre-burning furnace, and the pre-burning furnace regulating valve adjusts the amount of hot air blown into the pre-burning furnace.

[0026] The beneficial effects of the present invention are:

[0027] (1) A harmless disposal scheme is adopted, organic matter and bacteria are burned at high temperature, heavy metals and other inorganic salts are dissolved in the cement clinker lattice, and all harmful substances are harmlessly disposed;

[0028] (2) Systematic resource utilization: the calorific value in the sludge is used to burn cement clinker, and the sludge residue directly enters the cement clinker and becomes a component of the cement clinker, fully realizing the resource utilization of the calorific value and inorganic components of the sludge;

[0029] (3) It does not occupy the capacity of the decomposition furnace. The sludge heating and water evaporation are all completed in the pre-burning furnace, which creates conditions for large-scale coordinated treatment of sludge in cement kilns. This process is particularly suitable for cement plants with small decomposition furnace capacity.

[0030] (4) The temperature and atmosphere of the furnace can be adjusted by adjusting the amount of air entering the pre-burning furnace. The atmosphere is a reducing atmosphere or an oxidizing atmosphere. Since the decomposition furnace itself is also a combustion device, even if the sludge is fed into the furnace in a reducing atmosphere, the reducing gas can be burned in the decomposition furnace for the second time;

[0031] (5) The investment cost is not high. Only drying equipment and small temporary storage facilities need to be invested. No investment is required in flue gas treatment facilities, ash treatment facilities, or large storage facilities. Therefore, the investment cost is not high.

[0032] (6) The operating cost is not high. During the operation, there are only electricity costs, maintenance costs, and labor costs. There is no drying heat source cost, no chemical cost, no waste residue disposal cost, and no flue gas treatment cost. Therefore, the operating cost is not high;

[0033] (7) The management requirements are not high. Cement plants consume hundreds of tons of pulverized coal every day. Referring to the existing ultra-fine pulverized coal management experience and facilities of cement plants, the safety of sludge during storage and disposal can be fully ensured. Therefore, for cement plants, the management requirements of the sludge disposal system are not high. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 This is a schematic diagram of the structure of a sludge drying system of a municipal sludge disposal system of the present invention;

[0035] Figure 2 It is a structural schematic diagram of an out-of-furnace pre-burning system and a steam generation system of a municipal sludge disposal system of the present invention;

[0036] Figure 3 This is a schematic diagram of the structure of a condenser for a municipal sludge disposal system of the present invention;

[0037] Figure 4 This is a schematic diagram of the structure of a dryer for a municipal sludge disposal system of the present invention;

[0038] Figure 5 It is a schematic structural diagram of a steam boiler used in a municipal sludge disposal system of the present invention;

[0039] Figure 6 It is a schematic diagram of the structure of a cyclone dust collector used in a municipal sludge disposal system of the present invention;

[0040] Figure 7 The present invention is a schematic diagram of the structure of a pre-burning furnace for a municipal sludge disposal system.

[0041] In the figure, 10 is a sludge drying system: 101 is a sludge receiving hopper, 102 is a plate feeder, 103 is a belt conveyor, 104 is a sludge bin, 105 is a quantitative feeder, 106 is a dehumidification fan, 107 is a condenser, 1071 is a first inlet of the condenser, 1072 is a first outlet of the condenser, 1073 is a second inlet of the condenser, 1074 is a second outlet of the condenser, 1075 is a third outlet of the condenser, 108 is a dryer, 1081 is a heating device, 1082 is a first inlet of the dryer, 1083 is a first outlet of the dryer, 1084 is a second inlet of the dryer, 1085 is a second outlet of the dryer, 1086 is a third inlet of the dryer, 1087 is a third outlet of the dryer, 1088 is a fourth outlet of the dryer, 109 is an elevator, 110 is a drying sludge bin, 111 is a meter, and 112 is a Roots blower;

[0042] 20 is a pre-burning system outside the furnace: 21 is a blower, 22 is a pre-burning furnace regulating valve, 23 is a pre-burning furnace, 231 is a cone, 232 is a connecting pipe, 233 is a nozzle, 234 is a hot air cyclone inlet, 235 is a dust return port, 236 is a non-condensable gas inlet, 237 is a furnace body, and 24 is a cooler;

