A control structure and control method for long-term settlement of a shield or pipe-jacking tunnel
By using a combined structure of segment rings, track beds and supports in shield or pipe-jacking tunnels, using stable strata to support soft soil strata, and combining with pile-beam frame structures, the problem of uneven settlement is solved, and the load-bearing capacity and load-bearing capacity of the tunnel are improved. It is safe, avoids the restrictions of ground reinforcement, and is suitable for complex geological conditions.
Patent Information
- Application Number
- CN202010768202.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-03
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-08-03
AI Technical Summary
Shield and pipe jacking tunnels have uneven settlement problems after construction in liquefied sand and soft soil strata. Existing reinforcement methods such as ground reinforcement and tunnel reinforcement have limited effects, and are limited by ground conditions, making it difficult to effectively control settlement.
A shield or pipe-jacking tunnel long-term settlement control structure is adopted, including the first segment ring, track bed, sleepers and supports. The supports are connected to the track bed and stable stratum to form a clear stress system, and the stable stratum is used to support the soft The soil layer reduces uneven settlement and further enhances the support capacity through the pile-beam frame structure.
It effectively solves the problem of uneven settlement, improves the load-bearing capacity of the tunnel, avoids increased settlement and segment damage in later operations, ensures safe operation of the tunnel, and avoids the restrictions of ground reinforcement. It is suitable for complex geological conditions such as karst and Anhe et al.
Smart Images

Figure CN111764926B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield and pipe-jacking tunnel engineering, in particular to a control structure and a control method for long-term settlement of a shield or pipe-jacking tunnel. Background Art
[0002] Shield construction and pipe-jacking tunneling are the most widely used and important engineering technologies in underground tunnel construction. They have the advantages of safety, speed, and better control of tunnel quality. However, in liquefied sand layers and soft soil layers, shield and pipe-jacking tunnels not only have earthquake liquefaction problems after construction, but also have large settlements during operation, and it takes a long time to reach stability. The settlement also shows obvious non-uniform characteristics, which leads to long-term durability problems of tunnel segments and even endangers structural safety.
[0003] In shield and pipe-jacking tunnel projects, the most common method to solve earthquake liquefaction problems and control long-term operational settlement in soft soil stable strata is to reinforce the soft and stable strata around the tunnel. Therefore, reinforcement design has always been a key difficulty in the design and construction of shield and pipe-jacking tunnels, especially when the tunnel environment is complex and surrounded by thick soft soil and water-rich liquefied sand layers, its reinforcement is even more difficult for risk control.
[0004] The soft and stable strata around the tunnel are generally reinforced by ground reinforcement, such as ground grouting, mixing piles, and jet grouting piles, but the above methods are expensive; and the tunnels generally pass under existing municipal roads or buildings. Due to the restrictions of ground transportation, pipelines, and demolition of buildings, ground reinforcement cannot be implemented in most cases. Another method is to reinforce the tunnel inside the tunnel, such as grouting inside the tunnel, but due to the low permeability coefficient of the soil and the small diffusion range of the reinforcement body, the traditional grouting reinforcement inside the tunnel has a poor effect and cannot fundamentally solve the problems of earthquake liquefaction and uneven settlement during operation. Summary of the invention
[0005] The purpose of the present invention is to solve the problem that uneven settlement is easily generated after tunnel construction using shield and jacking tunnel methods in the prior art. The existing methods for controlling settlement include ground reinforcement and in-tunnel reinforcement. When the ground reinforcement method is used to control tunnel settlement, it is limited by ground traffic, pipelines, demolition of buildings and structures, etc. When in-tunnel reinforcement is used, the reinforcement effect is poor, and thus the effect is poor in solving the uneven settlement of the tunnel during earthquake liquefaction and operation. In view of the above problems, a control structure and control method for long-term settlement of a shield or jacking tunnel are provided.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is:
[0007] A control structure for long-term settlement of a shield or jacking tunnel comprises a first segment ring, a ballast is provided at the inner bottom of the first segment ring, a plurality of sleepers are provided on the ballast, a support is connected below the ballast, the upper end of the support is connected to the first segment ring, and the lower end is connected to a stable stratum.
[0008] The stable stratum refers to the stratum deep below the soft soil stratum where the tunnel is located, such as a rock stratum or hard soil stratum; the segment ring is a permanent lining structure in the shield or jacking construction method, and is the innermost barrier of the tunnel, which bears the role of resisting soil pressure, groundwater pressure and some special loads. The segment ring includes a first segment ring and a second segment ring, the first segment ring is a segment ring set on a liquefied sand layer or a soft stratum, the second segment ring is a segment ring set on a stratum with properties similar to the stable stratum, the second segment ring is a segment ring in the prior art, and the second segment ring can be a concrete segment ring or a steel segment ring. The roadbed and the sleepers are existing track structures, and the sleepers are laid with rails.
