A variable-section Japanese-shaped hollow thin-walled pier steel frame and its overall installation method

The design of the variable cross-section, H-shaped hollow thin-walled pier steel reinforcement cage and guide components solved the problem of difficult steel reinforcement cage splicing for ultra-high pier bridges, achieving an efficient and precise splicing process and improving construction quality and safety.

CN112195801BActive Publication Date: 2024-11-12ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011199696.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-29
Publication Date
2024-11-12
Estimated Expiration
2040-10-29

AI Technical Summary

Technical Problem

In existing technologies, splicing the steel reinforcement cage of ultra-high pier bridges is difficult and prone to splicing errors, which affects construction quality and efficiency.

Method used

A variable cross-section, H-shaped, hollow, thin-walled pier steel reinforcement cage is adopted, including the main cage body and guide components. The inner and outer tubes are used for guidance and positioning. The connection strength is increased and the splicing accuracy is ensured by connecting several first uprights, second uprights, I-beams and angle steels.

Benefits of technology

It effectively reduced the error in splicing the steel reinforcement cage, improved construction quality and efficiency, and reduced equipment requirements and hoisting risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112195801B_ABST
    Figure CN112195801B_ABST
Patent Text Reader

Abstract

The present application discloses a variable cross-section day-shaped hollow thin-wall pier steel bar skeleton and an overall installation method, which includes a skeleton main body and a guiding component. The skeleton main body includes a number of first vertical rods, a number of second vertical rods, a number of I-shaped steels and a number of angle steels. A number of first vertical rods are connected by a number of I-shaped steels, a number of second vertical rods are connected by a number of I-shaped steels, and a number of first vertical rods and a number of second vertical rods are connected by a number of angle steels. The guiding component includes a first connecting frame, an inner pipe, a second connecting frame and an outer pipe. The first connecting frame is installed on the upper side of the first vertical rod, the inner pipe is installed in the middle of the first connecting frame, the second connecting frame is installed on the lower side of the first vertical rod, the outer pipe is installed in the middle of the second connecting frame, and the lower end of the inner pipe is opposite to the upper end of the outer pipe. In this solution, through the cooperation of the inner pipe and the outer pipe, when two such stiffening skeletons are butted, guiding and positioning are carried out, so that the two such stiffening skeletons are well butted, which is convenient for reducing the splicing error.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of high pier bridge construction. Specifically, it relates to a variable cross-section day-shaped open-web thin-walled pier steel reinforcement cage. Background Technique

[0002] For the construction of super-high piers, the overall weight is large, the requirements for the equipment needed for hoisting are high, the hoisting risk is great, and the cross-sectional size is large. During the hoisting process, the steel reinforcement cage is prone to deformation, resulting in difficult docking, which affects the construction efficiency. Generally, the standard cross-section steel bars are divided into 2 "[-]" shaped segments and 1 "[I]" shaped segment, and then the stiffening skeletons are assembled inside the "[-]" shaped segments and the "[I]" shaped segment, and then multiple stiffening skeletons are spliced upwards in sequence to form the main structure.

[0003] In the prior art, the main piers of super-high pier bridges usually have a height of 159 m, the piers are of equal width of 18.5 m in the transverse direction of the bridge, and the longitudinal direction of the bridge is widened from 8.0 m at the pier top according to a slope of 80:1 towards the pier bottom. Steel bar binding is a key process in pier construction. The number of main steel bars in the standard cross-section of the pier body exceeds 1200, and the time for scattered splicing of steel bars is as long as 3 days, and the construction efficiency is low. Currently, the existing method for integral hoisting of steel bars is applicable to the integral hoisting of steel bars for small cross-section pier bodies. 1) The weight of a single-section steel bar in this project is 70 t, and the requirements for the equipment needed for integral hoisting are high, and the hoisting risk is great; 2) The cross-sectional size is large, and the steel reinforcement cage is prone to deformation during the hoisting process, resulting in difficult docking.

[0004] However, when the existing stiffening skeletons are spliced, there is a lack of guiding components, resulting in difficulties in subsequent splicing and prone to splicing errors, which affects the quality. Summary of the Invention

[0005] The main purpose of the present application is to provide a variable cross-section day-shaped open-web thin-walled pier steel reinforcement cage and an integral installation method to solve the problems in the related technology that it is difficult to splice between stiffening skeletons, the splicing error is relatively large, and the splicing quality is affected.

