A tunnel open hole segment assembly trolley
By designing the tunnel open tunnel segment assembly trolley, the entire mechanized assembly construction was realized, which solved the problems of low construction efficiency and unstable quality in the existing technology, improved the assembly accuracy and efficiency, and extended the service life of the railway open tunnel.
Patent Information
- Application Number
- CN202010744591.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing railway open tunnel construction methods have a low degree of mechanization and cannot effectively solve problems such as delamination, cracking, heaving, subsidence, slurry and mud at the base of the open tunnel, resulting in low construction efficiency and unstable quality.
A tunnel segment assembly trolley is designed, including track, running wheel assembly, main support frame, alignment formwork frame, assembly formwork frame, push segment bracket, adjustment mechanism, adjacent wall centering mechanism, and side wall centering mechanism. and traction mechanism to achieve full mechanized assembly construction to ensure assembly accuracy and efficiency.
Through mechanized assembly construction, labor intensity is reduced, segment assembly efficiency and accuracy are improved, construction quality and efficiency are ensured, and the service life of the railway open tunnel is extended.
Smart Images

Figure CN111794783B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction equipment, and more particularly to a tunnel open hole segment assembly trolley. Background Art
[0002] Railway tunnels are passages specially designed for train transportation. When the railway passes through mountainous areas, due to limited traction capacity and maximum slope requirements (less than 24%), it is necessary to overcome elevation obstacles. Digging tunnels to cross mountains is a reasonable choice. Its function is to shorten the line, reduce the slope, improve operating conditions, and increase traction capacity. Between mountains, the mountains are prone to looseness, which is prone to falling rocks, affecting the normal operation of trains.
[0003] At present, the existing railway open-cut structures usually adopt the method of pouring concrete to form a shed-shaped section, and the cast-in-place open-cut invert adopts the method of tying steel bars on site and then pouring concrete. This construction method has the disadvantages of low mechanization, inability to effectively solve the common problems of open-cut base such as delamination, cracking, bottom bulging, subsidence, mud oozing, etc., which leads to the inability to guarantee the quality. In addition, this construction method also has the disadvantages of being time-consuming and labor-intensive, increasing the labor intensity of workers, and low construction efficiency.
[0004] Prefabricated railway tunnels improve construction efficiency and facilitate later maintenance. The invention patent for a prefabricated railway tunnel and its construction method (CN110344442A) discloses a prefabricated railway tunnel. Fig.17 As shown, the segment rings are composed of side wall prefabricated blocks A, adjacent wall prefabricated blocks B and top wall prefabricated blocks K. By sequentially connecting the open hole base, side wall prefabricated blocks A, adjacent wall prefabricated blocks B and top wall prefabricated blocks K, multiple segment rings are assembled to form an arch structure, which effectively improves the stability of the railway open hole. The arch wall structure can ensure that the railway open hole has good supporting performance, can effectively reduce the damage to the open hole, and is convenient for the maintenance of the open hole. It is also easy to disassemble and assemble, has a reasonable design, high structural strength, is easy to install, saves resources, is convenient for later maintenance, reduces construction and maintenance costs, and effectively extends the service life of the railway open hole.
[0005] However, during the segment assembly process, due to the lack of special segment assembly equipment, the use of ordinary lifting equipment for assembly results in high labor intensity, low assembly efficiency, and it is difficult to ensure assembly accuracy.
[0006] Therefore, how to provide a tunnel open hole segment assembly trolley to solve the above-mentioned defects has become a technical problem that people in this field urgently need to solve. Summary of the invention
[0007] The purpose of the present invention is to provide a tunnel open hole pipe segment assembly trolley, which realizes the whole process of mechanized assembly construction, reduces the labor intensity, improves the pipe segment assembly efficiency and ensures the assembly accuracy.
[0008] In view of this, the present invention provides a tunnel open hole segment assembly trolley, comprising a track, a walking wheel assembly, a lower lateral movement assembly, a main support frame, an alignment template frame, an assembly template frame, a segment pushing bracket, an adjustment mechanism, an adjacent wall straightening mechanism, a side wall straightening mechanism and a traction mechanism;
[0009] The two tracks are laid in parallel on the open hole foundation, and the bottom of the main support frame is connected to the walking wheel assembly through a plurality of lower transverse moving assemblies arranged perpendicular to the tracks, and the walking wheel assembly rolls along the tracks;
[0010] The alignment template frame is arranged at the front middle position above the main support frame through the first lifting mechanism, and the arch plate at the top of the alignment template frame fits and penetrates into the lower surface of the top wall prefabricated block of the assembled segment ring as a positioning reference;
[0011] The assembly template frame is arranged on the main support frame and is located behind the alignment template frame through the adjustment mechanism. The assembly template frame positions the top wall prefabricated blocks to be installed, and the adjustment mechanism adjusts the height, left, right, front and back distances of the top wall prefabricated blocks;
[0012] The adjacent wall straightening mechanism is arranged on both sides of the main support frame and below the assembly formwork frame, and the adjacent wall straightening mechanism positions the adjacent wall prefabricated blocks;
[0013] The side wall straightening mechanism is arranged on both sides of the main support frame and below the adjacent wall straightening mechanism, and the side wall straightening mechanism straightens and positions the side wall prefabricated blocks;
[0014] The pipe segment pushing bracket is installed at the rear of the main support frame, and a plurality of jacking cylinders are arranged on the pipe segment pushing bracket, and the working ends of the jacking cylinders push the sides of the top wall prefabricated blocks, the adjacent wall prefabricated blocks and the side wall prefabricated blocks;
[0015] The traction mechanism is arranged in front of the main support frame, the cantilever end of the traction mechanism is connected to the installed segment ring, and the traction mechanism provides the wheel assembly with rolling power along the track.
