An automated garbage transfer station for construction sites
By designing an automated garbage transfer station on the construction site and using technologies such as hoppers, rails, and spray pipes, the problems of inconvenient operation and dust emission of existing garbage bins have been solved, and fully automated processing of construction waste and environmental protection and energy saving effects have been achieved.
Patent Information
- Application Number
- CN202010938445.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-09
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-09-09
AI Technical Summary
The existing garbage bins at construction sites have a single structure, are inconvenient to operate, and have a low degree of automation, which results in high labor intensity and generates a large amount of dust during the garbage transfer process, affecting the construction environment.
An automated garbage transfer station including a garbage bin box, a feeding system, a dust removal system and a control system is designed. The automatic loading and unloading of garbage is realized through the hopper and track, and the spray pipe and infrared induction probe are used to control the system. Reduce dust and achieve fully automated operation.
It has realized fully automated shipping, transportation and transfer of construction waste, significantly reduced labor intensity and dust, improved the construction environment, and improved the management efficiency and environmental protection of the construction site.
Smart Images

Figure CN111891606B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a garbage bin used in the construction industry, and in particular to an automated closed garbage bin used in construction sites. Background Art
[0002] In the process of construction site operation, construction waste is inevitably generated. Construction waste refers to the slag, abandoned soil, abandoned materials, residual mud and other wastes generated during the construction, laying, demolition and repair of various buildings, structures, pipe networks, etc. by construction units or individuals. In order to facilitate site management, the garbage needs to be piled up and processed in a centralized manner. The existing garbage bins have a single structure, are inconvenient to operate, time-consuming and labor-intensive, and have a low degree of automation. They are almost all operated manually, which is not only labor-intensive, but also generates a lot of dust during use, affecting the construction environment. Summary of the invention
[0003] In order to solve the deficiencies in the above technical problems, the present invention provides an automated garbage transfer station for a construction site.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: an automated garbage transfer station for construction sites, including a garbage bin body, a feeding system, a dust removal system, and a control system; a feeding port is provided on the top surface of the garbage bin body, a discharging port is provided on the bottom, and four columns are fixedly connected at the four corners below the garbage bin body. The feeding system includes a hopper and a track, the track is tilted and arranged on one side of the garbage bin body, the lower end of the track is fixed to the ground by bolts, and the upper end is fixedly connected to the top of the side of the garbage bin body; a hopper that can slide up and down along the track is provided on the track, and a cavity for accommodating the hopper is provided at the bottom of the track.
[0005] The dust removal device includes a feed inlet spray pipe and a discharge port spray pipe; the feed inlet spray pipe is installed on one side of the feed inlet of the garbage bin body, and the discharge port spray pipe is installed around the outer periphery of the discharge port at the bottom of the garbage bin body; the feed inlet spray pipe and the discharge port spray pipe are connected to the tap water pipeline through the second electric valve and the first electric valve on the pipeline respectively.
[0006] The control system includes a power distribution control cabinet, a signal sensing device, and an execution device; the power distribution control cabinet is connected to the signal sensing device and the execution device respectively; the signal sensing device includes a limit mechanism arranged on the track and an infrared sensing probe arranged on the column; the execution device includes a loading motor, a discharging motor, a first electric valve, and a second electric valve;
[0007] In the present invention, the loading motor drives the material hopper to be transferred to the feed port of the garbage bin body through the track, and the accumulated construction waste is collected in the garbage bin body. The infrared sensing probe triggers the unloading motor to open the unloading port door panel of the garbage bin body to transfer the construction waste to the slag truck body. The dust removal system sprays water at the feed port and unloading port of the garbage bin body respectively when the construction waste is transferred through the operation of the control system to reduce dust.
[0008] Furthermore, the upper part of the garbage bin body is in a rectangular shape, and the lower part is reduced in diameter. Below the reduced diameter is a discharge port to facilitate garbage dumping. The upper and lower parts of the garbage bin body are welded together.
[0009] There are two tracks, and a reinforcing cross brace is arranged between the two tracks to increase the bearing capacity of the tracks.
