A high-rise building concrete pouring guide mechanism
By designing a concrete pouring guide mechanism for high-rise buildings including rectangular seats, installation parts and adjustment parts, the problems of workers being injured and inconvenient to install and disassemble when adjusting the pouring angle in the prior art are solved, and safe and efficient pouring angle adjustment is achieved and easy equipment operation.
Patent Information
- Application Number
- CN202011093043.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-13
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2040-10-13
AI Technical Summary
When adjusting the pouring angle of the existing concrete pouring guide mechanism of high-rise buildings, workers need to be hugged and injured, causing workers to be inconvenient to install and disassemble.
A concrete pouring guide mechanism for high-rise buildings including rectangular seats, installation parts and adjustment parts is designed. The guide plate is realized through the structures such as T-trough, T-sleeve, fixed block, installation rod, moving rod, rotating rod and compression spring. The installation and disassembly process is simplified through structures such as rubber sleeves, arc clamping rods and strip handles.
The casting angle can be adjusted without the need for workers to hug each other, which improves workers' safety and simplifies the installation and disassembly of equipment.
Smart Images

Figure CN112065056B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a high-rise building concrete pouring guide mechanism. Background Art
[0002] In China, the old regulations stipulate that buildings with less than 8 floors are called multi-story buildings. Buildings with nearly 20 floors are called medium-high-rise buildings, buildings with about 30 floors and close to 100 meters are called high-rise buildings, and buildings with about 50 floors and more than 200 meters are called super-high-rise buildings. Reinforced concrete structures with 10 floors or more or a height of more than 28 meters are called high-rise building structures. When the building height exceeds 100 meters, it is called a super-high-rise building.
[0003] Nowadays, high-rise buildings are basically constructed by pouring concrete. Concrete pouring refers to the process of pouring concrete into a mold until it is plasticized. When pouring concrete, many aspects must be prepared in advance, because the concrete will be finalized after pouring. Among them, the concrete pouring guide mechanism is also very important. The discharge end of the existing concrete pouring guide mechanism requires workers to adjust the angle by hugging. This will cause harm to the workers due to the strong impact of the discharge port, and the installation and disassembly of the adjustment device should be simple and convenient. For this reason, we provide a high-rise building concrete pouring guide mechanism. Summary of the invention
[0004] The purpose of the present invention is to provide a high-rise building concrete pouring guide mechanism to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-rise building concrete pouring guide mechanism, comprising a rectangular seat, a mounting portion and an adjusting portion installed on the rectangular seat, the adjusting portion comprising a T-slot opened on the bottom side of the rectangular seat, a T-slot rotatably installed in the T-slot, the bottom side of the T-slot extends outside the T-slot and is fixedly installed with a fixing block, mounting rods are fixedly installed on both sides of the fixing block, the same guide plate is rotatably installed on the side where the two mounting rods are close to each other, moving holes are opened on both sides of the two mounting rods, the same moving rod is slidably installed in the two moving holes, two rotating rods are movably sleeved on the moving rod, and the sides where the two rotating rods are close to each other are rotatably installed on the guide plate.
[0006] Preferably, a circular plate is fixedly sleeved on the moving rod, a compression spring movably sleeved on the moving rod is fixedly mounted on one side of the circular plate, and a baffle movably sleeved on the moving rod is fixedly mounted on the other end of the compression spring.
[0007] Preferably, a limiting rod is fixedly mounted on one side of the baffle, a plurality of limiting grooves are formed on one side of one of the mounting rods, and one end of the limiting rod extends into one of the limiting grooves.
[0008] Preferably, a semicircular groove is provided on one side of the guide plate, and an L-shaped handle is fixedly mounted on one side of the baffle.
[0009] Preferably, the mounting portion includes a connecting tube fixedly mounted on the top side of the rectangular seat, a rubber sleeve fixedly mounted on the connecting tube, a sliding hole is provided on the bottom side of the fixed block, one end of the connecting tube passes through the rectangular seat, the T-shaped sleeve and the sliding hole, two support columns are fixedly mounted on the top side of the rectangular seat, and the same annular frame is fixedly mounted on the top sides of the two support columns.
[0010] Preferably, two arc-shaped clamping rods are rotatably mounted on the top side of the annular frame, one end of the two arc-shaped clamping rods are rotatably mounted relative to each other, and a strip handle is fixedly mounted on the top side of one arc-shaped clamping rod and the bottom side of the other arc-shaped clamping rod.
[0011] Preferably, a positioning rod is fixedly mounted on the top side of one of the strip handles, and a rotating block is rotatably mounted on the top side of the other strip handle, and a positioning hole matched with the positioning rod is formed on one side of the rotating block.