[0016] The beneficial effects of the present invention are as follows: the tunnel open hole pipe segment assembly trolley composed of the track, the walking wheel assembly, the lower transverse movement assembly, the main support frame, the alignment template frame, the assembly template frame, the pipe segment support, the adjustment mechanism, the adjacent wall straightening mechanism, the side wall straightening mechanism and the traction mechanism realizes the full mechanized assembly construction and reduces the labor intensity of the operators compared with the conventional technology of using ordinary lifting equipment for assembly. Through the setting of the alignment template frame and the assembly template frame, the lower transverse movement assembly adjusts the left and right lateral position of the entire trolley to facilitate the alignment of the alignment template frame with the center line of the top wall prefabricated block at the top of the installed pipe segment ring. The first lifting mechanism lifts the alignment template frame, and the arch plate of the alignment template frame is tightly fitted with the lower arc surface of the top wall prefabricated block as a positioning reference, so that the assembly template frame can adjust the height, left and right front and back distance of the next group of top wall prefabricated blocks to be installed through the adjustment mechanism, thereby ensuring accurate assembly. On the basis of accurate positioning of the top wall prefabricated block, the adjacent wall straightening mechanism, the side wall straightening mechanism and the pipe segment pusher bracket are used to assist in the installation of the adjacent wall prefabricated block and the side wall prefabricated block below, thereby improving the installation efficiency and assembly quality. Through the setting of the traction mechanism, the movement of the trolley is realized, which facilitates the gradual installation of the entire tunnel open hole ring by ring, and ensures the construction quality and construction efficiency. The tunnel open hole pipe segment assembly trolley of the present invention realizes the full mechanized assembly construction, reduces the labor intensity, improves the pipe segment assembly efficiency and ensures the assembly accuracy.
[0017] Furthermore, the first lifting mechanism includes an alignment upper bracket and a circular alignment cylinder, the alignment upper bracket is installed on the front upper part of the main support frame, four circular alignment cylinders are vertically fixedly connected to the alignment upper bracket, and the working ends of the circular alignment cylinders are connected to the alignment template frame.
[0018] Preferably, the adjustment mechanism comprises a lifting middle bracket, an upper short transverse movement component, an upper long longitudinal movement component and a lifting cylinder, wherein the lifting middle bracket is mounted on the top of the main support frame and is located behind the alignment upper bracket;
[0019] The lifting middle bracket includes a frame structure composed of a lateral limiting beam, a connecting beam and a bottom beam, two upper long longitudinal movement components are longitudinally installed between the two bottom beams, four upper short transverse movement components are installed on the top of the two upper long longitudinal movement components, the four upper short transverse movement components are arranged between two opposite lateral limiting beams, and the connecting beam is connected between the two upper short transverse movement components arranged transversely;
[0020] The top of each upper short transverse shift assembly is vertically fixedly connected to a lifting cylinder, and the working ends of the four lifting cylinders are connected to the assembly template frame.
[0021] Preferably, the upper short transverse shift assembly comprises an upper short transverse shift frame base, a second transverse shift hydraulic cylinder and a second transverse shift sliding shoe, one end of the second transverse shift hydraulic cylinder is pinned to a pin seat of the upper short transverse shift frame base, and a working end is pinned to a pin hole below the second transverse shift sliding shoe, and the second transverse shift sliding shoe slides horizontally left and right on the upper surface of the upper short transverse shift frame base;
[0022] The upper longitudinal movement assembly comprises an upper longitudinal movement frame base, a longitudinal movement hydraulic cylinder and a longitudinal movement sliding shoe. A bidirectional pin seat is provided in the middle of the upper longitudinal movement frame base. The two sides of the bidirectional pin seat are respectively pinned to one end of the longitudinal movement hydraulic cylinder. The working end of the longitudinal movement hydraulic cylinder is pinned to the pin hole below the longitudinal movement sliding shoe. The longitudinal movement sliding shoe slides longitudinally forward and backward in the upper longitudinal movement frame base.
[0023] The bottom surface of the upper long longitudinal shift frame base is longitudinally installed on the top surfaces of the two bottom beams, the bottom surface of the upper short transverse shift frame base is transversely installed on the longitudinal shift sliding shoe, and the lifting cylinder is installed on the second transverse shift sliding shoe.
[0024] Furthermore, the adjacent wall straightening mechanism comprises a lifting cylinder, a ball cylinder and a supporting cylinder which are respectively arranged in pairs from top to bottom, the bottom end of the lifting cylinder is hinged to the outside of the lifting middle bracket, the bottom end of the ball cylinder is fixedly connected to the outside of the bottom of the lifting middle bracket, and the bottom end of the supporting cylinder is fixedly connected to the outside of the main supporting frame;
[0025] The working end of the lifting cylinder is hinged to the process mounting hole on the top inner wall of the adjacent wall prefabricated block; the working end of the ball cylinder is inlaid with a rolling steel ball, and the steel ball is positioned to contact the inner wall of the adjacent wall prefabricated block; the working end of the supporting cylinder is installed with an inclined rubber block, and the inclined rubber block is positioned to contact the inner wall of the joint between the adjacent wall prefabricated block and the side wall prefabricated block.
[0026] Preferably, the side wall straightening mechanism comprises a middle push-pull cylinder and a bottom push-pull cylinder, the bottom end of the middle push-pull cylinder is hinged on the longitudinal beam on the outside of the main support frame, and the working end of the middle push-pull cylinder is hinged to the process installation hole on the inner side of the side wall prefabricated block; the bottom of the bottom push-pull cylinder is hinged on the outer end of the lower transverse displacement assembly, and the working end of the bottom push-pull cylinder is connected to a bottom positioning rod, and the bottom positioning rod positions the bottom surface of the side wall prefabricated block;
[0027] The bottom end of the middle push-pull oil cylinder is connected to the longitudinal beam outside the main support frame in a two-stage hinged manner perpendicular to each other.
[0028] Further, the lower transverse shift assembly includes a lower transverse shift frame base, a first transverse shift hydraulic cylinder and a first transverse shift sliding shoe, one end of the first transverse shift hydraulic cylinder is pinned to the pin seat of the upper short transverse shift frame base, and the working end is pinned to the pin hole below the first transverse shift sliding shoe, and the second transverse shift sliding shoe slides horizontally left and right on the upper surface of the upper short transverse shift frame base;
[0029] The number of the second transverse sliding shoes is set to three, one of the second transverse sliding shoes is an active sliding shoe connected to the working end of the first transverse hydraulic cylinder, and the other two second transverse sliding shoes are auxiliary sliding shoes, and the three second transverse sliding shoes are all connected to the bottom of the main support frame.