[0043] 30 is a steam generating system: 31 is an exhaust fan, 32 is a steam boiler regulating valve, 33 is a steam boiler, 331 is a first inlet of the steam boiler, 332 is a first outlet of the steam boiler, 333 is a second inlet of the steam boiler, 334 is a second outlet of the steam boiler, 335 is a third outlet of the steam boiler, 34 is a cyclone dust collector, 341 is a first inlet of the cyclone dust collector, 342 is a first outlet of the cyclone dust collector, 343 is a second outlet of the cyclone dust collector, 35 is an ascending flue, 36 is a cyclone preheater; 40 is a decomposition furnace, and 41 is a cement kiln. DETAILED DESCRIPTION

[0044] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention.

[0045] Please refer to Figure 1-7The present invention provides a disposal system for municipal sludge, which is arranged outside the decomposition furnace 40 and connected to the decomposition furnace 40 and cement plant equipment, including a sludge drying system 10, an off-furnace pre-burning system 20 and a steam generating system 30, wherein the steam generating system 30 is connected to the sludge drying system 10, and the off-furnace pre-burning system 20 is respectively connected to the sludge drying system 10 and the steam generating system 30, and the cement plant equipment includes a cooling water circulation treatment system, a sewage treatment system, a waste heat power generation chemical water system, a kiln tail bag dust collector and a cement clinker production line flue gas treatment system, etc.

[0046] The decomposition furnace 40 is connected to the cement kiln 41. The decomposition furnace 40 is used for decomposing cement raw materials, and the cement kiln 41 is used for calcining cement raw materials.

[0047] After the sludge is treated by plate and frame filter pressing in the sewage treatment plant, the moisture content is about 55-65%, which can be calculated as 60%. The sludge is in solid block form and is transported by car to the cement plant for temporary storage. The cement plant uses a forklift to shovel the sludge into the sludge receiving hopper 101 according to the needs of treatment. The sludge in the sludge receiving hopper 101 is sent to the sludge bin 104 through the plate feeder 102 and the belt conveyor 103. A quantitative feeder 105 is provided under the sludge bin. After the sludge is weighed by the quantitative feeder 105, it is fed into the sludge drying system 10 from the first inlet 1082 of the dryer.

[0048] When the dryer 108 is a hollow blade dryer, the hollow blade dryer is composed of a heating device 1081, a hollow shaft, a wedge-shaped blade and other components; wherein the hollow shaft is connected to the hollow semicircular wedge-shaped blade, and the heat medium can enter the wedge-shaped blade through the hollow shaft, and the heat medium is steam. In addition to the hollow blade dryer, the dryer 108 can be selected as a disc continuous dryer, or a hollow blade dryer + disc continuous dryer combined drying method.

[0049] The steam from the steam generating system 30 enters the hollow shaft and wedge-shaped blades of the dryer through the second inlet 1084 of the dryer, and transfers heat to the sludge through the outer wall of the hollow shaft and the wedge-shaped blades, thereby increasing the temperature of the sludge and evaporating the water. After the steam transfers its own latent heat and sensible heat to the sludge, it condenses into water in the hollow shaft and the wedge-shaped blades, and is discharged from the sludge drying system 10 through the second outlet 1085 of the dryer, and is sent back to the waste heat power generation chemical water system by the condensate pump for deoxygenation treatment.

[0050] The steam from the steam generating system 30 enters the heating device 1081 of the dryer 108 through the third inlet 1086 of the dryer. The heating device is W-shaped and exchanges heat with the sludge through the shell wall of the heating device 1081 to heat the sludge and evaporate the water in the sludge. After the steam transfers its own latent heat and sensible heat to the sludge, it condenses into water in the heating device 1081 and is discharged from the sludge drying system 10 from the third outlet 1087 of the dryer, and is sent back to the waste heat power generation chemical water system by the condensate pump for deoxygenation treatment.

