A continuous dry anaerobic-aerobic two-stage coupled fermentation system

Through the combination of a segmented helical structure and hollow tube, continuous inlet and discharge of high solid-rate waste is achieved, and combined with anaerobic and aerobic double-stage fermentation system, the continuous inlet and discharge of dry anaerobic fermentation is solved. Difficulties and low efficiency improve material utilization and production efficiency and reduce environmental pollution.

CN111363669BActive Publication Date: 2024-12-06AGRI MACHINERY INST CHINESE TROPICAL ACAD OF SCI +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010403633.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-13
Publication Date
2024-12-06
Estimated Expiration
2040-05-13

AI Technical Summary

Technical Problem

The existing dry anaerobic fermentation technology has problems such as difficulty in entering and exiting the material in a high solids content, poor fermentation fluidity, low conversion rate and efficiency under high solids content conditions, and has failed to effectively utilize the slag produced by anaerobic fermentation, resulting in waste of resources. and environmental pollution.

Method used

The combination of segmented spiral structure and hollow tube is adopted to realize the continuous inlet and discharge of high solid-rate waste, ensure the sealing environment of the anaerobic fermentation tank, and improve the material through anaerobic and aerobic double-stage coupled fermentation system. utilization and productivity.

Benefits of technology

The continuous, stable and efficient progress of anaerobic and aerobic fermentation is achieved, the utilization rate of materials is improved, environmental pollution is reduced, and the problems of poor sealing and low efficiency are solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111363669B_ABST
    Figure CN111363669B_ABST
Patent Text Reader

Abstract

The present invention is applicable to the field of organic waste resource utilization equipment, and provides a continuous dry anaerobic-aerobic two-stage coupled fermentation system, including a feeding module, a dry anaerobic reaction module, a discharging module and an aerobic reaction module. The feeding and discharging modules are connected by a combination of two sections of spirals and a hollow tube, and a certain height of fermented materials is retained in the hollow tube at any time. The discharging module connects the anaerobic reaction module and the aerobic reaction module in series. The bipolar coupled fermentation system of the present invention can be applied to a fermentation material with a solid content of up to 20-40%, which is matched with the hollow tube design to achieve (dry) continuous feeding and discharging of agricultural waste with high solid content, and can also meet the requirements of dynamic sealing. The series connection of the anaerobic reaction module and the aerobic reaction module not only ensures the sealing and continuous discharging function of the anaerobic fermentation module, but also completes the continuous feeding of aerobic fermentation, and realizes the function of dynamically adjusting the bipolar fermentation process according to the requirements of the gas fertilizer product.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of organic waste resource utilization equipment, and in particular relates to a continuous dry anaerobic-aerobic two-stage coupled fermentation system. Background Art

[0002] In recent years, with the continuous development of farming and breeding, the output of straw and livestock and poultry manure has increased year by year. However, due to limitations such as single technology and lack of equipment, most agricultural waste has not been well treated and utilized, causing serious environmental pollution and increasingly prominent problems such as the deterioration of the natural ecology.

[0003] Anaerobic fermentation technology can reduce the volume of waste such as straw and feces, render them harmless and convert them into clean energy and primary raw materials for organic fertilizer. It is one of the commonly used technologies for resource utilization of agricultural waste. According to the solid content (TS) of the material in the reactor, it is divided into wet anaerobic fermentation (TS≤12%) and dry anaerobic fermentation (abbreviated as "dry fermentation", TS≥20). Compared with wet fermentation technology, dry fermentation technology has the advantages of high volumetric gas production rate; small footprint; stable operation process, no scum and precipitation problems in wet process; low or no water requirement, saving water resources; less biogas slurry, low water content of waste residue, low subsequent treatment cost, etc., and is increasingly favored by the market.