[0009] The support member is connected to the ballast, the first segment ring and the stable stratum at the same time, so that the ballast, the first segment ring, the stable stratum and the support member form a clear force system, which can reduce the uneven settlement of the tunnel. The number of the support members is determined according to the actual construction situation. The support member uses the stronger stable stratum to support the tunnel above the soft soil stratum, which can improve the supporting capacity of the stratum under the tunnel to the tunnel, thereby improving the bearing capacity of the tunnel, thereby reducing the settlement of the tunnel at the soft soil stratum and ensuring the safety of the tunnel. There is no need to increase the support of the soft soil stratum to the tunnel by reinforcing the soft soil stratum under the tunnel, thereby avoiding the difficulty in controlling the reinforcement of the soft soil stratum and avoiding repeated reinforcement construction. There is no need to construct on the ground working surface, so that the construction of the control structure for the long-term settlement of the shield or jacking tunnel described in the present invention is not limited by ground traffic, pipelines, building demolition and other conditions, thereby better solving the problem of uneven settlement of the tunnel during earthquake liquefaction and operation. The control structure for long-term settlement of shield or jacking tunnels described in the present invention effectively solves the problem that ground reinforcement cannot be implemented due to the current restrictions on ground conditions and the grouting reinforcement effect in the tunnel is poor, thereby avoiding the increase in settlement of the tunnel in the later stage of operation and even the occurrence of damage such as pipe segment damage due to the poor reinforcement effect of the soft foundation in the tunnel, and ensuring the long-term safe operation of the tunnel. In addition to soft soil layers, the control structure for long-term settlement of shield or jacking tunnels described in the present invention can also be used for unfavorable geology such as karst development and underground dark rivers.
[0010] Preferably, the lower part of the sleeper is embedded in the track bed.
[0011] Embedding the lower part of the sleeper into the track bed can improve the force transmission performance of the track.
[0012] Preferably, two longitudinal beams are provided in the roadbed along the longitudinal direction of the tunnel, the two longitudinal beams are located below the sleepers, and the support members are connected to the longitudinal beams.
[0013] The longitudinal beam is arranged below the sleeper and inside the roadbed. With the support of the supporting member, the longitudinal beam can strengthen the support of the sleeper above it, thereby strengthening the supporting capacity of the rails above the sleeper and reducing tunnel settlement during train operation.
[0014] Preferably, the support members comprise piles.
[0015] The support member is designed as a pile structure, and the longitudinal beams are connected by piles to form a pile-beam frame structure. The pile-beam frame structure has higher supporting capacity and stability, and can better utilize the stable stratum to support the track above, thereby reducing the load of the track in the tunnel on the tunnel; at the same time, the pile can utilize the stable stratum to directly support the first pipe segment ring, that is, directly support the tunnel, thereby improving the bearing capacity of the tunnel.
[0016] Preferably, the piles and the longitudinal beams are both arranged directly below the rails, so that the pile-beam frame structure directly provides vertical support for the rails, thereby improving the supporting capacity of the tunnel.
[0017] Preferably, the piles can be reinforced concrete piles, prefabricated pipe piles, CFG piles, single-tube jet-jet piles, etc.
[0018] Reinforced concrete piles are cast-in-place concrete with mature technology and controllable quality. Prefabricated pipe piles are only suitable for soft strata due to the limited construction space in the hole, and the quality is difficult to control due to the many connection points. CFG piles and single-tube jet grouting piles. Since they are all mixed with original soil, the quality of the pile foundation is controlled by the mix ratio and the quality of on-site construction.
[0019] Preferably, the pile is a reinforced concrete member, and the pile comprises pile longitudinal reinforcements arranged along the longitudinal direction thereof, and the pile longitudinal reinforcements are welded to the main reinforcements on the top surface of the longitudinal beam.
[0020] The reinforced concrete pile is a cast-in-place structure, which is convenient for construction according to actual conditions and is less affected by the construction space. The pile longitudinal reinforcement is the longitudinal reinforcement of the reinforcement cage inside the pile. The upper end of the pile longitudinal reinforcement is the part reserved on the top surface of the pile when the pile is cast. By passing the pile longitudinal reinforcement through the first segment ring and welding its upper end to the top main reinforcement on the reinforcement mesh inside the longitudinal beam, the connection capacity of the pile and the corresponding longitudinal beam can be improved, so that the pile can better support the tunnel structure with the help of stable strata.
[0021] Preferably, the top surface of the pile is an inclined surface, and the inclined surface gradually decreases from both sides to the middle of the first segment ring.
[0022] In the limited space within the first segment ring, by increasing the area of the pile top surface, the cross-section of the beam can be increased, thereby increasing the rigidity and strength of the beam and better supporting the sleeper.
[0023] Preferably, the first segment ring is a steel segment ring having a hole at the bottom, the hole is adapted to connect to the pile, and the hole is arranged directly below the rail.
[0024] Among them, the first segment ring is a steel segment ring with a hole at the bottom adapted to connect the pile, the first segment ring is a prefabricated component, the first segment ring includes a capping block located at the top of the first segment ring, an opening block located at the bottom of the first segment ring, an adjacent block 1 and an adjacent block 2 respectively connected to both sides of the capping block, and two standard blocks respectively connected to both sides of the opening block, the hole is on the opening block, and the opening block is provided with at least one hole under each rail.
[0025] The first segment ring is made of steel, which is convenient for processing the holes of the opening block. A reserved hole structure is set on the opening block at the bottom of the first segment ring for construction piles, which is convenient for the piles to be connected to the first segment ring and the longitudinal beam respectively; and the position of the hole is directly below the rail, so that the piles and longitudinal beams under construction can be directly below the rail. The hole is prefabricated, such as: the cover plate on the reserved hole of the opening block can be quickly disassembled through bolt connection to form the hole, which can avoid secondary cutting of the hole on site and damage to the entire opening block, thereby avoiding damage to the tunnel.