[0051] The dried sludge is discharged from the sludge drying system 10 through the first outlet 1083 of the dryer, and is sent to the drying sludge bin 110 by the elevator 109 for storage. The moisture content of the dried sludge is about 20-25%, which can be calculated as 20%. At this time, the dried sludge is in powdery form and can meet the requirements of pneumatic conveying.

[0052] The water vapor evaporated from the sludge is discharged from the drying system through the fourth outlet 1088 of the dryer, and is sent to the condenser 107 through the first inlet 1071 of the condenser by the dehumidification fan 106; the cooling water from the cooling water circulation system enters the condenser 107 from the second inlet 1072 of the condenser, absorbs the latent heat of the water vapor through the tube wall of the tube in the condenser 107, and condenses the water vapor into liquid water; the cooling water after absorbing heat is discharged from the condenser 107 from the second outlet 1074 of the condenser, and is sent back to the cooling water circulation system for cooling treatment; the condensed water condensed by the cooling water is discharged from the condenser from the first outlet 1072 of the condenser, and is sent to the sewage treatment system by the condensation water pump to be treated into reclaimed water, which is used as supplementary water for cooling water, enters the cooling water circulation system, and evaporates during the cooling equipment without external discharge; a small amount of non-condensable gas is discharged from the condenser 107 from the third outlet 1075 of the condenser, and is led to the pre-burning system 20 outside the furnace for incineration and purification through a pipeline.

[0053] The dried sludge in the dried sludge bin 110 is weighed and measured by a metering device 111 and then pneumatically conveyed by a Roots blower 112 to the pre-burning furnace 23 of the pre-burning system 20 outside the furnace for incineration.

[0054] The pre-sintering furnace 23 is the core equipment of this process and the key difference between this process and other processes. The pre-sintering furnace 23 includes a furnace body 237, a cone 231, a connecting pipe 232, a nozzle 233, a hot air cyclone inlet 234, a dust return port 235, and a non-condensable gas inlet 236. The furnace body 237 is Figure 7 The cone 231 is a straight cylindrical part, and the cone 231 is an inclined contraction part. The material and gas swirl in the furnace body 237 for better preheating and incineration. After preheating and incineration, the gas flow enters the cone 231. Since the cone 231 is inclined and contracted, the gas flow gradually changes from swirl to straight flow and is sprayed into the decomposition furnace 40.

[0055] The dried sludge from the sludge drying system 10 is sprayed into the pre-burning furnace 23 from the nozzle 233 on the top of the furnace body of the pre-burning furnace 23, mixed with the hot air from the cooler 24, and burned and released heat under the action of the hot air; the hot air from the cooler 24 is extracted by the blower 21, and blown into the pre-burning furnace 23 along the tangential direction through the hot air cyclone inlet 234 on the upper part of the furnace body of the pre-burning furnace 23, driving the dried sludge to swirl in the furnace, extending the residence time of the dried sludge in the furnace, so that the dried sludge is fully dispersed in the gas, evenly heated and burned; the amount of hot air blown in is adjusted by the pre-burning furnace regulating valve 22, so that the amount of gas entering the decomposition furnace 40 from the pre-burning furnace 23 is in principle equal to the amount of flue gas extracted from the steam generation system 30.

[0056] The dust return material from the steam generation system 30 enters the pre-burning furnace 23 through the dust return port 235 in the middle of the pre-burning furnace body, and driven by the gas in the furnace, it performs a swirling motion and is evenly heated; the non-condensable gas from the sludge drying system 10 enters the pre-burning furnace 23 from the non-condensable gas inlet 236 at the lower part of the pre-burning furnace 23 body and mixes with the gas in the furnace.

[0057] The dried sludge and its incineration ash from the top of the pre-burning furnace 23, the hot air and its incineration flue gas from the upper part of the pre-burning furnace 23, the dust return from the middle part of the pre-burning furnace 23, and the non-condensable gas from the lower part of the furnace body are mixed again in the cone 231 of the pre-burning furnace 23 to form a gas flow and material flow with uniform temperature, and enter the decomposition furnace 40 through the connecting pipe 232 of the pre-burning furnace 23.