[0004] At present, in terms of dry fermentation, European countries and my country have carried out the development of anaerobic fermentation technology and equipment. In terms of dry fermentation in Europe, the main technology is the garage-type dry anaerobic technology in Germany. In China, the patent CN102242052 B discloses a horizontal baffled dry anaerobic fermentation reaction device, the patent CN 206768095 U discloses a garage-type anaerobic fermentation reactor, and the patent CN 209816130 U provides a stirrer for dry anaerobic fermentation. The main mode is batch fermentation. The patents have studied the fermentation tank structure, stirring shaft design and other aspects.

[0005] However, according to the current research on high-solid dry fermentation projects, batch dry fermentation is in conflict with the continuous output of waste and cannot meet the requirements; the closed environment in the reactor is easily destroyed during the continuous feeding and discharging process, resulting in fermentation failure; in addition, the continuous dry fermentation with high solid content has poor fluidity and difficulty in feeding and discharging; agricultural waste only through anaerobic fermentation has problems with conversion rate and efficiency; currently, the sludge produced by anaerobic fermentation is often discarded, but it contains rich nutrients such as nitrogen, phosphorus, and potassium. The comprehensive utilization of the sludge has problems such as dehydration difficulties and high transfer and transportation costs. At present, there is no integrated system that completes dry anaerobic fermentation, aerobic fermentation, and organic fertilizer production at the same time.

[0006] Therefore, a new technical solution is urgently needed in the existing technical equipment to solve the difficulties in the resource utilization of agricultural waste in the actual process. Summary of the invention

[0007] In order to solve the above technical problems, the present invention provides a continuous dry anaerobic-aerobic two-stage coupled fermentation system, which adopts a segmented spiral structure in structure to adapt to the continuous feeding and discharging of high-solid content waste; the spiral structure is connected with a hollow tube, and is matched with materials with a certain solid content to achieve synchronous sealing and linkage adjustment; the spiral structure and the hollow tube are matched to connect the dry anaerobic fermentation tank and the aerobic fermentation tank in a two-stage coupling manner, so as not to destroy the sealing environment of the anaerobic fermentation tank, and to achieve continuous, stable and efficient gas production, and at the same time, the material can be subjected to anaerobic gas production and aerobic fertilizer production and anaerobic gas-fertilizer co-production fermentation treatment, which greatly improves the utilization rate of the material and reduces environmental pollution.

[0008] The present invention is achieved through the following technical solutions:

[0009] It can carry out anaerobic and aerobic continuous fermentation, with convenient material loading and unloading, good sealing effect, and easy process operation. It does not need to frequently deoxygenate the anaerobic fermentation tank. During the material transmission process, the sealing status of the material channel can also be checked, and the fermentation process parameters can be calculated according to the material situation in the hollow tube. In addition, the material can be fermented separately for anaerobic and aerobic fermentation, which improves the utilization rate of the material and the production efficiency and reduces environmental pollution.

[0010] The present invention is implemented as follows: a continuous dry anaerobic-aerobic two-stage coupled fermentation system comprises a first feed screw, a first hollow tube, a second feed screw, a dry anaerobic reaction module, a first feed screw, a second hollow tube, a second feed screw and an aerobic reaction module;

[0011] The first feeding screw comprises a first feeding barrel, a first feeding shaft, and a feeding hopper. The first feeding shaft is installed inside the first feeding barrel. The first feeding shaft and the first feeding barrel are coaxially arranged. The top of one end of the first feeding barrel is provided with the feeding hopper. The bottom of the other end of the first feeding barrel is provided with a vertically arranged first hollow tube.

