High temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device
By designing a three-axis multi-sample sample loading stress corrosion crack initiation test device for high-temperature and high-pressure water, multiple samples in high-temperature and high-pressure water are simultaneously tested and load balanced, solving the problems of low testing efficiency and difficulty in collecting electrochemical signals, and improving the testing efficiency and Reliability of signal detection.
Patent Information
- Application Number
- CN201910507272.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2039-06-12
AI Technical Summary
The prior art is difficult to implement stress corrosion crack initiation tests for multiple samples in high-temperature and high-pressure water at the same time, and the test efficiency of the samples under different stress levels is low, and effective electrochemical signal acquisition and insulation measures are lacking.
A high-temperature and high-pressure water three-axis multi-sample loading stress corrosion crack initiation test device is designed, and a three-axis loading structure is adopted to drive the hydraulic lifting column through a hydraulic pump motor to achieve lifting and lowering of the autoclave body. It is equipped with a thermocouple and a ceramic heating device to ensure uniform temperature. , use stepper motors and load sensors to achieve load balance, and electrochemical signal detection is performed through zirconium alloy insulating gaskets.
18 samples in high-temperature and high-pressure water were simultaneously tested for stress corrosion crack initiation, which improved the test efficiency, ensured the electrochemical signal detection of the samples during crack initiation, and solved the load balance and insulation problems.
Smart Images

Figure HDA0002092240530000011 
Figure HDA0002092240530000021 
Figure HDA0002092240530000031
Abstract
Description
Technical Field
[0001] The invention relates to the field of stress corrosion crack initiation testing, in particular to a high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation testing device. Background Art
[0002] Stress corrosion cracking has become one of the main failure forms of materials for key components of pressurized water reactor nuclear power plants. Stress corrosion failure can generally be divided into two stages: crack initiation process and crack propagation process. Among them, the crack initiation life accounts for about 90% of the total time of failure and fracture of components caused by stress corrosion, and once the crack initiates, it enters a stable and rapid expansion stage. Therefore, obtaining the effective stress corrosion crack initiation time of materials in high temperature and high pressure water (200-360℃, 4-20MPa) is crucial for evaluating their service life and carrying out aging management of nuclear power plants. In high temperature and high pressure water environment, the initiation rate of stress corrosion cracks of materials is extremely slow, and affected by multiple factors such as microstructure and surface state, the randomness of crack initiation is very large, and long-term crack initiation experiments are required.
[0003] At present, conventional commercial stress corrosion test devices are generally uniaxial loading, with one specimen installed on each loading shaft. However, in stress corrosion testing in high temperature and high pressure water, the crack incubation time is long and the initiation is very slow. The experimental test efficiency of this uniaxial single sample is very low, and one device can only complete the test of a few specimens per year. In order to improve the test efficiency, it is necessary to test multiple samples simultaneously in a single test, which requires increasing the number of loading shafts or installing multiple samples on the same loading shaft. In addition, when loading the specimen inside the autoclave through the stepper motor outside the autoclave, a series of issues such as the pressure difference inside and outside the autoclave, sealing, and insulation between the specimen and the fixture need to be considered. It is precisely because of the technical difficulties on these experimental equipment that the experimental test of stress corrosion crack initiation of materials in high temperature and high pressure water is limited. At present, there has been no report on related equipment in China. Due to the lack of equipment for stress corrosion crack initiation testing in high temperature and high pressure water, there has been no experimental research on the stress corrosion crack initiation time test of materials in high temperature and high pressure water in China, especially for the large number of domestic materials required for the rapid development of nuclear power in China, and relevant experimental data are extremely lacking. Summary of the invention
[0004] The purpose of the present invention is to provide a high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device to solve the problems of difficulty in simultaneously performing stress corrosion crack initiation tests on multiple samples in high-temperature and high-pressure water, simultaneous testing of crack initiation of samples of the same material at different stress levels, simultaneous testing of crack initiation of samples of different materials at the same stress level, and sample insulation required for collecting electrochemical signals and potential signals of the samples during crack initiation.