[0058] A pre-burning furnace 23 is built outside the decomposition furnace 40, and the processes of sludge heating, water evaporation, organic matter incineration, etc. are moved to the pre-burning furnace 23 to complete, without occupying the furnace capacity of the decomposition furnace 40. This disposal method is particularly suitable for some cement plants with small decomposition furnace capacity. The operating temperature of the decomposition furnace 40 is about 850-900℃, and the temperature of the flue gas and sludge ash after pre-burning can completely reach or even exceed this operating temperature, directly providing heat for the decomposition furnace 40.

[0059] By adjusting the pre-burning furnace regulating valve 22, the cement plant can adjust the temperature and atmosphere of the gas entering the decomposition furnace 40 from the pre-burning furnace 23 according to actual production needs. The gas entering the decomposition furnace 40 can be selected to enter in an oxidizing atmosphere or a reducing atmosphere; since the decomposition furnace 40 itself is also a combustion device, even if it enters the furnace in a reducing atmosphere, the reducing gas can be secondary burned in the decomposition furnace. The reducing gas can promote the reduction of nitrogen oxides in the flue gas of the decomposition furnace.

[0060] The dried sludge incineration ash entering the decomposition furnace 40 from the pre-burning furnace 23 is mixed with the cement raw material in the decomposition furnace, and enters the cement kiln 41 for calcination, thereby forming a component of cement clinker; the unburned dried sludge entering the decomposition furnace 40 from the pre-burning furnace 23 is secondary burned in the decomposition furnace 40 to become ash, which is also mixed with the cement raw material in the decomposition furnace 40, and enters the cement kiln 41 for calcination, thereby forming a component of cement clinker; the high-temperature gas entering the decomposition furnace 40 from the pre-burning furnace 23 enters the cyclone preheater 36 after being purified by the decomposition furnace to preheat the cement raw material; the strong alkaline material field in the decomposition furnace 40 can effectively absorb the harmful substances volatilized during the incineration of the dried sludge, and bring it into the cement kiln 41 for calcination, and solid-dissolve it in the cement clinker lattice.

[0061] The high-temperature gas from the pre-burning system 20 outside the furnace exchanges heat with the cement raw material in the cyclone preheater 36, transfers part of the heat to the cement raw material, and its own temperature drops to 500-600°C, and is extracted from the ascending flue 35 of the cyclone preheater 36 by the exhaust fan 31; the high-temperature gas leaving the ascending flue 35 contains a considerable amount of cement raw material dust, which needs to be separated; the dust-containing gas enters the cyclone dust collector 34 from the first inlet 341 of the cyclone dust collector, and most of the cement raw material dust is removed in the cyclone dust collector 34; the dust-removed gas is discharged from the second outlet 343 of the cyclone dust collector, enters the boiler through the first inlet 331 of the steam boiler, and heats the water working medium in the boiler; the cement raw material dust separated from the gas is discharged into the pre-burning system 20 outside the furnace through the first outlet 342 of the cyclone dust collector, enters the pre-burning furnace 23 through the dust return port 235 of the pre-burning furnace 23, and returns to the cement clinker production system.

[0062] The water working medium used in the steam boiler 33 comes from the waste heat power generation chemical water system. The water working medium is injected into the boiler from the second inlet 333 of the steam boiler, and becomes saturated water vapor after absorbing heat. It is discharged from the steam boiler 33 through the second outlet 334 of the steam boiler, and introduced into the sludge drying system 10 through the water steam pipeline to dry the sludge; the gas after heat exchange leaves the steam boiler 33 from the first outlet 332 of the steam boiler, is sent to the bag filter at the end of the kiln by the exhaust fan 31, and returns to the flue gas treatment system of the cement clinker production line; the extraction amount of high-temperature gas is adjusted by the steam boiler regulating valve 32, and the extracted gas amount is in principle equal to the gas amount entering the cement clinker production line from the off-furnace pre-burning system 20; the cement raw material dust settled during the heat exchange process is collected, and then discharged from the third outlet 335 of the steam boiler into the off-furnace pre-burning system 20 and returned to the cement clinker production system.

