Construction method of double cone-shaped big head anchor bolt by spraying

Through the construction method of extruded double cone table-type large-head anchor rod, the problem of insufficient pulling force of anchor rods in deep foundation pit support is solved, efficient and low-cost construction is achieved, and the bearing capacity and tensile resistance of anchor rods are significantly improved. The pulling force enhances the solidification effect of the soil and improves the safety of the support structure.

CN111364459BActive Publication Date: 2024-11-05SHANDONG BEI TE LI FOUND ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010278820.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-10
Publication Date
2024-11-05
Estimated Expiration
2040-04-10

AI Technical Summary

Technical Problem

In the existing deep foundation pit support technology, the ultimate pulling force of the soil layer anchor is insufficient, which is difficult to meet the design needs. In addition, a large buoyancy-resistant anti-floating anchor is required under groundwater conditions. The existing method is difficult and costly. high.

Method used

采用挤喷双锥台型大头锚杆施工方法,通过钻杆与喷嘴的组合使用,旋喷水泥浆进行锚杆孔的形成和固化,利用螺旋叶片和芯管的组合结构,提升锚杆的承载力和抗拉拔力,结合钢拉杆和水泥浆的配合,形成高强度的锚杆体。

Benefits of technology

It has achieved efficient construction under various geological conditions, and the ultimate pulling force of the anchor rod has been significantly improved, the cost is reduced, and it meets the design needs of deep foundation pits, strengthens the soil, weakens the soil pressure of the support piles, and improves the support structure. Security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111364459B_ABST
    Figure CN111364459B_ABST
Patent Text Reader

Abstract

The construction method of the squeeze-sprayed double-cone type big-head anchor rod of the present invention comprises: according to the position of the anchor rod hole, using a special drilling rig and a drill rod to drill the anchor rod hole position to a designed depth; when the drill rod is lifted to the lower end of the second cone, two symmetrical nozzles start to spray cement slurry until the drill rod is lifted to the upper end of the first cone, and the first cone is sprayed downward from the upper end of the first cone to the lower end of the first cone, and the cement soil in the borehole is pressed down by the drill rod to the upper end of the second cone, and the second cone is sprayed downward from the upper end of the second cone to the lower end of the second cone, and then the drill rod is pressed down to the designed depth again; the drill rod is lifted, and cement slurry is poured into the set position on the first cone through the drill rod core tube at the same time, and the grouting is stopped, and then the drill rod is squeezed downward to the bottom of the borehole, and cement slurry is poured into the borehole to the hole mouth through the drill rod core tube, and a steel pull rod and a grouting tube are inserted from the center of the anchor rod body, and cement slurry is replenished from the grouting tube for multiple times.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction method for a building foundation pit support project and a building anti-floating anchoring project. Background Art

[0002] At present, in order to save land and make full use of underground space, urban construction has promoted the development of deep foundation pit support. At present, most deep foundation pit supports use pile and anchor support structures. The current ultimate pull-out force of soil anchor rods is only 20-50T / root, which is far from meeting the design needs of deep foundation pits. The method of lengthening anchor rods is often used. Because the length-diameter ratio of anchor rods exceeds the optimal value, the friction resistance no longer increases but gradually decreases. It is very difficult to make large pull-out force anchor rods with ordinary anchor rods. At present, it is an urgent task to solve the problem of large pull-out force anchor rods. In general, deep foundation pits have deep groundwater and large buoyancy, and they need anti-floating anchor rods with large anti-buoyancy. Summary of the invention

[0003] The purpose of the present invention is to provide a method for constructing an extruded double-cone type large-head anchor rod and an anchor rod which has high bearing capacity, low cost, simple process and can be constructed under various geological conditions.

[0004] In order to achieve the invention purpose of this application, the present invention adopts the following technical solutions:

[0005] The invention discloses a construction method of an extrusion spray double cone type big head anchor rod. The drill rod used in the construction method comprises: a core tube, a nozzle and a spiral blade. The spiral blade is welded along the axial direction of the core tube. Two nozzles are provided on the core tube connected with the spiral blade and symmetrical along the axial direction of the core tube. The angle between the nozzle and the axis of the core tube is 5° to 85°. The invention is characterized in that: the construction method of the extrusion spray double cone type big head anchor rod comprises the following steps:

[0006] (a) According to the location of the anchor hole, use a special drilling rig and the above-mentioned drill rod to drill at the location of the anchor hole to the designed depth; then stop the rotation of the drill rod;