[0006] To achieve the above purpose, the present application provides a variable cross-section day-shaped open-web thin-walled pier steel reinforcement cage, including a cage main body and a guiding assembly.

[0007] The cage main body includes a plurality of first vertical rods, a plurality of second vertical rods, a plurality of I-shaped steels and a plurality of angle steels. A plurality of the first vertical rods are connected by a plurality of I-shaped steels, a plurality of the second vertical rods are connected by a plurality of the I-shaped steels, and a plurality of the first vertical rods and a plurality of the second vertical rods are connected by a plurality of the angle steels. The guiding assembly includes a first connecting frame, an inner pipe, a second connecting frame and an outer pipe. The first connecting frame is installed on the upper side of the first vertical rod, the inner pipe is installed in the middle of the first connecting frame, the second connecting frame is installed on the lower side of the first vertical rod, the outer pipe is installed in the middle of the second connecting frame, and the lower end of the inner pipe faces the upper end of the outer pipe.

[0008] In an embodiment of the present invention, the heights of several of the first vertical rods are the same, and the diameters of several of the first vertical rods and several of the second vertical rods are the same.

[0009] In an embodiment of the present invention, several of the I-shaped steel are arranged in three rows relative to the first vertical rod, and several of the I-shaped steel are arranged in three rows relative to the second vertical rod. The I-shaped steel in the same row is in the same horizontal plane.

[0010] In an embodiment of the present invention, a first diagonal brace is connected to the side portions of several of the first vertical rods and the side portions of several of the I-shaped steel.

[0011] In an embodiment of the present invention, a second diagonal brace is connected to the side portions of several of the second vertical rods and the side portions of several of the I-shaped steel.

[0012] In an embodiment of the present invention, a lifting lug is installed on the side portion of the I-shaped steel in the uppermost row, and a connection hole is provided on the side portion of the lifting lug.

[0013] In an embodiment of the present invention, the lifting lug is connected to the adjacent first vertical rod and the second vertical rod.

[0014] In an embodiment of the present invention, a guide block is welded to the upper end of the inner pipe. The cross section of the guide block is tapered, and the sharp corner of the taper is arc-shaped.

[0015] In an embodiment of the present invention, the outer wall of the inner pipe is set as a smooth surface, and the inner wall of the outer pipe is set as a smooth surface.

[0016] In an embodiment of the present invention, the outer diameter of the inner pipe is 5 mm - 10 mm smaller than the inner diameter of the outer pipe.

[0017] This application also includes an overall installation method for a variable cross-section day-shaped hollow thin-wall pier steel reinforcement cage, including the following steps:

[0018] S1: Reinforcement zoning. The standard-section steel bars are divided into 2 "[-]" shaped block segments and 1 "I"-shaped block segment. Except for leaving 30 - 40 cm between the block segments to prevent the steel bars from colliding, the rest of the main steel bars are prefabricated in advance; the width of the segmented skeleton of the "[-]" shaped part is 5 - 7 m, and the width of the segmented skeleton of the "I"-shaped part is 3 - 5 m.

[0019] S2: Prefabrication formwork. Due to the process requirements of the secondary-section steel bar binding and the secondary-section to reference-section conversion, 2 prefabrication formworks need to be set up, namely 2 "I"-shaped formworks and 4 "[-]" shaped formworks. The formworks are set up near the large tower crane, and the prefabrication formworks are arranged staggeredly.

