Elongation deformation compensation device after equal stress locking of two-unit pressure-dispersed anchor cable
By designing the structure of clip parts and shear keys in the anchor cable, the problem of tension of steel strands of different lengths breaking at the same time after stress locking is solved, and all steel strands of the anchor cable reach the limit value at the same time when deformation is achieved. , solves the unreasonable damage model in the prior art and saves costs.
Patent Information
- Application Number
- CN202011168322.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-10-27
AI Technical Summary
In the prior art, the two-unit pressure dispersed anchor cables produce different tensions when the steel strands of different lengths are elongated and deformed simultaneously after stress locking, resulting in the inability to disconnect at the same time, and the damage mode is unreasonable.
A structure including a carrier and a compensation device is designed. Through the cooperation of the clip member and the shear key, the steel strands of different lengths are ensured to be disconnected at the same time when the tension reaches the limit. The clip member is embedded in the groove to balance the deformation difference. , shear bonds are cut when they are ultimately shear-resistant.
When the anchor cable is further deformed, the tension of all steel strands of different lengths reaches the limit value and disconnects, giving full play to the role of each steel strand and saving costs.
Smart Images

Figure CN112195933B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of anchoring construction, and in particular to an elongation deformation compensation device after stress locking of a two-unit pressure dispersion anchor cable. Background Art
[0002] At present, the support method of bored cast-in-place piles plus prestressed anchor cables is often used in foundation pit projects. That is, a row of bored cast-in-place piles with a certain spacing is used as the vertical support structure, and one or more prestressed anchor cables are set on the side walls of the bored cast-in-place piles for support.
[0003] refer to Figure 1 As shown, the foundation pit begins to excavate a layer of earthwork, then construct the first prestressed anchor cable, then excavate the next layer of earthwork, and construct the next layer of anchor cables 04'. The anchor cables 04' are constructed between the ground a' and the bottom b' of the foundation pit. The anchor cables 04' are fixedly connected to the support piles 02' through the anchor cable waist beam 04', and a locking beam 01' is arranged between the top of the support piles 03' and the ground. In the most common bored cast-in-place piles plus prestressed anchor cable support method for foundation pit support, the anchor cables 04' can be divided into pressure dispersion type and tension type according to the different force types. Among them, the pressure dispersion type anchor cable has the advantages of uniform anchoring force distribution and large bearing capacity, and has a wide range of applications. In particular, the two-unit pressure dispersion type anchor cable 04' commonly used in engineering, the pressure dispersion type anchor cable generally has a number of tensioning units of different lengths, and steel strands of different lengths are correspondingly arranged in the tensioning units.
[0004] The pressure-dispersed anchor cable 04' needs to be prestressed for locking, but due to the different lengths of the steel strands, the elongation and deformation of each steel strand under the locking load is different. In order to solve the problem of ensuring that the tension of steel strands of different lengths is the same after being tensioned and locked, the prior art is to use a jack to tension each steel strand in each tensioning unit to the locking load. For example, the first tensioning unit is first tensioned and locked with a load on two steel strands, and then the second tensioning unit is tensioned and locked with a load on two steel strands. This tensioning and locking of the tensioning units avoids the problem of different elongation and deformation between different steel strands if all tensioning unit steel strands are tensioned at the same time. After the pressure-dispersed anchor cable is tensioned and locked using the above method, the locking load is evenly shared by each steel strand, that is, the stress or tension of each steel strand is the same.
