Elevator operation performance real-time monitoring system

By designing the protection and dust-proof structure of the real-time monitoring system for elevator operation performance, the problems of equipment installation jammed wear and static failure are solved, and the stable operation and efficient monitoring of the equipment are achieved.

CN111532923BActive Publication Date: 2024-12-06JIANGSU ALPHA ELEVATOR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010443053.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-22
Publication Date
2024-12-06
Estimated Expiration
2040-05-22

AI Technical Summary

Technical Problem

The real-time monitoring equipment for elevator operation performance on the market lacks external protection, resulting in wear of installation jams, electrostatic failures and accumulation of foreign objects at the end, making it difficult to carry out overall reinforcement.

Method used

A monitoring frame system, protective frame, tethering column, merge frame, slide chute, slide block, closing frame, equipment board, end frame, seal frame, return spring, engaging frame, spare port, dustproof frame, The real-time monitoring system for elevator operation performance of bolt sleeves, fixing frames and rubber frames provides external protection and dust protection functions through the combination of sliding structures, elastic structures, snap structures and disassembly structures to prevent installation jamming wear and static failures.

Benefits of technology

It effectively prevents installation jammed wear, prevents static failures and foreign matter accumulation, and realizes the overall reinforcement of the real-time monitoring equipment for the elevator operation performance, ensuring the stable operation and efficient monitoring of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111532923B_ABST
    Figure CN111532923B_ABST
Patent Text Reader

Abstract

The present invention relates to a real-time monitoring system for elevator operation performance, comprising a monitoring frame system, a spare port and a bolt sleeve, wherein protective frames are arranged on both sides of the monitoring frame system, and bolt columns are arranged inside the protective frames, a merging frame is connected to the middle of the monitoring frame system, and sliders are arranged on the upper and lower sides of the merging frame, and slide grooves are arranged on the upper and lower sides of the slider, a closing frame is arranged on one side of the merging frame, and a through hole is arranged on the inner side of the closing frame, an equipment plate is connected to the bottom end of the slide groove, and an end frame is arranged on the outer bottom end of the monitoring frame system. The beneficial effects of the present invention are: the connecting plate and the rubber frame of the concave structure are effectively glued between the protective frames, the gap between the monitoring frame system and the protective frame can achieve the effect of insulation protection, external electrostatic faults are prevented, and foreign matter accumulation at the connection end is avoided, which is conducive to the overall reinforcement of the real-time monitoring equipment for elevator operation performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of elevator operation performance real-time monitoring equipment, in particular to an elevator operation performance real-time monitoring system. Background Art

[0002] The real-time monitoring system for elevator operation can provide voice alarms and WeChat alarms for daily elevator failures such as failure to open the door, sudden sliding, overspeeding, sudden rising, getting stuck in the middle of a floor (stuck), locking people in the elevator for a long time (trapped people), rushing to the top, and squatting at the bottom. It ensures that rescue can be carried out quickly after an elevator failure. However, the real-time monitoring equipment for elevator operation performance has installation defects, which is not conducive to the use of the real-time monitoring equipment for elevator operation performance.

[0003] The real-time monitoring equipment for elevator operation performance on the market does not have corresponding external protective equipment, which can easily cause installation jams and wear. External static electricity failures often occur, and foreign matter accumulates at the connections, making it difficult to reinforce the real-time monitoring equipment for elevator operation performance as a whole. Summary of the invention