[0020] S3: Rigid frame design, the rigid frame adopts truss structure, the vertical pole adopts L100×10 angle steel, the middle and upper horizontal pole adopts L125×10 angle steel, the bottom horizontal pole adopts L63×8, and the diagonal pole adopts L63×8 angle steel;

[0021] S4: Rebar processing, the main bars are connected by rolled straight thread sleeves, and the butt thread heads are matched by upper full thread and lower half thread. When processing the steel bar thread heads, the long thread joint is processed with 1 more thread, and the short thread is exposed with 2 threads after the sleeve is screwed into place;

[0022] S5: Installation of base section reinforcement,

[0023] 1) Installation of the rigid skeleton: According to the drawings, the top and bottom coordinates of the reference section skeleton are set out on the tire frame, and the rigid skeleton is assembled. After the rigid skeleton is formed, it is cantilevered to the bracket through the load-bearing beam. The weight of the reference section steel bars is transferred to the bracket through the rigid skeleton;

[0024] 2) Steel bar installation: First, install 24cm long Φ32 steel bars as cantilever bars on the horizontal bars of the rigid skeleton, with a cantilever bar spacing of 0.75m; the main bars are welded to the cantilever bars through horizontal separation steel bars, and horizontal isolation bars are set between the rigid skeleton and the main bars to adjust the linear shape of the main bars, prevent the rigid skeleton from welding deformation, ensure the steel bar protection layer, isolate the main bars from the skeleton, and facilitate the sleeve tightening when the main bars are connected within the range of the rigid skeleton poles;

[0025] S6: Second section steel bar installation,

[0026] 1) Install the rigid skeleton, re-measure the spatial coordinates of the top of the reference section rigid skeleton, and use it as the base model of the secondary section rigid skeleton; connect the secondary section rigid skeleton with the column of the reference section rigid skeleton;

[0027] 2) Steel bar installation: Position the upper end of the secondary main bar on the rigid skeleton according to the layout position; butt the lower end of the secondary main bar with the reference main bar;

[0028] S7: Lifting. The steel bar segment is lifted at 4 points. The lifting lugs are arranged on the top flat joint of the rigid frame. The segment lifting center is as close to the segment gravity center as possible to ensure lifting balance. The next segment of steel bar is lifted to another frame as the reference segment of steel bar for the next segment. The original reference segment is lifted to the working surface of the pier body for installation and docking.

[0029] In one embodiment of the present invention, in step S2, the tire frame includes four parts: columns, flat joints, shoulder pole beams, and binding platforms. The columns are fixed to the platform with steel pipes, and the steel pipes are connected by flat joints to enhance the overall stability; the shoulder pole beams are made of channel steels, with a total of four layers designed, and the pier body steel bars are placed on the shoulder pole beams through a rigid frame; the binding platform is designed with three layers, which are used for connecting and releasing steel bars, and for tying stirrups and hooks.

[0030] In an embodiment of the present invention, in the middle of step S3, a layer of Φ32 steel bars is arranged between the double-limb main reinforcements and between the main reinforcements and the stiffening skeleton. This steel bar plays an isolating role to prevent the double-limb main reinforcements from being too close to the stiffening skeleton columns and the main reinforcement sleeves, making it impossible to perform fine adjustment.

[0031] In an embodiment of the present invention, in the middle of step S5, the upper end of the steel bar is accurately positioned by measuring with the upper end of the stiffening skeleton as the reference; the height difference between adjacent joints of the steel bars at the top opening of the segment is 1.3 m; after the position of the main reinforcement is adjusted, a careful inspection is carried out. After it is accurate and error-free, the binding between the main reinforcement and the horizontal reinforcement is started; the installation height of the horizontal reinforcement is controlled at 4.2 m, and 1.3 m and 0.5 m are reserved at the positions of the upper and lower horizontal reinforcements respectively for connecting with the reserved steel bars of the previous section. The length of the horizontal stirrup does not exceed the stiffening skeleton, and the joints are staggered by 0.75 m.

[0032] In an embodiment of the present invention, in the middle of the steel bar installation in step S6, the main reinforcement uses a 23-cm-long C25 steel bar to pick on the cross bar of the stiffening skeleton. The overall weight is transmitted to the pre-assembled support through the bearing beam. At this time, the steel bar joint only bears part of the weight of a single steel bar, and the force is small and convenient for demolition; the installation height of the horizontal reinforcement is controlled at 4.2 m.

[0033] In an embodiment of the present invention, it further includes step S8: installing the remaining steel bars. After the steel bar docking of the precast block segments is completed, install the main reinforcements at the 35-cm gap between the block segments, and then install the horizontal stirrups and the tension bars within 1.7 m on the concrete surface and at the 35-cm gap. The tower crane releases the hook and installs the steel bars of another block segment.

