Offshore large-diameter steel pipe pile turning equipment and pile turning construction method
By designing a pile-turning mechanism and a back-pull mechanism that can be turned horizontally, combined with the rotation function of the hanger, the problem of difficulty in turning over large-diameter steel pipe piles in offshore wind power is solved, and efficient and safe pile-turning construction is achieved. It is suitable for large-diameter or large-diameter steel pipe piles. Extra large diameter steel pipe piles.
Patent Information
- Application Number
- CN202010634288.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-07-02
AI Technical Summary
In existing offshore wind power construction, the increase in the diameter and length of single pile foundations makes it difficult to turn piles. Existing pile turning technology requires high lifting equipment and low construction efficiency, and cannot meet the needs of large-diameter or ultra-large-diameter steel pipe piles. The need to turn over.
An offshore large-diameter steel pipe pile turning equipment including a pile turning mechanism and a back-pull mechanism is designed. The pile-turning mechanism is movably fixed on the crane ship through multiple supports and can be flipped from a horizontal state to a vertical state. The back-pull mechanism The back-pull wire rope is used to assist in controlling the flipping of the steel pipe pile, and the hanger design can be rotated to reduce the occupied area.
It achieves efficient turning of large-diameter steel pipe piles, avoids equipment collision damage caused by heavy weight, improves construction efficiency and safety, and is suitable for turning over large-diameter or extra-large-diameter steel pipe piles.
Smart Images

Figure CN111749237B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power construction operations, and in particular to offshore large-diameter steel pipe pile turning equipment and a pile turning construction method thereof. Background Art
[0002] During the construction of offshore wind power foundations, single pile foundations have been widely used due to their many advantages, such as high bearing capacity, convenient construction, and high construction efficiency. As the installed power of offshore wind power increases, the diameter and length of single pile foundations are also increasing, and turning piles is becoming more and more difficult.
[0003] The current pile turning technology is mainly divided into double-hook pile turning and hinged point pile turning. Double-hook pile turning is to connect the two ends of the steel pipe pile through the two large hooks of two cranes or the main and auxiliary hooks of one crane respectively. After lifting, the two hooks move up and down to turn the steel pipe pile into a vertical state. Its disadvantage is that it has high requirements for lifting equipment. If two cranes are used, they need to cooperate closely and the construction efficiency is low. Hinged point pile turning is to set a tooling hinge point on the platform deck to connect with the bottom end of the steel pipe pile. After the steel pipe pile is horizontally lifted on the deck, the upper end of the steel pipe pile is lifted by the crane to turn the tower into a vertical state. Its disadvantage is that it is necessary to connect and remove the flange bolts to ensure the accuracy of the horizontal placement of the steel pipe pile. The crane operation is difficult and time-consuming. If the steel pipe pile is long, it also has extremely high requirements for the captain.
[0004] The published patent CN 201822187287.X discloses a pile turning guide, which includes a pile turning frame and a turning mechanism, wherein the turning mechanism is detachably mounted on the hull, the pile turning frame is detachably connected to the turning mechanism, the turning mechanism can drive the pile turning frame to turn over, and the tower or foundation pile is detachably mounted in the pile turning frame. It has the functions of turning over the tower and foundation pile, and can also conveniently have the functions of guiding the foundation pile and correcting the deviation of the foundation pile; the turning action is safe and simple, and the foundation pile or tower is equivalent to being placed on the deck of the hull, without the need for high-risk aerial joint lifting operations. Its disadvantage is that its scope of application is limited, and it is only suitable for turning over small and medium diameter steel pipe piles, and cannot meet the turning requirements of large or even super-large diameter steel pipe piles. Summary of the invention
[0005] The purpose of the present invention is to provide an offshore large-diameter steel pipe pile turning device which can solve the current problem of difficulty in turning over offshore large-diameter or even super-large-diameter steel pipe piles.
[0006] Another object of the present invention is to provide a pile turning construction method implemented by using the above-mentioned offshore large-diameter steel pipe pile turning equipment.