[0005] Since the anchor cable only maintains a prestressed state after being locked, the structure remains stable temporarily under this prestressed state. However, various external factors in nature are constantly changing, and even over time, the structure reinforced by the anchor cable will deform. When the anchor cable is deformed again after being prestressed and locked, the elongation deformation of all steel strands in different tensioning units is the same, but the loads generated by the steel strands of different units due to the re-elongation deformation are not equal. For example, the steel strand of the first tensioning unit is shorter than the steel strand of the second tensioning unit, and the steel strand of the first tensioning unit with a shorter length generates a larger tensile force due to the re-deformation, so the steel strand of the first tensioning unit with a shorter length will be destroyed first, and the steel strand of the second tensioning unit with a longer length will not be destroyed at this time, and the elongation deformation needs to develop further, and the corresponding tensile force will be further increased before it will be destroyed. This kind of pressure-dispersed anchor cable after being tensioned and locked, the mode of asynchronous destruction of the steel strands of different tensioning units due to further deformation is not reasonable. The ideal anchor cable structure should be that when the locked anchor cable is further deformed, the tensile force of all steel strands of different tensioning units reaches the limit value at the same time and is destroyed. Summary of the invention
[0006] The object of the present invention is to provide an elongation deformation compensation device after stress locking of a two-unit pressure-distributed anchor cable, etc., aiming to solve the problem in the prior art that steel strands of different lengths generate different tensile forces during synchronous elongation deformation after stress locking of a distributed anchor cable, etc., resulting in the inability to disconnect steel strands of different lengths at the same time.
[0007] The present invention is implemented in this way: the elongation deformation compensation device after stress locking of the two-unit pressure dispersion anchor cable comprises a bearing body and a compensation device, the bearing body comprises a first bearing body and a second bearing body, the first bearing body is connected to the compensation device, the first bearing body, the second bearing body and the compensation device are penetrated and connected with a plurality of steel strands, the plurality of steel strands can be set to the same or different lengths, and the plurality of steel strands of the same or different lengths are subjected to force and deform synchronously;
[0008] The compensation device includes a clip component and a shear key connected to each other. The first carrier is provided with a groove matching the front end of the clip component. The clip component clamps and connects the steel strand. The steel strand is deformed by force and pulls the clip component to move a certain distance in the direction of the groove. The shear key is in contact with and fits the open end surface of the groove. When the shear key reaches the limit shear force, it cuts off to make the clip component move into the groove. The measured length from the front end of the clip component to the bottom of the groove is equal to the measured length of the deformation difference caused by the force on the steel strands of different lengths.
[0009] Further, the first carrier includes a first front plate and a first rear plate connected to each other, the second carrier includes a second front plate and a second rear plate connected to each other, the steel strand connecting the first front plate, the first rear plate and the clip member is set as a first steel strand, the steel strand connecting the first front plate, the first rear plate, the second front plate and the second rear plate is set as a second steel strand, and the length of the second steel strand is longer than the length of the first steel strand;
[0010] The clip component is arranged between the first front plate and the first rear plate, the groove is arranged on one side of the first front plate and matches with the front end of the clip component, the rear end of the clip component is connected to the first rear plate, and the displacement of the clip component toward the groove is determined according to the measured length of the deformation difference between the first steel strand and the second steel strand, the material limit value and the locking value.
[0011] Furthermore, the shear key is arranged around the surface of the clip component, the front end of the clip component is set to a wedge-shaped structure, the groove is set to a concave wedge-shaped structure matching the front end of the clip component, the first front plate and the first rear plate are provided with a through hole that passes through the bottom of the groove and matches the diameter of the first steel strand, and the first front plate, the first rear plate, the second front plate and the second rear plate are correspondingly penetrated by through holes that match the diameter of the second steel strand.
[0012] Furthermore, it also includes an anchor cable, wherein the first steel strand and the second steel strand are arranged in the anchor cable, the first steel strand and the second steel strand are respectively divided into a first tensioning unit and a second tensioning unit corresponding to the anchor cable, and the portion extending out of the anchor cable is a tensioning section;
[0013] After being locked, the anchor cable is deformed again. According to Hooke's law, Wherein F is the tensile load borne by the first steel strand or the second steel strand, K is the axial stiffness coefficient, l is the length of the first steel strand or the second steel strand, Δl is the elongation deformation of the first steel strand or the second steel strand under load, and the length of the first steel strand is shorter than that of the second steel strand, so the tensile force generated by the first steel strand increases faster than that of the second steel strand;
[0014] The clip component moves toward the bottom of the groove under the tension of the first steel strand, and the shear key is blocked by the open end surface of the groove and reaches the limit shear force and is cut off, so that the clip component continues to move a certain distance toward the bottom of the groove, and the retraction tension load of the first steel strand is reduced. When the tension continues to increase so that the first steel strand and the second steel strand continue to be deformed by the force, the first steel strand and the second steel strand are finally disconnected at the same time.