[0034] In the embodiment of the present application, a variable-section day-shaped empty thin-wall pier steel bar skeleton is provided. Through the cooperation of the inner pipe and the outer pipe, when two such stiffening skeletons are docked, guiding and positioning are carried out, so that the two such stiffening skeletons are well docked, which is convenient for reducing the splicing error; and the skeleton main body is composed of a number of first vertical rods, a number of second vertical rods, a number of I-shaped steels and a number of angle steels. The I-shaped steel increases the connection strength between a number of first vertical rods and increases the connection strength between a number of second vertical rods; the angle steel increases the connection strength between the first vertical rod and the second vertical rod to ensure the overall strength of the skeleton main body. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The drawings constituting a part of this application are used to provide a further understanding of this application, making other features, purposes and advantages of this application more obvious. The schematic embodiment drawings of this application and their descriptions are used to explain this application and do not constitute an improper limitation of this application. In the drawings:

[0036] Figure 1 is a top view schematic diagram of a stiffening skeleton for variable-section day-shaped empty thin-wall pier steel bars provided according to the embodiment of this application;

[0037] Figure 2 It is a front view schematic diagram of the structure of the first vertical rod part of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application;

[0038] Figure 3 It is a front view schematic diagram of the structure of the second vertical rod part of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application;

[0039] Figure 4 It is a side view schematic diagram of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application;

[0040] Figure 5 It is the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application Figure 3 Schematic diagram of the cross-section at position A;

[0041] Figure 6 It is a schematic diagram of the structure of the lifting lug part of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application;

[0042] Figure 7 It is a schematic diagram of the structure of the inner pipe and guide block part of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application;

[0043] Figure 8 It is a top view schematic diagram of the structure of the second connecting frame and outer pipe part of the stiffening skeleton for the reinforced bars of the variable cross-section "day"-shaped hollow thin-wall pier provided by the embodiment of the present application.

[0044] In the figure: 100, skeleton main body; 110, first vertical rod; 111, first diagonal brace; 120, second vertical rod; 121, second diagonal brace; 130, I-beam; 131, lifting lug; 132, connecting hole; 140, angle steel; 200, guiding assembly; 210, first connecting frame; 220, inner pipe; 221, guide block; 230, second connecting frame; 240, outer pipe. Detailed implementation manners

[0045] In order to enable those skilled in the art to better understand the solution of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present application.

[0046] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0047] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0048] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0049] In addition, the term "plurality" shall mean two or more.

[0050] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0051] Example 1

[0052] See also Figure 1-8 The present application provides a variable-section Japanese-shaped hollow thin-walled pier steel bar skeleton, comprising a skeleton body 100 and a guide assembly 200, wherein the guide assembly 200 is installed on the side of the skeleton body 100, wherein the skeleton body 100 constitutes the main body of the rigid skeleton, and the guide assembly 200 is used for guiding and limiting during docking.

[0053] See also Figure 1 , Figure 2 , Figure 4 , Figure 5 and Figure 6The skeleton body 100 includes a plurality of first vertical poles 110, a plurality of second vertical poles 120, a plurality of I-shaped steels 130 and a plurality of angle steels 140. The plurality of first vertical poles 110 are connected to each other through the plurality of I-shaped steels 130, and the first vertical poles 110 and the I-shaped steels 130 are welded to each other. The plurality of second vertical poles 120 are connected to each other through the plurality of I-shaped steels 130, and the second vertical poles 120 and the I-shaped steels 130 are welded to each other. In specific configuration, the plurality of first vertical poles 110 and the plurality of second vertical poles 120 have the same height, and the plurality of first vertical poles 110 and the plurality of second vertical poles 120 have the same diameter. The first vertical poles 110 and the second vertical poles 120 having the same height and diameter are helpful for subsequent docking with another skeleton body 100, and the plurality of first vertical poles 110 and the plurality of second vertical poles 120 are welded to each other through the plurality of angle steels 140.