[0005] The technical solution of the present invention is as follows:
[0006] A high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device, wherein the device stand pillars are symmetrically installed on the device base, the top of the device stand pillars is provided with an autoclave base, the middle of the autoclave base is provided with an autoclave, and columns and hydraulic lifting columns are symmetrically installed on both sides of the autoclave on the autoclave base, and the hydraulic lifting columns are located on the outside of the columns; the autoclave body is inverted on the autoclave cover to form the autoclave, the autoclave body and the autoclave cover adopt a vertical connection structure, and the corresponding parts of the autoclave body and the autoclave cover are connected by the autoclave cover fastening bolts; a horizontally arranged lifting plate is installed above the autoclave body, the top of the autoclave body is connected to the middle of the lifting plate by the autoclave lifting bolts, and the columns and the hydraulic lifting columns pass through the lifting plate respectively;
[0007] The autoclave cover is equipped with thermocouple I, thermocouple II, thermocouple III, loading shaft I, working electrode / auxiliary electrode holder, reference electrode holder and external water-cooled reference electrode; the autoclave is provided with working electrode and auxiliary electrode, and the working electrode and auxiliary electrode are respectively led out through wires passing through the working electrode / auxiliary electrode holder; the autoclave cover is provided with a reference electrode liquid guide tube in the autoclave, the lower end of the reference electrode liquid guide tube corresponds to the reference electrode holder, the reference electrode is installed on the reference electrode holder, and one end of the reference electrode is connected through the reference electrode liquid guide tube extending into the autoclave body; the autoclave cover is provided with a thermocouple installation sleeve, one end of the thermocouple installation sleeve extends into the autoclave, and the thermocouple I, thermocouple II and thermocouple III extend into the autoclave from the other end of the thermocouple installation sleeve;
[0008] Two or more parallel loading shafts I of the same structure are installed on the autoclave cover, and the upper part of each loading shaft I is connected to a transmission rod I, which passes through the autoclave cover and enters the autoclave, and the transmission rod I is connected to the sample fixing plate bracket in sequence through a sample fixture, a connecting transition rod, a sample, a sample fixing plate, and the sample fixing plate inside the autoclave; the upper end of the transmission rod I is connected to the sample fixture through a pin, and the corresponding positions of two adjacent samples on each transmission rod I are connected through a connecting transition rod, and more than two connecting transition rods are installed on each transmission rod I; the lower part of the lowest sample is connected to the loading shaft I through the sample fixture and the transmission rod I, and the upper part of the highest sample is connected to the middle part of the horizontally arranged sample fixing plate through the transmission rod III and the connecting nut III in sequence, and the two ends of the sample fixing plate are connected to the sample fixing plate bracket inside the autoclave through symmetrically arranged fastening nuts, and the lower end of the sample fixing plate bracket is fixed on the autoclave cover.
[0009] The high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device is characterized in that each hydraulic lifting column is equipped with a fixing bolt above the lifting plate, each column is equipped with an upper limit sleeve above the lifting plate, each column is equipped with a slider and a lower limit sleeve below the lifting plate, the slider corresponds to the bottom of the lifting plate, the lifting plate is respectively connected to the column and the hydraulic lifting column through the slider and the fixing bolt, and the upper limit sleeve and the lower limit sleeve installed on the column fix the autoclave body in the desired position when locked.
[0010] The high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device, the hydraulic lifting column is connected to the hydraulic pump through a hydraulic pipeline, a booster valve, and an air release valve, a hydraulic pump motor is installed on the hydraulic pump, and the hydraulic pump motor switch is connected to the hydraulic pump motor through a line. The hydraulic pump is driven by the hydraulic pump motor to provide hydraulic power for the hydraulic lifting column, driving the lifting plate on the high-pressure autoclave body to move up and down, thereby realizing the lifting movement of the high-pressure autoclave body.
[0011] In the high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device, the interior of the autoclave base is connected to the autoclave inner cavity through a liquid inlet pipe and a liquid discharge pipe, wherein: one end of the liquid inlet pipe extends out of the outside of the autoclave base, a liquid inlet valve and a safety valve are installed on the end, and the other end of the liquid inlet pipe extends to the autoclave inner cavity; one end of the liquid discharge pipe extends out of the outside of the autoclave base, a liquid discharge valve is installed on the end, and the other end of the liquid discharge pipe extends to the autoclave inner cavity.
[0012] The high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device has thermocouples I, II and III installed at three different height positions of the upper, middle and lower parts of the autoclave body, respectively, and an annular heating device including an upper ceramic heating jacket, a middle ceramic heating jacket and a lower ceramic heating jacket is installed on the outside of the autoclave body; at the connection between the autoclave body and the autoclave cover, an annular auxiliary ceramic heating jacket is installed on the outside of the autoclave body, and an annular autoclave cover ceramic heating jacket is installed on the outside of the autoclave cover.
[0013] The high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device is characterized in that a pressure balance mechanism is installed on each loading shaft I, the pressure balance mechanism is connected to the loading shaft I through a pressure balance mechanism locking flange, and a cooling water jacket is installed on the upper side of the pressure balance mechanism; a load sensor I is installed at the lower part of each loading shaft I, and each load sensor I is connected to the flange through its own connecting stud and connecting nut I, so as to achieve load balance between the parallel loading shafts I; the bottom of the flange is connected to the loading shaft II through a connecting nut II, the loading shaft II is installed with a load sensor II and a displacement sensor through a load sensor II connector, the bottom of the loading shaft II is connected to the load sensor II through a load sensor II connector, and the bottom of the load sensor II is connected to a stepper motor through a transmission rod II, so as to achieve that the stepper motor applies load to the parallel loading shafts I at the same time; a displacement sensor is installed on the top of the load sensor II connector, and the displacement sensor is installed on a displacement sensor fixing frame through a displacement sensor fixing plate.
[0014] In the high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device, the sample and the sample fixture are fixed inside the autoclave through the sample fixing plate bracket, and the stepping motor drives the movement of the transmission rod II, the loading shaft II, the flange, the loading shaft I, the transmission rod I, the sample fixture and the connecting transition rod of the sample to realize the application of load to the sample during the stress corrosion crack initiation test.
[0015] In the high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device, the stepper motor provides a load of 0 to 10 kN for each loading axis I through the transmission rod II, the loading axis II and the flange, and performs real-time measurement and control through the data acquisition, processing and control system.
[0016] In the high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device, the sample is processed from stainless steel, nickel-based alloy or welding material used in high-temperature and high-pressure water. The zirconium alloy insulating gasket is installed between the sample and the sample fixture, the sample and the connecting transition rod, the sample and the transmission rod III, and the sample and the sample fixing plate to achieve insulation of the sample, and then the corresponding electrochemical test and sample potential signal monitoring during the crack initiation process of the sample are carried out.