[0026] Preferably, the pile includes a circumferentially arranged water stop plate, the inner side of the water stop plate is welded to the pile longitudinal reinforcement, and the outer side of the water stop plate is welded to the inner wall of the hole.
[0027] The inner side of the water stop plate is welded to the pile longitudinal reinforcement and is a part of the pile. It is used to connect the pile longitudinal reinforcement inside the pile and the inner wall of the hole, that is, to stably connect the first pipe segment ring and the pile; at the same time, the water stop plate can block the gap between the pile and the hole to prevent groundwater from pouring into the tunnel, meeting the waterproofing requirements of the tunnel. Through the above connection, the pile and the first pipe segment ring can be connected, and then the pile, the first pipe segment ring and the longitudinal beam form an integral force system, so that the bearing capacity of the tunnel is better.
[0028] Preferably, the water stop plate is a galvanized steel plate.
[0029] Preferably, an annular steel plate is provided on the inner wall of the hole, and the outer side of the water stop plate is welded to the annular steel plate, and the annular steel plate is used to strengthen the strength of the hole.
[0030] Preferably, a water stop is provided at the inner lower part of the annular steel plate. The water stop is a rubber strip or a water stop cotton strip, etc. The rubber strip can swell when it comes into contact with water. The water stop is used to cooperate with the water stop plate to stop water.
[0031] Preferably, drainage ditches are provided on the outer sides of both ends of the sleepers along the longitudinal direction of the tunnel to drain the accumulated water in the tunnel and ensure the safety of tunnel operation.
[0032] A method for controlling long-term settlement of a shield or jacking tunnel comprises constructing a control structure for long-term settlement of a shield or jacking tunnel, wherein the construction method comprises the following steps:
[0033] A: Install the first segment ring at the position where settlement control is required; wherein the first segment ring is a steel segment ring with holes at the bottom;
[0034] B: Open one of the holes at the bottom of the first segment ring, then extend the casing of the rotary drilling rig from the corresponding hole into the stable stratum and follow up with rotary drilling to form a pile hole, then put the steel cage into the pile hole, then weld the inner side of the annular water stop plate to the pile longitudinal reinforcement of the steel cage, and weld the outer side to the inner wall of the current hole, and then pour concrete to the pre-designed height of the pile to form the pile;
[0035] C: Repeat step B until all the piles corresponding to the first segment ring are constructed;
[0036] D: Build the steel mesh of the ballast and the steel mesh of the sleepers on the ballast above the piles, weld the longitudinal reinforcement of the piles to the steel mesh of the ballast, pour concrete to form the ballast and the sleepers, and the control structure construction of the long-term settlement of the shield or pipe jacking tunnel is completed.
[0037] The control method for long-term settlement of a shield or jacking tunnel of the present invention determines whether to construct the control structure for long-term settlement of the shield or jacking tunnel according to the geological conditions of the tunnel section when constructing the tunnel structure in the tunnel hole; after the construction is determined, the first segment ring is assembled by a shield machine or a jacking machine, and the tail brush is removed, so that the first segment ring is installed in the tunnel hole, and then the cover plate prefabricated at the hole below the first segment ring is disassembled to form a hole, which is convenient for constructing a pile structure from the hole; each of the first segment rings is provided with at least two holes, and at least two holes correspond to two rails respectively; that is, each of the first segment rings is provided with at least two piles, and at least two piles correspond to two rails respectively. When constructing the pile structure and the track structure, a method of graded casting from bottom to top is adopted, and the pile construction is completed first, so that the lower end of the pile is connected to the stable stratum and the upper end is connected to the first segment ring, so that the pile first supports the tunnel, and then the track structure is constructed, which can reduce the settlement of the tunnel. When constructing the pile structure, a rotary drilling rig is used to excavate the pile hole, and then the steel cage is installed in the pile hole, and the steel cage is directly welded to the water stop plate arranged along the circumference of the steel cage, and then the water stop plate is welded to the first segment ring, and then concrete is poured into the pile hole to a pre-designed height to form a pile, and the pile longitudinal reinforcement extends from the top of the pile as a reserved connecting steel bar for connecting the roadbed above the pile; the above method is adopted, firstly, the connectivity between the first segment ring and the pile is better, and secondly, the holes opened on the first segment ring can be blocked, water can be stopped in advance, and the impact of sand gushing on subsequent construction can be reduced; and the construction of the pile is carried out in batches, which can reasonably utilize the limited construction space in the tunnel, and the holes opened on the first segment ring can be blocked in time to avoid opening multiple holes and causing serious sand gushing, thereby improving construction safety. After all the piles are constructed, the upper end of the reserved pile longitudinal reinforcement is welded to the roadbed steel mesh, and the steel mesh of the sleeper is built, and the sleeper and the roadbed are cast together, so that the pile below forms a stable rigid connection with the roadbed, and the control structure of the long-term settlement of the shield or jacking tunnel is completed. The control method of the long-term settlement of the shield or jacking tunnel described in the present invention adopts a hierarchical construction and hierarchical construction method, and successively constructs piles and the track structure located above the first pipe segment ring, so that the piles support the tunnel before constructing the track structure, reducing the settlement of the tunnel; and the hierarchical construction can improve the construction efficiency, improve the connection ability of the piles with the roadbed and the first pipe segment ring, and then improve the supporting capacity of the piles; and the piles are constructed one by one, which effectively utilizes the limited construction space in the tunnel, reduces the sand surge, and improves the construction safety. Compared with grouting in the tunnel, this method can use piles to cooperate with stable strata to support the tunnel only during the in-tunnel construction, and the anti-tunnel settlement effect is better.