[0007] To this end, the technical solution of the present invention is as follows:
[0008] A large diameter steel pipe pile turning device at sea, comprising a turning mechanism and a back pulling mechanism respectively arranged at the sides of a crane ship; wherein:
[0009] The pile turning mechanism comprises a pile turning frame, an upper pile gripper and a lower pile gripper; the bottom end of the pile turning frame is movably fixed on the crane ship through a plurality of supports arranged in a line at intervals on the side, so that the pile turning frame can be turned from a horizontal state to a vertical state through the plurality of supports; the front end of the pile turning frame is pressed on two turning frame pillars symmetrically fixed on the crane ship, so that the pile turning frame is initially arranged on the crane ship in a horizontal state; the holding arms of the upper pile gripper and the holding arms of the lower pile gripper are both arranged on the pile turning frame at intervals with the opening direction facing upward, and the central axis of the pile turning frame is kept to coincide with the central axis of the two holding arms and to be perpendicular to the side of the crane ship;
[0010] The back-pull mechanism includes a back-pull support frame, a back-pull device arranged on the inner side of the back-pull support frame, and a back-pull wire rope arranged between the back-pull device and the pile-turning frame; one end of the back-pull wire rope is wound around and fixed on a pile-turning frame pulley arranged at the front end of the pile-turning frame, and the other end passes around the pulley on the back-pull device and is wound around a wire rope drum controlled by a hydraulic device; the height of the back-pull support frame is adapted to the setting position of the pile gripper arm, so that the front end of the steel pipe pile horizontally fixed in the upper pile gripper arm and the lower pile gripper arm is pressed onto the upper end surface of the back-pull support frame.
[0011] Furthermore, the pile turning mechanism also includes a hanging frame, which is horizontally arranged on the outside of the crane ship in a manner that the axial direction is perpendicular to the side of the crane ship, and its front end is fixed to the bottom end of the pile turning frame, so that the rear end of the steel pipe pile horizontally fixed in the arms of the upper pile gripper and the lower pile gripper is pressed onto the bottom end support plate of the hanging frame.
[0012] Furthermore, two first mounting ear plates are symmetrically arranged on the front end surface of the hanger, and two second mounting ear plates are symmetrically arranged on the bottom end surface of the pile turning frame, so that the hanger and the pile turning frame are movably connected through the hanger rotating shaft inserted in the two first mounting ear plates and the two second mounting ear plates; a limiting plate is also arranged under the two second mounting ear plates, so that the hanger which is initially horizontally arranged can only be flipped upward to a vertical state.
[0013] Furthermore, the support is composed of a base, a left bearing seat, a right bearing seat, a kingpin, a pressure ring, a spherical bearing, a bushing and a pressure plate; wherein the base is fixed to the side of the ship by bolts, the left bearing seat and the right bearing seat are symmetrically fixed on both sides of the base, and the kingpin is inserted and fixed in radial through holes symmetrically opened on the left bearing seat and the right bearing seat; the bushing, the spherical bearing and the pressure ring are sequentially mounted and fixed on the outside of the kingpin, so that the pressure ring can rotate freely around its axis under the action of the spherical bearing and can also tilt at a small angle horizontally.
[0014] A pile turning construction method implemented by using the above-mentioned offshore large-diameter steel pipe pile turning equipment comprises the following steps:
[0015] S1. After the crane ship is stationed, the hanger and pile turning frame are placed in a horizontal state, and the arms of the upper pile gripper and the lower pile gripper are opened;
[0016] S2. Use a crane installed on a crane ship to horizontally place the large-diameter steel pipe pile inside the arms of the upper pile gripper and the lower pile gripper, and place the front end of the large-diameter steel pipe pile on the back-pull support frame and the bottom end on the bottom end of the hanger; close the arms of the upper pile gripper and the lower pile gripper and fix them with the latch at the opening and closing end of each arm, and use the arm pushing device to adjust the large-diameter steel pipe pile to be centrally placed inside the arms of the upper pile gripper and the lower pile gripper;
[0017] S3, the crane hangs the large diameter steel pipe pile lifting lug by the lifting wire rope and slowly lifts it up, at which time the back-pull device slowly releases the back-pull wire rope and keeps its release speed consistent with the lifting speed of the large diameter steel pipe pile until the large diameter steel pipe pile reaches a vertical state;
[0018] S4, the arms of the upper pile gripper and the lower pile gripper are opened, and the crane uses the lifting wire rope to lift the flipped large-diameter steel pipe pile to the construction area for construction;
[0019] S5. After the construction is completed, the crane hangs the lifting lugs on the pile-turning frame and slowly lowers it. At this time, the back-pull device slowly tightens the back-pull wire rope and keeps its tightening speed consistent with the speed of the crane lowering the pile-turning frame until the front end of the pile-turning frame is pressed onto the pile-turning frame support again and placed in a horizontal state.