[0012] The second feed screw includes a second feed barrel and a second feed shaft, the top of one end of the second feed barrel is provided with a feed port, the feed port is connected to the first feed barrel through the first hollow tube, the second feed shaft is installed inside the second feed barrel, the second feed shaft and the second feed barrel are coaxially arranged, and the lower surface of the upper end of the second feed barrel is provided with a discharge port;

[0013] The dry anaerobic reaction module comprises an anaerobic fermentation tank and an anaerobic tank discharge pipe, the top of the anaerobic fermentation tank is connected to the discharge port of the second feed cylinder, and the bottom of the anaerobic fermentation tank is connected to an anaerobic tank discharge pipe;

[0014] The first feeding screw includes a first feeding cylinder and a first feeding shaft. The first feeding cylinder is inclined. The upper surface of the lower end of the first feeding cylinder has a feeding port, and the feeding port is connected to the anaerobic tank discharge pipe through the anaerobic tank discharge pipe. The first feeding shaft is installed inside the first feeding cylinder. The first feeding shaft and the first feeding cylinder are coaxially arranged. The upper end of the lower surface of the first feeding cylinder is connected to a second hollow tube, and the second hollow tube is vertically arranged.

[0015] The second feeding screw includes a second feeding cylinder and a second feeding shaft, the second feeding cylinder is inclined, and the upper surface of the lower end of the second feeding cylinder has a feeding port, the feeding port is connected to the first feeding cylinder through the second hollow tube, the second feeding shaft is installed in the second feeding cylinder, the second feeding shaft and the second feeding cylinder are coaxially arranged, and the lower surface of the upper end of the second feeding cylinder has a discharge port;

[0016] The aerobic reaction module comprises an aerobic fermentation tank and an aerobic tank discharge pipe, the top of the aerobic fermentation tank is connected to the discharge port of the second feed barrel, the bottom of the aerobic fermentation tank is connected to an aerobic tank discharge pipe, and the aerobic tank discharge pipe is provided with a valve;

[0017] A first pressure relief valve is installed at the upper end of the anaerobic fermentation tank, and a second pressure relief valve is installed at the upper end of the aerobic fermentation tank.

[0018] Preferably, one end of the first feed shaft, one end of the second feed shaft, one end of the first delivery shaft and one end of the second delivery shaft are respectively fixedly connected to the output end of a driving motor.

[0019] Preferably, a first stirring shaft is installed in the anaerobic fermentation tank, one end of the first stirring shaft extends from the top of the anaerobic fermentation tank and is fixedly connected to the output end of a first stirring motor, and a first spiral blade is fixed on the outer wall of the first stirring shaft.

[0020] Preferably, a second stirring shaft is installed in the aerobic fermentation tank, one end of the second stirring shaft extends from the top of the aerobic fermentation tank and is fixedly connected to the output end of a second stirring motor, and a second spiral blade is fixed on the outer wall of the second stirring shaft.

[0021] Preferably, the first hollow tube and the second hollow tube are both made of transparent tempered glass material.

[0022] Preferably, both the first hollow tube and the second hollow tube are provided with height scales.

[0023] Preferably, the first hollow tube is provided with a first warehouse wall vibrator, and the second hollow tube is provided with a second warehouse wall vibrator.

[0024] Preferably, the anaerobic fermentation tank is connected to the discharge port of the second feed cylinder through an anaerobic tank feed pipe, and the aerobic fermentation tank is connected to the discharge port of the second feed cylinder through an aerobic tank feed pipe. Both the anaerobic tank feed pipe and the aerobic tank feed pipe are provided with a one-way valve, and the one-way valve includes a valve seat provided on the corresponding feed pipe, a ball valve supported on the lower side of the valve seat, and a spring connected to the ball valve and fixed to the corresponding feed pipe port.

[0025] Preferably, the first hollow tube and the first feed cylinder, the second feed cylinder, the second hollow tube and the first delivery cylinder, the second delivery cylinder can be connected by welding or by bolts, and sealing gaskets are installed at the connection points to perform sealing. The first hollow tube or the second hollow tube can be spliced ​​in sections, so that the length of the hollow tube can be adjusted more flexibly, which is convenient for the use of different processes and installation and construction in various scenarios.