[0038] Preferably, the rotary drilling rig is a DKZ-10 engineering drilling rig, which is a micro reverse circulation rotary drilling rig that can be used for subway station construction and is suitable for foundation construction in complex strata such as soil layers, weathered rock layers, and especially gravel layers and cemented layers.
[0039] Preferably, the step D can be replaced by D1 and D2 implemented in sequence;
[0040] The step D1: constructing two steel meshes of longitudinal beams arranged along the longitudinal direction of the tunnel above the corresponding piles, welding the main reinforcement of the top surface of the longitudinal beams to the upper ends of the longitudinal reinforcement of the piles, and then pouring concrete to form the two longitudinal beams;
[0041] The step D2 is as follows: constructing a steel mesh of the ballast around the longitudinal beam and constructing a steel mesh of sleepers embedded in the ballast above the longitudinal beam, pouring concrete to form the ballast and the sleepers, and completing the construction of the control structure for long-term settlement of the shield or jacking tunnel.
[0042] The use of a pile-beam frame structure to support the tunnel makes the control structure of the long-term settlement of the shield or jacking tunnel better able to prevent tunnel settlement. When a longitudinal beam is provided in the roadbed, the method of the present invention still adopts a hierarchical construction and hierarchical construction method. All the piles are constructed first, and the upper end of the pile longitudinal reinforcement is reserved. When the steel mesh of the longitudinal beam is constructed, the top main reinforcement of the steel mesh of the longitudinal beam is welded to the upper end of the pile longitudinal reinforcement, and then concrete is poured to form the longitudinal beam. Among them, the design of the pile is determined based on the geology below the first pipe segment ring to determine whether to construct, and the longitudinal beam is continuously arranged along the longitudinal direction of the tunnel. After the construction of the longitudinal beam corresponding to the current first pipe segment ring is completed, the roadbed and sleepers are constructed, the steel mesh of the sleepers and the steel mesh of the roadbed are tied together, and then poured at the same time, so that the sleepers can be embedded in the roadbed, thereby making the sleepers more capable of bearing force.
[0043] Preferably, before step A, the first segment ring and the second segment ring are assembled inside a shield machine or a pipe jacking machine by an assembling machine, the first segment ring and the second segment ring are connected by a connecting steel ring, the connecting steel ring and the first segment ring are first connected by bolts and then welded, and the second segment ring is bolted to the connecting steel ring.
[0044] Due to the limited size of the first segment ring, after the hole for the construction pile is provided in the hole block at the bottom of the first segment ring, the number of connecting screw holes of the first segment ring may be reduced, thereby reducing the connection strength when the first segment ring and the concrete segment ring are connected. When the first segment ring needs to be connected with the second segment ring and the second segment ring is a concrete segment ring, the connecting steel ring is provided between the first segment ring and the concrete segment ring. The size of the connecting steel ring is consistent with that of the existing segment ring. Since there is no need to provide a hole for the construction pile foundation, the connecting steel ring can be provided with normal screw holes at both ends. One end connected to the first segment ring is first connected to the first segment ring by bolts, and then the connection between the two is strengthened by welding, and the other end can be connected to the concrete segment ring normally by bolts. Through the connecting steel ring, the connection strength between the first segment ring and the concrete segment ring can be strengthened, thereby improving the overall strength of the segment rings in the tunnel and improving the safety of the tunnel. Through the connecting steel ring, the first segment ring can be normally connected to other segment rings, which is convenient for the construction of the tunnel.
[0045] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0046] 1. The control structure for long-term settlement of a shield or jacking tunnel of the present invention is connected to the ballast, the first segment ring and the stable stratum through the support member at the same time, so that the ballast, the first segment ring, the stable stratum and the support member form a clear force system. The support member uses the stronger stable stratum to support the tunnel above the soft soil stratum, which can improve the supporting capacity of the stratum under the tunnel to the tunnel, thereby improving the bearing capacity of the tunnel, ensuring the safety of the tunnel, and effectively solving the current problems of being unable to implement ground reinforcement due to restrictions on ground conditions and poor grouting reinforcement effect in the tunnel, thereby avoiding the increase in tunnel settlement in the later operation and even the occurrence of diseases such as segment damage due to poor reinforcement effect of the soft foundation in the tunnel, and ensuring the long-term safe operation of the tunnel.
[0047] 2. The supporting members of the control structure for long-term settlement of a shield or jacking tunnel described in the present invention include piles. The tops of the piles are connected to longitudinal beams arranged in the roadbed to form a pile-beam frame structure. The pile-beam frame structure has higher supporting capacity and stability and can better utilize stable strata to support the tracks above, thereby reducing the load of the tracks in the tunnel on the tunnel. At the same time, the piles can utilize stable strata to directly support the first segment ring, that is, directly support the tunnel, thereby improving the bearing capacity of the tunnel.