[0015] Furthermore, the first front plate and the first rear plate are fixedly connected by through-screws to form a certain gap, the clip component is arranged in the gap formed by the first front plate and the first rear plate, and the first steel strand is movably connected to the first front plate and the first rear plate through the clip component.
[0016] Furthermore, the second front plate and the second rear plate are fixedly connected by through-screws to form a certain gap, the second steel strand penetrates and connects the second front plate and the second rear plate, the second steel strand located between the second front plate and the second rear plate is sleeved with an extruded steel sleeve, the extruded steel sleeve and the second steel strand are fixedly connected through extrusion deformation, and the second steel strand is fixedly connected to the second front plate and the second rear plate through the extruded steel sleeve.
[0017] Furthermore, the first steel strand of the first tensioning unit and the second steel strand of the second tensioning unit are fixed with rubber brackets at a certain distance, and the rubber brackets are provided with threading holes matching the first steel strand and the second steel strand.
[0018] Furthermore, the anchor cable is filled with a cement mortar anchor layer, which is mixed with the first steel strand, the second steel strand, the first bearing body and the second bearing body, and the first steel strand and the second steel strand have opposite forces to the cement mortar anchor layer.
[0019] Furthermore, the first steel strand and the second steel strand are coated with anti-corrosion grease and then covered with a PE protective sheath.
[0020] Furthermore, the clip component is composed of a plurality of clips, and a steel wire binding groove for winding a steel wire is provided at the rear end of the clip component.
[0021] Compared with the prior art, the elongation deformation compensation device after stress locking of the two-unit pressure-dispersed anchor cable is provided with a first carrier and a compensation device connected to each other, and a plurality of steel strands are connected therethrough. The compensation device includes a clip component and a shear key connected to each other, the first carrier is provided with a groove matching the front end of the clip component, the clip component clamps and connects the steel strand, and the shear key is cut off when the limit shear force is reached, so that when the steel strand is deformed by force, the clip component is pulled to move a certain displacement in the direction of the groove. The displacement of the clip component is equal to the measured length of the deformation difference caused by the force on the steel strands of different lengths. Therefore, by setting up the compensation device, when the locked anchor cable is further deformed, all steel strands of different lengths are disconnected at the same time when the tension reaches the limit value at the same time, giving full play to the role of each steel strand and saving costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1It is a schematic diagram of the application of anchor cables in foundation pits in the prior art;
[0023] Figure 2 It is a schematic diagram of the connection relationship between the anchor cable and the compensation device of the present invention;
[0024] Figure 3 yes Figure 2 Schematic diagram of the cross-sectional structure in the AA direction;
[0025] Figure 4 is a schematic diagram of the connection relationship between the compensation device of the present invention and the first carrier;
[0026] Figure 5 yes Figure 4 Schematic diagram of the cross-sectional structure in the AA direction;
[0027] Figure 6 yes Figure 4 Schematic diagram of the cross-sectional structure along the BB direction;
[0028] Figure 7 is a schematic diagram of the connection relationship between the compensation device of the present invention and the first steel strand;
[0029] Figure 8 is a side schematic diagram of the compensation device of the present invention;
[0030] Fig. 9 It is a schematic diagram of the connection relationship between the second carrier, the second steel strand and the extrusion sleeve of the present invention;
[0031] Fig.10 yes Fig. 9 Schematic diagram of the cross-sectional structure in the AA direction;
[0032] Fig.11 yes Fig. 9 Schematic diagram of the cross-sectional structure along the BB direction;
[0033] Fig.12 It is a schematic diagram of the transfer mechanism of the anchor cable load of the present invention;
[0034] Fig.13 It is a schematic cross-sectional view of the steel strand of the present invention.