[0026] Compared with the prior art, the beneficial effects of the present invention are as follows: Compared with the prior art, the beneficial effects of the present invention are as follows: A continuous dry anaerobic-aerobic two-stage coupled fermentation system of the present invention, by setting a spiral feeding module and an in-and-out material module to input and output materials, the spiral feeding module and the in-and-out material module are both connected by a hollow tube between two sections of the spiral, a certain height of material is retained in the hollow tube at any time, and the characteristic of the moisture content of the fermented material is about 60%-80%, which is matched with the special design of the hollow tube in the in-and-out material module to achieve the requirements of both continuous feeding and sealing. The anaerobic reaction module and the aerobic reaction module are connected in series by the first discharging spiral, the second hollow tube and the second feeding spiral, which not only ensures the closed continuous discharging function of the anaerobic fermentation module, but also completes the continuous feeding of the aerobic fermentation, and realizes the function of dynamically adjusting the two-stage fermentation process according to the requirements of the gas fertilizer product. This system can realize continuous fermentation, has good sealing, high processing efficiency, can dynamically adjust the double-stage fermentation effect, is easy to use, and solves the problems of poor sealing of continuous fermentation, low efficiency of single-stage fermentation, and waste of biogas residue resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of a continuous dry anaerobic-aerobic two-stage coupled fermentation system of the present invention;

[0028] Figure 2 for Figure 1 A is an enlarged schematic diagram of the details.

[0029] In the figure:

[0030] 11 feed hopper, 12 first feed barrel, 13 first feed shaft, 14 first hollow tube, 141 first silo wall vibrator, 15 second feed barrel, 16 second feed shaft, 21 anaerobic fermentation tank, 22 anaerobic tank discharge pipe, 23 anaerobic tank feed pipe, 24 first stirring motor, 211 first pressure relief valve 25 first stirring shaft, 26 first spiral blade, 31 first delivery barrel, 32 first delivery shaft, 33 second hollow tube, 331 second silo wall vibrator, 34 second delivery barrel, 35 second delivery shaft, 41 aerobic fermentation tank, 42 ​​aerobic tank discharge pipe, 43, aerobic tank feed pipe, 44, second stirring motor, 411 second pressure relief valve, 45 second stirring shaft, 46 second spiral blade, 421 valve, 5 one-way valve, 51 valve seat, 52 ball valve, 53 spring. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0032] See also Figure 1-2 The present invention provides a technical solution: a continuous dry anaerobic-aerobic two-stage coupled fermentation system, comprising a first feeding screw, a second feeding screw, a dry anaerobic reaction module, a first feeding screw, a second feeding screw and an aerobic reaction module.

[0033] The first feed screw includes a first feed barrel 12, a first feed shaft 13, a feed hopper 11 and a first hollow tube 14. The first feed shaft 13 is installed inside the first feed barrel 12. The first feed shaft 13 and the first feed barrel 12 are coaxially arranged. A feed hopper 11 is arranged at the top of one end of the first feed barrel 12, and a vertically arranged first hollow tube 14 is arranged at the bottom of the other end of the first feed barrel 12. The outer wall of the first hollow tube 14 is provided with a first warehouse wall vibrator 141.

[0034] The second feed screw includes a second feed barrel 15 and a second feed shaft 16. The second feed barrel 15 has a feed port at the top of one end, and the feed port is connected to the first feed barrel 12 through the first hollow tube 14. The second feed shaft 16 is installed inside the second feed barrel 15, and the second feed shaft 16 and the second feed barrel 15 are coaxially arranged.

[0035] The dry anaerobic reaction module includes an anaerobic fermentation tank 21 and an anaerobic tank discharge pipe 22 . The top of the anaerobic fermentation tank 21 is connected to the discharge port of the second feed barrel 15 , and the bottom of the anaerobic fermentation tank 21 is connected to an anaerobic tank discharge pipe 22 .