[0048] 3. The control structure for long-term settlement of the shield or jacking tunnel described in the present invention is used for construction piles through a reserved hole structure set on the bottom opening block of the first segment ring, so that the piles are connected to the first segment ring and the longitudinal beam respectively; at the same time, the first segment ring adopts a steel structure, which is convenient for the processing of the holes; and the holes are located directly below the rails, so that the piles and longitudinal beams under construction can be directly below the rails, so that the pile-beam frame structure directly provides vertical support for the rails, thereby improving the supporting capacity of the tunnel; and the holes are prefabricated, which can avoid secondary cutting of the holes on site to destroy the entire opening block, thereby avoiding damage to the tunnel.
[0049] 4. The control method for long-term settlement of the shield or jacking tunnel of the present invention adopts the method of hierarchical construction and hierarchical construction, and successively constructs the piles and the track structure located above the first segment ring, so that the piles support the tunnel before constructing the track structure, reducing the settlement of the tunnel; and the hierarchical construction can improve the construction efficiency, improve the connection ability of the piles with the roadbed and the first segment ring, and then improve the supporting capacity of the piles; and the piles are constructed one by one, effectively utilizing the limited construction space in the tunnel, reducing the appearance of sand surge, and improving the construction safety. Compared with grouting in the tunnel, this method can use piles to cooperate with stable strata to support the tunnel only during the construction in the tunnel, and the anti-tunnel settlement effect is better. And when the piles are connected to the longitudinal beams arranged in the roadbed, the method of the present invention still adopts the method of hierarchical construction and hierarchical construction, first constructs all the piles, reserves the upper end of the pile longitudinal reinforcement, and when constructing the steel mesh of the longitudinal beam, the top main reinforcement of the steel mesh of the longitudinal beam is welded to the upper end of the pile longitudinal reinforcement, and then concrete is poured to form the longitudinal beam. The use of a pile-beam frame structure to support the tunnel makes the control structure for long-term settlement of the shield or jacking tunnel better able to prevent tunnel settlement. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a schematic elevation view of the control structure for long-term settlement of the shield or jacking tunnel described in Example 1.
[0051] Figure 2 is a schematic diagram of the arrangement of the piles and the beams in Example 1;
[0052] Figure 3 This is a node schematic diagram of the reinforced connection structure described in Example 1.
[0053] Icons: 11-capping block; 12-adjacent block one; 13-adjacent block two; 14-standard block; 15-opening block; 16-hole; 17-pile; 20-rail; 21-sleeper; 22-ballast bed; 23-drainage ditch; 24-longitudinal beam; 30-pile spiral stirrup; 31-pile longitudinal reinforcement; 32-top surface main reinforcement; 33-waterstop plate; 34-circumferential steel plate; 35-rubber strip; 36-bolt. DETAILED DESCRIPTION
[0054] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0055] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0056] Example 1
[0057] This embodiment provides a control structure for long-term settlement of a shield or jacking tunnel. Figure 1-3 , including a first segment ring, a ballast 22 is provided at the inner bottom of the first segment ring, a plurality of sleepers 21 are provided on the ballast 22, a support is connected below the ballast 22, an upper end of the support is connected to the first segment ring, and a lower end is connected to a stable stratum.
[0058] Among them, long-term settlement refers to the settlement of the tunnel during operation; the stable stratum refers to the stratum deep below the soft soil stratum where the tunnel is located, such as a rock stratum or hard soil stratum; the segment ring is a permanent lining structure in the shield or jacking construction method, and is the innermost barrier of the tunnel, which bears the role of resisting soil pressure, groundwater pressure and some special loads. The roadbed 22 and the sleeper 21 are existing track structures. The first segment ring is a segment ring set on a liquefied sand layer or a soft stratum. When the segment rings connected at both ends of the first segment ring are in a stratum with properties similar to those of a stable stratum and can meet the force requirements, a second segment ring is used. The second segment ring is a segment ring in the prior art, and the second segment ring can be a concrete segment ring or a steel segment ring. In this embodiment, the lower part of the sleeper 21 is embedded in the roadbed 22, which can improve the force transmission performance of the track.
[0059] In this embodiment, Figure 1 As shown, the first segment ring is a steel segment ring, and the first segment ring includes a hole block 15 located at the bottom of the first segment ring, a capping block 11 located at the top of the first segment ring, an adjacent block 12 and an adjacent block 2 13 respectively connected to both sides of the capping block 11, and two standard blocks 14 respectively connected to both sides of the hole block 15. The hole block 15 has a plurality of holes 16, and the spacing of the holes 16 is determined according to the actual geological conditions. The support member is connected to the inner wall of the hole 16. Specifically, as Figure 1-3As shown, the opening block 15 has two holes 16 distributed in the transverse direction. The positions of the two holes 16 are respectively correspondingly arranged directly below the two rails 20. The inner wall of each hole 16 is respectively provided with an annular steel plate 34, and the annular steel plate 34 is used to strengthen the strength of the hole 16. The two holes 16 are prefabricated, such as: the cover plate of the hole 16 reserved in the opening block 15 can be quickly disassembled by connecting with bolts 36. Opening the hole 16 can avoid the secondary cutting of the hole 16 on site and the destruction of the entire opening block 15, thereby avoiding damage to the tunnel. The inner wall of the hole 16 is provided with an annular steel plate 34, and the outer side of the water stop plate 33 is welded to the annular steel plate 34, and the annular steel plate 34 is used to strengthen the strength of the hole 16.