[0012] Technical effects and advantages of the present invention:
[0013] The invention has a reasonable structure. When the pouring angle needs to be adjusted, the L-shaped handle is pulled to drive the baffle to move, and then the limit rod is driven to move out of the limit groove. At this time, the moving rod can be moved to drive the rotating rod to rotate, and then the guide plate is driven to rotate. When the guide plate moves to a suitable angle, the L-shaped handle is released, and the limit rod is moved into the limit groove under the elastic force of the compression spring. At this time, the moving rod is fixed, and then the angle of the guide plate is fixed, so that the worker is prevented from adjusting the angle by hugging and causing harm to the worker.
[0014] The present invention has a reasonable structure. When installation is required, the rubber sleeve is connected to the concrete discharge pipe, and the two strip handles are pinched at the same time, so that the two arc-shaped clamping rods are rotated close to each other and clamp the rubber sleeve and the concrete discharge pipe. At this time, the rotating clamping block is rotated so that the positioning hole on the rotating clamping block clamps the positioning rod, thereby fixing the rubber sleeve and the concrete discharge pipe. When disassembly is required, the reverse operation can be performed, so that installation and disassembly should be simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;
[0016] Figure 2 It is a front view structural schematic diagram of the present invention;
[0017] Figure 3 For the present invention Figure 1 The enlarged structural diagram at A in the middle;
[0018] Figure 4 It is an enlarged structural schematic diagram of the installation part in the present invention;
[0019] Figure 5 It is a schematic diagram of the enlarged structure of the rectangular seat, the fixing block and the T-shaped sleeve in the present invention.
[0020] In the figure: 1. rectangular seat; 2. fixing block; 3. guide plate; 4. mounting rod; 5. limiting groove; 6. rotating rod; 7. rubber sleeve; 8. support column; 9. connecting pipe; 10. ring frame; 11. arc clamping rod; 12. bar handle; 121. rotating block; 13. limiting rod; 14. baffle; 15. compression spring; 16. L-shaped handle; 17. moving rod; 18. T-shaped sleeve. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] The present invention provides Figure 1-5 A high-rise building concrete pouring guide mechanism shown in the figure includes a rectangular seat 1, on which a mounting portion and an adjusting portion are installed, the adjusting portion includes a T-slot opened on the bottom side of the rectangular seat 1, a T-slot is rotatably installed in the T-slot, the bottom side of the T-slot 18 extends to the outside of the T-slot and is fixedly installed with a fixing block 2, both sides of the fixing block 2 are fixedly installed with mounting rods 4, the side of the two mounting rods 4 close to each other is rotatably installed with the same guide plate 3, both sides of the two mounting rods 4 are opened with moving holes, the two moving holes are slidably installed with the same moving rod 17, the moving rod 17 is movably sleeved with two rotating rods 6, the sides of the two rotating rods 6 close to each other are rotatably installed on the guide plate 3, and the guide plate 3 can be rotatably adjusted by the arrangement of the T-slot and the T-slot 18.
[0023] Furthermore, in the above scheme, a circular plate is fixedly mounted on the moving rod 17, a compression spring 15 movably mounted on the moving rod 17 is fixedly installed on one side of the circular plate, and a baffle 14 movably mounted on the moving rod 17 is fixedly installed on the other end of the compression spring 15. By setting the compression spring 15, the baffle 14 returns to its original position.
[0024] Furthermore, in the above scheme, a limiting rod 13 is fixedly installed on one side of the baffle 14, and a plurality of limiting grooves 5 are opened on one side of one of the mounting rods 4, and one end of the limiting rod 13 extends into one of the limiting grooves 5. By setting the limiting rod 13 and the limiting groove 5, the guide plate 3 is fixed.
[0025] Furthermore, in the above solution, a semicircular groove is provided on one side of the guide plate 3 , and an L-shaped handle 16 is fixedly installed on one side of the baffle 14 . The setting of the L-shaped handle 16 allows the limiting rod 13 to move out of the limiting groove 5 .
[0026] Furthermore, in the above scheme, the mounting portion includes a connecting tube 9 fixedly mounted on the top side of the rectangular seat 1, a rubber sleeve 7 is fixedly sleeved on the connecting tube 9, a sliding hole is opened on the bottom side of the fixed block 2, one end of the connecting tube 9 passes through the rectangular seat 1, the T-shaped sleeve 18 and the sliding hole, two support columns 8 are fixedly mounted on the top side of the rectangular seat 1, and the top sides of the two support columns 8 are fixedly mounted with the same annular frame 10, which is connected to the discharge pipe through the rubber sleeve 7.
[0027] Furthermore, in the above scheme, two arc-shaped clamping rods 11 are rotatably installed on the top side of the annular frame 10, and one end of the two arc-shaped clamping rods 11 are rotatably installed with each other, and a strip handle 12 is fixedly installed on the top side of one arc-shaped clamping rod 11 and the bottom side of the other arc-shaped clamping rod 11. Through the setting of the arc-shaped clamping rod 11, the connecting pipe 9 is fixed to the discharge pipe.