[0035] In the figure: A-first tensioning unit, B-second tensioning unit, C-tensioning section, D-load, 01-anchor cable, 11-first steel strand, 12-second steel strand, 21-first bearing body, 211-first front plate, 2111-groove, 212 first rear plate, 22 second bearing body, 221-second front plate, 222-second rear plate, 31-compensation device, 311-clip component, 312-shear key, 313-wire binding groove, 41-extruded copper sleeve, 51-rubber bracket, 61-through screw, 71-cement mortar anchoring layer, 81-anti-corrosion grease, 91-PE protective cover. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0037] The implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0038] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0039] Reference Figures 2 to 13 The figure shows a preferred embodiment of the present invention.
[0040] The invention provides a two-unit pressure dispersion anchor cable and other stress locking elongation deformation compensation device, such as Figure 2 , Figure 4 As shown, the elongation deformation compensation device after stress locking of the two-unit pressure-dispersed anchor cable includes a bearing body and a compensation device 31, wherein the bearing body includes a first bearing body 21 and a second bearing body 22, wherein the first bearing body 21 is connected to the compensation device 31, wherein the first bearing body 21, the second bearing body 22 and the compensation device 31 are penetrated and connected with a plurality of steel strands, wherein the plurality of steel strands can be set to the same or different lengths, and the plurality of steel strands of the same or different lengths are subjected to stress and deformed synchronously. The compensation device 31 includes a clip component 311 and a shear key 312 that are connected to each other. The first carrier 21 is provided with a groove 2111 that matches the front end of the clip component 311. The clip component 311 clamps and connects the steel strand. The steel strand is deformed by force and pulls the clip component 311 to move a certain distance in the direction of the groove 2111. The shear key 312 is in contact with and fits the open end surface of the groove 2111. When the limit shear force is reached, the shear key 312 is cut off to make the clip component 311 move and embed into the groove 2111. The measured length from the front end of the clip component 211 to the bottom of the groove 2111 is equal to the measured length of the deformation difference caused by the force on the steel strands of different lengths.
[0041] With respect to the corresponding scheme of the above-mentioned figures, the following specific embodiments are described:
[0042] First embodiment
[0043] Please refer to Figure 2 As shown, in this embodiment, the anchor cable of the two-unit pressure-dispersed anchor cable and other elongation deformation compensation devices after stress locking is provided with a first carrier 21 and at least one second carrier 22, as well as a first steel strand 11 and at least one second steel strand 12, and the first carrier 21 is installed with a compensation device 31. The lengths of the first steel strand 11 and the second steel strand 12 are inconsistent, and at the same time, one end of the first steel strand 11 is movably connected to the first carrier 21 and the compensation device 31, and one end of the second steel strand 12 is fixedly connected to the second carrier 22, and the first steel strand 11 and the second steel strand 12 are arranged along the radial direction of the anchor cable 01 and in parallel with each other. The first steel strand 11 and the second steel strand 12 are divided into a first tensioning unit A and a second tensioning unit B along the radial direction of the anchor cable 01, and the part extending out of the anchor cable 01 is the tensioning section C. When applying, please refer to Figure 12-13 As shown, the anchor cable 01 is filled with a cement mortar anchoring layer 71, and the cement mortar anchoring layer 71 is mixed with the first steel strand 11, the second steel strand 12, the first bearing body 21 and the second bearing body 22 to prevent them from moving outward. Therefore, the external tension borne by the first steel strand 11 and the second steel strand 12 is transmitted to the stratum around the anchor cable anchoring layer, and the external tension is balanced by the friction around the anchoring layer. The first steel strand 11 and the second steel strand 12 are opposite to the force of the cement mortar anchoring layer 71. And the first steel strand 11 and the second steel strand 12 are coated with anti-corrosion grease 81 and the PE protective sleeve 91 is externally sleeved, so that when the first steel strand 11 and the second steel strand 12 are subjected to load D and tensioned, the PE protective sleeve 91 isolates the first steel strand 11 and the second steel strand 12 from the external cement or concrete, and the first steel strand 11 and the second steel strand 12 can slide freely in the PE protective sleeve 91. After being manufactured, the anchor cable 01 can be applied to the support pile and the solid rock mass for locking connection.