[0060] The support member includes a pile 17 vertically arranged in the hole 16. The pile 17 can be a reinforced concrete pile, a prefabricated pipe pile, a CFG pile, a single-tube jet-jet pile, etc. The lower end of the pile 17 extends into the stable stratum, and the upper end side of the pile 17 is connected to the annular steel plate 34; preferably, in this embodiment, Figure 3 As shown, the pile 17 is a reinforced concrete component, the top surface of the pile 17 is an inclined surface, and the inclined surface gradually decreases from the two sides of the first segment ring to the middle part. The pile 17 includes a steel cage inside it and a circumferentially arranged water stop plate 33 connected to the steel cage. The steel cage includes a pile longitudinal reinforcement 31 arranged along the longitudinal direction of the pile 17 and a pile spiral stirrup 30 arranged along the circumferential direction of the pile 17. The water stop plate 33 is a galvanized steel plate. The outer side of the water stop plate 33 is welded to the circumferential steel plate 34 at the inner wall of the hole 16, and the inner side of the water stop plate 33 is welded to the pile longitudinal reinforcement 31 arranged longitudinally inside the pile 17.
[0061] The upper end surface of the pile 17 is connected with two longitudinal beams 24 arranged along the longitudinal direction of the tunnel. The bottom surface of the longitudinal beam 24 is adapted to the top surface of the pile 17, and the two longitudinal beams 24 are located in the roadbed 22 and below the sleeper 21. Specifically, the two longitudinal beams 24 and the corresponding piles 17 are respectively arranged directly below the two rails 20. The pile longitudinal reinforcement 31 passes through the first pipe segment ring and is welded to the top main reinforcement 32 of the longitudinal beam 24. Specifically, the upper end of the pile longitudinal reinforcement 31 is welded to the top main reinforcement 32 of the longitudinal beam 24; the top main reinforcement 32 is the reinforcement arranged along the longitudinal direction of the steel mesh inside the longitudinal beam 24, and is located at the upper part of the longitudinal beam 24. As a preferred embodiment, a water stop is provided at the inner lower part of the annular steel plate 34. The water stop is a rubber strip 35 or a water stop cotton strip, etc. The rubber strip 35 can swell when exposed to water, and the water stop is used to cooperate with the water stop plate 33 to stop water.
[0062] like Figure 2 As shown, the longitudinal beams 24 are continuously arranged along the longitudinal direction of the tunnel, that is, Figure 2 The three first segment rings all have a longitudinal beam 24 structure, but two piles 17 distributed along the longitudinal direction are respectively arranged at the bottom of two spaced first segment rings. Through the longitudinal beam 24, all the corresponding piles 17 in the same longitudinal direction can be indirectly connected to form an overall pile-beam frame structure. The pile-beam frame structure has higher supporting capacity and stability, and can better utilize the stable stratum to support the track above, thereby reducing the load of the track in the tunnel on the tunnel; at the same time, the piles 17 can utilize the stable stratum to directly support the first segment ring, that is, directly support the tunnel, thereby improving the bearing capacity of the tunnel.
[0063] Example 2
[0064] This embodiment provides a method for controlling the long-term settlement of a shield or jacking tunnel, comprising constructing a control structure for the long-term settlement of a shield or jacking tunnel as described in Example 1 to control the long-term settlement of the shield or jacking tunnel, see Figure 1-3 When constructing a tunnel structure in a tunnel, whether to construct the shield or jacking tunnel long-term settlement control structure is determined according to the soft soil geological conditions of the tunnel section; when the shield or jacking tunnel long-term settlement control structure does not have the longitudinal beam 24, the construction method of the shield or jacking tunnel long-term settlement control structure includes the following steps:
[0065] First, the segment rings are assembled inside the shield machine or the jacking machine by an assembling machine. When all the segment rings are first segment rings, all the first segment rings are connected by bolts and then welded, and then the control structure for the long-term settlement of the shield or jacking tunnel corresponding to each first segment ring is sequentially implemented according to steps AD; when all the segment rings are second segment rings, all of them are connected by bolts, and all the segment rings are installed in the tunnel hole, and then the segment ring assembly of the next cycle is carried out; when all the segment rings have both second segment rings and first segment rings, wherein the first segment ring is a steel segment ring with a hole 16 at the bottom, and the second segment ring is a concrete segment ring, when the first segment ring needs to be connected with the concrete segment ring, by arranging the connecting steel ring between the first segment ring and the concrete segment ring, the normal connection between the first segment ring and the concrete segment ring can be ensured; when the first segment ring needs to be connected with the adjacent first segment ring, it is first connected by bolts and then welded;
[0066] In this embodiment, connecting steel rings are provided at both ends of the first segment ring, the connecting steel ring and the first segment ring are first connected by bolts and then welded, and the second segment ring is connected to the connecting steel ring by bolts;
[0067] After the segment rings are assembled, step A is performed.