[0020] Compared with the prior art, the offshore large-diameter steel pipe pile turning equipment has a simple structure, and the corresponding pile turning construction is convenient and easy to operate. Through the auxiliary control of the back-pulling device, it can effectively avoid the problem of damage caused by collision between the large-diameter steel pipe pile and the ship machinery equipment due to the large weight of the large-diameter steel pipe pile and the excessively fast pile turning speed; at the same time, the support design of the pile turning frame enables it to not only rotate in the vertical direction, but also tilt at a small angle in the horizontal direction, effectively avoiding the problem of damage caused by collision between the large-diameter steel pipe pile and the ship machinery equipment when it tilts left and right during pile turning; in addition, the bracket can be retracted to a vertical state when not in use, reducing the area occupied by the sea area and improving the efficiency of ship moving and positioning. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of the offshore large-diameter steel pipe pile turning equipment of the present invention;
[0022] Figure 2 The plan layout of the offshore large-diameter steel pipe pile turning equipment of the present invention is as follows Figure 1 ;
[0023] Figure 3The plan layout of the offshore large-diameter steel pipe pile turning equipment of the present invention is as follows Figure 2 ;
[0024] Figure 4 It is a structural schematic diagram of the initial lifting state of the offshore large-diameter steel pipe pile turning device of the present invention;
[0025] Figure 5 It is a schematic structural diagram of the offshore large-diameter steel pipe pile turning device of the present invention during the turning process;
[0026] Figure 6 A side view of the offshore large-diameter steel pipe pile turning device of the present invention after turning the pile;
[0027] Figure 7 A top view of the offshore large-diameter steel pipe pile turning device of the present invention completing the pile turning;
[0028] Figure 8 It is a structural schematic diagram of the arm on the pile turning frame of the offshore large-diameter steel pipe pile turning equipment of the present invention in an open state;
[0029] Fig. 9 It is a structural schematic diagram of the arm on the pile turning frame of the offshore large-diameter steel pipe pile turning equipment of the present invention in a closed state;
[0030] Fig.10 It is a structural schematic diagram of the hanging frame of the offshore large-diameter steel pipe pile turning equipment of the present invention being turned over to a vertical state;
[0031] Fig.11 It is a schematic structural diagram of a support of the offshore large-diameter steel pipe pile turning equipment of the present invention. DETAILED DESCRIPTION
[0032] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments do not limit the present invention in any way. For ease of explanation, in the description of the pile turning mechanism, the front end of each component refers to the end close to the inner side of the hull, and correspondingly, the bottom end of each component refers to the end close to the outer side of the hull.