[0017] The high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device also includes a control part of the temperature and pressure protection system, and a display and regulator for temperature, pressure, loading mode and experimental parameter settings are arranged in the control cabinet; the control program display switch is connected to the control program display; the ceramic heater output power adjustment switch is connected to the temperature display and the ceramic heater output voltage display; the data output USB interface power switch is connected to the data output USB interface; each controller is connected to the relay in the control cabinet, and the relay is connected to the electric furnace wire in the upper ceramic heating sleeve, the middle ceramic heating sleeve and the lower ceramic heating sleeve through a wire; the ceramic heater switch is arranged on the wire to form a power-off protection structure under over-temperature or low-temperature conditions.
[0018] The advantages and beneficial effects of the present invention are:
[0019] 1. The device of the present invention can realize simultaneous loading of three parallel axes in high-temperature and high-pressure water and simultaneous stress corrosion crack initiation testing of 18 specimens, which significantly improves the testing efficiency.
[0020] 2. The present invention can achieve simultaneous testing of crack initiation of samples of the same material at different stress levels and simultaneous testing of crack initiation of samples of different materials at the same stress level by changing the diameter and material of the sample.
[0021] 3. The present invention evenly distributes the load on one loading shaft to three parallel loading shafts I by means of flange connection, so that one stepper motor can load the three loading shafts simultaneously.
[0022] 4. The present invention sets load sensors on three parallel loading axes I, and through cooperation with the connecting flange, can display and adjust the load applied to each loading axis in real time to ensure that the load balance is maintained between the three parallel loading axes I.
[0023] 5. The present invention ensures uniform temperature at different heights inside the autoclave by arranging three thermocouples at different heights inside the autoclave and cooperating with the annular heating device of the upper ceramic heating jacket, the middle ceramic heating jacket and the lower ceramic heating jacket outside the autoclave.
[0024] 6. The present invention adopts a hydraulic pump motor to drive a hydraulic pump to provide hydraulic power for the hydraulic lifting column, thereby facilitating the lifting of the autoclave body.
[0025] 7. The present invention uses five identical specimen connection transition rods to connect six specimens on the same loading axis, which is convenient for installation, fixation and position adjustment of different specimens.
[0026] 8. The present invention achieves insulation of the sample by arranging zirconium alloy insulating gaskets between the sample and the sample fixture, the sample and the connecting transition rod, the sample and the transmission rod, and the sample and the sample fixing plate, so as to detect the corresponding electrochemical test and sample potential signal of the sample during the crack initiation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a structural schematic diagram of the high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device. In the figure, 1 is the upper limit clamp; 2 is the column; 3 is the slider; 4 is the lower limit clamp; 5 is the hydraulic pipeline; 6 is the hydraulic lifting column; 7 is the lower ceramic heating sleeve; 8 is the auxiliary ceramic heating sleeve; 9 is the kettle cover ceramic heating sleeve; 10 is the pressure gauge; 11 is the pressure sensor; 12 is the drain valve; 13 is the hydraulic pump pressure gauge; 14 is the boost valve; 15 is the air release valve; 16 is the reference electrode seat; 17 is the hydraulic pump motor switch; 18 is the reference electrode; 19 is the emergency stop switch; 20 is the hydraulic pump motor; 21 is the hydraulic pump; 22 is the displacement sensor; 23 is the stepper motor; 24 is the load sensor II; 25 is the device base; 26 is the connection Connecting nut I; 27 flange; 28 connecting stud; 29 load sensor I; 30 working electrode / auxiliary electrode holder; 31 device stand support; 32 thermocouple I; 33 thermocouple II; 34 thermocouple III; 35 cooling water jacket; 36 thermocouple mounting sleeve; 37 liquid inlet valve; 38 autoclave cover; 39 safety valve; 40 autoclave cover fastening bolts; 41 middle ceramic heating jacket; 42 upper ceramic heating jacket; 43 autoclave body; 44 fixing bolts; 45 lifting plate; 46 autoclave lifting bolts; 48 autoclave base; 86 liquid inlet pipe; 87 liquid discharge pipe.
[0028] Figure 2 It is a schematic diagram of the loading shaft and stepper motor structure. In the figure, 22 displacement sensor; 23 stepper motor; 24 load sensor II; 26 connecting nut I; 27 flange; 28 connecting stud; 29 load sensor I; 35 cooling water jacket; 47 tightening nut; 49 pressure balance mechanism; 50 pressure balance mechanism locking flange; 51 loading shaft I; 52 displacement sensor fixing plate; 53 displacement sensor fixing frame; 54 transmission rod II; 55 load sensor II connecting piece; 56 loading shaft II; 57 connecting nut II; 58 load sensor I connecting piece.
[0029] Figure 3 The schematic diagram of the connection between the sample and the fixed support in the autoclave is shown in FIG. 36, the thermocouple installation sleeve; 38, the autoclave cover; 59, the fastening nut; 60, the connecting nut III; 61, the sample fixing plate; 62, the transmission rod III; 63, the connecting transition rod; 64, the sample; 65, the pin; 66, the sample fixture; 67, the transmission rod I; 68, the reference electrode liquid guide tube; 69, the sample fixing plate support.