[0030] Furthermore, it also includes a track locker, which includes a clamping plate, a rocker and a cylindrical pin, a clamping portion for clamping the track is provided at the bottom of the clamping plate, two clamping plates are symmetrically arranged face to face, one clamping plate is provided with a left-handed threaded hole on the clamping portion, and the other clamping plate is correspondingly provided with a right-handed threaded hole, and two sections of left-handed threaded rods and right-handed threaded rods are respectively provided on the working rod of the rocker, and the left-handed threaded rods and right-handed threaded rods are respectively connected to the left-handed threaded holes and right-handed threaded holes of the two clamping plates;
[0031] The clamping plate is provided with a waist-shaped hole, the end of the walking wheel assembly is provided with a locking hole plate, and the cylindrical pin is pin-connected in the waist-shaped hole and the circular hole of the locking hole plate.
[0032] Furthermore, the traction mechanism includes a plurality of traction cylinders arranged in front of the main support frame and distributed at equal intervals in accordance with the shape of the segment ring. The bottom end of the traction cylinder is hinged to the outer connecting part of the main support frame, and the working end of the traction cylinder is hinged to the installation process hole on the inner side of the segment ring.
[0033] Furthermore, it also includes a main platform, a side platform and a ladder. The main platform is horizontally installed on the top of the main support frame, the front end of the main platform protrudes out of the main support frame, and a first guardrail is installed on the upper part of the front end of the main platform; the two side platforms are respectively installed in the middle position on both sides of the main support frame, and the front end of the side platform is provided with a second guardrail; the inner side of the side platform is provided with a ladder for people to go up and down. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0035] Figure 1It is a schematic diagram of the three-dimensional structure of the trolley for assembling the open-cut tunnel segments of the present invention;
[0036] Figure 2 This is a schematic diagram of the main structure of the open-cut tunnel segment assembly trolley of the present invention;
[0037] Figure 3 It is a right side structural schematic diagram of the open-cut tunnel segment assembly trolley of the present invention;
[0038] Figure 4 It is a schematic diagram of the three-dimensional structure of the traveling wheel assembly of the present invention;
[0039] Figure 5 It is a schematic diagram of the three-dimensional structure of the lower lateral movement assembly of the present invention;
[0040] Figure 6 It is a schematic diagram of the longitudinal cross-sectional structure of the lower transverse shift assembly of the present invention;
[0041] Figure 7 This is a schematic diagram of the three-dimensional structure of the main support frame of the present invention;
[0042] Figure 8 This is a schematic diagram of the three-dimensional structure of the alignment template frame of the present invention;
[0043] Fig. 9 This is a schematic diagram of the three-dimensional structure of the assembled template frame of the present invention;
[0044] Fig.10 This is a schematic diagram of the three-dimensional structure of the pipe segment support of the present invention;
[0045] Fig.11 This is a schematic diagram of the three-dimensional structure of the upper support for aligning the present invention;
[0046] Fig.12 This is a schematic diagram of the three-dimensional structure of the lifting bracket of the present invention;
[0047] Fig.13 It is a schematic diagram of the three-dimensional structure of the upper short traverse assembly of the present invention;
[0048] Fig.14 It is a schematic diagram of the three-dimensional structure of the upper longitudinal displacement assembly of the present invention;
[0049] Fig.15 It is a schematic diagram of the longitudinal cross-sectional structure of the upper longitudinal displacement assembly of the present invention;
[0050] Fig.16 It is a schematic diagram of the three-dimensional structure of the track locker of the present invention;
[0051] Fig.17 This is a schematic diagram of the tunnel open hole segment structure.
[0052] Among them, 1-track, 2-walking wheel assembly, 201-roller, 202-locking hole plate, 3-lower transverse movement assembly, 302-first transverse movement hydraulic cylinder, 303-first transverse movement sliding shoe, 4-main support frame, 5-alignment template frame, 501-circular cylinder, 6-assembly template frame, 601-lifting cylinder, 7-push pipe segment bracket, 701-jacking cylinder, 8-alignment upper bracket, 9-lifting middle bracket, 901-lateral limit beam, 902-connecting beam, 903-bottom beam, 11-upper short transverse movement assembly, 112-second transverse movement hydraulic Cylinder, 113-second transverse sliding shoe, 12-upper long longitudinal moving assembly, 122-longitudinal moving hydraulic cylinder, 123-longitudinal moving sliding shoe, 13-lifting cylinder, 14-ball cylinder, 15-support cylinder, 16-middle push-pull cylinder, 17-bottom push-pull cylinder, 171-bottom positioning rod, 18-traction cylinder, 19-main platform, 191-first escalator, 20-side platform, 2001-second escalator, 21-track locker, 211-clamping plate, 2111-rail clamping part, 212-rocker, 213-cylindrical pin, 22-ladder;
[0053] A-side wall precast block, B-adjacent wall precast block, K-top wall precast block. DETAILED DESCRIPTION
[0054] The core of the present invention is to provide a tunnel open hole pipe segment assembly trolley, which realizes the whole process of mechanized assembly construction, reduces labor intensity, improves the pipe segment assembly efficiency and ensures the assembly accuracy.