[0007] (b) adjusting the cement slurry pressure of the nozzle and the lifting speed of the drill rod, starting to lift the drill rod, and when the drill rod is lifted to the lower end of the second truncated cone, allowing the two symmetrical nozzles on the drill rod to start to spray cement slurry until the drill rod is lifted to the upper end of the first truncated cone, then stopping the lifting of the drill rod and the nozzles from spraying cement slurry;

[0008] (c) The drill pipe then moves downward from the upper end of the first truncated cone at a set speed, and at the same time, two symmetrical nozzles spray the first truncated cone until the spraying stops at the lower end of the first truncated cone;

[0009] (d) Use the drill rod to press the cement soil in the borehole to the upper end of the second cone. The drill rod starts to move downward from the upper end of the second cone. At the same time, two symmetrical nozzles spray the second cone until the spraying stops at the lower end of the second cone. Then the drill rod is pressed down to the designed depth.

[0010] (e) Lift the drill pipe and simultaneously inject cement slurry into the borehole from the nozzle at low pressure. When the injected cement slurry is 0.9-1.1m higher than the first cone, stop injecting grouting. Then squeeze the drill pipe downward to the bottom of the borehole. Then lift the drill pipe and inject cement slurry into the borehole from the nozzle at low pressure.

[0011] (f) Remove the drill rod, drill a hole to form the anchor body, insert the steel tie rod and grouting pipe from the center of the anchor body, and fix the steel tie rod to the designed position;

[0012] (g) Add cement slurry into the anchor body from the grouting pipe multiple times. The last grouting must be done after the cement slurry in the borehole has initially set. Then, press in cement slurry with early strength agent. After the grouting is completed, pull out the grouting pipe.

[0013] The invention provides a construction method for an extrusion sprayed double-cone type big-head anchor rod, wherein: at the beginning of step (c), the nozzle starts to spray again from the upper end of the first circular cone for 10 to 60 seconds, and then the drill rod moves downward.

[0014] The invention discloses a construction method of an extruded double-cone type big-head anchor rod, wherein: in step (c), the drill rod moves downward at a speed of 10 to 30 cm / min, and in step d, the drill rod moves downward at a speed of 10 to 30 cm / min.

[0015] The present invention provides a construction method for an extruded double-cone type large-head anchor rod, wherein: the maximum diameters of the first and second frustums are greater than the diameter of the cylindrical enlarged head, the diameter of the cylindrical enlarged head is greater than the diameter of the anchor rod body, the connecting parts of the first frustum, the anchor rod body and the cylindrical enlarged head are respectively cone-shaped, the connecting parts of the second frustum, the anchor rod body and the cylindrical enlarged head are respectively cone-shaped, and the angles between the oblique lines of the front ends of the frustums of the first and second frustums and the axis of the anchor rod body are 5° to 85°.

[0016] The invention discloses a construction method for an extruded double-cone type big-head anchor rod, wherein: the water-cement ratio of the cement slurry sprayed out by the nozzle is 0.7-1.5; in step (e), the pressure of the nozzle (12) injecting the cement slurry into the borehole at a low pressure is 0.1-1.0 MPa; in step (g), the water-cement ratio of the cement slurry injected from the grouting pipe into the anchor rod body is 1:2, the cement slurry with an early strength agent is a cement slurry with a water-cement ratio of 1:2 with 1-10% of the early strength agent added to the cement weight, and the early strength agent is water glass with a Baume degree of 45 degrees.

[0017] The extruded double-cone big-head anchor rod of the present invention, wherein: the extruded double-cone big-head anchor rod comprises: an anchor rod body, a steel pull rod, a first frustum, a cylindrical enlarged head and a second frustum, the steel pull rod is wrapped in the anchor rod body, and near the bottom end of the anchor rod body are the second frustum, the cylindrical enlarged head and the first frustum in sequence, the cylindrical enlarged head is between the first frustum and the second frustum, the two ends of the cylindrical enlarged head are respectively connected to the first frustum and the second frustum, the lower end diameter of the second frustum is the same as the diameter of the cylindrical enlarged head, the upper end diameter of the first frustum is the same as the anchor rod body, the maximum diameters of the first frustum and the second frustum are larger than the diameters of the cylindrical enlarged head, and the angles between the front end oblique lines of the frustums of the first frustum and the second frustum and the axis of the anchor rod body are 5° to 85°.