[0030] Figure 4The structure diagram of the signal acquisition and processing control system is shown in the figure. In the figure, 70 is an emergency switch; 71 is a control program display; 72 is a control program display switch; 73 is a ceramic heater switch; 74 is a ceramic heater output power adjustment switch; 75 is a data output USB interface; 76 is a data output USB interface power switch; 77 is a leakage circuit breaker; 78 is a control cabinet power switch; 79 is a control cabinet vent; 80 is a control cabinet mounting foot; 81 is a fan switch; 82 is a temperature display; 83 is a ceramic heater output voltage display; 84 is a pressure display; and 85 is a control cabinet. DETAILED DESCRIPTION
[0031] In the specific implementation process, the high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device of the present invention is composed of an autoclave cover, an autoclave body, an annular heating device, a thermocouple, a column, a hydraulic pump, a stepping motor, a loading axis I, a loading axis II, a flange, a displacement sensor, a load sensor, a pressure gauge, a pressure sensor, a reference electrode holder, an auxiliary electrode holder, a working electrode holder, a sample fixing plate bracket and a control cabinet, etc., which can realize the stress corrosion crack initiation test of multiple samples in high temperature and high pressure water at the same time. When necessary, the electrochemical signal and potential signal on the surface of the sample during the stress corrosion crack initiation process can also be detected by the high temperature and high pressure working electrode, auxiliary electrode and reference electrode installed on the autoclave cover in conjunction with the electrochemical workstation and the DC potential drop device.
[0032] like Figure 1-Figure 4 As shown, the high-temperature and high-pressure water triaxial multi-sample loading stress corrosion crack initiation test device of the present invention mainly includes: an upper limit clamping sleeve 1, a column 2, a slider 3, a lower limit clamping sleeve 4, a hydraulic pipeline 5, a hydraulic lifting column 6, a lower ceramic heating sleeve 7, an auxiliary ceramic heating sleeve 8, a kettle cover ceramic heating sleeve 9, a pressure gauge 10, a pressure sensor 11, a drain valve 12, a hydraulic pump pressure gauge 13, a booster valve 14, a venting valve 15, a reference electrode seat 16, a hydraulic pump motor switch 17, a reference electrode 18, an emergency stop switch 19, a hydraulic pump motor 20, a hydraulic pump 21, a displacement sensor 22, a stepper motor 23, a load sensor II24, and a device base 25. , connecting nut I26, flange 27, connecting stud 28, load sensor I29, working electrode / auxiliary electrode holder 30, device stand support 31, thermocouple I32, thermocouple II33, thermocouple III34, cooling water jacket 35, thermocouple mounting sleeve 36, liquid inlet valve 37, autoclave cover 38, safety valve 39, autoclave cover fastening bolt 40, middle ceramic heating jacket 41, upper ceramic heating jacket 42, autoclave body 43, fixing bolt 44, lifting plate 45, autoclave lifting bolt 46, tightening nut 47, autoclave base 48; pressure balance mechanism 49, pressure balance mechanism locking flange 50, etc. The specific structure is as follows:
[0033] The device stand support 31 is symmetrically installed on the device base 25, and the top of the device stand support 31 is provided with an autoclave base 48, and the autoclave is provided in the middle of the autoclave base 48. The autoclave on the autoclave base 48 is symmetrically provided with columns 2 and hydraulic lifting columns 6 on both sides of the autoclave, and the hydraulic lifting columns 6 are located outside the columns 2. The inside of the autoclave base 48 is connected with the inner cavity of the autoclave through a liquid inlet pipe 86 and a liquid discharge pipe 87, wherein: one end of the liquid inlet pipe 86 extends out of the outer side of the autoclave base 48, and the liquid inlet valve 37 and the safety valve 39 are installed on the end, and the other end of the liquid inlet pipe 86 extends to the inner cavity of the autoclave; one end of the liquid discharge pipe 87 extends out of the outer side of the autoclave base 48, and the liquid discharge valve 12 is installed on the end, and the other end of the liquid discharge pipe 87 extends to the inner cavity of the autoclave; in addition, the pressure gauge 10 is connected to the pressure sensor 11 through a pipeline, and the pressure gauge 10 can display the solution pressure in the autoclave in real time, and the pressure sensor 11 can transmit the pressure in the autoclave to the control cabinet 85 through signal conversion.