[0044] Specifically, the first carrier 21 includes a first front plate 211 and a first rear plate 212 connected to each other, and the second carrier 22 includes a second front plate 221 and a second rear plate 222 connected to each other, the first front plate 211 and the first rear plate 212 are fixedly connected by a through screw 61 to form a certain gap, and the through screw 61 is also fixed with a nut, and the second front plate 221 and the second rear plate 222 are fixedly connected by a through screw 61 to form a certain gap, and the through screw 61 is also fixed with a nut. Specifically, the steel strand that passes through and connects the first front plate 211, the first rear plate 212 and the clip part 311 is set as a first steel strand 11, and the steel strand that passes through and connects the first front plate 211, the first rear plate 212, the second front plate 221 and the second rear plate 222 is set as a second steel strand 12, and the length of the second steel strand 12 is longer than the length of the first steel strand 11. Please refer to Figure 2-3 As shown, the first steel strand 11 of the first tensioning unit A and the second steel strand 12 of the second tensioning unit B are fixed at a certain distance by a rubber bracket 51, and the rubber bracket 51 is provided with threading holes matching the first steel strand 11 and the second steel strand 12.
[0045] Please refer to Figures 4 to 8 As shown, the compensation device 31 includes a clip part 311 and a shear key 312 connected to each other. The clip part 311 is arranged in the gap formed by the first front plate 211 and the first rear plate 212. The front end of the clip part 311 is set as a wedge-shaped structure, and the shear key 312 is arranged around the surface of the clip part 311. A groove 2111 is provided on one side of the first front plate 211. The groove 2111 is set as a concave wedge-shaped structure matching the front end of the clip part 311. Therefore, the front end of the clip part 311 is matched and embedded with the groove 2111, and the rear end of the clip part 311 is connected to the first rear plate 212. The first front plate 211 and the first rear plate 212 are provided with through holes penetrating the bottom of the groove 2111 and matching the diameter of the first steel strand 11, and the first front plate 211, the first rear plate 212, the second front plate 221 and the second rear plate 222 are correspondingly penetrated with through holes matching the diameter of the second steel strand 12.
[0046] The clip part 311 is composed of a plurality of clips with the same opposite sides. In this embodiment, the clip part 311 composed of three clips is preferably selected for explanation. The rear end of the clip part 311 is provided with a wire binding groove 313 for winding a steel wire. The three clips are combined to clamp and connect the first steel strand 11. After the combination is completed, the steel wire is used to bind and fix it on the wire binding groove 313 at the rear end of the clip part 311. Therefore, the first steel strand 11 can be movably connected between the first front plate 211 and the first rear plate 212 through the clip part 311. When the anchor cable 01 is locked, the shear key 312 is in contact with the open end surface of the groove 2111. When the first steel strand 11 is deformed by force and pulls the clip part 311 to move toward the groove 2111, the shear key 312 will be cut off when the limit shear force is reached, and then the clip part 311 is moved to the groove 2111 and embedded for a certain distance.