[0018] The extruded double-cone type large-head anchor rod of the present invention, wherein: the filler inside the anchor rod body is a cement slurry stone body, the fillers of the first frustum, the cylindrical enlarged head and the second frustum from the inside to the outside are cement slurry stone bodies and compressed cement soil, and the outsides of the first frustum, the cylindrical enlarged head and the second frustum are wrapped by a compacted soil layer.

[0019] Patent features:

[0020] A. In the above anchor construction method, during the jetting of cement slurry in steps (b), (c) and (d), the high-pressure cement slurry jet flows in the stratum, cutting and destroying the soil. The reinforcement range is a cylinder with a radius equal to the jetting distance plus the length of the penetration part or the compression part. A portion of the fine soil particles are replaced by the jetted slurry. The remaining soil particles are mixed with the slurry. Under the combined action of the jetting dynamic pressure, centrifugal force and gravity, the soil particles are arranged regularly according to their mass size on the cross section. Small particles are mostly in the middle, and large particles are mostly on the outside or the edge. After a certain period of time, they solidify into a solidified body with a small permeability coefficient. With different soil qualities, the structure of the cross section is somewhat different. Since the jetting body is not a monomer structure with equal particles, the consolidation quality is not very uniform. Usually, the strength in the center is low and the strength in the edge is high. The ultimate pull-out force of the squeezed double-cone type big-head anchor sometimes reaches hundreds of tons. The main pulling force is mostly on the enlarged head. Since the strength of the cement soil in the center of the jet grouting pile is low after consolidation, it is difficult to meet the design requirements of the bond strength with the steel tie rod. The present invention is accompanied by the pressing of cement slurry when lifting the core tube. The cement slurry in the center of the rod body passes through twice (this patent invention is accompanied by grouting. When the core tube is lifted, the gap below is filled with cement slurry in time. The anchor hole is full of cement slurry. When the ordinary anchor is lifted, the gap below is filled with cement soil. The subsequent grouting only replenishes the gap where the water in the cement slurry seeps away). The cement slurry is pressed into the core tube and then squeezed in sections. The strength of the cement slurry consolidated in the center of the rod body is very high, which is several times the strength of the cement soil in the center of the original jet grouting pile. The strength of the cement slurry consolidated in the center of the newly formed jet grouting anchor body is higher than the consolidation strength of the surrounding cement soil, which meets the bond strength requirements of the steel tie rod and has an innovative structure.

[0021] B. In the above anchor construction method, when the large end of the expansion body is expanded by rotary jetting in the above steps (c) and (d), the cement soil rises along the core tube, and the excess water in the cement slurry penetrates into the soil layer around the anchor hole to soften the soil. When the core tube is lifted, the cement slurry in the core tube hole is pressed down in sections by the core tube, and the cement slurry compacts the cement soil in the hole, and the cement soil compacts the surrounding soil layer (rearranges the size of the soil layer around the hole) and squeezes the cement soil into the surrounding soil layer. The cement soil and cement slurry outside the center of the hole are squeezed into the surrounding soil layer. The compacted soil layer around the hole is tightly bonded together. After solidification, the cement paste, cement soil and soil layer around the hole are connected as a whole. After solidification, the strength of cement paste is greater than that of the surrounding cement soil, and the strength of cement soil is greater than that of the compacted soil layer around the hole. In the soil layer, there is a layer of permeable cement paste outside the cement soil layer and bonded to the soil layer. In the sand layer, there is a layer of cement paste permeable layer outside the cement soil layer with a thickness of 10 to 15 cm, and the strength is greater than the compacted soil layer. After solidification, when the anchor rod is pulled, the internal strength of the rod body is high and the compacted soil layer is low. According to the theory of force conduction, shear failure only occurs in the compacted soil layer around the anchor body. In the design, the rod resistance is calculated using the shear strength of the compacted soil layer, and the shear area around the rod body is increased at the same time.

[0022] C. In step (g) of the above-mentioned anchor construction method, the last pressure filling of drought-strength cement slurry must be carried out after the initial setting of the large-head cement slurry. After years of experience, there is a settlement layer on the top of the circular hole after the excavation of the inclined anchor construction, which is about 1 / 3 to 1 / 4 of the diameter of the circle. It not only reduces the friction area, but also relaxes the tension of the entire hole. The main reason is that the water-cement ratio of the rotary sprayed cement slurry is sufficient for hydration. 50% of the water in the cement slurry penetrates into the soil layer, causing cavities in the cylindrical enlarged head of the rotary spray. In order to ensure the quality of the project and improve the pull-out force of the anchor, the present invention, in the construction method, determines the initial setting of the rotary sprayed large-head anchor slurry, and uses drought-strength cement slurry for pressure filling according to the initial setting time.