[0036] The first feed screw includes a first feed cylinder 31, a first feed shaft 32 and a second hollow tube 33. The first feed cylinder 31 is inclined. The upper surface of the lower end of the first feed cylinder 31 has a feed port, and the feed port is connected to the anaerobic fermentation tank 21 through the anaerobic tank discharge pipe 22. The first feed shaft 32 is installed inside the first feed cylinder 31. The first feed shaft 32 and the first feed cylinder 31 are coaxially arranged. The upper end of the lower surface of the first feed cylinder 31 is connected to a second hollow tube 33. The second hollow tube 33 is vertically arranged, and the outer wall of the second hollow tube 33 is provided with a second bin wall vibrator 331.

[0037] The second feed screw includes a second feed cylinder 34 and a second feed shaft 35. The second feed cylinder 34 is inclined and has a feed port on the upper surface of the lower end of the second feed cylinder 34. The feed port is connected to the first feed cylinder 31 through a second hollow tube 33. The second feed shaft 35 is installed in the second feed cylinder 34. The second feed shaft 35 and the second feed cylinder 34 are coaxially arranged.

[0038] The aerobic reaction module includes an aerobic fermentation tank 41 and an aerobic tank discharge pipe 42 . The top of the aerobic fermentation tank 41 is connected to the discharge port of the second feed barrel 34 . The bottom of the aerobic fermentation tank 41 is connected to an aerobic tank discharge pipe 42 . The aerobic tank discharge pipe is provided with a valve 421 .

[0039] In this embodiment, the first feed cylinder 12 and the second feed cylinder 15 are arranged obliquely, and the second feed cylinder 15 is located below the first feed cylinder 12. The first hollow tube 14 and the second hollow tube 33 are both arranged vertically. The two ends of the first hollow tube 14 are connected to the first feed cylinder 12 and the second feed cylinder 15 by welding. The two ends of the second hollow tube 33 are connected to the first delivery cylinder 31 and the second delivery cylinder 34 by welding. The feed hopper 11 is used for users to put in materials to be fermented. The materials enter the first feed barrel 12. When the first feed shaft 13 rotates, the materials are transported into the first hollow tube 14, and then enter the second feed barrel 15. When the second feed shaft 16 rotates, the materials are transported into the anaerobic fermentation tank 21. After the materials are anaerobically fermented in the anaerobic fermentation tank 21, the materials are transported from the first feed barrel 31 to the second hollow tube 33 through the first feed shaft 32. The materials in the second hollow tube 33 flow into the second feed barrel 34. When the second feed shaft 35 rotates, the materials are transported into the aerobic fermentation tank 41. After the fermentation of the aerobic fermentation tank 41 is completed, the fermented materials are passed through the aerobic tank discharge pipe 42, and the valve 421 is opened to discharge the fermented organic fertilizer. During the fermentation process, a certain height of material is maintained in the first hollow tube 14 and the second hollow tube 33 at any time, blocking the direct connection between the first feed cylinder 12, the second feed cylinder 34 and the anaerobic fermentation tank 21, preventing air from entering the anaerobic fermentation tank, and realizing dynamic sealing of the material and the hollow tubes. In other embodiments, the first feed screw 1, the second feed screw 2, the first feed screw 4, and the second feed screw 5 can adopt other forms of conveying devices. In addition, a level measuring instrument for detecting the material height can be set on the top wall of the anaerobic fermentation tank 21, so that the user can obtain the material height in the anaerobic fermentation tank 21 in real time. In other embodiments, 1 to 2 observation windows can be set on the anaerobic fermentation tank 21 for the user to observe the material height.

[0040] Furthermore, one end of the first feed shaft 13, one end of the second feed shaft 16, one end of the first delivery shaft 32 and one end of the second delivery shaft 35 are respectively fixedly connected to an output end of a driving motor.