[0010] A transmission pulley is provided on the side of the material transport hopper close to the garbage bin body, and a winding wheel is fixed on the shaft of the feeding motor. The steel wire is wound on the winding wheel and connected to the fixed hook through the fixed pulley, the transmission pulley. When the feeding motor rotates forward, the steel wire is tightened to drive the material transport hopper to move upward. When the motor reverses, the steel wire is loosened to drive the material transport hopper to move downward under gravity.
[0011] A lower baffle is provided under the hopper, and vertical side panels are provided on both sides of the lower baffle. The opening ends of the vertical side panels are arc-shaped, and the fixed ends of the vertical side panels extend beyond the lower opening of the hopper and bend upward. The fixed ends of the vertical side panels are connected to spring fixings fixed on both sides of the hopper. A baffle is provided at the feed port of the garbage bin body on the track corresponding to the feed port position. When the hopper rises to the feed port position, the baffle blocks the vertical side panels on both sides of the lower baffle of the hopper. The hopper continues to rise, and the bottom baffle is opened to dump the construction waste into the garbage bin body.
[0012] The upper and lower ends of the inner side of the track are respectively provided with a hopper limit mechanism, which is connected to the feeding motor through the power distribution control cabinet. Through the hopper limit mechanism, the operation of the hopper on the track can be further automatically realized. When the hopper is transported upward and reaches the position of the upper limit mechanism, the upper limit mechanism is triggered, and the feeding motor stops. After the hopper has dumped the garbage, the time relay sends a signal to the feeding motor to reverse operation, driving the hopper to transport downward, and reaching the cavity on the ground that accommodates the hopper, the lower limit mechanism is triggered, and the feeding motor stops. At this time, the hopper can be filled with construction waste. After it is full, the feeding motor is started to work, driving the hopper to transport upward.
[0013] In order to further reduce dust during the transportation of construction waste, the present invention provides an upwardly extending dust baffle above the feed inlet of the waste bin body to prevent the dust from spreading.
[0014] There are two pairs of infrared sensing probes, which are respectively arranged between a pair of vertical columns extending in the horizontal direction. In this way, when the slag truck under the garbage bin body stops at the preset position, it blocks the signal transmission of the corresponding infrared sensing probe, and the unloading motor is started to work. At this time, the unloading port at the bottom of the garbage bin body is opened, and the construction waste previously collected in the garbage bin body through the hopper is poured into the slag truck without the need for manual secondary transfer. Support rods are arranged around the periphery of the unloading port at the bottom of the garbage bin body, and the upper end of the support rod is fixedly connected to the bottom of the garbage bin body. The unloading port spray pipe is fixed on the support rod. Water is sprayed through the unloading port spray pipe when the unloading port is opened, so as to effectively reduce dust.
[0015] Furthermore, the upper end of the column of the present invention is welded to the four corners of the lower side of the garbage bin body, and the column can be selected to have a detachable structure. According to the needs of the site, the height of the column can be adjusted to adapt to different slag transport vehicles.
[0016] The present invention provides a method for realizing garbage transfer according to the above-mentioned garbage transfer station, and the specific operation method is: the material transport hopper on the track transports the construction waste into the garbage bin body through the feed port of the garbage bin body, and then transfers it to the slag transport vehicle through the discharge port at the bottom of the garbage bin body; the feed port spray pipe and the discharge port spray pipe are respectively controlled by the control system to spray water at the feed port when the construction waste is dumped into the garbage bin body and at the discharge port when the construction waste is discharged from the garbage bin body, so as to prevent a large amount of dust from being raised during the transportation process of the construction waste. The control system controls the garbage dumping time and the opening time of the door panel of the garbage bin body discharge port through the signal sensing device and the execution device to realize full automatic operation.
[0017] The present invention realizes the fully automated control of construction waste from loading, transportation, transfer to slag trucks, has low labor intensity, is easy to operate, greatly reduces dust in the transfer process during use, is environmentally friendly and energy-saving, and effectively improves the construction working environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0020] Figure 2 for Figure 1 Schematic diagram of the structure where the mid-haul hopper is transferred to the bottom of the track.
