A flexible connection structure of prefabricated wall and prefabricated steel pipe frame column
By adopting a flexible connecting structure between the prefabricated wall and the prefabricated steel pipe frame column, and using solid iron balls, rotatable sleeves and tie ribs, the seismic performance problems caused by rigid connections and the durability problems of chemical reinforcement methods are solved. It achieves higher seismic resistance and construction convenience.
Patent Information
- Application Number
- CN202010775424.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-05
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-08-05
AI Technical Summary
In the prior art, the rigid connection between the fill wall and the frame structure leads to the contact between the frame column and the prefabricated wall, which changes the stiffness distribution of the frame structure, forms structural torque and weak layers, affects seismic resistance, and the chemical reinforcement method has a durability. The problem of unstable properties and additional stress reduces the stress performance and safety of the structure.
Using a flexible connection structure between prefabricated wall and prefabricated steel pipe frame column, flexible connection is achieved by setting solid iron balls and rotatable sleeves on the prefabricated steel pipe frame column, and using tie ribs to reserved gaps and filling materials, a flexible connection is achieved, avoiding additional Problems caused by stress and rigid connections ensure the integrity and safety of the structure.
It improves the seismic resistance of the structure, reduces the impact of prefabricated wall settlement on the tie ribs, ensures the durability of the connection and the simplicity of construction, and enhances the integrity and safety of the structure.
Smart Images

Figure CN111794407B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building technology, and particularly relates to a flexible connection structure of a prefabricated wall and a prefabricated steel pipe frame column. Background Art
[0002] In structural design, infill walls are usually treated as non-structural components and do not participate in structural seismic calculations. Under actual earthquake action, the infill wall and the frame become a whole and jointly resist the earthquake action. The appropriate wall-frame connection method can reduce the interaction between the two, thereby improving the overall seismic performance of the structure. The connection method between the infill wall and the frame can be roughly divided into rigid connection and flexible connection. When using a rigid connection, the specific methods include oblique masonry of the infill wall against the frame beams and columns, and setting tie bars between the infill wall and the frame. When using a flexible connection, the specific methods include separating the infill wall from the frame to reserve a gap and filling it with filling materials.
[0003] At present, in the infill wall frame structure, the infill wall and the frame are mainly connected by rigid connection. There is no clear regulation on the applicable construction measures for flexible connection. The biggest disadvantage of the rigid connection design method is that the frame column and the prefabricated wall are in contact, which locally changes the stiffness mutation or stiffness distribution of the frame structure, forms structural torque and weak layer, and changes the deformation form of the corresponding frame column. When rigidly connected, the mutual pushing effect between the wall and the frame is obvious, which changes the force transmission mechanism of the structure and affects the seismic performance of the structure.
[0004] There are also many problems with the chemical reinforcement method and pre-embedded reinforcement method used in the connection between the frame column and the steel bars in the prefabricated wall. The method of pre-embedded tie bars in the frame column often causes the positions of the horizontal mortar joints and the pre-embedded tie bars to be inconsistent due to the different moduli of the blocks and the errors in the actual construction and masonry. The tie bars have to be bent artificially, which changes their force performance and force transmission path, thus reducing the force performance of the structure and the role of the tie bars. Secondly, the elastic modulus of the masonry mortar in the prefabricated wall is low, which causes settlement after masonry, resulting in additional stress at the connection between the wall and the tie bars. The unstable durability of the chemical adhesive and the weak implanted steel bars are the main problems of the chemical reinforcement method for tie bars. Moreover, the reinforcement method cannot solve the problem of additional stress at the connection between the tie bars and the prefabricated wall caused by settlement after masonry. The occurrence of these problems seriously affects the structural safety, reduces the seismic performance of the structure, and leaves quality and safety risks for the project. Summary of the invention
[0005] The present invention provides a flexible connection structure between a prefabricated wall and a prefabricated steel pipe frame column, which solves the problem of additional stress on tie bars caused by settlement deformation of the prefabricated wall, avoids the use of a rigid contact connection between the prefabricated wall and the prefabricated frame column, improves the local seismic performance of the structure, improves the influence of settlement deformation of the prefabricated wall on the tie bars, has a simple structure, clear force transmission, good integrity, convenient construction, and is safe and reliable.