[0041] In this embodiment, a driving motor is installed at the end of the first feed cylinder 12, the second feed cylinder 15, the first delivery cylinder 31 and the second delivery cylinder 34, and the driving motor is used to drive the first feed shaft 13, the second feed shaft 16, the first delivery shaft 32 and the second delivery shaft 35 to rotate, and the driving motor is connected to an external power supply.

[0042] Furthermore, a first stirring shaft 25 is installed in the anaerobic fermentation tank 21 , one end of the first stirring shaft 25 extends from the top of the anaerobic fermentation tank 21 and is fixedly connected to the output end of a first stirring motor 24 , and a first spiral blade 26 is fixed on the outer wall of the first stirring shaft 25 .

[0043] Furthermore, a second stirring shaft 45 is installed in the aerobic fermentation tank 41 , one end of the second stirring shaft 45 extends from the top of the aerobic fermentation tank 41 and is fixedly connected to the output end of a second stirring motor 44 , and a second spiral blade 46 is fixed on the outer wall of the second stirring shaft 45 .

[0044] In this embodiment, the first stirring motor 24 is used to drive the first stirring shaft 25 to rotate, and the first stirring shaft 25 stirs the material in the anaerobic fermentation tank 21 through the first spiral blade 26 to improve the fermentation effect, and the first stirring motor 24 is connected to an external power supply. The second stirring motor 44 is used to drive the second stirring shaft 45 to rotate, and the second stirring shaft 45 stirs the material in the aerobic fermentation tank 41 through the second spiral blade 46 to improve the fermentation effect, and the second stirring motor 44 is connected to an external power supply.

[0045] Furthermore, the first hollow tube 14 and the second hollow tube 33 are both made of transparent tempered glass material.

[0046] In this embodiment, the first hollow tube 14 and the second hollow tube 33 made of tempered glass material have a stable structure and good light transmission effect, which is convenient for users to observe the state of the materials.

[0047] Furthermore, the first hollow tube 14 and the second hollow tube 33 are both provided with height scales, which facilitate the operator to observe the height of the material in the hollow tube, provide convenience for process optimization and research, and various other automatic height detection devices can also be installed, such as infrared height detection devices.

[0048] Furthermore, the outer wall of the first hollow tube 14 is provided with a first silo wall vibrator 141, and the second hollow tube 33 is provided with a second silo wall vibrator 331. The silo wall vibrator is an energy-saving general-purpose product with a vibration motor as an excitation source. It relies on high-frequency vibration and impact force to effectively eliminate the phenomena of bridging, arching, and blockage caused by internal friction, deliquescence, electrification, component segregation, etc., so that the material can be discharged smoothly from the silo, which is one of the necessary equipment to ensure stable feeding. The use of a silo material vibrator here can make solid or semi-solid raw materials less likely to hang on the wall and increase the density of the settled material, thereby improving air tightness.

[0049] Furthermore, the anaerobic fermentation tank 21 is connected to the discharge port of the second feed barrel 15 through an anaerobic tank feed pipe 23, and the material can enter the anaerobic fermentation tank 21 through the anaerobic tank feed pipe 23; the aerobic fermentation tank 41 is connected to the discharge port of the second feed barrel 34 through an aerobic tank feed pipe 43, and the material can enter the aerobic fermentation tank 41 through the aerobic tank feed pipe 43. The feed pipe can facilitate the disassembly and assembly of the entire dry continuous fermentation device, and other devices such as a switch valve can also be set to facilitate the later optimization and improvement of the device.

[0050] Furthermore, the anaerobic fermentation tank 21 is connected to the discharge port of the second feed cylinder 15 through an anaerobic tank feed pipe 23, and the aerobic fermentation tank 41 is connected to the discharge port of the second delivery cylinder 34 through an aerobic tank feed pipe 43. Both the anaerobic tank feed pipe 23 and the aerobic tank feed pipe 43 are provided with a one-way valve 5, and the one-way valve 5 includes a valve seat 51 provided on the corresponding feed pipe, a ball valve 52 pressed against the lower side of the valve seat, and a spring 53 connected to the ball valve 52 and fixed to the corresponding feed pipe port.