[0021] Figure 3 for Figure 1 Side view
[0022] Figure 4 This is a schematic diagram of the structure of the hopper.
[0023] Figure 5 for Figure 4 Side view of.
[0024] Figure 6 This is a partial schematic diagram of the unloading port of the garbage bin.
[0025] In the figure: 1. Trash bin body; 2. Material transport hopper; 3. Track; 4. Cross brace; 5. Dust baffle; 6. Loading motor; 7. Pulley; 8. Column; 9. Support rod; 10. Discharge motor 11. First electric valve; 12. Second electric valve; 13. Threading tube; 14. Feed inlet spray pipe; 15. Discharge outlet spray pipe; 16. Reducer; 17. Power distribution control cabinet; 18. Infrared sensor probe; 19. Fixed hook; 20. Transmission pulley; 21. Lower baffle of material transport hopper; 22. Baffle; 23. Transmission shaft 24. Positive thread; 25. Negative thread; 26. Discharge outlet door panel. DETAILED DESCRIPTION
[0026] like Figure 1-Figure 5 As shown, the present invention includes a garbage bin body 1, a feeding system, a dust removal system, and a control system; a feeding port is provided on the top surface of the garbage bin body 1, and a discharge port is provided on the bottom. Four columns 8 are welded and fixedly connected at the four corners below the garbage bin body 1. Among them, the feeding system includes a hopper 2 and a track 3. The track 3 is obliquely arranged on one side of the garbage bin body 1. The lower end of the track 3 is fixed to the ground by bolts, and the upper end is fixedly connected to the top of the side of the garbage bin body 1; a hopper 2 that can slide up and down is provided on the track 3, and a cavity for accommodating the hopper is provided at the bottom of the track 3. The upper part of the garbage bin body 1 is a rectangular parallelepiped, and the lower part is a reduced diameter. Below the diameter change is the discharge port. The upper and lower parts of the garbage bin body 1 are welded.
[0027] The dust removal device includes a feed inlet spray pipe 14 and a discharge port spray pipe 15; the feed inlet spray pipe 14 is installed on one side of the feed inlet of the garbage bin body 1, and the discharge port spray pipe 15 is installed around the outer periphery of the discharge port at the bottom of the garbage bin body 1; the feed inlet spray pipe 14 and the discharge port spray pipe 15 are respectively connected to the tap water pipeline through the second electric valve 12 and the first electric valve 11 preset on the pipeline; when the hopper 2 dumps construction waste into the garbage bin body 1, the feed inlet spray pipe 14 is opened to spray water, which can effectively reduce dust. When the garbage bin body 1 transfers construction waste to the slag truck through the discharge port, the discharge port spray pipe 15 is opened to spray water, which can also effectively reduce dust and protect the on-site construction environment.
[0028] The control system of the present invention includes a power distribution control cabinet, a signal sensing device, and an execution device; the power distribution control cabinet is connected to the signal sensing device and the execution device respectively; the signal sensing device includes a limit mechanism arranged on the track 3, an infrared sensing probe 18 arranged on the column 8, and limit mechanisms on both sides of the discharge port door plate 26; the execution device includes a feeding motor 6, a discharge motor 10, a first electric valve 11, and a second electric valve 12; when the feeding motor 6 is running, it drives the transport hopper 2 to move to the feed port of the garbage bin body 1 through the track 3, and the collected construction waste is concentrated in the garbage bin body 1; the limit mechanism on the track 3 triggers the second electric valve 12 to open, and the feed port spray pipe works. The infrared sensing probe 18 triggers the discharge motor 10 to operate to open the discharge port of the garbage bin body 1 to transfer the construction waste to the slag transport vehicle body. At the same time, the dust removal system of the discharge port spray pipe is triggered, and the operation of the control system through the limit mechanism sprays water at the feed port and the discharge port of the garbage bin body 1 respectively when the construction waste is transferred, so as to reduce dust.