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0057] With reference to the accompanying drawings, Figure 1 It is a schematic diagram of the three-dimensional structure of the trolley for assembling the open-cut tunnel segments of the present invention; Figure 2 This is a schematic diagram of the main structure of the open-cut tunnel segment assembly trolley of the present invention; Figure 3 It is a right side structural schematic diagram of the open-cut tunnel segment assembly trolley of the present invention; Figure 4 It is a schematic diagram of the three-dimensional structure of the traveling wheel assembly of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of the lower lateral movement assembly of the present invention; Figure 6 It is a schematic diagram of the longitudinal cross-sectional structure of the lower transverse shift assembly of the present invention; Figure 7 This is a schematic diagram of the three-dimensional structure of the main support frame of the present invention; Figure 8 This is a schematic diagram of the three-dimensional structure of the alignment template frame of the present invention; Fig. 9 This is a schematic diagram of the three-dimensional structure of the assembled template frame of the present invention; Fig.10 This is a schematic diagram of the three-dimensional structure of the pipe segment support of the present invention; Fig.11 This is a schematic diagram of the three-dimensional structure of the upper support for aligning the present invention; Fig.12 This is a schematic diagram of the three-dimensional structure of the lifting bracket of the present invention; Fig.13 It is a schematic diagram of the three-dimensional structure of the upper short traverse assembly of the present invention; Fig.14 It is a schematic diagram of the three-dimensional structure of the upper longitudinal displacement assembly of the present invention; Fig.15 It is a schematic diagram of the longitudinal cross-sectional structure of the upper longitudinal displacement assembly of the present invention; Fig.16 It is a schematic diagram of the three-dimensional structure of the track locker of the present invention; Fig.17 This is a schematic diagram of the tunnel open hole segment structure.
[0058] In a specific embodiment, Figures 1 to 15 As shown, a tunnel open hole segment assembly trolley includes a track 1, a walking wheel assembly 2, a lower transverse movement assembly 3, a main support frame 4, an alignment template frame 5, an assembly template frame 6, a segment pushing bracket 7, an adjustment mechanism, an adjacent wall straightening mechanism, a side wall straightening mechanism and a traction mechanism.
[0059] Two tracks 1 are laid in parallel on the open hole foundation. Ten lower transverse moving components 3 arranged perpendicular to the tracks 1 are installed at the bottom of the main support frame 4 by bolts. The walking wheel components 2 are installed at the bottom of the lower transverse moving components 3 by bolts, and the walking wheel components 2 roll along the tracks 1.
[0060] The alignment template frame 5 is installed in the front middle position above the main support frame 4 through the first lifting mechanism. The arch plate on the top of the alignment template frame 5 is consistent with the lower arc shape of the top wall prefabricated block K. The arch plate fits into the lower surface of the top wall prefabricated block K of the assembled segment ring as a positioning reference.
[0061] The assembly template frame 6 is arranged on the top of the main support frame 4 and behind the alignment template frame 5 through the adjustment mechanism. The assembly template frame 6 positions the top wall prefabricated block K to be installed. The adjustment mechanism adjusts the height, left and right, front and back distance of the top wall prefabricated block K to ensure accurate assembly.
[0062] The adjacent wall straightening mechanism is arranged on both sides of the main support frame 4 and below the assembly formwork frame 6, and the adjacent wall straightening mechanism positions the adjacent wall prefabricated block B. The side wall straightening mechanism is arranged on both sides of the main support frame 4 and below the adjacent wall straightening mechanism, and the side wall straightening mechanism straightens and positions the side wall prefabricated block A.
[0063] The segment pusher bracket 7 is installed at the rear of the main support frame 4. A plurality of jacking cylinders 701 are arranged on the segment pusher bracket 7. The working ends of the jacking cylinders 701 push the sides of the top wall prefabricated block K, the adjacent wall prefabricated block B and the side wall prefabricated block A. The traction mechanism is arranged in front of the main support frame 4. The cantilever end of the traction mechanism is connected to the installed segment ring. The traction mechanism provides the trolley with rolling power along the track 1.
[0064] The tunnel open hole segment assembly trolley composed of the track 1, the running wheel assembly 2, the lower transverse assembly 3, the main support frame 4, the alignment template frame 5, the assembly template frame 6, the segment pusher bracket 7, the adjustment mechanism, the adjacent wall straightening mechanism, the side wall straightening mechanism and the traction mechanism realizes the full mechanized assembly construction and reduces the labor intensity of the operators compared with the conventional technology using ordinary lifting equipment for assembly. Through the arrangement of the alignment template frame 5 and the assembly template frame 6, the lower transverse assembly 3 adjusts the left and right lateral position of the entire trolley to facilitate the alignment of the alignment template frame 5 with the center line of the top wall prefabricated block K at the top of the installed segment ring. The first lifting mechanism lifts the alignment template frame 5, and the arch plate of the alignment template frame 5 is closely fitted with the lower arc surface of the top wall prefabricated block K as a positioning reference, so that the assembly template frame 6 can adjust the height, left and right front and back distance of the next group of top wall prefabricated blocks K to be installed through the adjustment mechanism, thereby ensuring accurate assembly. On the basis of accurate positioning of the top wall prefabricated block K, the adjacent wall straightening mechanism, the side wall straightening mechanism and the pipe segment pusher bracket 7 are used to assist in the installation of the adjacent wall prefabricated block B and the side wall prefabricated block A below, thereby improving the installation efficiency and assembly quality. The setting of the traction mechanism realizes the movement of the trolley, which facilitates the gradual ring-by-ring installation of the entire tunnel open hole, thereby ensuring the construction quality and efficiency. The tunnel open hole pipe segment assembly trolley of the present invention realizes the full mechanized assembly construction, reduces the labor intensity, improves the pipe segment assembly efficiency and ensures the assembly accuracy.
[0065] In a specific embodiment of the present invention, Figures 1 to 3 , Figure 7 , Figure 8 and Fig.11 As shown, the first lifting mechanism includes an alignment upper bracket 8 and a circular alignment cylinder 501. The alignment upper bracket 8 is installed on the front upper part of the main support frame 4 by bolts. Four circular alignment cylinders 501 are installed on the alignment upper bracket 8 by bottom end flange bolts and are vertically arranged. The working end of the circular alignment cylinder 501 is connected to the alignment template frame 5.
[0066] By setting the alignment upper bracket 8, it is convenient to cooperate with the alignment template frame 5 to be installed on the front upper side of the main support frame 4, to adjust the installation position of the circular cylinder 501, and to install and debug the lifting action of the alignment template frame 5.