[0051] In this embodiment, the one-way valve 5 serves to prevent the gas in the fermentation tank, whether it is the aerobic fermentation tank 41 or the anaerobic fermentation tank 21, from flowing back into the corresponding hollow tube. In addition, the one-way valve 5 can adjust the pressure at the outlet of the second feed cylinder 15 and the second delivery cylinder 34 by adjusting the spring 53. By increasing the pressure at the outlet of the second feed cylinder 15 and the second delivery cylinder 34, the density of the material in the second feed cylinder 15 and the second delivery cylinder 34 is increased, and the air tightness is improved. Moreover, the pressure of the spring is adjustable, which is convenient for optimizing the process of different materials. Different spring forces are used for different solid contents, and the process is optimized and designed in conjunction with the rotation speed of the second feed shaft 16 and the second delivery shaft 35, so that the fermentation equipment is more convenient to use.

[0052] Furthermore, the first hollow tube 14 and the first feed tube 12, the second feed tube 15, and the second hollow tube 33 and the first delivery tube 31, the second delivery tube 34 can be connected together by welding or by bolts, and sealing gaskets are installed at the connection points to perform a sealing effect. The first hollow tube 14 or the second hollow tube 33 can also be spliced ​​in sections. Such segmented splicing can more flexibly adjust the length of the hollow tube, which is convenient for the use of different processes and installation and construction in various scenarios.

[0053] Working principle and use process of the present invention: After the present invention is installed, the raw materials are pretreated first so that the moisture content of the fermented materials reaches 60% to 80%. The user puts the material to be fermented into the feed hopper 11, and the material enters the first feed barrel 12. When the first feed shaft 13 rotates, the material is conveyed into the first hollow tube 14, and then enters the second feed barrel 15. When the second feed shaft 16 rotates, the material is conveyed into the anaerobic fermentation tank 21. After the material is anaerobically fermented in the anaerobic fermentation tank 21, the anaerobic fermentation tank 21 during the first fermentation needs to be deoxygenated. In the subsequent fermentation of the same batch of materials, the deoxygenation operation of the fermentation tank 21 will no longer be required. The material is transported from the first feeding cylinder 31 to the second hollow tube 33 through the first feeding shaft 32, and the material in the second hollow tube 33 flows into the second feeding cylinder 34. When the second feeding shaft 35 rotates, the material is transported to the aerobic fermentation tank 41. After the fermentation in the aerobic fermentation tank 41 is completed, the fermented material is passed through the aerobic tank discharge pipe 42, and the valve 421 is opened to discharge the waste.

[0054] The two-stage coupled fermentation system provided by the present invention can perform dry anaerobic-aerobic two-stage continuous fermentation, and the material loading and unloading is convenient. During the material transmission process, the first hollow tube 14 and the second hollow tube 33 can always have a certain height of material, so that the aerobic fermentation tank 21 can always be in a sealed state during the material loading and unloading process, and can also be continuously loaded and unloaded, which greatly improves the fermentation efficiency and material utilization. The first pressure relief valve 211 can release pressure when the air pressure of the anaerobic fermentation tank 21 is too high, and the second pressure relief valve 411 can release pressure when the air pressure of the aerobic fermentation tank 41 is too high, and the device operation is safer.