[0029] There are two rails 3, and a reinforcing cross brace 4 is arranged between the two rails 3. A transmission pulley 20 is arranged on the side of the material transport hopper 2 close to the garbage bin body 1. A winding wheel is fixed on the shaft of the feeding motor 6. The steel wire is wound on the winding wheel and connected to the fixed hook 19 through the fixed pulley 7 and the transmission pulley 20. In the present invention, the fixed pulley 7 and the fixed hook 19 are both arranged on the reinforcing cross brace 4 at the upper end. When the feeding motor 6 rotates forward, the steel wire is tightened to drive the material transport hopper 2 to move upward. When the feeding motor 6 rotates reversely, the steel wire is loosened to drive the material transport hopper 2 to move downward under gravity.
[0030] like Figure 4 , Figure 5 As shown, the present invention is provided with a lower baffle 21 below the hopper 2, and vertical side panels are provided on both sides of the lower baffle 21. The opening end of the vertical side panel is arc-shaped, and the fixed end of the vertical side panel exceeds the lower opening of the hopper 2 and bends upward. The fixed end of the vertical side panel is connected to the spring fixings fixed on both sides of the hopper 2; a baffle 22 is provided at the feed inlet corresponding to the garbage bin body 1 on the track 3. When the hopper 2 rises to the feed inlet position, the baffle 22 blocks the vertical side panels on both sides of the lower baffle 21 of the hopper 2, and the lower baffle 21 at the bottom of the hopper 2 is opened, and the construction waste is dumped into the garbage bin body 1. In order to better realize automatic control and precise positioning, the present invention is provided with a hopper limit mechanism at the upper and lower ends of the inner side of the track 3, and the hopper limit mechanism is connected to the feeding motor 6 through the power distribution control cabinet. In specific operation, the operation of the hopper on the track 3 can be further automatically realized through the design of the limit mechanisms of the upper and lower hoppers. In the present invention, a dust baffle 5 extending upward is arranged on the periphery above the feed opening of the garbage bin body 1, so as to further reduce the diffusion of dust during the transportation of construction waste.
[0031] The present invention provides a method for transporting construction waste for construction sites, and the specific operation mode is as follows: the transport hopper 2 on the track 3 transports the construction waste into the garbage bin body 1 through the feed port of the garbage bin body 1, and then transports it to the slag transport vehicle through the discharge port at the bottom of the garbage bin body 1; wherein, the feed port spray pipe 14 and the discharge port spray pipe 15 are respectively controlled by the control system to spray water at the feed port when the construction waste is dumped into the garbage bin body 1 and the discharge port when the construction waste is discharged from the garbage bin body 1, so as to prevent a large amount of dust from being raised during the transport process of the construction waste, and the control system controls the garbage dumping time and the opening time of the discharge port door panel 26 of the garbage bin body 1 through the signal sensing device and the execution device, so as to realize full automatic operation. More specifically, the lower baffle 21 of the transport hopper 2 is usually in a closed state under the action of the spring fixing member. When the material transport hopper 2 moves along the track 3 to the feed port of the garbage bin body 1, the baffle 22 extending from the track 3 blocks the vertical baffles on both sides of the transport hopper, and the material transport hopper continues to move up to the limit position. At this time, the lower baffle 21 of the material transport hopper opens under the action of the baffle 22. At the same time, the second electric valve 12 opens, and the feed port spray pipe 14 sprays water to remove dust. At the same time, the time relay starts timing. The time can be flexibly set according to the specific time of the material transport hopper unloading the construction waste. The preset time of the present invention is 20s. After 20s of tilting the construction waste, the feeding motor 6 reverses under the action of the time relay, and the second electric valve 12 is closed. The material transport hopper 2 moves down along the track 3 to the initial position. When moving down, the lower baffle 21 of the material transport hopper 2 is closed under the action of the spring until it contacts the travel switch below. The feeding motor 6 stops working until the next travel starts, and this is repeated.