[0004] The object of the present invention is to provide a real-time monitoring system for elevator operation performance, so as to solve the problems of the real-time monitoring equipment for elevator operation performance on the market proposed in the above background technology, which has no corresponding external protective equipment, is prone to installation jam and wear, external electrostatic failures often occur, foreign matter accumulates at the connection ends, and it is difficult to reinforce the real-time monitoring equipment for elevator operation performance as a whole.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a real-time monitoring system for elevator operation performance, comprising a monitoring frame system, a spare port and a bolt sleeve, wherein protective frames are arranged on both sides of the monitoring frame system, and bolt columns are arranged inside the protective frames, a merging frame is connected to the middle of the monitoring frame system, and sliders are arranged on the upper and lower sides of the merging frame, and slide grooves are arranged on the upper and lower sides of the slider, a closing frame is arranged on one side of the merging frame, and a through hole is arranged on the inner side of the closing frame, an equipment plate is connected to the bottom end of the slide groove, an end frame is arranged on the outer bottom end of the monitoring frame system, a placement frame is arranged at the bottom end of the bolt column, and the bolt column The mounting frame is threadedly connected thereto, a return spring is connected around the end frame, and a sealing frame is mounted on the outside of the return spring, a port frame is connected to an outer side of the sealing frame, a sliding rod is provided on one side of the port frame, and a snap-fit ​​frame is connected to the top of the sliding rod, a spare port is mounted on the bottom end of the snap-fit ​​frame, a dustproof frame is provided at the bottom end of the spare port, and limited bolts are connected to both sides of the dustproof frame, a plywood frame is connected to the rear end of the protective frame, and a fixing frame is provided inside the plywood frame, a bolt sleeve is mounted on the bottom end of the fixing frame, rubber frames are provided on both sides of the equipment plate, and connecting plates are connected to both sides of the rubber frames.

[0006] Preferably, the monitoring frame system and the protective frame are fixedly connected, and the protective frame and the bolt column are threadedly connected.

[0007] Preferably, the slide groove and the slider are fitted with each other, and the merging frame forms a sliding structure through the slide groove and the slider.

[0008] Preferably, the sealing frame and the return spring are fixedly connected, and the end frame forms an elastic structure through the sealing frame and the return spring.

[0009] Preferably, the central axis between the snap-fit ​​frame and the spare port intersects, and the spare port and the dustproof frame are movably connected.

[0010] Preferably, the outer wall of the fixing frame is tightly fitted with the inner wall of the plywood frame, and the plywood frame is a hollow structure.

[0011] Preferably, the bolt sleeve is threadedly connected to the fixing frame, and the bolt sleeve forms a snap-fit ​​structure with the plywood frame through the fixing frame.

[0012] Preferably, the sliding rod and the limiting bolt are movably connected, and the dustproof frame forms a disassembly structure through the sliding rod and the limiting bolt.

[0013] Preferably, the connecting plate and the rubber frame are bonded with glue, and the rubber frame is a concave structure.

[0014] Preferably, the monitoring frame system includes a security alarm host, a hard disk recorder, a network camera and a voice alarm device. The monitoring frame system is electrically connected to the security alarm host, and the security alarm host is electrically connected to the hard disk recorder, the hard disk recorder is electrically connected to the network camera, and the network camera is electrically connected to the voice alarm device.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. The merging frame of the present invention forms a sliding structure through a slide groove and a slider. The user manually pushes the merging frame to drive the slider to slide along the slide groove, effectively sliding the merging frame and the closing frame between the through holes, which is conducive to the protective installation of the merging frame and the closing frame between the protective frames. At the same time, the fixing device can be penetrated and buckled between the through hole and the closing frame, and the real-time monitoring device of the elevator running performance can achieve an external protection effect to prevent installation jamming and wear.

[0017] 2. The end frame of the present invention forms an elastic structure through a sealing frame and a reset spring. Relying on the elasticity of the reset spring, it can be squeezed between the end frames, effectively squeezing the sealing frame and the reset spring elastically around the end frame, achieving a protective installation effect around the end frame, which is beneficial to the connection of equipment around the end frame.

[0018] 3. The bolt sleeve of the present invention forms a snap-fit ​​structure through the fixing frame and the plywood frame, so that the fixing frame thread is snap-fitted between the bolt sleeves. When the monitoring frame system and the protective frame are fixedly placed, the user can manually push the fixing frame to extend the fixing frame thread between the plywood frames, effectively sleeve the fixing parts between the fixing frames, which is conducive to fixing the monitoring frame system and the protective frame.

[0019] 4. The dustproof frame of the present invention forms a disassembly structure through a slide rod and a limit bolt. The user can manually loosen the limit bolt between the slide rods and install the loose dustproof frame assembly between the spare ports to prevent dust accumulation between the spare ports and prevent foreign matter accumulation at the connection end of the elevator operation performance real-time monitoring device.