[0068] A: Install the first segment ring at the position where settlement control is required;
[0069] The first segment ring assembled by the assembling machine is removed from the tail brush, wherein the first segment ring is a steel segment ring with a reserved hole 16 at the bottom. After the first segment ring is installed at the designated position, the construction of step B is performed;
[0070] Step B: open one of the reserved holes 16 of the opening block 15 at the bottom of the current first segment ring; specifically, select any hole 16 of the current first segment ring to construct the pile 17, first remove the structure blocking the current hole 16 by removing the bolts 36, so that the hole 16 is opened. Then execute the steps: extend the casing of the micro reverse circulation rotary drilling rig from the current hole 16 into the stable stratum and follow up with rotary drilling to form a pile hole, the micro reverse circulation rotary drilling rig is a DKZ-10 engineering drilling rig, then put the steel cage into the pile hole, and weld an annular water stop plate 33 on the pile longitudinal reinforcement 31 around the steel cage, and at the same time weld the outer side of the water stop plate 33 to the annular steel plate on the inner wall of the current hole 16, and then pour concrete into the pile hole to the pre-designed height of the pile 17 to form the pile 17. At this time, the upper end of the pile longitudinal reinforcement 31 extends out of the top surface of the pile 17;
[0071] After the current pile 17 is constructed, step C is performed; step C: repeating step B until all the piles 17 corresponding to the first segment ring are constructed; step C is to start construction after the previous pile 17 is constructed and reaches a certain strength, repeating step B, selecting another hole 16 to repeat the construction of pile 17, until the piles 17 corresponding to all the holes 16 of the first segment ring are constructed, step C ends, and then step D is performed;
[0072] The step D is as follows: constructing the steel mesh of the ballast 22 and the steel mesh of the sleeper 21 embedded in the upper part of the ballast 22, welding the upper end of the pile longitudinal reinforcement 31 of the pile to the steel mesh of the ballast 22, pouring concrete to form the ballast 22 and the sleeper 21, and completing the construction of the control structure for long-term settlement of the shield or pipe jacking tunnel.
[0073] The method for controlling long-term settlement of a shield or jacking tunnel described in this embodiment adopts a hierarchical construction and hierarchical construction method, and successively constructs piles 17 and a track structure located above the first segment ring, so that the piles 17 support the tunnel before constructing the track structure, thereby reducing the settlement of the tunnel; and the hierarchical construction can improve the construction efficiency, enhance the connection ability of the piles 17 with the ballast 22 and the first segment ring, respectively, and thereby enhance the supporting capacity of the piles 17; and the piles 17 are constructed one by one, so that the limited construction space in the tunnel is effectively utilized, the sand surge is reduced, and the construction safety is improved. Compared with grouting in the tunnel, the method can use piles 17 in combination with stable strata to support the tunnel only during the in-tunnel construction, and the anti-tunnel settlement effect is better.
[0074] Example 3
[0075] This embodiment provides a method for controlling the long-term settlement of a shield or a jacking tunnel, which is basically the same as the method for controlling the long-term settlement of a shield or a jacking tunnel described in Example 2, and still includes constructing a control structure for the long-term settlement of a shield or a jacking tunnel as described in Example 1 to control the long-term settlement of the shield or the jacking tunnel, see Figure 1-3 The difference is that the control structure for long-term settlement of the shield or jacking tunnel has two longitudinal beams 24 arranged in the roadbed 22, and the step D is replaced by D1 and D2 implemented in sequence;
[0076] The step D1: constructing two steel meshes of longitudinal beams 24 arranged along the longitudinal direction of the tunnel above the corresponding piles 17, welding the top main reinforcement 32 of the steel mesh of the longitudinal beams 24 to the upper ends of the pile longitudinal reinforcements 31, and then pouring concrete to form the two longitudinal beams 24;
[0077] The step D2 is as follows: a steel mesh of the ballast 22 is built around the longitudinal beam 24 and a steel mesh of the sleepers 21 embedded in the ballast 22 is built above the longitudinal beam 24, concrete is poured to form the ballast 22 and the sleepers 21, and the control structure construction of the long-term settlement of the shield or pipe jacking tunnel is completed.
[0078] The use of a pile-beam frame structure to support the tunnel makes the control structure of the long-term settlement of the shield or jacking tunnel better able to prevent tunnel settlement. When a longitudinal beam 24 is provided in the roadbed 22, the method of the present invention still adopts a hierarchical construction and hierarchical construction method, first constructing all the piles 17, reserving the upper end of the pile longitudinal reinforcement 31, and when building the steel mesh of the longitudinal beam 24, welding the top main reinforcement 32 of the steel mesh of the longitudinal beam 24 to the upper end of the pile longitudinal reinforcement 31, and then pouring concrete to form the longitudinal beam 24. Among them, the design of the pile 17 is determined according to the geology below the first pipe segment ring to determine whether to construct, and the longitudinal beam 24 is continuously arranged along the longitudinal direction of the tunnel. After the construction of the longitudinal beam 24 corresponding to the current first pipe segment ring, the roadbed 22 and the sleeper 21 are constructed, the steel mesh of the sleeper 21 and the steel mesh of the roadbed 22 are tied together, and then poured at the same time, so that the sleeper 21 can be embedded in the roadbed 22, thereby making the force bearing capacity of the sleeper 21 better.