[0034] The autoclave body 43 is buckled on the autoclave cover 38 to form an autoclave. The autoclave body 43 and the autoclave cover 38 adopt a vertical connection structure. The corresponding parts of the autoclave body 43 and the autoclave cover 38 are connected by the autoclave cover fastening bolts 40; a horizontally arranged lifting plate 45 is installed above the autoclave body 43, and the top of the autoclave body 43 is connected to the middle part of the lifting plate 45 through the autoclave lifting bolts 46, and the column 2 and the hydraulic lifting column 6 pass through the lifting plate 45 respectively. A fixing bolt 44 is installed on each hydraulic lifting column 6 above the lifting plate 45, and an upper limit clamping sleeve 1 is installed on each column 2 above the lifting plate 45, and a slider 3 and a lower limit clamping sleeve 4 are installed on each column 2 below the lifting plate 45. The slider 3 corresponds to the bottom of the lifting plate 45, and the lifting plate 45 is connected to the column 2 and the hydraulic lifting column 6 through the slider 3 and the fixing bolt 44. The upper limit clamping sleeve 1 and the lower limit clamping sleeve 4 installed on the column 2 can fix the autoclave body 43 at the desired position when locked. The hydraulic pump pressure gauge 13, boost valve 14, bleed valve 15, hydraulic pump motor switch 17, and emergency stop switch 19 are installed on the device stand support 31. The hydraulic lifting column 6 is connected to the hydraulic pump 21 through the hydraulic pipeline 5, boost valve 14, and bleed valve 15. The hydraulic pump motor 20 is installed on the hydraulic pump 21. The hydraulic pump motor switch 17 is connected to the hydraulic pump motor 20 through the line. The hydraulic pump motor 20 drives the hydraulic pump 21 to provide hydraulic power for the hydraulic lifting column 6, thereby driving the lifting plate 45 on the autoclave body 43 to move up and down, thereby realizing the lifting and lowering movement of the autoclave body 43. In addition, the hydraulic pump pressure gauge 13 and the emergency stop switch 19 are connected to the hydraulic pump 21 through the connecting pipeline. The hydraulic pump pressure gauge 13 can display the output pressure of the hydraulic pump in real time. When the output pressure of the hydraulic pump is abnormal, the emergency stop switch 19 can be used to urgently control the shutdown of the hydraulic pump, thereby controlling the abnormal lifting and lowering of the autoclave caused by the abnormal lifting and lowering of the autoclave.
[0035] The autoclave cover 38 is equipped with thermocouple I32, thermocouple II33, thermocouple III34, loading shaft I51, working electrode / auxiliary electrode holder 30, reference electrode holder 16 and external water-cooled reference electrode 18; the autoclave is provided with a working electrode (test sample) and an auxiliary electrode (platinum electrode), and the working electrode and the auxiliary electrode are respectively led out through the working electrode / auxiliary electrode holder 30 by wires; the autoclave cover 38 is provided with a reference electrode liquid guide tube 68 in the autoclave, The lower end of the reference electrode liquid conduit 68 corresponds to the reference electrode holder 16. The reference electrode 18 is installed on the reference electrode holder 16. One end of the reference electrode 18 is connected through the reference electrode liquid conduit 68 extending into the autoclave body 43. A thermocouple mounting sleeve 36 is passed through the autoclave cover 38. One end of the thermocouple mounting sleeve 36 extends into the autoclave. Thermocouple I32, thermocouple II33, and thermocouple III34 extend into the autoclave from the other end of the thermocouple mounting sleeve 36.
[0036] Thermocouple I32, thermocouple II33 and thermocouple III34 are installed at three different height positions in the upper, middle and lower parts of the autoclave body 43, respectively. The outer side of the autoclave body 43 is installed with an annular heating device including an upper ceramic heating jacket 42, a middle ceramic heating jacket 41 and a lower ceramic heating jacket 7. The temperature inside the autoclave body 43 is measured and controlled in real time through a temperature acquisition and control system, and the temperature at different height positions inside the autoclave body 43 is uniform. At the connection between the autoclave body 43 and the autoclave cover 38, an annular auxiliary ceramic heating jacket 8 is installed on the outer side of the autoclave body 43, and an annular autoclave cover ceramic heating jacket 9 is installed on the outer side of the autoclave cover 38.
[0037] Three parallel loading shafts I51 of the same structure are installed on the autoclave cover 38. The upper part of each loading shaft I51 is connected to a transmission rod I67. The loading shaft I51 and the transmission rod I67 are connected by tightening a nut 47. The transmission rod I67 passes through the autoclave cover 38 and enters the autoclave. Inside the autoclave, the transmission rod I67 is connected to the sample fixture 66, the connecting transition rod 63, the sample 64, the sample fixing plate 61 and the sample fixing plate bracket 69 in sequence. The upper end of the transmission rod I67 is connected to the sample fixture 66 through a pin 65. The corresponding positions of two adjacent samples 64 on each transmission rod I67 are connected by a connecting transition rod 63. Five connecting transition rods 63 are installed on each transmission rod I67, so that six samples 64 can be installed on each transmission rod I67, thereby realizing that 18 samples 64 can be subjected to stress corrosion crack initiation test at the same time. The lower part of the lowermost sample 64 is connected to the loading shaft I51 through the sample clamp 66 and the transmission rod I67, and the upper part of the uppermost sample 64 is connected to the middle part of the horizontally arranged sample fixing plate 61 through the transmission rod III62 and the connecting nut III60 in turn. The two ends of the sample fixing plate 61 are connected to the sample fixing plate bracket 69 inside the autoclave through symmetrically arranged fastening nuts 59, and the lower end of the sample fixing plate bracket 69 is fixed on the autoclave cover 38.