[0054] In this embodiment, a plurality of I-shaped steels 130 are arranged in three rows relative to the first vertical pole 110, and a plurality of I-shaped steels 130 are arranged in three rows relative to the second vertical pole 120. The I-shaped steels 130 in the same row are in the same horizontal plane. In the specific setting, the side of the I-shaped steel 130 in the uppermost row is equipped with a lifting ear 131 through a bolt, and a connecting hole 132 is opened on the side of the lifting ear 131. The connecting hole 132 facilitates the passage of the lifting wire rope. Specifically, the lifting ear 131 is connected to the adjacent first vertical pole 110 and the second vertical pole 120 to increase the stability of the fixing of the lifting ear 131.

[0055] See also Figure 1 , Figure 4 , Figure 7 and Figure 8 The guide assembly 200 includes a first connecting frame 210, an inner tube 220, a second connecting frame 230 and an outer tube 240. The first connecting frame 210 is installed on the upper side of the first vertical pole 110 by bolts, the inner tube 220 is welded and installed on the middle part of the first connecting frame 210, the second connecting frame 230 is installed on the lower side of the first vertical pole 110 by bolts, and the outer tube 240 is installed on the middle part of the second connecting frame 230. The lower end of the inner tube 220 is opposite to the upper end of the outer tube 240. When specifically set, the upper end of the inner tube 220 is welded and installed. A guide block 221 is connected, and the cross-section of the guide block 221 is conical, and the sharp corner of the cone is arc-shaped. The guide block 221 is used for guiding, so that the outer tube 240 is conveniently inserted into the inner tube 220. The outer wall of the inner tube 220 is set as a smooth surface, and the inner wall of the outer tube 240 is set as a smooth surface. The smooth inner tube 220 and outer tube 240 help to reduce the friction during contact. The outer diameter of the inner tube 220 is 5mm-10mm smaller than the inner diameter of the outer tube 240, providing a deviation margin for easy docking.

[0056] Specifically, the working principle of the variable cross-section day-shaped open-web thin-wall pier steel bars' stiffening skeleton: During use, through the cooperation of the inner pipe 220 and the outer pipe 240, when two such stiffening skeletons are butted, it conducts guiding and positioning, enabling good butt joint of the two stiffening skeletons, facilitating reduction of splicing errors; and the main body of the skeleton 100 formed by connecting a number of first vertical rods 110, a number of second vertical rods 120, a number of I-shaped steel bars 130 and a number of angle steel bars 140, the I-shaped steel bars 130 increase the connection strength between a number of first vertical rods 110 and also increase the connection strength between a number of second vertical rods 120; the angle steel bars 140 increase the connection strength between the first vertical rods 110 and the second vertical rods 120, ensuring the overall strength of the main body of the skeleton 100.

[0057] The single-section steel bar weighs up to 70t, with a cross-sectional size of 18.5m×11.2m, and it cannot be hoisted at one time. This application also provides an overall installation method for the variable cross-section day-shaped open-web thin-wall pier steel bar skeleton, including the following steps:

[0058] S1: Steel bar zoning. To reduce the single-time lifting weight, the standard cross-section steel bars are divided into 2 "[-shaped block segments and 1 "I"-shaped block segment. Except for leaving 35cm between the block segments to prevent steel bar collision, the rest of the main steel bars are prefabricated in advance; the width of the sub-block skeleton of the "[-shaped part is 6.5m, and the width of the sub-block skeleton of the "I"-shaped part is 4.8m.

[0059] S2: Prefabrication jigs. Due to the process requirements of the secondary-section steel bar binding and the secondary-section to reference-section conversion, 2 prefabrication jigs need to be set up, namely 2 I-shaped jigs and 4 [-shaped jigs. The jigs are set near the large tower crane, and the prefabrication jigs are arranged staggeredly to make full use of the space to reduce the lifting radius.

[0060] The jig structure includes 4 parts: columns, horizontal bracings, crossbeams, and binding platforms. The columns are fixed on the platform by steel pipes, and the steel pipes are connected by horizontal bracings to enhance the overall stability; the crossbeams are made of channel steel, with a total of 4 layers designed, and the pier body steel bars are prevented from falling on the crossbeams through the stiffening skeleton; the binding platform is designed with 3 layers, which are used for steel bar butt joint and disassembly, stirrup and hook bar binding.