[0079] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A control structure for long-term settlement of a shield or pipe-jacking tunnel, characterized in that: It comprises a first segment ring, wherein a ballast bed (22) is provided at the inner bottom of the first segment ring, a plurality of sleepers (21) are provided on the ballast bed (22), a support member is connected below the ballast bed (22), an upper end of the support member is connected to the first segment ring, and a lower end of the support member is connected to a stable stratum; Two longitudinal beams (24) are arranged in the track bed (22) along the longitudinal direction of the tunnel, the two longitudinal beams (24) are located below the sleepers (21), and the support members are connected to the longitudinal beams (24); The support member comprises a pile (17), the pile (17) is a reinforced concrete member, the pile (17) comprises pile longitudinal reinforcement (31) arranged along the longitudinal direction thereof, the pile longitudinal reinforcement (31) is welded to the main reinforcement (32) on the top surface of the longitudinal beam (24); the top surface of the pile is an inclined surface, and the inclined surface gradually decreases from both sides of the first segment ring to the middle; The first segment ring is a steel segment ring with a hole (16) at the bottom, the hole (16) is adapted to connect the pile (17), and the hole (16) is arranged directly below the rail (20); the first segment ring is a prefabricated component, the first segment ring comprises a capping block located at the top of the first segment ring, an opening block located at the bottom of the first segment ring, an adjacent block 1 and an adjacent block 2 respectively connected to both sides of the capping block, and two standard blocks respectively connected to both sides of the opening block, the hole is on the opening block, the opening block is provided with at least one hole below each rail, and the cover plate on the hole reserved in the opening block can be quickly disassembled by bolt connection to form the hole; The pile (17) includes a circumferentially arranged water stop plate (33), the inner side of the water stop plate (33) is welded to the pile longitudinal reinforcement (31), the outer side of the water stop plate (33) is welded to the inner wall of the hole (16), the inner wall of the hole is provided with an circumferential steel plate, the outer side of the water stop plate is welded to the circumferential steel plate, and the inner lower part of the circumferential steel plate is provided with a water stop member, the water stop member is a rubber strip or a water stop cotton strip, the rubber strip can swell when exposed to water, and the water stop member is used to cooperate with the water stop plate to stop water.
2. The control structure for long-term settlement of a shield or pipe jacking tunnel according to claim 1, characterized in that: The water stop plate (33) is a galvanized steel plate.
3. The control structure for long-term settlement of a shield or pipe-jacking tunnel according to any one of claims 1-2, characterized in that: The outer sides of both ends of the sleeper (21) are provided with drainage ditches (23) arranged along the longitudinal direction of the tunnel.
4. A method for controlling long-term settlement of a shield or pipe-jacking tunnel, characterized in that: The invention comprises constructing a control structure for long-term settlement of a shield or pipe-jacking tunnel as described in any one of claims 1 to 3, and the construction method thereof comprises the following steps: A: Installing a first segment ring at a position where settlement control is required; wherein the first segment ring is a steel segment ring with a hole (16) at the bottom; B: Open one of the holes (16) at the bottom of the first segment ring, then extend the casing of the rotary drilling rig from the corresponding hole (16) into the stable stratum and follow up with rotary drilling to form a pile hole, and then put the steel cage into the pile hole; then, weld the inner side of the annular water stop plate (33) to the pile longitudinal reinforcement (31) of the steel cage, and weld the outer side to the inner wall of the current hole (16), and then pour concrete to the pre-designed height of the pile (17) to form the pile (17); C: repeating step B until the construction of all the piles (17) corresponding to the first segment ring is completed; D: A steel mesh of the ballast (22) and a steel mesh of the sleeper (21) on the upper part of the ballast (22) are built above the pile (17), and the pile longitudinal reinforcement (31) of the pile (17) is welded to the steel mesh of the ballast (22), and concrete is poured to form the ballast (22) and the sleeper (21), and the construction of the control structure for long-term settlement of the shield or jacking tunnel is completed.
5. The method for controlling long-term settlement of a shield or pipe jacking tunnel according to claim 4, characterized in that: The step D can be replaced by D1 and D2 implemented in sequence; The step D1: constructing two steel meshes of longitudinal beams (24) arranged along the longitudinal direction of the tunnel above the corresponding piles (17), welding the top main reinforcement (32) of the longitudinal beams (24) to the upper ends of the pile longitudinal reinforcements (31), and then pouring concrete to form the two longitudinal beams (24); The step D2 comprises: constructing a steel mesh of the ballast (22) around the longitudinal beam (24) and constructing a steel mesh of a sleeper (21) embedded in the ballast (22) above the longitudinal beam (24), pouring concrete to form the ballast (22) and the sleeper (21), and completing the construction of a control structure for long-term settlement of a shield or pipe jacking tunnel.
6. The method for controlling long-term settlement of a shield or pipe-jacking tunnel according to any one of claims 4 or 5, characterized in that: Before step A, the first segment ring and the second segment ring are assembled inside a shield machine or a pipe jacking machine by an assembling machine, the first segment ring and the second segment ring are connected by a connecting steel ring, the connecting steel ring and the first segment ring are first connected by bolts and then welded, and the second segment ring is bolted to the connecting steel ring.
Citation Information
Patent Citations
Sinking reducing and vibration reducing device of subway tunnel and construction method thereof
CN106812536A
Basement reinforcement system of heavy-duty railway tunnel in water-rich soft stratum and construction method thereof
CN108547641A
Control method for preventing long-term settlement of metro shield tunnel
CN111287763A
Control structure for long-term settlement of shield tunnel or pipe-jacking tunnel
CN212296394U