[0063] This system creatively builds a pre-burning furnace 23 outside the decomposition furnace 40. The calorific value of the dried sludge is used to pre-burn it to a certain temperature in the pre-burning furnace 23 before entering the decomposition furnace 40. The pre-burned ash is mixed with cement raw materials and becomes a component of cement clinker after being calcined in the cement kiln 41. The pre-burned flue gas is purified by the powerful alkaline material field of the decomposition furnace and enters the cyclone preheater 36. It is then extracted from the ascending flue 35 of the cyclone preheater 36 and sent to the steam boiler 33 to generate steam, which is then led to the sludge drying system 10 to dry the sludge.

[0064] This system moves the preheating and incineration of sludge outside the decomposition furnace 40, which does not occupy the furnace capacity of the decomposition furnace 40, creating conditions for large-scale coordinated disposal of sludge in cement kilns; the heat after preburning is used to preheat raw materials, decompose calcium carbonate and dry sludge, and the preburned ash is calcined to become a component of cement clinker, realizing the resource utilization of sludge and the final disposal of sludge; the toxic and harmful substances in the sludge are incinerated and absorbed by the decomposition furnace, and then brought into the cement kiln 41 for calcination, and solid-dissolved in the cement clinker lattice, realizing the harmless disposal of sludge; the existing equipment of the cement clinker production line is directly used to purify the flue gas, and there is no need to build a flue gas disposal system, which greatly reduces the investment cost of the sludge project; the flue gas purified by the decomposition furnace is separately extracted to generate steam and dry the sludge, and no additional sludge drying heat source is required, which greatly reduces the disposal cost of the sludge; the cement plant consumes hundreds of tons of coal powder every day. Referring to the existing ultra-fine coal powder management experience and facilities of the cement plant, the safety of the sludge during storage and disposal can be fully ensured.

[0065] The above-mentioned embodiment only expresses one implementation mode of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A system for treating municipal sludge, which is located outside a decomposition furnace and connected to the decomposition furnace and cement plant equipment, characterized in that: The sludge drying system includes a sludge drying system, an off-furnace pre-burning system and a steam generating system. The steam generating system is connected to the sludge drying system, and the off-furnace pre-burning system is respectively connected to the sludge drying system and the steam generating system. The steam generated by the steam generating system enters the sludge drying system. The sludge drying system transfers the heat of the steam to the sludge. The sludge absorbs the heat and evaporates the water. The dried sludge, the non-condensable gas generated by the sludge drying system and the dust generated by the steam generating system are recycled into the off-furnace pre-burning system. The off-furnace pre-burning system incinerates organic matter. The dried sludge ash after the incineration of organic matter enters the decomposition furnace and is then calcined into cement clinker. The sludge drying system includes a raw material device, a dehumidification fan, a condenser, a dryer and an output device. The raw material device sends the sludge to the dryer. The dryer heats the sludge. The water evaporated from the sludge enters the condenser for recovery through the dehumidification fan. The output device collects and transports the dried sludge. The system includes an exhaust fan, a steam boiler regulating valve, a steam boiler, a cyclone dust collector, an ascending flue and a cyclone preheater. The steam boiler heats the water working medium in the boiler. The steam boiler regulating valve controls the amount of high-temperature gas entering the steam boiler. The exhaust fan extracts the high-temperature gas in the steam boiler into the cement plant flue gas treatment equipment. The cyclone preheater is connected to the off-furnace pre-burning system. The high-temperature gas generated by the off-furnace pre-burning system passes through the cyclone preheater and enters the cyclone dust collector through the ascending flue. The gas treated by the cyclone dust collector enters the steam boiler to heat the water working medium. The off-furnace pre-burning system includes a blower, a pre-burning furnace regulating valve, a pre-burning furnace and a cooler. The sludge dried by the sludge drying system enters the pre-burning furnace and burns to release heat. Then it enters the decomposition furnace to decompose the cement raw material, and then the calcined cement clinker enters the cooler for cooling. The hot air generated by the cooler is extracted by the blower into the pre-burning furnace. The pre-burning furnace regulating valve adjusts the amount of hot air blown into the pre-burning furnace.

2. The municipal sludge disposal system according to claim 1, characterized in that: The dryer includes at least one of a hollow paddle dryer and a disc continuous dryer.