[0020] 5. The connection plate and the rubber frame of the present invention are bonded by glue, and the rubber frame is a concave structure, so the connection plate and the rubber frame with the concave structure are effectively glued between the protective frame, so as to achieve the effect of insulation protection for the gap between the monitoring frame system and the protective frame, prevent external electrostatic faults, avoid the accumulation of foreign matter at the connection end, and facilitate the overall reinforcement of the real-time monitoring equipment of the elevator operation performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a top view structural schematic diagram of the elevator operation performance real-time monitoring system of the present invention;

[0022] Figure 2 It is a schematic diagram of the bottom structure of the real-time monitoring system for elevator operation performance of the present invention;

[0023] Figure 3 It is a rear view structural schematic diagram of the real-time monitoring system for elevator operation performance of the present invention;

[0024] Figure 4 The elevator operation performance real-time monitoring system of the present invention Figure 2 The schematic diagram of the structure is enlarged at B in the middle;

[0025] Figure 5 The elevator operation performance real-time monitoring system of the present invention Figure 1 The enlarged structural diagram at A in the middle;

[0026] Figure 6 It is a schematic diagram of the process structure of the real-time monitoring system for elevator operation performance of the present invention.

[0027] In the figure: 1. Monitoring frame system; 2. Protection frame; 3. Bolt column; 4. Merging frame; 5. Slide groove; 6. Slider; 7. Closing frame; 8. Through hole; 9. Equipment plate; 10. End frame; 11. Placement frame; 12. Sealing frame; 13. Reset spring; 14. Port frame; 15. Snap-fit ​​frame; 16. Spare port; 17. Dustproof frame; 18. Bolt sleeve; 19. Fixed frame; 20. Composite frame; 21. Slide bar; 22. Limit bolt; 23. Connecting plate; 24. Rubber frame; 25. Security alarm host; 26. Hard disk recorder; 27. Network camera; 28. Voice alarm equipment. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0030] See also Figure 1-6The present invention provides a technical solution: a real-time monitoring system for elevator operation performance, comprising a monitoring frame system 1, a protective frame 2, a bolt column 3, a merging frame 4, a slide groove 5, a slider 6, a closing frame 7, a through hole 8, an equipment plate 9, an end frame 10, a placement frame 11, a sealing frame 12, a reset spring 13, a port frame 14, a clamping frame 15, a spare port 16, a dustproof frame 17, a bolt sleeve 18, a fixing frame 19, a composite frame 20, a slide bar 21, a limit bolt 22, a connecting plate 23, a rubber frame 24, a security alarm host 25, a hard disk recorder 26, a network camera 27 and a voice alarm device 28. The monitoring frame system 1 is provided with protective frames 2 on both sides, and the protective frames 2 are provided with bolt columns 3 inside. The monitoring frame system 1 is connected to the merging frame 4 in the middle, and the sliders 6 are provided on the upper and lower sides of the merging frame 4. The sliders 6 are provided with slide grooves 5 on the upper and lower sides. A closing frame 7 is provided on one side of the merging frame 4, and the inner side of the closing frame 7 A through hole 8 is provided, an equipment plate 9 is connected to the bottom end of the slide groove 5, an end frame 10 is arranged at the external bottom end of the monitoring frame system 1, a placement frame 11 is arranged at the bottom end of the bolt column 3, and the bolt column 3 and the placement frame 11 are threadedly connected, a reset spring 13 is connected around the end frame 10, and a sealing frame 12 is arranged outside the reset spring 13, a port frame 14 is connected to the external side of the sealing frame 12, a sliding rod 21 is provided on one side of the port frame 14, and a snap-fit ​​frame 15 is connected to the top of the sliding rod 21, a spare port 16 is arranged at the bottom end of the snap-fit ​​frame 15, a dustproof frame 17 is provided at the bottom end of the spare port 16, and limited bolts 22 are connected to both sides of the dustproof frame 17, a plywood frame 20 is connected to the rear end of the protective frame 2, and a fixing frame 19 is provided inside the plywood frame 20, and a bolt sleeve 18 is arranged at the bottom end of the fixing frame 19, rubber frames 24 are provided on both sides of the equipment plate 9, and connecting plates 23 are connected to both sides of the rubber frame 24;