[0067] Specifically, if Figures 1 to 3 , Fig. 9 , Figures 12 to 15 As shown, the adjustment mechanism includes a lifting middle bracket 9, an upper short transverse movement component 11, an upper long longitudinal movement component 12 and a lifting cylinder 601. The lifting middle bracket 9 is installed on the top of the main support frame 4 by bolts and is located behind the alignment upper bracket 8.
[0068] The lifting middle bracket 9 includes a frame structure composed of a lateral limiting beam 901, a connecting beam 902 and a bottom beam 903. Two upper long longitudinal movement components 12 are longitudinally installed between the two bottom beams 903. Four upper short transverse movement components 11 are installed on the top of the two upper long longitudinal movement components 12. The four upper short transverse movement components 11 are arranged between two opposite lateral limiting beams 901. A connecting beam 902 is arranged laterally to connect the two upper short transverse movement components 11.
[0069] A lifting cylinder 601 is installed on the top of each upper short transverse displacement assembly 11 through flange bolts. The lifting cylinder 601 is vertically arranged, and the working ends of the four lifting cylinders 601 are connected to the assembly template frame 6.
[0070] Through the stacked installation method of two upper long longitudinal movement components 12, four upper short transverse movement components 11 and four lifting cylinders 601, the front and rear, left and right, up and down positions of the top assembly formwork frame 6 can be adjusted, which can ensure that the top wall prefabricated block K clamped on the arch plate of the assembly formwork frame 6 is accurately docked and assembled with the top wall prefabricated block K of the previous pipe segment ring.
[0071] Specifically, if Figures 13-15 As shown, the upper short transverse shift assembly 11 includes an upper short transverse shift frame base, a second transverse shift hydraulic cylinder 112 and a second transverse shift shoe 113. One end of the second transverse shift hydraulic cylinder 112 is pinned to the pin seat of the upper short transverse shift frame base, and the working end is pinned to the pin hole below the second transverse shift shoe 113. The second transverse shift shoe 113 slides horizontally left and right on the upper surface of the upper short transverse shift frame base.
[0072] The upper longitudinal movement component 12 includes an upper longitudinal movement frame base, a longitudinal movement hydraulic cylinder 122 and a longitudinal movement shoe 123. A bidirectional pin seat is arranged in the middle position of the upper longitudinal movement frame base. One end of a longitudinal movement hydraulic cylinder 122 is pinned to both sides of the bidirectional pin seat respectively. The working end of the longitudinal movement hydraulic cylinder 122 is pinned to the pin hole below the longitudinal movement shoe 123. The longitudinal movement shoe 123 slides longitudinally back and forth in the upper longitudinal movement frame base.
[0073] The bottom surface of the upper long longitudinal movement frame base is longitudinally installed on the top surfaces of the two bottom beams 903, the bottom surface of the upper short transverse movement frame base is transversely installed on the longitudinal movement sliding shoe 123, and the lifting cylinder 601 is installed on the second transverse movement sliding shoe 113.
[0074] The upper short transverse movement assembly 11 and the upper long longitudinal movement assembly 12 both use a cylinder-driven sliding shoe to perform corresponding transverse and longitudinal movements, thereby ensuring accurate and stable adjustment during the assembly process.
[0075] In a specific embodiment of the present invention, Figures 1 to 3 As shown, the adjacent wall straightening mechanism includes a lifting cylinder 13, a ball cylinder 14 and a supporting cylinder 15 which are respectively arranged in pairs from top to bottom. The bottom end of the lifting cylinder 13 is hinged to the outside of the lifting middle bracket 9, the bottom end of the ball cylinder 14 is fixedly connected to the outside of the bottom of the lifting middle bracket 9, and the bottom end of the supporting cylinder 15 is fixedly connected to the outside of the main supporting frame 4.
[0076] Specifically, the working end of the lifting cylinder 13 is hinged to the process mounting hole on the top inner wall of the adjacent wall prefabricated block B, and the working end of the ball cylinder 14 is inlaid with a rolling steel ball, which is positioned to contact the inner wall of the adjacent wall prefabricated block B; the working end of the supporting cylinder 15 is installed with an inclined rubber block, which is positioned to contact the inner wall of the joint between the adjacent wall prefabricated block B and the side wall prefabricated block A.
[0077] The adjacent wall straightening mechanism composed of the lifting cylinder 13, the ball cylinder 14 and the supporting cylinder 15 can lift and straighten the adjacent wall prefabricated block B in the upper, middle and lower sections, ensuring that the adjacent wall prefabricated block B is accurately in place, and the assembly process is smooth and reliable. By embedding a rolling steel ball at the working end of the ball cylinder 14, it can be ensured that the ball cylinder 14 only plays a supporting role without generating resistance in the front and rear directions and will not affect the assembly accuracy. By setting an inclined rubber block at the working end of the supporting cylinder 15, the inclined rubber block ensures that the adjacent wall prefabricated block B and the side wall prefabricated block A are accurately assembled at the joint according to the designed inclination angle.
[0078] In a specific embodiment of the present invention, Figures 1 to 3As shown, the side wall straightening mechanism includes a middle push-pull cylinder 16 and a bottom push-pull cylinder 17. The bottom end of the middle push-pull cylinder 16 is hinged to the longitudinal beam outside the main support frame 4, and the working end of the middle push-pull cylinder 16 is hinged to the process installation hole inside the side wall prefabricated block A. The bottom of the bottom push-pull cylinder 17 is hinged to the outer end of the lower transverse displacement assembly 3, and the working end of the bottom push-pull cylinder 17 is connected to a bottom positioning rod 171, which positions the bottom surface of the side wall prefabricated block A. The bottom positioning rod 171 includes a round rod, and both ends of the round rod are provided with an articulated seat. The inner side of the articulated seat is articulated to the working end of the bottom push-pull cylinder 17. The bottom of the side wall prefabricated block A is clamped between the articulated seats at both ends of the round rod, and is pin-connected to the corresponding mounting parts on the side wall prefabricated block A.
[0079] Specifically, the bottom end of the middle push-pull oil cylinder 16 is connected to the longitudinal beam outside the main support frame 4 by means of two-stage hinges perpendicular to each other.