[0032] There are two pairs of infrared sensing probes 18, which are respectively arranged on two pairs of columns 8 extending in the horizontal direction. In this way, when the slag truck under the garbage bin body 1 stays at a preset position, it blocks the signal transmission of the corresponding infrared sensing probes 18, and then the unloading motor 10 is started to work. At this time, the unloading port at the bottom of the garbage bin body 1 is opened, and the construction waste previously collected in the garbage bin body 1 through the hopper 2 is poured into the slag truck without the need for manual secondary transfer. Support rods are arranged around the periphery of the unloading port at the bottom of the garbage bin body 1, and the upper end of the support rod is fixedly connected to the bottom of the garbage bin body 1. The unloading port spray pipe 15 is fixed on the support rod. Water is sprayed through the unloading port spray pipe when the unloading port is opened, thereby effectively reducing dust.
[0033] In specific implementation, the garbage dumping time of the discharge port at the bottom of the garbage bin body 1 of the present invention can still be controlled by a time relay, and the infrared sensor probe 18 gives a signal, and the discharge port door panel 26 opens to start timing. The dumping time when the garbage bin body 1 is full of construction waste can be preset to, for example, 300S, or it can be temporarily adjusted or manually intervened according to the size of the slag truck body. When the discharge port door panel 26 is opened, the discharge motor 10 starts to run, and at the same time, the first electric valve 11 is triggered to open, and the discharge port spray pipe 15 is opened to spray water at the discharge port of the garbage bin body 1 to reduce dust. In order to protect each connection line, the present invention is provided with an insulating threading tube 13 on the outer periphery of the line, and the operation is safer and more reliable. The discharge port of the garbage bin body 1 is automatically opened and closed by the discharge port door panel 26.
[0034] The specific working mode of the discharge port door plate 26 of the present invention is as follows: when the infrared sensor probes 18 on the first pair of horizontal columns 8 on the front side and the second pair of horizontal columns 8 on the rear side receive signals at the same time, the discharge motor 10 is triggered to start, the reduction box 16 and the transmission shaft 23 start to work, and the positive wire 24 and the reverse wire 25 on the discharge port 26 move to both sides under the action of the transmission shaft 23, and the discharge port 26 opens. The opening degree of the discharge port is controlled by controlling the running time of the discharge motor 10. When the discharge motor 10 starts to start, the first electric valve 11 opens, and the discharge port spray pipe 15 starts to spray water. The time relay in the control system starts timing when the discharge motor 10 starts to run. After the preset 300s, the discharge motor 10 reverses, the discharge port door plate 26 is closed, and the first electric valve 11 is closed at the same time, and the discharge port spray pipe 15 stops spraying water. After the discharge port door plate 26 is closed in place, the discharge motor 10 stops running. When the signal of any group of infrared sensor probes 18 is disconnected, the discharge motor 10 reverses, the discharge port door plate 26 is closed, and the first electric valve 11 is closed, and the discharge port spray pipe 15 stops spraying water. The next time the infrared sensor probe 18 senses the entry of the slag truck, the discharge motor is triggered to start working, and the cycle is repeated.
[0035] The present invention completely liberates manual labor and realizes fully automated control of construction waste from loading, transportation, and transfer to slag trucks. It has low labor intensity and is easy to operate. It greatly reduces dust in the transfer process during use, is environmentally friendly and energy-saving, and effectively improves the construction working environment.
[0036] The above implementation modes are not limitations of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the scope of the technical solution of the present invention also belong to the protection scope of the present invention.