[0031] The monitoring frame system 1 is fixedly connected to the protection frame 2, and the protection frame 2 is threadedly connected to the bolt column 3. By fixing the protection frame 2 to the monitoring frame system 1, the thread of the bolt column 3 penetrates and snaps into the protection frame 2, which is conducive to the reinforcement and protection installation of the fixedly connected protection frame 2 and the monitoring frame system 1 on both sides;

[0032] The slide groove 5 and the slider 6 fit each other, and the merging frame 4 forms a sliding structure through the slide groove 5 and the slider 6. By arranging the slide groove 5 and the slider 6 that fit each other between the protective frame 2, the slider 6 is fixedly connected between the merging frame 4. The user manually pushes the merging frame 4 to drive the slider 6 to slide along the slide groove 5, and effectively slides the merging frame 4 and the closing frame 7 between the through hole 8, which is conducive to the protective installation of the merging frame 4 and the closing frame 7 between the protective frame 2. At the same time, the fixing device can be penetrated and buckled between the through hole 8 and the closing frame 7, and the real-time monitoring device of the elevator running performance can achieve an external protection effect to prevent the installation jam and wear;

[0033] The sealing frame 12 and the return spring 13 are fixedly connected, and the end frame 10 forms an elastic structure through the sealing frame 12 and the return spring 13. By placing the sealing frame 12 and the return spring 13 fixedly connected to the end frame 10 around the end frame 10, the return spring 13 can be squeezed between the end frame 10 by virtue of its elasticity, and the sealing frame 12 and the return spring 13 are effectively elastically squeezed around the end frame 10, so that the protective installation effect can be achieved around the end frame 10, which is conducive to the connection of equipment around the end frame 10;

[0034] The central axis of the snap-in frame 15 and the spare port 16 intersects, and the spare port 16 and the dustproof frame 17 are movably connected. The snap-in frame 15 and the spare port 16 whose central axes intersect are arranged between the slide bars 21, so that the snap-in frame 15 is protectively installed on the top of the spare port 16;

[0035] The outer wall of the fixing frame 19 is tightly fitted with the inner wall of the plywood frame 20, and the plywood frame 20 is a hollow structure. The inner wall of the plywood frame 20 is tightly fitted between the outer walls of the fixing frame 19, so that the fixing frame 19 can be installed between the plywood frames 20 of the hollow structure.

[0036] The bolt sleeve 18 and the fixing frame 19 are threadedly connected, and the bolt sleeve 18 forms a buckle structure through the fixing frame 19 and the plywood frame 20, so that the fixing frame 19 is screwed between the bolt sleeves 18. When the monitoring frame system 1 and the protective frame 2 are fixedly placed, the user can manually push the fixing frame 19 to extend the fixing frame 19 thread between the plywood frames 20, effectively sleeve the fixing parts between the fixing frame 19, and facilitate the fixing of the monitoring frame system 1 and the protective frame 2.

[0037] The sliding rod 21 and the limit bolt 22 are movably connected, and the dustproof frame 17 forms a disassembly structure through the sliding rod 21 and the limit bolt 22. The user can thread the limit bolt 22 between the sliding rods 21 to fix the dustproof frame 17 between the limit bolts 22. The user can manually loosen the limit bolts 22 between the sliding rods 21, and can install the loose dustproof frame 17 assembly between the spare ports 16 to prevent dust from accumulating and entering between the spare ports 16, and prevent foreign matter from accumulating at the connection end of the elevator operation performance real-time monitoring device;

[0038] The connecting plate 23 and the rubber frame 24 are glued, and the rubber frame 24 is a concave structure. By fixing the equipment plate 9 to the bottom end of the protective frame 2, the rubber frame 24 with the concave structure is glued between the connecting plates 23, and the connecting plate 23 and the rubber frame 24 with the concave structure are effectively glued between the protective frame 2, so that the gap between the monitoring frame system 1 and the protective frame 2 can achieve the effect of insulation protection, prevent external electrostatic faults, avoid the accumulation of foreign matter at the connection end, and facilitate the overall reinforcement of the real-time monitoring equipment of the elevator operation performance.