[0006] The technical solution of the present invention is as follows:
[0007] A flexible connection structure between a prefabricated wall and a prefabricated steel tube frame column comprises a solid iron ball, a tie bar I, a rotatable sleeve and a tie bar II. Openings are left on the steel tube of the prefabricated steel tube frame column at regular intervals. The solid iron ball is arranged in the steel tube of the prefabricated steel tube frame column. One end of the tie bar I is fixedly connected to the solid iron ball, and the other end of the tie bar I protrudes out of the prefabricated steel tube frame column through the opening as a reserved end; one end of the tie bar II is pre-buried in the prefabricated wall, and the other end of the tie bar II protrudes out of the prefabricated wall as a protruding end; the reserved end of the tie bar I and the protruding end of the tie bar II are connected together through the rotatable sleeve.
[0008] Furthermore, the flexible connection structure of the prefabricated wall and the prefabricated steel pipe frame column, wherein the rotatable sleeve includes a cylinder, a rotating ball head and a connecting steel bar, a spherical cavity is provided inside one end of the cylinder, the spherical cavity is communicated with the outside through a through hole, the rotating ball head is placed in the spherical cavity, one end of the connecting steel bar is fixedly connected to the rotating ball head, and the other end of the connecting steel bar protrudes out of the cylinder through the through hole; the other end of the cylinder is provided with an internal thread.
[0009] Furthermore, in the flexible connection structure of the prefabricated wall and the prefabricated steel pipe frame column, the protruding end of the tie bar II is provided with an external thread; the reserved end of the tie bar I is welded to the connecting steel bar, and the cylinder is screwed to the tie bar II.
[0010] Furthermore, in the flexible connection structure of the prefabricated wall and the prefabricated steel tube frame column, reserved holes are provided at the bottom of the prefabricated wall and the prefabricated steel tube frame column, reserved steel bars are provided on the bottom beam, and the prefabricated steel tube frame column and the prefabricated wall are connected and fixed to the bottom beam by the reserved steel bars and the reserved holes.
[0011] Furthermore, in the flexible connection structure between the prefabricated wall and the prefabricated steel tube frame column, a disengagement gap is left between the prefabricated steel tube frame column and the prefabricated wall, and the disengagement gap is filled with a filling material.
[0012] The beneficial effects of the present invention are as follows: the present invention reduces the interaction between the prefabricated steel tube frame column and the prefabricated wall by a design method of reserving a disengagement gap between the prefabricated wall and the prefabricated steel tube frame column and filling it with filling material, thereby providing an ideal flexible form; a rotatable sleeve is provided in the connection structure of the present invention, and the horizontal steel bars of the wall can settle simultaneously with the prefabricated wall, which can solve the problem in traditional practices that the tie bars are affected by additional stress caused by the settlement of the prefabricated wall after masonry; the flexible connection structure of the present invention has reasonable force, simple operation, convenient construction and strong durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of the facade assembly is shown in which the prefabricated wall and the prefabricated steel pipe frame column are connected by a flexible connection structure;
[0014] Figure 2 It is a schematic diagram of the plane of assembling the prefabricated wall and the prefabricated steel pipe frame column through the flexible connection structure;
[0015] Figure 3 It is a schematic diagram of the rotatable sleeve structure. DETAILED DESCRIPTION