[0080] The middle push-pull cylinder 16 and the bottom push-pull cylinder 17 cooperate with the supporting cylinder 15 to straighten the side wall prefabricated block A in the upper, middle and lower sections; and the bottom end of the middle push-pull cylinder 16 is connected to the longitudinal beam on the outer side of the main support frame 4 by a two-stage hinged connection perpendicular to each other, so as to form a universal joint-type push-pull side wall prefabricated block A, which will not form resistance in the front, back and up and down directions, and is convenient for precise assembly.
[0081] In a specific embodiment of the present invention, Figures 1 to 3 , Figure 5 and Figure 6 As shown, the lower transverse movement assembly 3 includes a lower transverse movement frame base, a first transverse movement hydraulic cylinder 302 and a first transverse movement shoe 303. One end of the first transverse movement hydraulic cylinder 302 is pinned to the pin seat of the upper short transverse movement frame base, and the working end is pinned to the pin hole below the first transverse movement shoe 303. The second transverse movement shoe 113 slides horizontally left and right on the upper surface of the upper short transverse movement frame base.
[0082] Specifically, the number of the second transverse sliding shoes 113 is set to three, one second transverse sliding shoe 113 is an active sliding shoe connected to the working end of the first transverse hydraulic cylinder 302, and the other two second transverse sliding shoes 113 are auxiliary sliding shoes, and the three second transverse sliding shoes 113 are all connected to the bottom of the main support frame 4.
[0083] Specifically, auxiliary legs 301 are installed at both ends of the lower surface of the lower transverse frame base. The auxiliary legs 301 are specifically in the form of threaded sleeves and screws, and the height of the auxiliary legs 301 can be adjusted telescopically.
[0084] The lower lateral movement assembly 3 uses a hydraulic cylinder to drive the sliding shoe to perform the corresponding lateral movement, ensuring accurate and stable adjustment during assembly. Each lower lateral movement assembly 3 is provided with three second lateral movement sliding shoes 113 connected to the main support frame 4, ensuring the stability of the main support frame 4. The auxiliary support legs 301 are provided to facilitate the separate placement of the trolley body when it leaves the track 1, and to prevent tipping accidents.
[0085] In a specific embodiment of the present invention, Figures 1 to 3 , Fig.16 As shown, the tunnel open hole segment assembly trolley of the present invention also includes a track locker 21, which includes a clamping plate 211, a rocker 212 and a cylindrical pin 213. A rail clamping portion 2111 for clamping the track 1 is provided at the bottom of the clamping plate 211. The rail clamping portion 2111 is two round steel bars with a spacing less than the head height of the track 1, and the round steel bars are welded to the bottom of the clamping plate 211; the two clamping plates 211 are symmetrically arranged face to face, one clamping plate 211 is provided with a left-handed threaded hole on the rail clamping portion 2111, and the other clamping plate 211 is correspondingly provided with a right-handed threaded hole, and two sections of left-handed threaded rod and right-handed threaded rod are respectively provided on the working rod of the rocker 212, and the left-handed threaded rod and the right-handed threaded rod are respectively connected to the left-handed threaded holes and the right-handed threaded holes of the two clamping plates 211.
[0086] The clamping plate 211 is provided with a waist-shaped hole, and the end of the running wheel assembly 2 is provided with a locking hole plate 202 . The cylindrical pin 213 is pinned in the waist-shaped hole and the circular hole of the locking hole plate 202 .
[0087] The rail locker 21 is provided to facilitate braking of the trolley body of the present invention, and prevent the trolley body from moving during the assembly process, which causes a decrease in assembly accuracy. The rocker 212 with two sections of screws in opposite directions drives the two clamping plates 211 to move away from or close to each other when shaking, thereby making a head movement to loosen or clamp the track 1. The structure is simple, practical, and easy to operate.
[0088] In a specific embodiment of the present invention, Figures 1 to 3 As shown, the traction mechanism includes eight traction cylinders 18 arranged in front of the main support frame 4 and distributed at equal intervals in accordance with the shape of the pipe segment ring. The bottom end of the traction cylinder 18 is hinged to the outer connecting part of the main support frame 4, and the working end of the traction cylinder 18 is hinged to the installation process hole on the inner side of the pipe segment ring.
[0089] By setting the traction cylinder 18, when the working end is pushed out, the reaction force generated by the installed segment ring is utilized to move the trolley body backward into the installation position for assembling the next group of segment rings.
[0090] In a specific embodiment of the present invention, Figures 1 to 3As shown, the tunnel open hole segment assembly trolley of the present invention also includes a main platform 19, a side platform 20 and a ladder 22. The main platform 19 is horizontally installed on the top of the main support frame 4, and the front end of the main platform 19 protrudes out of the main support frame 4. A first guardrail 191 is installed on the upper front end of the main platform 19; the two side platforms 20 are respectively installed at the middle position on both sides of the main support frame 4, and a second guardrail 2001 is arranged at the front end of the side platform 20; the inner side of the side platform 20 is provided with a ladder 22 for workers to go up and down.
[0091] The arrangement of the main platform 19, the side platform 20 and the ladder 22 facilitates the assembly workers to enter the assembly trolley to perform coordinated operations, check the splicing conditions, and make timely observations and corrections.
[0092] Working process of the tunnel open hole segment assembly trolley of the present invention:
[0093] In the first step, the trolley body moves forward on the track 1 to the outside, and the track lockers 21 at both ends of the running wheel assembly 2 are locked to longitudinally position the trolley body.
[0094] The second step is to use a gantry crane to lift the side wall prefabricated block A to the designated installation position. The middle push-pull cylinder 16 and the bottom push-pull cylinder 17 are connected to the side wall prefabricated block A respectively, and the middle push-pull cylinder 16 and the bottom push-pull cylinder 17 are adjusted to make the side wall prefabricated block A straighten in place, and then use a total station to detect.
[0095] In the third step, the oil cylinders of the lower transverse moving assembly 3 under the trolley body are simultaneously actuated to laterally adjust the trolley body to make it centered, and a total station is used for detection.