[0061] S3: Stiffening skeleton design. The stiffening skeleton adopts a truss structure, and the design idea of "rigid at the top and flexible at the bottom" is adopted. The vertical rods adopt L100×10 angle steel, the middle and upper horizontal rods adopt L125×10 angle steel, the bottom horizontal rods adopt L63×8, and the diagonal rods adopt L63×8 angle steel. A layer of Φ32 steel bars is arranged between the double-limb main steel bars and between the main steel bars and the stiffening skeleton, and this steel bar plays an isolation role to prevent the double-limb main steel bars from being too close to each other or the main steel bar sleeves from being too close to the stiffening skeleton columns and unable to be finely adjusted.

[0062] S4: Steel bar processing. All the main steel bars adopt rolled straight thread sleeve connections, and the butt joint screw threads adopt full threads (upper)

[0063] Matching processing for half-wire (below);

[0064] In order to facilitate the removal of the segmental steel bars after assembly, one more thread is processed for the long-wire joint when processing the steel wire head. After the sleeve is screwed into place, two threads of the short wire are exposed;

[0065] S5: Installation of base section reinforcement

[0066] a: Rigid frame installation

[0067] According to the drawings, the top and bottom coordinates of the reference section frame are laid out on the frame, and the rigid frame is assembled. After the rigid frame is formed, it is cantilevered to the bracket through the load-bearing beam. The weight of the reference section steel bars is transferred to the bracket through the rigid frame.

[0068] b: Steel bar installation

[0069] First, install 24cm long Φ32 steel bars as cantilever bars on the horizontal bars of the rigid frame, with a cantilever bar spacing of 0.75m; the main bars are welded to the cantilever bars through horizontal separation bars. The horizontal isolation bars are set between the rigid frame and the main bars to adjust the linear shape of the main bars, prevent the rigid frame from welding deformation, ensure the steel bar protection layer, isolate the main bars from the frame, and facilitate the sleeve tightening when the main bars are connected within the range of the rigid frame vertical poles.

[0070] The upper end of the steel bar is measured and accurately positioned with the upper end of the rigid frame as the reference; the height difference between the two adjacent joints of the segment top steel bar is 1.3m; after the position of the main reinforcement is adjusted, it is carefully checked again, and after it is accurate, the binding between the main reinforcement and the horizontal reinforcement is started.

[0071] The installation height of horizontal reinforcement is controlled at 4.2m, and 1.3m and 0.5m are reserved for the upper and lower horizontal reinforcement positions respectively, so as to connect with the reserved reinforcement of the previous section. The length of horizontal stirrups shall not exceed the rigid skeleton, and the joints shall be staggered by 0.75m.

[0072] S6: Second section reinforcement installation

[0073] a: Rigid skeleton installation. Re-measure the spatial coordinates of the top of the reference section rigid skeleton and use it as the base model of the secondary section rigid skeleton; the secondary section rigid skeleton is connected to the column of the reference section rigid skeleton;

[0074] b: Steel bar installation. Position the upper end of the secondary main bar on the rigid frame according to the layout position; butt the lower end of the secondary main bar with the reference main bar;

[0075] The main reinforcement is 23cm long C25 steel bars on the rigid skeleton crossbar. The overall weight is transferred to the pre-assembled bracket through the load-bearing beam. At this time, the steel bar joint only bears part of the weight of a single steel bar, and the force is small, which is easy to dismantle;

[0076] The installation height of horizontal steel bars is controlled at 4.2m.

[0077] S7: Lifting. The steel bar segment is lifted at four points, with the lifting lugs arranged on the top flat joint of the rigid frame. The segment lifting center is as close to the segment gravity center as possible to ensure lifting balance.

[0078] The second section of steel bars is hoisted to another frame as the reference section of the next section of steel bars, and the original reference section is hoisted to the working surface of the pier body for installation and docking.

[0079] S8: Install the remaining steel bars. After the prefabricated block segments are butt-jointed, install the main bars at the 35cm gap between the blocks, and then install the horizontal stirrups and tension bars within 1.7m and at the 35cm gap on the concrete surface. Unhook the tower crane and install the steel bars for another block segment.