[0033] like Figures 1 to 3 As shown, the offshore large-diameter steel pipe pile turning equipment includes a turning mechanism and a back-pulling mechanism respectively arranged at the sides of the crane ship 10; wherein,
[0034] The pile turning mechanism includes a hanger 1, a pile turning frame 4, an upper pile gripper 8 and a lower pile gripper 9; specifically,
[0035] The pile turning frame 4 is a truss horizontally arranged on the crane ship 10, and its bottom end is movably fixed on the crane ship 10 through three supports 2 arranged in a line at the side 16 at intervals, so that the pile turning frame 4 can be turned from a horizontal state to a vertical state through the three supports 2;
[0036] like Fig.11 As shown, the support 2 is composed of a base 2a, a left bearing seat 2b, a right bearing seat 2c, a kingpin 2d, a pressure ring 2e, a spherical bearing 2f, a sleeve 2g and a pressure plate 2h; wherein the base 2a is fixed to the ship's side by bolts, the left bearing seat 2b and the right bearing seat 2c are symmetrically fixed on both sides of the base 2a, and the kingpin 2d is inserted and fixed in radial through holes symmetrically opened on the left bearing seat 2b and the right bearing seat 2c; the sleeve 2g, the spherical bearing 2f and the pressure ring 2e are sequentially mounted and fixed on the outside of the kingpin 2d, so that the pressure ring 2e can freely rotate around its axis under the action of the spherical bearing 2f and can also tilt at a small angle in the lateral direction;
[0037] The three supports 2 are respectively arranged at both sides and the middle of the bottom end of the pile turning frame 4, so that a certain margin is left between the supports 2 in the extension direction along the ship's side, ensuring that the pile turning frame 4 can be tilted at an angle not exceeding 10° in the extension direction along the ship's side;
[0038] Two turning frame pillars 5 are symmetrically arranged on the crane ship 10, so that the front ends of the pile turning frame 4 are respectively pressed on the two turning frame pillars 5 to keep the pile turning frame 4 initially arranged in a horizontal state on the crane ship 10; the holding arms of the upper pile gripper 8 and the holding arms of the lower pile gripper 9 are welded and fixed on the front end face and the bottom end face of the pile turning frame 4 in an upward opening direction, and the central axis of the pile turning frame 4 is kept to coincide with the central axes of the two holding arms and to be perpendicular to the side of the crane ship 10; the holding arm hydraulic control device 11 for controlling the opening and closing state of the holding arms of the upper pile gripper 8 and the lower pile gripper 9 is arranged on the adjacent side of the pile gripper and fixed on the crane ship 10;
[0039] The hanger 1 is a truss structure with a horizontal support plate at the bottom end, which is horizontally arranged on the outside of the crane ship 10 in a manner that the axial direction is perpendicular to the side of the crane ship 10, and its front end is fixed to the bottom end of the pile turning frame 4, so that the rear end of the steel pipe pile horizontally fixed in the arms of the upper pile gripper 8 and the lower pile gripper 9 is pressed on the bottom support plate of the hanger 1;
[0040] Two first mounting lugs are symmetrically arranged on the front end surface of the pylon 1, and correspondingly, two second mounting lugs are symmetrically arranged on the front end surface of the upper pile gripper 8, so that the pylon 1 and the upper pile gripper 8 are movably connected through the pylon rotating shaft 14 inserted in the two first mounting lugs and the two second mounting lugs; at the same time, a limit plate is also arranged under the two second mounting lugs, so that the pylon 1 which is initially horizontally arranged can only be flipped upward to a vertical state;
[0041] The back-pull mechanism comprises a back-pull support frame 7, a back-pull device 6 arranged inside the back-pull support frame 7, and a back-pull wire rope 21 arranged between the back-pull device 6 and the pile turning frame 4; one end of the back-pull wire rope 21 is wound around and fixed on a pile turning frame pulley 20 arranged at the front end of the pile turning frame 4, and the other end is passed around the pulley on the back-pull device 6 and wound around a wire rope drum 11 controlled by a hydraulic device; the height of the back-pull support frame 7 is adapted to the setting position of the pile gripper arm, so that the front end of the steel pipe pile horizontally fixed in the upper pile gripper 8 arm and the lower pile gripper 7 arm is pressed on the upper end surface of the back-pull support frame 7;
[0042] In order to facilitate the control of the pile turning equipment, a control console 13 is provided on the crane vessel 10, and a back-pull wire rope retracting and releasing control button and an arm opening and closing control button are provided on the control console 13; wherein, the back-pull wire rope retracting and releasing control button is electrically connected to the hydraulic device controlling the wire rope drum 11, so that the operator can control the tightening or releasing of the back-pull wire rope 21 through the back-pull wire rope retracting and releasing control button; the arm opening and closing control button is electrically connected to the arm hydraulic control device, so that the operator can control the synchronous opening or synchronous closing of the arms of the two pile grippers through the arm opening and closing control button.