[0039] The monitoring frame system 1 includes a security alarm host 25, a hard disk recorder 26, a network camera 27 and a voice alarm device 28. The monitoring frame system 1 is electrically connected to the security alarm host 25, and the security alarm host 25 is electrically connected to the hard disk recorder 26, the hard disk recorder 26 is electrically connected to the network camera 27, and the network camera 27 is electrically connected to the voice alarm device 28. By electrically connecting the security alarm host 25 and the hard disk recorder 26 to the monitoring frame system 1, the monitoring frame system 1 can be monitored in real time, and real-time broadcast monitoring can be performed with the help of the network camera 27 and the voice alarm device 28.

[0040] Working principle of this embodiment: The elevator operation performance real-time monitoring system, by arranging the slide groove 5 and the slider 6 that fit each other between the protection frame 2, so that the slider 6 is fixedly connected between the merging frames 4, the user manually pushes the merging frame 4 to drive the slider 6 to slide along the slide groove 5, effectively slidably merges the merging frame 4 and the closing frame 7 between the through hole 8, which is conducive to the protective installation of the merging frame 4 and the closing frame 7 between the protection frame 2, and at the same time, the fixing device can be penetrated and buckled between the through hole 8 and the closing frame 7, so that the elevator operation performance real-time monitoring device can achieve external protection effect, prevent installation jam wear, the user threadedly connects the limit bolt 22 between the slide rods 21, The dustproof frame 17 between the limit bolts 22 can be placed and fixed between the limit bolts 22. The user can manually loosen the limit bolts 22 between the slide bars 21, and the loose dustproof frame 17 can be assembled and installed between the spare ports 16 to prevent dust accumulation from entering between the spare ports 16, and to prevent foreign matter from accumulating at the connection end of the elevator operation performance real-time monitoring device. The inner wall of the plywood frame 20 is tightly fitted between the outer wall of the fixing frame 19, and the fixing frame 19 can be installed between the plywood frames 20 of the hollow structure. At the same time, the equipment plate 9 is fixedly connected to the bottom end of the protective frame 2, so that the rubber frame 24 of the concave structure is glued between the connecting plates 23, effectively connecting the connecting plates 23 and the concave structure. The rubber frame 24 is glued between the protective frames 2, and the gap between the monitoring frame system 1 and the protective frame 2 can achieve the effect of insulation protection, prevent external electrostatic faults, avoid the accumulation of foreign matter at the connection end, and facilitate the overall reinforcement of the real-time monitoring equipment for elevator operation performance. Finally, the fixing frame 19 is threadedly buckled between the bolt sleeves 18. When the monitoring frame system 1 and the protective frame 2 are fixedly placed, the user can manually push the fixing frame 19, and the fixing frame 19 thread can be extended between the plywood frames 20, effectively sleeve the fixed parts between the fixing frames 19, which is conducive to the fixed placement of the monitoring frame system 1 and the protective frame 2. By intersecting the central axis of the clamping frame 15 and the spare The port 16 is arranged between the sliding rods 21, so that the snap-fit ​​frame 15 is protectively installed at the top of the spare port 16, and by fixing the sealing frame 12 and the reset spring 13 around the end frame 10, the elasticity of the reset spring 13 can be squeezed between the end frames 10, and the sealing frame 12 and the reset spring 13 are effectively elastically squeezed around the end frame 10, so that the effect of protective installation can be achieved around the end frame 10, which is beneficial to the connection of equipment around the end frame 10, and the protective frame 2 is fixedly connected between the monitoring frame system 1, so that the thread of the bolt column 3 passes through the buckle between the protective frame 2, which is beneficial to the reinforcement and protection installation on both sides of the fixedly connected protective frame 2 and the monitoring frame system 1.