[0038] A pressure balancing mechanism 49 is installed on each loading shaft I51, and the pressure balancing mechanism 49 is connected to the loading shaft I51 through a pressure balancing mechanism locking flange 50. A cooling water jacket 35 is installed on the upper side of the pressure balancing mechanism 49. The cooling water jacket 35 circulates cooling water to prevent the temperature of the pressure balancing mechanism 49 and the load control strain gauge built into the load sensor I29 from being too high; a tightening nut 47 is installed on the top of the pressure balancing mechanism 49, and the loading shaft I51 and the transmission rod I67 are connected by tightening the nut 47. The pressure balancing mechanism 49 contains an O-ring and a tubular structure with a through hole in the shaft, which can maintain the pressure balance inside and outside the autoclave body 43, offset the force generated by the high temperature and high pressure in the solution in the autoclave, and then realize the precise control of the load of each loading shaft I51. A load sensor I29 is installed at the bottom of each loading shaft I51. The bottom of each load sensor I29 is connected to the flange 27 through its own load sensor I connector 58, connecting stud 28 and connecting nut I26, so as to achieve load balance between the three parallel loading shafts I51. The bottom of the flange 27 is connected to the loading shaft II56 through the connecting nut II57. The loading shaft II56 is installed with the load sensor II24 and the displacement sensor 22 through the load sensor II connector 55. The bottom of the loading shaft II56 is connected to the load sensor II24 through the load sensor II connector 55. The bottom of the load sensor II24 is connected to the stepper motor 23 through the transmission rod II54, so as to achieve one stepper motor 23 applying load to the three parallel loading shafts I51 at the same time. The displacement sensor 22 is installed on the top of the load sensor II connector 55, and the displacement sensor 22 is installed on the displacement sensor fixing frame 53 through the displacement sensor fixing plate 52.
[0039] The sample 64 and the sample fixture 66 are fixed inside the autoclave through the sample fixing plate bracket 69. The stepper motor 23 drives the movement of the transmission rod II54, the loading shaft II56, the flange 27, the loading shaft I51, the transmission rod I67, the sample fixture 66 and the connecting transition rod 63 of the sample 64 to realize the load on the sample 64 during the stress corrosion crack initiation test. In addition, by changing the diameter of the sample 64, the stress level of the sample 64 can be controlled, and the simultaneous stress corrosion crack initiation test of the sample 64 of the same material at different stress levels can be realized. By changing the material of the sample 64 and controlling the same diameter, the simultaneous stress corrosion crack initiation test of the sample 64 of different materials at the same stress level can be realized. The stepper motor 23 provides a load of 0 to 10 kN for each loading shaft I51 through the transmission rod II54, the loading shaft II56 and the flange 27, and performs real-time measurement and control through the data acquisition, processing and control system.
[0040] Sample 64 is mainly made of stainless steel, nickel-based alloys and welding materials used in high-temperature and high-pressure water. Zirconium alloy insulating gaskets are installed between sample 64 and sample fixture 66, sample 64 and connecting transition rod 63, sample 64 and transmission rod III62, and sample 64 and sample fixing plate 61 to achieve insulation of sample 64, and then carry out corresponding electrochemical tests and monitor the sample potential signal during the crack initiation process of sample 64.
[0041] The present invention is provided with a standard interface outside the autoclave, which can be connected with an external high-temperature and high-pressure water circulation corrosion test system with an automatic control function (see Chinese invention patent, publication number: CN102401780A, application date: September 8, 2010; Chinese utility model patent, authorization announcement number: CN201852774U, application date: September 8, 2010, authorization date: June 1, 2011) through a ferrule, so that the water chemical environment in the autoclave can be accurately controlled.
[0042] like Figure 4 As shown, the signal acquisition and processing control system of the present invention also includes the control part of the temperature and pressure protection system. The control cabinet 85 is provided with a display and regulator for setting the temperature, pressure, loading mode and experimental parameters. The control program display switch 72 is connected to the control program display 71; the ceramic heater output power adjustment switch 74 is connected to the temperature display 82 and the ceramic heater output voltage display 83; the data output USB interface power switch 76 is connected to the data output USB interface 75; each controller is connected to the relay in the control cabinet 85, and the relay is connected to the electric furnace wire in the upper ceramic heating sleeve 42, the middle ceramic heating sleeve 41 and the lower ceramic heating sleeve 7 through a wire. The ceramic heater switch 73 is provided on the wire to form a power-off protection structure under special circumstances such as over-temperature and low temperature. At the same time, the upper part of the control cabinet 85 is also provided with an emergency switch 70 and a pressure display 84, and the middle and lower part of the control cabinet 85 is provided with a leakage circuit breaker 77, a control cabinet power switch 78, and a fan switch 81, wherein: the emergency switch 70 is connected to the control cabinet power switch 78 through a wire, which is used to cope with the need to shut down all settings at the same time under special circumstances; the pressure display 84 is connected to the pressure sensor 11 and the relay in the control cabinet 85 through a wire, which is used to display and automatically control the pressure in the autoclave body 43; the leakage circuit breaker 77 is connected to the control cabinet power switch 78 through a wire, which is used for automatic power-off protection when there is a short circuit in the relevant circuit of the device; the control cabinet power switch 78 is connected to the external power supply through a wire, which is used to provide power for the entire device; the fan switch 81 is connected to the fan in the control cabinet through a wire, which is used to control the start and stop of the fan, and to supply air for cooling the relevant electronic components in the control cabinet. In addition, a control cabinet vent 79 is provided on the lower side of the control cabinet 85, and a control cabinet mounting foot 80 is provided at the bottom of the control cabinet 85.
[0043] The present invention greatly improves the safety of the device during operation through the automatic power-off protection structure under various conditions set in the control part. When an accident such as a high-pressure autoclave leak occurs, the power can be automatically cut off through the alarm system to cut off the heating device, which can provide good protection for sample materials and equipment.