[0043] A pile turning construction method implemented by using the above-mentioned offshore large-diameter steel pipe pile turning equipment comprises the following steps:
[0044] S1, such as Figure 1 and Figure 8 As shown, when the crane ship 10 is stationed, the hanging frame 1 and the pile turning frame 4 are placed in a horizontal state; the arms of the upper pile gripper 8 and the lower pile gripper 9 are controlled to be in an open state through the arm hydraulic control device;
[0045] S2, such as Figure 2 and Figure 3 As shown, a large-diameter steel pipe pile 17 is horizontally placed on the inner side of the arms of the upper pile gripper 8 and the lower pile gripper 9 by using a crane 15 installed on a crane ship 10, and the front end of the large-diameter steel pipe pile 17 is placed on the upper end surface of the back-pull support frame 7, and the bottom end of the large-diameter steel pipe pile 17 is placed on the bottom support plate of the hanger 1; the arms of the upper pile gripper 8 and the lower pile gripper 9 are controlled to close by an arm hydraulic control device, and the plug-in latch 23 at the opening and closing end of each arm is further fixed; then the arm pushing device 22 is used to adjust the large-diameter steel pipe pile 17 to be centrally arranged on the inner side of the two arms;
[0046] S3, such as Figure 4-5As shown, the crane 15 uses the lifting wire rope 19 to hang the two lifting ears 18 on the large diameter steel pipe pile 17, and slowly lifts the large diameter steel pipe pile 17; at the same time, the hydraulic device of the wire rope drum 11 controls the back-pull device 6 to slowly release the back-pull wire rope 21, and keeps its release speed consistent with the lifting speed of the large diameter steel pipe pile 17, until the large diameter steel pipe pile 17 is flipped to a vertical state, as shown in FIG. Figure 6 , Figure 7 and Fig. 9 As shown;
[0047] S4, such as Figure 8 As shown, the arms of the upper pile gripper 8 and the lower pile gripper 9 are opened by the arm hydraulic control device, and the crane 15 hoists the completed flipped large-diameter steel pipe pile 17 to the construction area for construction by hoisting the wire rope 19;
[0048] S5. After the construction is completed, the crane 15 removes the lifting wire rope 19 from the large-diameter steel pipe pile 17 and fixes it on the lifting lug of the pile-turning frame 4, and slowly lowers the pile-turning frame 4 by releasing the lifting wire rope 19 through the crane; at the same time, the hydraulic device controlling the wire rope drum 11 controls the back-pull device 6 to slowly tighten the back-pull wire rope 21, and keeps its tightening speed consistent with the speed of the crane lowering the pile-turning frame 4, until the pile-turning frame returns to the horizontal setting state, and its front end is pressed onto the pile-turning frame support 5 again, and the pile-turning construction process of the large-diameter steel pipe pile 17 is completed.
[0049] If there are several large-diameter steel pipe piles that need to be constructed in the area, the next large-diameter steel pipe pile 17 is hoisted in, and the above steps S2 to S5 are repeated until the construction work in the area is completed.
[0050] When the next area needs to be constructed, Fig.10 As shown, the hanger 1 is first rotated to a vertical state through the hanger rotation axis 14 and fixed, and then the crane ship 15 is moved to the next area for parking, and then the above steps S1 to S5 are repeated.
Claims
1. A large diameter steel pipe pile turning device at sea, characterized in that: It comprises a pile turning mechanism and a back pulling mechanism respectively arranged at the sides of the crane ship (10); wherein, The pile turning mechanism comprises a pile turning frame (4), an upper pile gripper (8) and a lower pile gripper (9); the bottom end of the pile turning frame (4) is movably fixed on a crane ship (10) through a plurality of supports (2) arranged in a line at intervals on the side (16), so that the pile turning frame (4) can be turned from a horizontal state to a vertical state through the plurality of supports (2); the front end of the pile turning frame (4) is pressed onto two turning frame pillars (5) symmetrically fixed on the crane ship (10), so that the pile turning frame (4) is initially arranged on the crane ship (10) in a horizontal state; the holding arms of the upper pile gripper (8) and the holding arms of the lower pile gripper (9) are both arranged on the pile turning frame (4) at intervals with the opening direction facing upward, and the central axis of the pile turning frame (4) is kept coincident with the central axis of the holding arms of the two pile grippers and is perpendicular to the crane ship (10). 10) side; the support (2) is composed of a base (2a), a left bearing seat (2b), a right bearing seat (2c), a kingpin (2d), a pressure ring (2e), a joint bearing (2f), a sleeve (2g) and a pressure plate (2h); wherein the base (2a) is fixed to the ship's side by bolts, the left bearing seat (2b) and the right bearing seat (2c) are symmetrically fixed on both sides of the base (2a), and the kingpin (2d) is inserted and fixed in radial through holes symmetrically opened on the left bearing seat (2b) and the right bearing seat (2c); the sleeve (2g), the joint bearing (2f) and the pressure ring (2e) are sequentially mounted and fixed on the outside of the kingpin (2d), so that the pressure ring (2e) can freely rotate around its axis under the action of the joint bearing (2f) and can also tilt at a small angle in the horizontal direction; The back-pull mechanism comprises a back-pull support frame (7), a back-pull device (6) arranged inside the back-pull support frame (7), and a back-pull wire rope (21) arranged between the back-pull device (6) and the pile turning frame (4); one end of the back-pull wire rope (21) is wound around and fixed on a pile turning frame pulley (20) arranged at the front end of the pile turning frame (4), and the other end passes around the pulley on the back-pull device (6) and is wound around a wire rope drum (11) controlled by a hydraulic device; the height of the back-pull support frame (7) is adapted to the setting height of the arm of the pile gripper, so that the front end of the steel pipe pile horizontally fixed in the arm of the upper pile gripper (8) and the arm of the lower pile gripper (9) can be pressed onto the upper end surface of the back-pull support frame (7).