[0016] like Figure 1-3As shown, a flexible connection structure of a prefabricated wall and a prefabricated steel tube frame column comprises a solid iron ball 5, a tie bar I6, a rotatable sleeve 7 and a tie bar II8. Openings are left at regular intervals on the steel tube 2 of the prefabricated steel tube frame column 1. The solid iron ball 5 is arranged in the steel tube 2 of the prefabricated steel tube frame column 1. One end of the tie bar I6 is fixedly connected to the solid iron ball 5, and the other end of the tie bar I6 protrudes through the opening outside the prefabricated steel tube frame column 1 as a reserved end. One end of the tie bar II 8 is embedded in the prefabricated wall 3, and the other end of the tie bar II 8 protrudes out of the prefabricated wall 3 as a protruding end; the protruding end of the tie bar II 8 is provided with an external thread; the rotatable sleeve 7 includes a cylinder 9, a rotating ball head 10 and a connecting steel bar 11, one end of the cylinder 9 is provided with a spherical cavity inside, the spherical cavity is communicated with the outside through a through hole, the rotating ball head 10 is placed in the spherical cavity, and one end of the connecting steel bar 11 is connected to the rotating ball head 10 Fixed connection, the other end of the connecting steel bar 11 protrudes from the cylinder 9 through the through hole, and the rotating ball head 10 can rotate in the spherical cavity but cannot be pulled out by the connecting steel bar 11; the other end of the cylinder 9 is provided with an internal thread 12; the reserved end of the tie bar I6 is welded to the connecting steel bar 11, and the cylinder 9 is screwed together with the tie bar II8. The rotating ball head 10 is rotatable, so the threaded connection operation is simpler; the reserved end of the tie bar I6 and the protruding end of the tie bar II8 are connected together through the rotatable sleeve 7 to achieve the function of the tie bar; reserved holes are provided at the bottom of the prefabricated wall 3 and the prefabricated steel pipe frame column 1, and reserved steel bars are provided on the bottom beam 4. The prefabricated steel pipe frame column 1 and the prefabricated wall 3 are connected and fixed on the bottom beam 4 through the reserved steel bars and the reserved holes; a disengagement gap is left between the prefabricated steel pipe frame column 1 and the prefabricated wall 3, and the disengagement gap is filled with filling material.
Claims
1. A flexible connection structure of a prefabricated wall and a prefabricated steel pipe frame column, characterized in that: It comprises a solid iron ball, a tie bar I, a rotatable sleeve and a tie bar II. The steel tube of the prefabricated steel tube frame column is provided with openings at regular intervals. The solid iron ball is arranged in the steel tube of the prefabricated steel tube frame column. One end of the tie bar I is fixedly connected to the solid iron ball, and the other end of the tie bar I protrudes out of the prefabricated steel tube frame column through the opening as a reserved end. One end of the tie bar II is pre-buried in the prefabricated wall, and the other end of the tie bar II protrudes out of the prefabricated wall as a protruding end. The reserved end of the tie bar I and the protruding end of the tie bar II are connected together through the rotatable sleeve. The rotatable sleeve comprises a cylinder, a rotating ball head and a connecting steel bar. A spherical cavity is provided inside one end of the cylinder, the spherical cavity is communicated with the outside through a through hole, the rotating ball head is placed in the spherical cavity, one end of the connecting steel bar is fixedly connected to the rotating ball head, and the other end of the connecting steel bar protrudes out of the cylinder through the through hole; the other end of the cylinder is provided with an internal thread; The bottoms of the prefabricated walls and prefabricated steel pipe frame columns are provided with reserved holes, the bottom beams are provided with reserved steel bars, and the prefabricated steel pipe frame columns and prefabricated walls are connected and fixed on the bottom beams through the reserved steel bars and the reserved holes.
2. The flexible connection structure of the prefabricated wall and the prefabricated steel pipe frame column according to claim 1 is characterized in that: The protruding end of the tie bar II is provided with an external thread; the reserved end of the tie bar I is welded to the connecting steel bar, and the cylinder is screwed to the tie bar II.
3. The flexible connection structure of the prefabricated wall and the prefabricated steel pipe frame column according to claim 1 is characterized in that: A disengagement gap is left between the prefabricated steel pipe frame column and the prefabricated wall, and the disengagement gap is filled with a filling material.