[0047] Please refer to Figures 9 to 11 As shown, the second steel strand 12 between the second front plate 221 and the second rear plate 222 is sleeved with an extruded steel sleeve 41. Specifically, the extruded steel sleeve 41 and the second steel strand 12 are fixedly connected after extrusion and deformation, and the portion of the second steel strand 12 that passes through the second front plate 221 is stripped of the PE protective sleeve 91. The extruded steel sleeve 41, whose inner diameter is slightly larger than the diameter of the second steel strand 12, is sleeved on the end of the second steel strand 12, and then the extruded steel sleeve 41 is extruded by a jack hydraulic extruder. The extruded steel sleeve 41 is extruded and deformed, and then it is clamped together with the second steel strand 12 with the PE protective sleeve 91 stripped off. The extruded steel sleeve 41 has notched teeth inside. When it is squeezed and deformed by the hydraulic extruder, the teeth are embedded in the second steel strand 12 and are interlocked with the second steel strand 12. Since the outer diameter of the extruded steel sleeve 41 is larger than the reserved hole diameter of the second steel strand 12 on the second front plate 221, when the second steel strand 12 is tensioned by the external load D, the second front plate 221 prevents the second steel strand 12 from moving outward, thereby achieving the purpose of fixing the second steel strand 12 to the second front plate 221 and the second rear plate 222 through the extruded steel sleeve 41.
[0048] To sum up, the main technical effect achieved by this technical solution is: when the locked anchor cable is further deformed, the first steel strand 11 and the second steel strand 12 of different lengths in the anchor cable 01 are disconnected at the same time when the tension reaches the limit value at the same time, so as to give full play to the role of each steel strand and save costs.
[0049] According to the above technical solution, when the anchor cable 01 is deformed again after being locked, according to Hooke's law, it can be obtained that: Wherein F is the tensile load D borne by the outside of the steel strand, K is the axial stiffness coefficient, l is the length of the steel strand, and Δl is the elongation deformation of the steel strand under load D.
[0050] The length of the first steel strand 11 is shorter than that of the second steel strand 12, so the tension generated by the first steel strand 11 increases faster than that of the second steel strand 12. The clip component 311 is subjected to the tension of the first steel strand 11 and is about to move toward the bottom of the groove 2111, so that the shear key 312 is blocked by the open end surface of the groove 2111 and reaches the limit shear force and is sheared off. The clip component 311 continues to move toward the bottom of the groove 2111 for a certain distance, and the retraction tension load D of the first steel strand 11 is reduced. When the tension continues to increase so that the first steel strand 11 and the second steel strand 12 continue to be deformed by force, the first steel strand 11 and the second steel strand 12 are finally disconnected at the same time.
[0051] Specifically, the displacement of the clip member 311 toward the groove 2111 is determined based on the measured length of the deformation difference between the first steel strand 11 and the second steel strand 12, the material limit value and the locking value. Therefore, the displacement of the clip member 311 is equal to the measured length of the deformation difference between the first steel strand 11 and the second steel strand 12 when they are subjected to force. Further analysis is conducted in combination with the principle of the Hooke's law formula, and the tension of the first steel strand 11 is set to F1, the tension of the second steel strand 12 is set to F2, K is the axial stiffness coefficient, the length of the first steel strand 11 is l1, the length of the second steel strand 12 is l2, the elongation deformation of the first steel strand 11 under load D is △l 1, and the elongation deformation of the second steel strand 12 under load D is △l2. It is known that the length of the first steel strand 11 is shorter than that of the second steel strand 12, i.e., l1<l2; therefore, when the locked anchor cable 01 is stretched and deformed again, the tension generated by the first steel strand 11 is greater than the tension generated by the second steel strand 12, i.e., F1>F2; the tension F1 of the first steel strand 11 with a shorter length increases faster and reaches the ultimate bearing capacity first, while the tension F2 of the second steel strand 12 with a longer length increases slower and reaches the ultimate bearing capacity last. In order to ensure that the steel strands of the two tensioning units reach the ultimate bearing capacity at the same time under the same elongation deformation, the elongation deformation between the first steel strand 11 and the second steel strand 12 of different lengths is compensated by setting the compensation device 31.