Claims
1. An automated garbage transfer station for a construction site, comprising a garbage bin body (1), characterized in that: It also includes a feeding system, a dust removal system, and a control system; the top surface of the garbage bin body (1) is provided with a feeding port, the bottom surface is provided with a discharging port, and four columns (8) are fixedly connected at the four corners below the garbage bin body (1); The feeding system comprises a material transport hopper (2) and a track (3); the track (3) is arranged obliquely on one side of the garbage bin body (1); the lower end of the track (3) is fixed to the ground by bolts, and the upper end is fixedly connected to the top of the side of the garbage bin body (1); the track (3) is provided with a material transport hopper (2) that can slide up and down along the track (3), and the bottom of the track (3) is provided with a cavity for accommodating the material transport hopper; The dust removal system comprises a feed inlet spray pipe (14) and a discharge outlet spray pipe (15); the feed inlet spray pipe (14) is installed on one side of the feed inlet of the garbage bin body (1), and the discharge outlet spray pipe (15) is installed around the periphery of the discharge inlet at the bottom of the garbage bin body (1); the feed inlet spray pipe (14) and the discharge outlet spray pipe (15) are respectively connected to the tap water pipeline through the second electric valve (12) and the first electric valve (11) on the pipeline; The control system comprises a power distribution control cabinet, a signal sensing device, and an execution device; the power distribution control cabinet is connected to the signal sensing device and the execution device respectively; the signal sensing device comprises a limit mechanism arranged on the track (3), and an infrared sensing probe (18) arranged on the column (8); the execution device comprises a loading motor (6), a discharging motor (10), a first electric valve (11), and a second electric valve (12); A lower baffle plate (21) is provided below the hopper (2), and vertical side plates are provided on both sides of the lower baffle plate (21). The opening ends of the vertical side plates are arc-shaped, and the fixed ends of the vertical side plates extend beyond the lower opening of the hopper (2) and bend upward. The fixed ends of the vertical side plates are connected to spring fixings fixed on both sides of the hopper (2). A baffle plate (22) is provided on the track (3) at the feed opening corresponding to the garbage bin body (1). When the hopper (2) rises to the feed opening position, the baffle plate (22) blocks the vertical side plates on both sides of the lower baffle plate (21) of the hopper, and the lower baffle plate (21) of the hopper is opened, so that construction waste is dumped into the garbage bin body (1). The infrared sensing probes (18) are in two pairs, and are respectively arranged between a pair of columns (8) extending in the horizontal direction. The transport hopper (2) on the track (3) transports the construction waste into the garbage bin body (1) through the feed port of the garbage bin body (1), and then transfers the construction waste to the slag transport vehicle through the discharge port at the bottom of the garbage bin body (1). The feed port spray pipe (14) and the discharge port spray pipe (15) are respectively controlled by the control system to spray water at the feed port when the construction waste is dumped into the garbage bin body (1) and the discharge port when the construction waste is discharged from the garbage bin body (1) to prevent a large amount of dust from being raised during the transportation of the construction waste. The control system controls the garbage dumping time and the opening time of the discharge port door panel (26) of the garbage bin body (1) through the signal sensing device and the execution device, thereby realizing full automatic operation.
2. The automated garbage transfer station for construction sites according to claim 1, characterized in that: The upper part of the trash bin body (1) is in the shape of a rectangular parallelepiped, and the lower part is in the shape of a reduced diameter, and below the reduced diameter is a discharge port, and the upper and lower parts of the trash bin body (1) are welded together.
3. The automated garbage transfer station for construction sites according to claim 1, characterized in that: There are two rails (3), and a reinforcing cross brace (4) is provided between the two rails (3).
4. The automated garbage transfer station for construction sites according to claim 1, characterized in that: A transmission pulley (20) is provided on the side of the material transport hopper (2) close to the garbage bin body (1), and a winding wheel is fixed on the shaft of the feeding motor (6). The steel wire is wound around the winding wheel and connected to the fixed hook (19) through the fixed pulley (7) and the transmission pulley (20).
5. The automated garbage transfer station for construction sites according to claim 1, characterized in that: The upper end and the lower end of the inner side of the track (3) are respectively provided with a material transport hopper limiting mechanism, and the material transport hopper limiting mechanism is connected to the feeding motor (6) through a power distribution control cabinet (17).
6. The automated garbage transfer station for construction sites according to claim 1, characterized in that: An upwardly extending dust baffle (5) is provided on the periphery above the feed opening of the garbage bin body (1).
7. The automated garbage transfer station for construction sites according to claim 1, characterized in that: The upper ends of the uprights (8) are welded to the four corners of the bottom of the garbage bin body (1); support rods (9) are arranged around the periphery of the discharge port at the bottom of the garbage bin body (1); the upper ends of the support rods (9) are fixedly connected to the bottom of the garbage bin body (1); and the discharge port spray pipe (15) is fixed to the support rods (9).