[0023] D. In the above core tube construction method, step (d) is to spray the core tube in rotation for a few seconds without lifting it, and then spray downward at a speed of 20 cm / min to increase the area of ​​the cone by more than 1 times. The force on the cone can be calculated using the Terzaghi formula.

[0024] Main features of "extrusion spray double cone type big head anchor":

[0025] The "squeeze-spray double cone type big head anchor" has a long free section and a short anchoring section, which can transmit the pulling force of the support structure to the deep strata. The anchoring force of the big head of the anchor body is very large in the deep sandy strata. The friction between the big head of the anchor body and the soil layer is converted into the shear force between the rod body and the enlarged head and the soil layer or the destructive bearing capacity of the anchor itself, which is used as the tensile strength limit value of the "squeeze-spray double cone type big head anchor".

[0026] The squeezed and sprayed double-cone big-head anchor rod not only improves the pull-out resistance of the anchor rod, but also strengthens the soil, reduces the soil pressure of the supporting piles, and makes the piles, anchors and soil work together to make the supporting pile continuous wall safer and more reliable.

[0027] When jet grouting the enlarger head, the core tube is used to squeeze the cement slurry in the enlarger head hole twice. The last extrusion is segmented vibration extrusion, which not only fills the anchor body with cement slurry, but also fills the inside of the "compression layer" of the jet grouting enlarger head with cement slurry. The excess water in the cement slurry continuously penetrates, dissipates and solidifies to form a structure of intermediate cement slurry, cement soil compression layer and compacted soil layer, forming a reasonable anchor tensile load transfer structure with high intermediate strength and low peripheral strength. The pure cement slurry pressed into the center of the jet grouting enlarger head has a greater grip on the steel tie rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 is a schematic diagram of a forward section of a drill rod used in the construction method of the present invention;

[0029] Figure 2 It is a schematic diagram of the front view of the extrusion spray double cone type big head anchor rod of the present invention; for the sake of clarity, the figure shows a schematic diagram after the grouting pipe is pulled out;

[0030] Figure 3 It is a schematic diagram of the forward section of the extruded double-cone type big-head anchor rod of the present invention. For the sake of clarity, the figure shows a schematic diagram of the grouting pipe not being pulled out.

[0031] exist Figures 1 to 3 Among them, number 1 is the anchor rod body; number 2 is the steel pull rod; number 3 is the cylindrical enlarged head; number 4 is the first frustum; number 5 is the second frustum; number 6 is the cement slurry stone body; number 7 is the compressed cement soil; number 8 is the compacted soil layer; number 9 is the core tube; number 10 is the spiral blade; number 11 is the grouting tube; number 12 is the nozzle. DETAILED DESCRIPTION

[0032] like Figure 1 As shown, the drill rod used in the construction method includes: a core tube 9, a nozzle 12 and a spiral blade 10. The spiral blade 10 is welded along the axial direction of the core tube 9. Two nozzles 12 are opened on the core tube 9 which are connected to the spiral blade 10 and are symmetrical along the axis of the core tube 9. The angle between the nozzle 12 and the axis of the core tube 9 is 5° to 85°.

[0033] The construction method of the extrusion spray double cone type big head anchor rod of the present invention comprises the following steps:

[0034] (a) According to the position of the anchor hole, use a special drilling rig and the above-mentioned drill rod to drill a hole at the position of the anchor hole to the designed depth; then stop the rotation of the drill rod;

[0035] (b) adjusting the cement slurry pressure of the nozzle 12 and the lifting speed of the drill rod, starting to lift the drill rod, and when the drill rod is lifted to the lower end of the second truncated cone 5, the two symmetrical nozzles 12 on the drill rod start to spray cement slurry until the drill rod is lifted to the upper end of the first truncated cone 4, then the drill rod stops being lifted and the nozzles 12 stop spraying cement slurry;

[0036] (c) After the nozzle 12 starts to spray from the upper end of the first truncated cone 4 for 40 to 60 seconds, the drill rod moves downward from the upper end of the first truncated cone 4 at a speed of 20 cm / min until it reaches the position of the lower end of the first truncated cone 4, and the nozzle 12 stops spraying;