[0044] like Figure 1-Figure 4 As shown, the method of using the high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device of the present invention is as follows:
[0045] 1. Press the hydraulic pump motor switch 17 and the boost valve 14, and drive the hydraulic pump 21 to drive the lifting plate 45 connected to the autoclave body to rise, and open the autoclave.
[0046] 2. Fix the specimen 64 and the specimen fixture 66 at the bottom to the transmission rod I61 through the pin 65, and connect the remaining five specimens 64 in series with the connecting transition rod 63. Fix the uppermost specimen 64 to the specimen fixing plate 61 through the transmission rod III62 and the connecting nut III60; fix the specimens 64 of the other two loading shafts I51 in the same way.
[0047] 3. Adjust the tightness of the connecting nut I26 of each loading shaft I51, and maintain load balance among the three loading shafts I51 by coordinating with the load value display of the load sensor I29 configured on each loading shaft I51.
[0048] 4. Open the hydraulic pump vent valve 15, slowly lower the autoclave body 43 until it is tightly combined with the autoclave cover 38, and tighten the autoclave cover fastening bolts 40 to combine the two into a tightly closed autoclave.
[0049] 5. Fill the autoclave with a solution with a volume of 1 / 2 to 2 / 3 of the autoclave volume, or fill it with a solution equivalent to the volume of the autoclave through a high-temperature and high-pressure water circulation corrosion test system.
[0050] 6. According to the experimental requirements, nitrogen is introduced into the autoclave through the drain valve 12 to remove oxygen, and then the gas is discharged through the inlet valve 37. After the degassing is completed, the inlet valve 37 and the drain valve 12 are closed in sequence.
[0051] 7. Set the target heating temperature and the corresponding over-temperature alarm limit temperature of the temperature display 82, and set the target pressure and the corresponding over-pressure alarm limit pressure of the pressure display 84.
[0052] 8. Set the sample loading method and the load and displacement experimental parameters during the test through the control program display 71.
[0053] 9. Turn on the cooling water switch to fill the cooling water jacket 35 with cooling water.
[0054] 10. Turn on the ceramic heater switch 73 to heat up the autoclave. When the temperature reaches the set value, set the corresponding temperature alarm limit and other safety automatic control parameters.
[0055] 11. After keeping warm for a certain period of time according to the experimental requirements, load according to the loading method set in the control program display 71.
[0056] 12. If it is necessary to collect the electrochemical signal and potential signal of the sample at the same time during the initiation of stress corrosion cracks, a nickel wire with a layer of polytetrafluoroethylene heat shrink tubing on the outer surface needs to be welded on the surface of sample 64 and led out through the working electrode / auxiliary electrode holder 30. At the same time, a platinum sheet is used as an auxiliary electrode and a platinum wire with a polytetrafluoroethylene heat shrink tubing on the outer surface is also led out through the working electrode / auxiliary electrode holder 30. The working electrode, auxiliary electrode and reference electrode are connected to the electrochemical workstation and the DC potential drop device through the corresponding leads to quickly collect and record the electrochemical information and potential information of the sample during the initiation of stress corrosion cracks.
[0057] The results of the embodiments show that the present invention can solve the problems of low efficiency of traditional single-axis single-sample test for stress corrosion crack initiation in high-temperature and high-pressure water, insulation of the sample, lead-out of the signal line, and maintaining load balance among the three loading axes.
Claims
1. A high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device, characterized in that: The device stand pillars are symmetrically installed on the device base, the top of the device stand pillars is provided with an autoclave base, the middle of the autoclave base is provided with an autoclave, and columns and hydraulic lifting columns are symmetrically installed on both sides of the autoclave on the autoclave base, and the hydraulic lifting columns are located on the outside of the columns; the autoclave body is inverted on the autoclave cover to form the autoclave, the autoclave body and the autoclave cover adopt a vertical connection structure, and the corresponding parts of the autoclave body and the autoclave cover are connected by the autoclave cover fastening bolts; a horizontally arranged lifting plate is installed above the autoclave body, the top of the autoclave body is connected to the middle of the lifting plate by the autoclave lifting bolts, and the columns and the hydraulic lifting columns pass through the lifting plate respectively; The autoclave cover is equipped with thermocouple I, thermocouple II, thermocouple III, loading shaft I, working electrode / auxiliary electrode holder, reference electrode holder and external water-cooled reference electrode; the autoclave is provided with working electrode and auxiliary electrode, and the working electrode and auxiliary electrode are respectively led out through wires passing through the working electrode / auxiliary electrode holder; the autoclave cover is provided with a reference electrode liquid guide tube in the autoclave, the lower end of the reference electrode liquid guide tube corresponds to the reference electrode holder, the reference electrode is installed on the reference electrode holder, and one end of the reference electrode is connected through the reference electrode liquid guide tube extending into the autoclave body; the autoclave cover is provided with a thermocouple installation sleeve, one end of the thermocouple installation sleeve extends into the autoclave, and the thermocouple I, thermocouple II and thermocouple III extend into the autoclave from the other end of the thermocouple installation sleeve; Two or more parallel loading shafts I of the same structure are installed on the autoclave cover, and the upper part of each loading shaft I is connected to a transmission rod I, which passes through the autoclave cover and enters the autoclave, and the transmission rod I is connected to the sample fixing plate bracket in sequence through the sample fixture, the connecting transition rod, the sample, the sample fixing plate, and the sample fixing plate inside the autoclave; the upper end of the transmission rod I is connected to the sample fixture through a pin, and the corresponding positions of two adjacent samples on each transmission rod I are connected through a connecting transition rod, and more than two connecting transition rods are installed on each transmission rod I; the lower part of the lowest sample is connected to the loading shaft I through the sample fixture and the transmission rod I, and the upper part of the highest sample is connected to the middle part of the horizontally arranged sample fixing plate through the transmission rod III and the connecting nut III in sequence, and the two ends of the sample fixing plate are connected to the sample fixing plate bracket inside the autoclave through symmetrically arranged fastening nuts, and the lower end of the sample fixing plate bracket is fixed on the autoclave cover; The interior of the autoclave base is connected to the autoclave cavity through a liquid inlet pipe and a liquid discharge pipe, wherein: one end of the liquid inlet pipe extends out of the autoclave base, and a liquid inlet valve and a safety valve are installed at the end, and the other end of the liquid inlet pipe extends to the autoclave cavity; one end of the liquid discharge pipe extends out of the autoclave base, and a liquid discharge valve is installed at the end, and the other end of the liquid discharge pipe extends to the autoclave cavity; Thermocouple I, thermocouple II and thermocouple III are installed at three different height positions of the upper, middle and lower parts of the autoclave body respectively, and an annular heating device including an upper ceramic heating jacket, a middle ceramic heating jacket and a lower ceramic heating jacket is installed on the outer side of the autoclave body; at the connection between the autoclave body and the autoclave cover, an annular auxiliary ceramic heating jacket is installed on the outer side of the autoclave body, and an annular autoclave cover ceramic heating jacket is installed on the outer side of the autoclave cover.
2. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 1, characterized in that: A fixing bolt is installed on each hydraulic lifting column above the lifting plate, an upper limit sleeve is installed on each column above the lifting plate, a slider and a lower limit sleeve are installed on each column below the lifting plate, the slider corresponds to the bottom of the lifting plate, the lifting plate is connected to the column and the hydraulic lifting column through the slider and fixing bolts respectively, the upper limit sleeve and the lower limit sleeve installed on the column fix the autoclave body at the desired position when locked.
3. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 1, characterized in that: The hydraulic lifting column is connected to the hydraulic pump through hydraulic pipelines, boost valves and air release valves. A hydraulic pump motor is installed on the hydraulic pump. The hydraulic pump motor switch is connected to the hydraulic pump motor through lines. The hydraulic pump is driven by the hydraulic pump motor to provide hydraulic power for the hydraulic lifting column, driving the lifting plate on the autoclave body to move up and down, thereby realizing the lifting movement of the autoclave body.
4. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 1, characterized in that: A pressure balancing mechanism is installed on each loading shaft I, and the pressure balancing mechanism is connected to the loading shaft I through a pressure balancing mechanism locking flange, and a cooling water jacket is installed on the upper side of the pressure balancing mechanism; a load sensor I is installed on the lower part of each loading shaft I, and each load sensor I is connected to the flange through its own connecting stud and connecting nut I, so as to achieve load balance between the parallel loading shafts I; the bottom of the flange is connected to the loading shaft II through a connecting nut II, and the loading shaft II is installed with a load sensor II and a displacement sensor through a load sensor II connector, and the bottom of the loading shaft II is connected to the load sensor II through a load sensor II connector, and the bottom of the load sensor II is connected to a stepper motor through a transmission rod II, so as to achieve that the stepper motor applies load to the parallel loading shafts I at the same time; a displacement sensor is installed on the top of the load sensor II connector, and the displacement sensor is installed on a displacement sensor fixing frame through a displacement sensor fixing plate.
5. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 1, characterized in that: The sample and the sample fixture are fixed inside the autoclave through the sample fixing plate bracket. The stepper motor drives the movement of the transmission rod II, the loading shaft II, the flange, the loading shaft I, the transmission rod I, the sample fixture and the connecting transition rod of the sample to apply load to the sample during the stress corrosion crack initiation test.
6. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 5, characterized in that: The stepper motor provides a load of 0 to 10 kN for each loading axis I through the transmission rod II, loading axis II and flange, and performs real-time measurement and control through the data acquisition, processing and control system.
7. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 5, characterized in that: The specimen is made of stainless steel, nickel-based alloy or welding material used in high temperature and high pressure water. The insulation of the specimen is achieved by installing zirconium alloy insulating gaskets between the specimen and the specimen fixture, the specimen and the connecting transition rod, the specimen and the transmission rod III, and the specimen and the specimen fixing plate, so as to carry out the corresponding electrochemical test and the monitoring of the specimen potential signal during the crack initiation process of the specimen.
8. The high temperature and high pressure water triaxial multi-sample loading stress corrosion crack initiation test device according to claim 1, characterized in that: It also includes the control part of the temperature and pressure protection system, and the control cabinet is equipped with displays and regulators for temperature, pressure, loading mode and experimental parameter settings; the control program display switch is connected to the control program display; the ceramic heater output power adjustment switch is connected to the temperature display and the ceramic heater output voltage display; the data output USB interface power switch is connected to the data output USB interface; each controller is connected to the relay in the control cabinet, and the relay is connected to the electric furnace wires in the upper ceramic heating sleeve, the middle ceramic heating sleeve and the lower ceramic heating sleeve through wires; the ceramic heater switch is arranged on the wire to form a power-off protection structure under over-temperature or low-temperature conditions.