[0096] In the fourth step, the alignment cylinder 501 is actuated, the alignment template frame 5 is raised, and the arch plate of the alignment template frame 5 is closely attached to the lower surface of the top wall prefabricated block K at the top of the assembled segment ring. In addition, when the first group of segment rings is initially installed, the alignment template frame 5 is inactive.
[0097] The fifth step is to use a gantry crane to hang the top wall prefabricated block K to be assembled on the arch plate of the assembly template frame 6, and use a screw pressure plate to press the positioning reference block on one side to ensure that it is parallel to the arch plate.
[0098] The sixth step is to use a gantry crane to lift the adjacent wall prefabricated block B onto the side wall prefabricated block A, and place a protective wooden board on the top of the side wall prefabricated block A; the lifting lug of the lifting cylinder 13 is connected to the process installation hole of the adjacent wall prefabricated block B, and the adjacent wall prefabricated block B is lifted up, and the ball cylinder 14 and the supporting cylinder 15 are adjusted to make the adjacent wall prefabricated block B reach the accurate assembly position.
[0099] In the seventh step, the adjacent wall prefabricated block B and the top wall prefabricated block K are connected by bolts, the wooden board in the above sixth step is removed, the lifting cylinder 601 moves to lower the assembly formwork frame 6, and falls on the side wall prefabricated block A, and the long longitudinal movement component 12 and the upper short transverse movement component 11 are used to adjust and align the transverse and longitudinal directions, and the adjacent wall prefabricated block B and the side wall prefabricated block A are connected by bolts.
[0100] In the eighth step, the jacking cylinder 701 is actuated to butt and press the newly assembled segment ring with the previous segment ring, and connect the segment ring with the previous segment ring by bolts.
[0101] In the ninth step, the trolley is shifted, the lifting cylinder 601 and the circle alignment cylinder 501 are activated, and the alignment template frame 5 and the assembly template frame 6 are lowered. The track locker 21 is released, and the traction cylinder 18 is connected to the newly assembled segment ring. The traction cylinder 18 is pushed out to provide a reaction force, and the trolley body is moved back to the next installation station, and the track locker 21 is re-locked to enter the next working cycle.
[0102] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0103] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A tunnel open hole segment assembly trolley, characterized in that: It comprises a track (1), a walking wheel assembly (2), a lower lateral movement assembly (3), a main support frame (4), an alignment template frame (5), an assembly template frame (6), a pipe segment pushing support (7), an adjustment mechanism, an adjacent wall straightening mechanism, a side wall straightening mechanism and a traction mechanism; The two tracks (1) are laid in parallel on the open hole foundation, and the bottom of the main support frame (4) is connected to the walking wheel assembly (2) via a plurality of lower transverse moving assemblies (3) arranged perpendicular to the tracks (1), and the walking wheel assembly (2) rolls along the tracks (1); The alignment template frame (5) is arranged at the front middle position above the main support frame (4) through a first lifting mechanism, and the arch plate on the top of the alignment template frame (5) fits and penetrates into the lower surface of the top wall prefabricated block (K) of the assembled segment ring as a positioning reference; The assembly template frame (6) is arranged on the top of the main support frame (4) and is located behind the alignment template frame (5) through the adjustment mechanism. The assembly template frame (6) positions the top wall prefabricated block (K) to be installed, and the adjustment mechanism adjusts the height, left, right, front and back distance of the top wall prefabricated block (K); The adjacent wall straightening mechanism is arranged on both sides of the main support frame (4) and is located below the assembly formwork frame (6), and the adjacent wall straightening mechanism positions the adjacent wall prefabricated block (B); The side wall straightening mechanism is arranged on both sides of the main support frame (4) and is located below the adjacent wall straightening mechanism, and the side wall straightening mechanism straightens and positions the side wall prefabricated block (A); The pipe segment pushing bracket (7) is installed at the rear of the main support frame (4), and a plurality of jacking cylinders (701) are arranged on the pipe segment pushing bracket (7), and the working ends of the jacking cylinders (701) push the sides of the top wall prefabricated block (K), the adjacent wall prefabricated block (B) and the side wall prefabricated block (A); The traction mechanism is arranged in front of the main support frame (4), the cantilever end of the traction mechanism is connected to the installed segment ring, and the traction mechanism provides the wheel assembly (2) with rolling power along the track (1).
2. The tunnel segment assembly trolley according to claim 1, characterized in that: The first lifting mechanism comprises an upper alignment bracket (8) and a circular alignment cylinder (501), wherein the upper alignment bracket (8) is installed at the front upper part of the main support frame (4), and four circular alignment cylinders (501) are vertically fixedly connected to the upper alignment bracket (8), and the working ends of the circular alignment cylinders (501) are connected to the alignment template frame (5).
3. The tunnel open hole segment assembly trolley according to claim 2 is characterized in that: The adjustment mechanism comprises a lifting middle bracket (9), an upper short transverse movement component (11), an upper long longitudinal movement component (12) and a lifting cylinder (601); the lifting middle bracket (9) is installed on the top of the main support frame (4) and is located behind the alignment upper bracket (8); The lifting middle bracket (9) comprises a frame structure composed of a lateral limiting beam (901), a connecting beam (902) and a bottom beam (903); two upper long longitudinal movement components (12) are longitudinally installed between the two bottom beams (903); four upper short transverse movement components (11) are installed on the top of the two upper long longitudinal movement components (12); the four upper short transverse movement components (11) are arranged between two opposite lateral limiting beams (901); and the connecting beam (902) is connected between two upper short transverse movement components (11) arranged transversely; The top of each upper short transverse shift assembly (11) is vertically fixedly connected to a lifting cylinder (601), and the working ends of the four lifting cylinders (601) are connected to the assembly template frame (6).