2. The offshore large-diameter steel pipe pile turning equipment according to claim 1 is characterized in that: The pile turning mechanism also includes a hanging frame (1), which is horizontally arranged on the outside of the crane ship (10) in a manner that the axial direction is perpendicular to the side of the crane ship (10), and the front end of which is fixed to the bottom end of the pile turning frame (4), so that the rear end of the steel pipe pile horizontally fixed in the upper pile gripper (8) and the lower pile gripper (9) can be pressed onto the bottom end support plate of the hanging frame (1).
3. The offshore large-diameter steel pipe pile turning equipment according to claim 2 is characterized in that: Two first mounting ear plates are symmetrically arranged on the front end surface of the hanging bracket (1), and two second mounting ear plates are symmetrically arranged on the bottom end surface of the pile turning frame (4), so that the hanging bracket (1) and the pile turning frame (4) are movably connected via a hanging bracket rotating shaft (14) inserted in the two first mounting ear plates and the two second mounting ear plates; a limiting plate is also arranged below the two second mounting ear plates, so that the hanging bracket (1) which is initially arranged horizontally can only be turned upward to a vertical state.
4. A pile turning construction method using the offshore large-diameter steel pipe pile turning equipment as claimed in claim 2, characterized in that: Here are the steps: S1. After the crane vessel (10) is stationed, the hanger (1) and the pile turning frame (4) are placed in a horizontal state, and the arms of the upper pile gripper (8) and the lower pile gripper (9) are opened; S2, using a crane (15) installed on a crane ship (10) to horizontally place the large-diameter steel pipe pile (17) on the inner side of the arms of the upper pile gripper (8) and the lower pile gripper (9), and placing the front end of the large-diameter steel pipe pile (17) on the back-pull support frame (7) and the bottom end on the bottom end of the hanger (1); closing the arms of the upper pile gripper (8) and the lower pile gripper (9) and fixing them with the latch (23) at the opening and closing end of each arm, and using the arm pushing device (22) to adjust the large-diameter steel pipe pile (17) to be centrally arranged on the inner side of the arms of the upper pile gripper (8) and the lower pile gripper (9); S3, the crane (15) uses the lifting wire rope (19) to hang the large-diameter steel pipe pile lifting lug and slowly lifts it up, and at this time, the back-pull device (6) slowly releases the back-pull wire rope (21) and keeps its release speed consistent with the lifting speed of the large-diameter steel pipe pile until the large-diameter steel pipe pile (17) reaches a vertical state; S4, the arms of the upper pile gripper (8) and the lower pile gripper (9) are opened, and the crane (15) hoists the turned large-diameter steel pipe pile (17) to the construction area for construction via the hoisting wire rope (19); S5. After the construction is completed, the crane (15) hangs the lifting lug on the pile turning frame (4) and slowly lowers it. At this time, the back-pull device (6) slowly tightens the back-pull wire rope (21) and keeps its tightening speed consistent with the speed of the crane lowering the pile turning frame (4) until the front end of the pile turning frame is pressed onto the pile turning frame support (5) again and placed in a horizontal state.