[0055] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0056] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A continuous dry anaerobic-aerobic two-stage coupled fermentation system, characterized in that: It includes a feeding module, a dry anaerobic reaction module, a discharging module and an aerobic reaction module; The feeding module comprises a first feeding screw, a first hollow tube and a second feeding screw; The first feeding screw is installed inside the first feeding barrel by the first feeding shaft, the first feeding shaft is coaxially arranged with the first feeding barrel, a feeding hopper is arranged at the top of one end of the first feeding barrel, and the bottom of the other end of the first feeding barrel is connected to the first hollow tube arranged vertically; The second feed screw includes a second feed barrel and a second feed shaft, the second feed barrel has a feed port at the top of one end, the feed port is connected to the first feed barrel through the first hollow tube, the second feed shaft is installed inside the second feed barrel, the second feed shaft and the second feed barrel are coaxially arranged, and the lower surface of the upper end of the second feed barrel has a discharge port; The dry anaerobic reaction module comprises an anaerobic fermentation tank and an anaerobic tank discharge pipe, the top of the anaerobic fermentation tank is connected to the discharge port of the second feed cylinder, and the bottom of the anaerobic fermentation tank is connected to an anaerobic tank discharge pipe; The discharging module comprises a first feeding screw, a second hollow tube and a second feeding screw; The first feeding screw includes a first feeding cylinder and a first feeding shaft. The upper surface of the lower end of the first feeding cylinder has a feeding port, and the feeding port is connected to the anaerobic tank discharge pipe through the anaerobic tank discharge pipe. The first feeding shaft is installed inside the first feeding cylinder. The first feeding shaft and the first feeding cylinder are coaxially arranged. The upper end of the lower surface of the first feeding cylinder is connected to a second hollow tube arranged vertically. The second feeding screw includes a second feeding cylinder and a second feeding shaft. The upper surface of the lower end of the second feeding cylinder has a feeding port, and the feeding port is connected to the first feeding cylinder through the second hollow tube. The second feeding shaft is installed in the second feeding cylinder. The second feeding shaft and the second feeding cylinder are coaxially arranged. The lower surface of the upper end of the second feeding cylinder has a discharge port. The aerobic reaction module comprises an aerobic fermentation tank and an aerobic tank discharge pipe, the top of the aerobic fermentation tank is connected to the discharge port of the second feed barrel, the bottom of the aerobic fermentation tank is connected to an aerobic tank discharge pipe, and the aerobic tank discharge pipe is provided with a valve; The aerobic fermentation tank and the anaerobic fermentation tank are respectively equipped with a pressure relief valve.

2. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: One end of the first feed shaft, one end of the second feed shaft, one end of the first delivery shaft and one end of the second delivery shaft are respectively fixedly connected to an output end of a driving motor.

3. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: A first stirring shaft is installed in the anaerobic fermentation tank, one end of the first stirring shaft extends from the top of the anaerobic fermentation tank and is fixedly connected to the output end of a first stirring motor, and a first spiral blade is fixed on the outer wall of the first stirring shaft.

4. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: A second stirring shaft is installed in the aerobic fermentation tank, one end of the second stirring shaft extends from the top of the aerobic fermentation tank and is fixedly connected to the output end of a second stirring motor, and a second spiral blade is fixed on the outer wall of the second stirring shaft.

5. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: The first hollow tube and the second hollow tube are both made of transparent tempered glass material.

6. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 5, characterized in that: The first hollow tube and the second hollow tube are both provided with height scales.

7. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 6, characterized in that: The first hollow tube and the second hollow tube are both provided with a warehouse wall vibrator.

8. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: The anaerobic fermentation tank is connected to the discharge port of the second feed cylinder through an anaerobic tank feed pipe, and the aerobic fermentation tank is connected to the discharge port of the second feed cylinder through an aerobic tank feed pipe.

9. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 8, characterized in that: The anaerobic tank feed pipe and the aerobic tank feed pipe are both provided with a one-way valve, which includes a valve seat provided on the corresponding feed pipe, a ball valve pressed against the lower side of the valve seat, and a spring connected to the ball valve and fixed to the corresponding feed pipe port.

10. A continuous dry anaerobic-aerobic two-stage coupled fermentation system as claimed in claim 1, characterized in that: The first feed screw, the first hollow tube and the second feed screw are connected by welding; the first feed screw, the second hollow tube and the second feed screw are connected by welding.