4. The tunnel open hole segment assembly trolley according to claim 3 is characterized in that: The upper short transverse shift assembly (11) comprises an upper short transverse shift frame base, a second transverse shift hydraulic cylinder (112) and a second transverse shift sliding shoe (113); one end of the second transverse shift hydraulic cylinder (112) is pinned to a pin seat on the upper short transverse shift frame base and the working end is pinned to a pin hole below the second transverse shift sliding shoe (113); the second transverse shift sliding shoe (113) slides horizontally left and right on the upper surface of the upper short transverse shift frame base; The upper longitudinal movement assembly (12) comprises an upper longitudinal movement frame base, a longitudinal movement hydraulic cylinder (122) and a longitudinal movement sliding shoe (123); a bidirectional pin seat is arranged in the middle of the upper longitudinal movement frame base, and the two sides of the bidirectional pin seat are respectively pinned to one end of the longitudinal movement hydraulic cylinder (122); the working end of the longitudinal movement hydraulic cylinder (122) is pinned to the pin hole below the longitudinal movement sliding shoe (123); and the longitudinal movement sliding shoe (123) slides longitudinally forward and backward in the upper longitudinal movement frame base; The bottom surface of the upper long longitudinal movement frame base is longitudinally installed on the top surfaces of the two bottom beams (903), the bottom surface of the upper short transverse movement frame base is transversely installed on the longitudinal movement sliding shoe (123), and the lifting cylinder (601) is installed on the second transverse movement sliding shoe (113).
5. The tunnel open hole segment assembly trolley according to claim 3 or 4, characterized in that: The adjacent wall straightening mechanism comprises a lifting cylinder (13), a ball cylinder (14) and a supporting cylinder (15) which are respectively arranged in pairs from top to bottom, the bottom end of the lifting cylinder (13) is hinged to the outside of the lifting middle bracket (9), the bottom end of the ball cylinder (14) is fixedly connected to the outside of the bottom of the lifting middle bracket (9), and the bottom end of the supporting cylinder (15) is fixedly connected to the outside of the main support frame (4); The working end of the lifting cylinder (13) is hinged to the process installation hole on the top inner wall of the adjacent wall prefabricated block (B); the working end of the ball cylinder (14) is inlaid with a rolling steel ball, and the steel ball is positioned to contact the inner wall of the adjacent wall prefabricated block (B); the working end of the supporting cylinder (15) is installed with an inclined rubber block, and the inclined rubber block is positioned to contact the inner wall of the joint between the adjacent wall prefabricated block (B) and the side wall prefabricated block (A).
6. The tunnel open hole segment assembly trolley according to claim 5, characterized in that: The side wall straightening mechanism comprises a middle push-pull cylinder (16) and a bottom push-pull cylinder (17); the bottom end of the middle push-pull cylinder (16) is hinged to the longitudinal beam on the outside of the main support frame (4); the working end of the middle push-pull cylinder (16) is hinged to the process installation hole on the inside of the side wall prefabricated block (A); the bottom of the bottom push-pull cylinder (17) is hinged to the outer end of the lower transverse displacement assembly (3); the working end of the bottom push-pull cylinder (17) is connected to a bottom positioning rod (171); the bottom positioning rod (171) positions the bottom surface of the side wall prefabricated block (A); The bottom end of the middle push-pull oil cylinder (16) is connected to the longitudinal beam on the outside of the main support frame (4) in a two-stage hinged manner that is perpendicular to each other.
7. The tunnel open hole segment assembly trolley according to claim 4, characterized in that: The lower transverse shift assembly (3) comprises a lower transverse shift frame base, a first transverse shift hydraulic cylinder (302) and a first transverse shift sliding shoe (303); one end of the first transverse shift hydraulic cylinder (302) is pinned to a pin seat of the upper short transverse shift frame base, and a working end is pinned to a pin hole below the first transverse shift sliding shoe (303); the second transverse shift sliding shoe (113) slides horizontally left and right on the upper surface of the upper short transverse shift frame base; The number of the second transverse sliding shoes (113) is set to three, one of the second transverse sliding shoes (113) is an active sliding shoe connected to the working end of the first transverse hydraulic cylinder (302), and the other two of the second transverse sliding shoes (113) are auxiliary sliding shoes, and the three second transverse sliding shoes (113) are all connected to the bottom of the main support frame (4).
8. The tunnel open hole segment assembly trolley according to claim 1, characterized in that: It also includes a track locker (21), the track locker (21) includes a clamping plate (211), a rocker (212) and a cylindrical pin (213), the bottom of the clamping plate (211) is provided with a rail clamping part (2111) for clamping the track (1), the two clamping plates (211) are symmetrically arranged face to face, one clamping plate (211) is provided with a left-handed threaded hole on the rail clamping part (2111), and the other clamping plate (211) is correspondingly provided with a right-handed threaded hole, and the working rod of the rocker (212) is respectively provided with two sections of left-handed threaded rod and right-handed threaded rod, and the left-handed threaded rod and the right-handed threaded rod are respectively connected to the left-handed threaded holes and the right-handed threaded holes of the two clamping plates (211); The clamping plate (211) is provided with a waist-shaped hole, the end of the running wheel assembly (2) is provided with a locking hole plate (202), and the cylindrical pin (213) is pinned in the waist-shaped hole and the circular hole of the locking hole plate (202).
9. The tunnel open hole segment assembly trolley according to claim 1, characterized in that: The traction mechanism comprises a plurality of traction cylinders (18) arranged in front of the main support frame (4) and arranged at equal intervals in accordance with the shape of the segment ring; the bottom end of the traction cylinder (18) is hinged to the peripheral connecting piece of the main support frame (4); the working end of the traction cylinder (18) is hinged to the installation process hole on the inner side of the segment ring.
10. The tunnel open hole segment assembly trolley according to any one of claims 1 to 4 and 6 to 9, characterized in that: It also includes a main platform (19), a side platform (20) and a ladder (22), wherein the main platform (19) is horizontally installed on the top of the main support frame (4), the front end of the main platform (19) protrudes out of the main support frame (4), and a first guardrail (191) is installed on the upper part of the front end of the main platform (19); the two side platforms (20) are respectively installed at the middle position on both sides of the main support frame (4), and the front end of the side platform (20) is provided with a second guardrail (2001); and the inner side of the side platform (20) is provided with a ladder (22) for people to go up and down.
Citation Information
Patent Citations
Prefabricated railway open cut tunnel and construction method thereof
CN110344442A
Tunnel open cut tunnel segment assembling trolley
CN212927891U