[0080] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A variable cross-section Japanese-shaped hollow thin-walled pier steel reinforcement skeleton, characterized in that: Including: A skeleton main body, which includes several first vertical rods, several second vertical rods, several I-beams and several angle steels. Several of the first vertical rods are connected by several I-beams, several of the second vertical rods are connected by several of the I-beams, and several of the first vertical rods and several of the second vertical rods are connected by several of the angle steels; A guiding assembly, which includes a first connecting frame, an inner tube, a second connecting frame and an outer tube. The first connecting frame is installed on the upper side of the first vertical rod, the inner tube is installed in the middle of the first connecting frame, the second connecting frame is installed on the lower side of the first vertical rod, the outer tube is installed in the middle of the second connecting frame, and the lower end of the inner tube faces the upper end of the outer tube; A guiding block is welded to the upper end of the inner tube. The cross-section of the guiding block is conical, and the sharp angle of the cone is arc-shaped. The guiding block is used for guiding to facilitate the insertion of the outer tube into the inner tube. The outer wall of the inner tube is set as a smooth surface, and the inner wall of the outer tube is set as a smooth surface. The smoothly set inner tube and outer tube help to reduce the friction during contact. The outer diameter of the inner tube is 5 mm - 10 mm smaller than the inner diameter of the outer tube.

2. A variable cross-section Japanese-shaped hollow thin-walled pier steel reinforcement skeleton as claimed in claim 1, characterized in that: Several of the first vertical rods and several of the second vertical rods have the same height, and several of the first vertical rods and several of the second vertical rods have the same diameter.

3. A variable cross-section "S"-shaped hollow thin-walled pier steel bar skeleton as claimed in claim 1, characterized in that: Several of the I-beams are arranged in three rows relative to the first vertical rod, and several of the I-beams are arranged in three rows relative to the second vertical rod. The I-beams in the same row are in the same horizontal plane. First diagonal braces are connected to the sides of several of the first vertical rods and the sides of several of the I-beams, and second diagonal braces are connected to the sides of several of the second vertical rods and the sides of several of the I-beams.

4. A variable cross-section "S"-shaped hollow thin-walled pier steel bar skeleton as claimed in claim 3, characterized in that: Lifting lugs are installed on the sides of the I-beams in the uppermost row. Connecting holes are provided on the sides of the lifting lugs, and the lifting lugs are connected to the adjacent first vertical rod and second vertical rod.

5. The integral installation structure of the variable-section "S"-shaped hollow thin-walled pier steel frame according to claim 1, characterized in that: S1: Reinforcement zoning. The standard-section reinforcement is divided into 2 "[”-shaped block segments and 1 "I”-shaped block segment. Except for leaving 30 - 40 cm between the block segments to prevent the reinforcement from colliding, the rest of the main reinforcements are prefabricated in advance. The width of the "[”-shaped part of the sectionalized skeleton is 5 - 7 m, and the width of the "I”-shaped part of the sectionalized skeleton is 3 - 5 m; S2: Prefabrication jig. Due to the process requirements of secondary-section reinforcement binding and the transformation from the secondary section to the reference section, 2 prefabrication jigs need to be set up, namely 2 "I”-shaped jigs and 4 "[”-shaped jigs. The jigs are set up near the large tower crane, and the prefabrication jigs are arranged staggeredly; S3: Stiffening skeleton design. The stiffening skeleton adopts a truss structure. The vertical rods use L100×10 angle steel, the middle and upper horizontal rods use L125×10 angle steel, the bottom horizontal rods use L63×8, and the diagonal rods use L63×8 angle steel; S4: Reinforcement processing. All the main reinforcements are connected by rolled straight thread sleeve connections. The butt thread heads are processed in a matching manner with the upper part being all-thread and the lower part being half-thread. When processing the reinforcement thread heads, the long-thread joints are processed with 1 more thread, and 2 threads of the short thread are exposed after the sleeve is tightened in place; S5: Installation of the reference-section reinforcement 1) Installation of the rigid skeleton: According to the drawings, the top and bottom coordinates of the reference section skeleton are set out on the tire frame, and the rigid skeleton is assembled. After the rigid skeleton is formed, it is cantilevered to the bracket through the load-bearing beam. The weight of the reference section steel bars is transferred to the bracket through the rigid skeleton; 2) Steel bar installation: First, install 24cm long Φ32 steel bars as cantilever bars on the horizontal bars of the rigid skeleton, with a cantilever bar spacing of 0.75m; the main bars are welded to the cantilever bars through horizontal separation steel bars, and horizontal isolation bars are set between the rigid skeleton and the main bars to adjust the linear shape of the main bars, prevent the rigid skeleton from welding deformation, ensure the steel bar protection layer, isolate the main bars from the skeleton, and facilitate the sleeve tightening when the main bars are connected within the range of the rigid skeleton poles; S6: Second section steel bar installation, 1) Install the rigid skeleton, re-measure the spatial coordinates of the top of the reference section rigid skeleton, and use it as the base model of the secondary section rigid skeleton; connect the secondary section rigid skeleton with the column of the reference section rigid skeleton; 2) Steel bar installation: Position the upper end of the secondary main bar on the rigid skeleton according to the layout position; butt the lower end of the secondary main bar with the main bar of the reference section; S7: Lifting. The steel bar segment is lifted at 4 points. The lifting lugs are arranged on the top flat joint of the rigid frame. The segment lifting center is as close to the segment gravity center as possible to ensure lifting balance. The next segment of steel bar is lifted to another frame as the reference segment of steel bar for the next segment. The original reference segment is lifted to the working surface of the pier body for installation and docking.