[0028] Furthermore, in the above scheme, a positioning rod is fixedly installed on the top side of one of the strip handles 12, and a rotating block 121 is rotatably installed on the top side of the other strip handle 12. A positioning hole matching the positioning rod is opened on one side of the rotating block 121. By setting the rotating block 121 and the positioning rod, the two strip handles 12 are fixed next year.
[0029] The working principle of the present invention is as follows: concrete flows into the guide groove on the guide plate 3 through the connecting pipe 9 and then is poured. When the pouring angle needs to be adjusted, the L-shaped handle 16 is pulled to drive the baffle 14 to move, thereby driving the limit rod 13 to move out of the limit groove 5. At this time, the moving rod 17 can be moved to drive the rotating rod 6 to rotate, thereby driving the guide plate 3 to rotate at an angle. When the guide plate 3 moves to a suitable angle, the L-shaped handle 16 is released, and the limit rod 13 moves into the limit groove 5 under the elastic force of the compression spring 15. At this time, the moving rod 17 is fixed, thereby fixing the angle of the guide plate 3.
[0030] When installation is required, the rubber sleeve 7 is sleeved on the concrete discharge pipe, and the two strip handles 12 are squeezed at the same time, so that the two arc-shaped clamping rods 11 rotate close to each other and clamp the rubber sleeve 7 and the concrete discharge pipe. At this time, the rotating clamp block 121 is rotated so that the positioning hole on the rotating clamp block 121 clamps the positioning rod, thereby fixing the rubber sleeve 7 and the concrete discharge pipe. When disassembly is required, the reverse operation can be performed.
[0031] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-rise building concrete pouring guide mechanism, comprising a rectangular seat (1), characterized in that: The rectangular seat (1) is provided with a mounting portion and an adjusting portion, the adjusting portion comprising a T-shaped slot provided on the bottom side of the rectangular seat (1), a T-shaped sleeve (18) being rotatably mounted in the T-shaped slot, the bottom side of the T-shaped sleeve (18) extending outside the T-shaped slot and being fixedly mounted with a fixing block (2), mounting rods (4) being fixedly mounted on both sides of the fixing block (2), a same guide plate (3) being rotatably mounted on the sides of the two mounting rods (4) close to each other, movable holes being provided on both sides of the two mounting rods (4), a same movable rod (17) being slidably mounted in the two movable holes, two rotating rods (6) being movably sleeved on the rotating rod (17), and the sides of the two rotating rods (6) close to each other are both rotatably mounted on the guide plate (3); A circular plate is fixedly sleeved on the moving rod (17), a compression spring (15) movably sleeved on the moving rod (17) is fixedly mounted on one side of the circular plate, and a baffle (14) movably sleeved on the moving rod (17) is fixedly mounted on the other end of the compression spring (15); A semicircular groove is provided on one side of the guide plate (3), and an L-shaped handle (16) is fixedly mounted on one side of the baffle plate (14).
2. A high-rise building concrete pouring guide mechanism according to claim 1, characterized in that: A limiting rod (13) is fixedly mounted on one side of the baffle (14), a plurality of limiting grooves (5) are formed on one side of one of the mounting rods (4), and one end of the limiting rod (13) extends into one of the limiting grooves (5).
3. A high-rise building concrete pouring guide mechanism according to claim 1, characterized in that: The mounting portion comprises a connecting tube (9) fixedly mounted on the top side of the rectangular seat (1), a rubber sleeve (7) being fixedly sleeved on the connecting tube (9), a sliding hole being provided on the bottom side of the fixing block (2), one end of the connecting tube (9) passing through the rectangular seat (1), the T-shaped sleeve (18) and the sliding hole, two supporting columns (8) being fixedly mounted on the top side of the rectangular seat (1), and the same annular frame (10) being fixedly mounted on the top sides of the two supporting columns (8).
4. A high-rise building concrete pouring guide mechanism according to claim 3, characterized in that: Two arc-shaped clamping rods (11) are rotatably mounted on the top side of the annular frame (10), one end of the two arc-shaped clamping rods (11) are rotatably mounted relative to each other, and a strip handle (12) is fixedly mounted on the top side of one arc-shaped clamping rod (11) and the bottom side of the other arc-shaped clamping rod (11).
5. A high-rise building concrete pouring guide mechanism according to claim 4, characterized in that: A positioning rod is fixedly mounted on the top side of one of the strip handles (12), and a rotating clamping block (121) is rotatably mounted on the top side of the other strip handle (12), wherein a positioning hole matching the positioning rod is formed on one side of the rotating clamping block (121).
Citation Information
Patent Citations
High-rise building concrete pouring guide mechanism
CN212507446U