[0037] (d) Use a drill rod to press the cement soil in the borehole down to the upper end of the second truncated cone 5, and the drill rod moves downward from the upper end of the second truncated cone 5 at a speed of 20 cm / min. At the same time, two symmetrical nozzles 12 spray the second truncated cone 5 until the spraying stops at the lower end of the second truncated cone 5, and then the drill rod is pressed down to the designed depth;

[0038] (e) lifting the drill pipe, while pouring cement slurry into the borehole at low pressure from the nozzle 12. When the poured cement slurry is 40.9-1.1 m higher than the first cone, stop pouring grouting, then squeeze the drill pipe downward to the bottom of the borehole, and then lift the drill pipe, while pouring cement slurry into the borehole mouth at low pressure from the nozzle 12;

[0039] (f) Remove the drill rod, drill a hole to form the anchor body 1, insert the steel tie rod 2 and the grouting pipe 11 from the center of the anchor body 1, and fix the steel tie rod 2 to the designed position;

[0040] (g) Cement slurry is added into the anchor body 1 from the grouting pipe 11 for multiple times. The last grouting must be done after the cement slurry in the borehole has initially set. Cement slurry with an early strength agent is then pressed in. After the grouting is completed, the grouting pipe is pulled out.

[0041] The maximum diameters of the first frustum 4 and the second frustum 5 are larger than the diameters of the cylindrical enlarged head 3, the diameter of the cylindrical enlarged head 3 is larger than the diameter of the anchor body 1, the connecting parts of the first frustum 4, the anchor body 1 and the cylindrical enlarged head 3 are respectively cone-shaped, the connecting parts of the second frustum 5, the anchor body 1 and the cylindrical enlarged head 3 are respectively cone-shaped, and the angles between the oblique lines of the front ends of the frustums of the first frustum 4 and the second frustum 5 and the axis of the anchor body 1 are 5° to 85°.

[0042] The water-cement ratio of the cement slurry sprayed out by the nozzle 12 is 0.7-1.5; in step (e), the pressure of the cement slurry injected into the borehole by the nozzle 12 at low pressure is 0.1-1.0 MPa; in steps (c) and (d), the pressure of the cement slurry sprayed out by the nozzle 12 depends on the hardness of the stratum; in step (g), the water-cement ratio of the cement slurry injected into the anchor body 1 from the grouting pipe 11 is 1:2, and the cement slurry with the early strength agent is a cement slurry with a water-cement ratio of 1:2 with 1-10% of the early strength agent added to the weight of the cement, and the early strength agent is water glass with a Baume degree of 45 degrees.

[0043] like Figure 2 As shown, the extruded double-cone type big-head anchor comprises: an anchor body 1, a steel pull rod 2, a first frustum 4, a cylindrical enlarged head 3 and a second frustum 5. The steel pull rod 2 is wrapped in the anchor body 1. Near the bottom end of the anchor body 1 are the second frustum 5, the cylindrical enlarged head 3 and the first frustum 4 in sequence. The cylindrical enlarged head 3 is between the first frustum 4 and the second frustum 5. The two ends of the cylindrical enlarged head 3 are respectively connected to the first frustum 4 and the second frustum 5. The diameter of the lower end of the second frustum 5 is the same as that of the cylindrical enlarged head 3. The diameter of the upper end of the first frustum 4 is the same as that of the anchor body 1. The maximum diameters of the first frustum 4 and the second frustum 5 are larger than the diameters of the cylindrical enlarged head 3. The angles between the front end oblique lines of the frustums of the first frustum 4 and the second frustum 5 and the axis of the anchor body 1 are 5° to 85°.

[0044] like Figure 3 As shown, the filler inside the anchor body 1 is a cement slurry stone body 6, and the fillers from the inside to the outside of the first frustum 4, the cylindrical enlarged head 3 and the second frustum 5 are cement slurry stone body 6 and compressed cement soil 7, and the outside of the first frustum 4, the cylindrical enlarged head 3 and the second frustum 5 are wrapped by a compacted soil layer 8.

[0045] The above-described embodiments are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made by ordinary technicians in this field to the technical solutions of the present invention should all fall within the scope of protection determined by the claims of the present invention.