6. The integral installation structure of the variable-section "S"-shaped hollow thin-walled pier steel frame as claimed in claim 5, characterized in that: In step S2, the frame includes four parts: columns, flat joints, shoulder pole beams, and binding platforms. The columns are fixed on the platform with steel pipes, and the steel pipes are connected by flat joints to enhance the overall stability. The shoulder pole beams are made of channel steels and are designed with a total of four layers. The pier body steel bars are placed on the shoulder pole beams through a rigid frame. The binding platform is designed with three layers for connecting and releasing steel bars, and for binding stirrups and hook bars.

7. The integral installation structure of the variable-section "S"-shaped hollow thin-walled pier steel frame as claimed in claim 5, characterized in that: In the middle of step S3, a layer of Φ32 steel bars is arranged between the two main bars and between the main bars and the rigid frame. The steel bars play an isolating role to prevent the two main bars and the main bar sleeves from being too close to the rigid frame columns and unable to be fine-tuned.

8. The integral installation structure of the variable-section "S"-shaped hollow thin-walled pier steel frame as claimed in claim 5, characterized in that: In the middle of step S5, the upper end of the steel bar is measured and accurately positioned with the upper end of the rigid frame as the reference; the height difference between the two adjacent joints of the segment top steel bar is 1.3m; after the main reinforcement position is adjusted, it is carefully checked again, and after it is accurate, the binding between the main reinforcement and the horizontal reinforcement is started; the installation height of the horizontal reinforcement is controlled at 4.2m, and the upper and lower horizontal reinforcement positions are reserved for 1.3m and 0.5m respectively, so as to connect with the reserved reinforcement of the previous section, the length of the horizontal stirrup does not exceed the rigid frame, and the joints are staggered by 0.75m.

9. The integral installation structure of a variable-section "S"-shaped hollow thin-walled pier steel frame as claimed in claim 5, characterized in that: In the middle part of the steel bar installation in step S6, the main reinforcement is a 23cm long C25 steel bar suspended on the rigid skeleton cross bar. The overall weight is transferred to the pre-assembled bracket through the load-bearing beam. At this time, the steel bar joint only bears part of the weight of a single steel bar, and the force is small, which is easy to dismantle; the installation height of the horizontal steel bar is controlled at 4.2m.

10. The integral installation structure of the variable-section "S"-shaped hollow thin-walled pier steel frame as claimed in claim 5, characterized in that: The step S8 is also included: installation of the remaining steel bars. After the prefabricated block segments are butt-jointed, the main bars are installed at the 35 cm gap between the blocks. Then, the horizontal stirrups and tension bars are installed within 1.7 m and at the 35 cm gap on the concrete surface. The tower crane is unhooked to install the steel bars of another block segment.