[0041] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A real-time monitoring system for elevator operation performance, comprising a monitoring frame system (1), a spare port (16) and a bolt sleeve (18), characterized in that: The monitoring frame system (1) is provided with protective frames (2) on both sides, and a tethering column (3) is arranged inside the protective frame (2). The middle part of the monitoring frame system (1) is connected with a merging frame (4), and sliders (6) are arranged on the upper and lower sides of the merging frame (4). The sliders (6) are provided with sliding grooves (5) on the upper and lower sides. A closing frame (7) is arranged on one side of the merging frame (4), and a through hole (8) is arranged on the inner side of the closing frame (7). The bottom end of the sliding groove (5) is connected with an equipment plate (9). The external bottom end of the monitoring frame system (1) is provided with an end frame (10). The bottom end of the tethering column (3) is provided with a placement frame (11), and the tethering column (3) and the placement frame (11) are threadedly connected. The four sides of the end frame (10) are connected with a return spring (13), and the return spring (13) is connected to the return spring (13). A sealing frame (12) is arranged outside the protective frame (13), a port frame (14) is connected to one side of the sealing frame (12), a sliding rod (21) is arranged on one side of the port frame (14), and a snap-fit ​​frame (15) is connected to the top of the sliding rod (21), a spare port (16) is arranged at the bottom of the snap-fit ​​frame (15), a dustproof frame (17) is arranged at the bottom of the spare port (16), and both sides of the dustproof frame (17) are connected to limit bolts (22), a rear end of the protective frame (2) is connected to a plywood frame (20), and a fixing frame (19) is arranged inside the plywood frame (20), and a bolt sleeve (18) is arranged at the bottom of the fixing frame (19), and rubber frames (24) are arranged on both sides of the equipment plate (9), and both sides of the rubber frames (24) are connected to connecting plates (23); The monitoring frame system (1) and the protection frame (2) are fixedly connected, and the protection frame (2) and the bolt column (3) are threadedly connected; The central axis between the snap-fit ​​frame (15) and the spare port (16) intersects, and the spare port (16) and the dustproof frame (17) are movably connected.

2. The elevator operation performance real-time monitoring system according to claim 1 is characterized in that: The slide groove (5) and the slide block (6) are fitted with each other, and the merging frame (4) forms a sliding structure through the slide groove (5) and the slide block (6).

3. The elevator operation performance real-time monitoring system according to claim 1 is characterized in that: The sealing frame (12) and the return spring (13) are fixedly connected, and the end frame (10) forms an elastic structure through the sealing frame (12) and the return spring (13).

4. The elevator operation performance real-time monitoring system according to claim 1 is characterized in that: The outer wall of the fixing frame (19) is tightly fitted with the inner wall of the plywood frame (20), and the plywood frame (20) is a hollow structure.

5. The elevator operation performance real-time monitoring system according to claim 1 is characterized in that: The bolt sleeve (18) and the fixing frame (19) are threadedly connected, and the bolt sleeve (18) forms a snap-fit ​​structure through the fixing frame (19) and the plywood frame (20).

6. The elevator operation performance real-time monitoring system according to claim 1 is characterized in that: The sliding rod (21) and the limiting bolt (22) are movably connected, and the dustproof frame (17) forms a disassembly structure through the sliding rod (21) and the limiting bolt (22).

7. The elevator operation performance real-time monitoring system according to claim 1, characterized in that; The connecting plate (23) and the rubber frame (24) are bonded by glue, and the rubber frame (24) is a concave structure.

8. The elevator operation performance real-time monitoring system according to claim 1, characterized in that; The monitoring frame system (1) comprises a security alarm host (25), a hard disk video recorder (26), a network camera (27) and a voice alarm device (28); the monitoring frame system (1) is electrically connected to the security alarm host (25), the security alarm host (25) is electrically connected to the hard disk video recorder (26), the hard disk video recorder (26) is electrically connected to the network camera (27), and the network camera (27) is electrically connected to the voice alarm device (28).