Claims

1. A construction method for an extrusion spray double cone type big head anchor rod, wherein the drill rod used in the construction method comprises: A core tube (9), a nozzle (12) and a spiral blade (10), wherein the spiral blade (10) is welded along the axial direction of the core tube (9), and two nozzles (12) are opened on the core tube (9) connected to the spiral blade (10) and the core tube (9) and are symmetrical along the axial direction of the core tube (9), and the angle between the nozzle (12) and the axis of the core tube (9) is 5° to 85°. The method is characterized in that: the construction method of the extrusion spray double cone type big head anchor comprises the following steps: (a) according to the position of the anchor hole, use the drilling machine and the above-mentioned drill rod to drill the anchor hole to the designed depth; then stop the rotation of the drill rod; (b) adjusting the cement slurry pressure of the nozzle (12) and the lifting speed of the drill rod, starting to lift the drill rod, and when the drill rod is lifted to the lower end of the second truncated cone (5), allowing the two symmetrical nozzles (12) on the drill rod to start spraying cement slurry until the drill rod is lifted to the upper end of the first truncated cone (4), then stopping the lifting of the drill rod and stopping the spraying of cement slurry by the nozzle (12); (c) the drill rod then moves downward from the upper end of the first truncated cone (4) at a set speed, and at the same time, the two symmetrical nozzles (12) spray the first truncated cone (4) until the spraying stops at the lower end of the first truncated cone (4); (d) using a drill rod to press the cement soil in the borehole down to the upper end of the second truncated cone (5), the drill rod starts to move downward from the upper end of the second truncated cone (5), and at the same time two symmetrical nozzles (12) spray the second truncated cone (5) until the spraying stops at the lower end of the second truncated cone (5), and then the drill rod is pressed down to the designed depth; (e) lifting the drill rod and simultaneously injecting cement slurry into the borehole from the nozzle (12) at low pressure. When the injected cement slurry is 0.9 to 1.1 m higher than the first cone (4), the injection is stopped. Then the drill rod is pressed downward to the bottom of the borehole. Then the drill rod is lifted again and simultaneously injecting cement slurry into the borehole from the nozzle (12) at low pressure. (f) Remove the drill rod, drill a hole to form the anchor rod body (1), insert the steel tie rod (2) and the grouting pipe (11) from the center of the anchor rod body (1), and fix the steel tie rod (2) to the designed position; (g) Cement slurry is repeatedly added into the anchor body (1) from the grouting pipe (11). The last grouting must be done after the cement slurry in the borehole has initially set. Cement slurry with an early strength agent is then pressed in. After the grouting is completed, the grouting pipe is pulled out; The maximum diameters of the first truncated cone (4) and the second truncated cone (5) are greater than the diameter of the cylindrical enlarged head (3), the diameter of the cylindrical enlarged head (3) is greater than the diameter of the anchor body (1), the connection parts between the first truncated cone (4) and the anchor body (1) and the cylindrical enlarged head (3) are respectively conical, the connection parts between the second truncated cone (5) and the anchor body (1) and the cylindrical enlarged head (3) are respectively conical, and the angles between the front end oblique lines of the truncated cones of the first truncated cone (4) and the second truncated cone (5) and the axis of the anchor body (1) are 5° to 85°; The filler in the anchor rod body (1) is a cement slurry stone body (6); the fillers of the first truncated cone (4), the cylindrical enlarged head (3) and the second truncated cone (5) from the inside to the outside are cement slurry stone body (6) and compressed cement soil (7); the outside of the first truncated cone (4), the cylindrical enlarged head (3) and the second truncated cone (5) is wrapped by a compacted soil layer (8).

2. The construction method of the extrusion spray double cone type big head anchor rod as claimed in claim 1, characterized in that: At the beginning of step (c), the nozzle (12) starts to spray from the upper end of the first truncated cone (4) for 10 to 60 seconds, and then the drill rod moves downward again.

3. The construction method of the extrusion spray double cone type big head anchor rod as claimed in claim 2, characterized in that: In step (c), the drill rod moves downward at a speed of 10 to 30 cm / min; in step (d), the drill rod moves downward at a speed of 10 to 30 cm / min.

4. The construction method of the extrusion sprayed double cone type big head anchor rod as claimed in claim 3, characterized in that: The water-cement ratio of the cement slurry sprayed out by the nozzle (12) is 0.7-1.5; in step (e), the pressure of the cement slurry injected into the borehole by the nozzle (12) at a low pressure is 0.1-1.0 MPa; in step (g), the water-cement ratio of the cement slurry added from the grouting pipe (11) into the anchor body (1) is 1:2, and the cement slurry with an early strength agent is a cement slurry with a water-cement ratio of 1:2 to which 1-10% of the early strength agent is added by weight of cement, and the early strength agent is water glass with a Baume degree of 45 degrees.