3. A process for treating municipal sludge, using the system for treating municipal sludge as claimed in claim 1, characterized in that: The following steps are involved: Step 1: After the sludge is treated by plate and frame filter pressing at the sewage treatment plant, it is transported to the cement plant by truck. The raw material device sends the sludge to the dryer of the sludge drying system; Step 2: The steam from the steam generation system enters the dryer of the sludge drying system. The heat of the steam is transferred to the sludge, which absorbs the heat and evaporates the water. Step 3: The water vapor evaporated from the sludge is discharged from the dryer to the sludge drying system and sent to the condenser by the dehumidification fan. The cooling water from the cooling water circulation system enters the condenser, condenses the water vapor into liquid water and then discharges it from the condenser and returns it to the cooling water circulation system for cooling treatment. The condensed water condensed by the cooling water is discharged from the condenser, and the remaining small amount of non-condensable gas enters the pre-burning system outside the furnace for incineration and purification; Step 4: The dried sludge is discharged from the dryer and enters the pre-burning furnace of the pre-burning system outside the furnace through the output device. The dust from the steam generation system is returned to the pre-burning furnace. The non-condensable gas from the sludge drying system enters the pre-burning furnace and mixes with the gas in the furnace to form a gas flow and material flow with uniform temperature. The gas flow and material flow enter the decomposition furnace through the connecting pipe of the pre-burning furnace. Step 5: The high-temperature gas exchanges heat with the cement raw meal in the cyclone preheater. After transferring part of the heat to the cement raw meal, it is extracted by the exhaust fan and enters the cyclone dust collector to remove most of the cement raw meal dust. The dust-removed gas enters the boiler to heat the water working medium in the steam boiler. The cement raw meal dust separated from the gas is discharged into the pre-burning furnace and returned to the cement clinker production system.

4. The process for treating municipal sludge according to claim 3, characterized in that: In step 2, the steam from the steam generation system enters the hollow shaft and wedge-shaped blades of the dryer, transfers heat to the sludge through the outer walls of the hollow shaft and wedge-shaped blades, increases the temperature of the sludge, and evaporates the water. After the steam transfers its own latent heat and sensible heat to the sludge, it condenses into water in the hollow shaft and wedge-shaped blades, is discharged from the sludge drying system, and is sent back to the waste heat power generation chemical water system by the condensate pump for deoxygenation treatment.

5. The process for treating municipal sludge according to claim 3, characterized in that: In step 4, the pre-burning furnace is independent of the decomposition furnace and connected to the decomposition furnace. The sludge is pre-burned in the pre-burning furnace before entering the decomposition furnace. The gas temperature and atmosphere entering the decomposition furnace are adjusted by the pre-burning furnace regulating valve. The reducing gas is secondary burned after entering the decomposition furnace.

6. The process for treating municipal sludge according to claim 3, characterized in that: The water working medium used in the steam boiler in step 5 comes from the waste heat power generation chemical water system. The water working medium is injected into the steam boiler, absorbs heat and becomes saturated water vapor and is discharged from the boiler. It is introduced into the sludge drying system to dry the sludge. The gas after heat exchange leaves the boiler and enters the bag dust collector at the end of the kiln, and returns to the flue gas treatment system of the cement clinker production line. The extraction amount of high-temperature gas is adjusted by the steam boiler regulating valve. The cement raw material dust settled during the heat exchange process is collected and discharged into the pre-burning system outside the furnace and returns to the cement clinker production system.

7. The process for treating municipal sludge according to claim 6, characterized in that: The steam boiler regulating valve controls the extraction amount of high-temperature gas to be no less than the amount of gas from the pre-burning furnace entering the decomposition furnace.

Citation Information

Patent Citations

  • Device for indirectly drying and utilizing sludge by cement kiln waste gas and process method thereof

    CN101857350A

  • System of cement kiln for co-treatment of household garbage

    CN104058614A

  • Treatment system for municipal sludge

    CN211847666U

  • Treatment method and treatment facility for organic sludge

    JP2006175355A

  • System and progress for treating wet sludge by drying and incinerating

    WO2008128465A1