[0052] The following is the elongation deformation analysis of the first and second steel strands:
[0053] 1) The tension of the steel strands of the anchor cable 01 after the tension units are locked is equal. If the locking value of the anchor cable 01 is F, the tension on each steel strand after locking is
[0054] 2) When the locked anchor cable 01 is further deformed due to external factors, the first steel strand 11 and the second steel strand 12 begin to stretch and deform synchronously, and the length of the first steel strand 11 of the first tensioning unit A is shorter than the second steel strand 12 of the second tensioning unit B. Therefore, the tension generated by the first steel strand 11 increases faster due to the stretching deformation again. When the tension generated by the first steel strand 11 increases to a certain value When "F 极 = is the material ultimate bearing capacity of a single strand of the first steel strand 11, the shear key 312 is cut off, the ultimate bearing capacity of the shear key 312 = F1, the wedge-shaped clip member 311 slides into the groove 2111 of the first front plate 211 for a distance △l 2-1 , △l 2-1 The tension of the first steel strand 11 and the second steel strand 12 is given by F 锁 Increase to F 极 The difference in elongation deformation produced when The elongation deformation of the first steel strand 11 before the tension reaches F1 and the clip member 311 has not yet slid is
[0055] The elongation deformation of the first steel strand 11 after the clip member 311 slides under the force is: The tensile force at this time can be calculated by using the elongation deformation of the first steel strand 11 after the clip member 311 slides. That is, the tension F1 generated by the elongation and deformation of the first steel strand 11 after locking reaches When the shear key 312 is cut, the clip member 311 slides into the groove 2111 by a distance The tension of the first steel strand 11 is Rapidly decrease to The half of the limit value is used as the bearing capacity of the shear key 312, thereby preventing the shear key 312 from being damaged in advance or in delay;
[0056] 3) Then the tension of the first steel strand 11 and the second steel strand 12 continues to increase with the increase of elongation deformation. Similarly, the tension of the first steel strand 11 increases faster because of its shorter length. When the tension of the first steel strand 11 is increased by the sliding of the clip member 312, Increase to the limit value F 极When the second steel strand 12 is increased to the limit value F 极 At this time, the first steel strand 11 and the second steel strand 12 both reach their ultimate bearing capacity and fail. This is because the first steel strand 11 has its own tension from F 锁 Increase to F 极 The elongation deformation In addition, there is also the sliding deformation of the clip member 312 The sum of the two is exactly equal to the tension of the second steel strand 12 from F 锁 Increase to F 极 The elongation deformation Therefore, the first steel strand 11 and the second steel strand 12 eventually reach the limit value F at the same time. 极 Entering a state of destruction.
[0057] (4) The shear key is made of cast iron, which is a brittle material. Once the tension of the first steel strand 11 reaches When the shear key 312 is cut off immediately, no plastic deformation will occur. The connection size of the shear key 312 surrounding the clip part 311 is where τ 极 The ultimate shear strength of the shear key 312 made of cast iron is determined based on the calculated area A, and the plane area size of the cast iron welded to the wedge-shaped clip is determined.
[0058] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A two-unit pressure-dispersed anchor cable elongation deformation compensation device after stress locking, characterized in that: The invention comprises a bearing body and a compensation device, wherein the bearing body comprises a first bearing body and a second bearing body, the first bearing body is connected to the compensation device, a plurality of steel strands are connected through the first bearing body, the second bearing body and the compensation device, the plurality of steel strands are set to be of the same or different lengths, and the plurality of steel strands of the same or different lengths are deformed synchronously under stress; The compensation device comprises a clip component and a shear key connected to each other, the first carrier is provided with a groove matched with the front end of the clip component, the clip component clamps and connects the steel strand, the steel strand is deformed by force and pulls the clip component to move a certain distance in the direction of the groove, the shear key is in contact with the open end surface of the groove, and the shear key is cut off when the limit shear force is reached to make the clip component move and embed into the groove, and the measured length from the front end of the clip component to the bottom of the groove is equal to the measured length of the deformation difference caused by the force of the steel strands of different lengths; The first carrier includes a first front plate and a first rear plate connected to each other, the second carrier includes a second front plate and a second rear plate connected to each other, the steel strands penetrating and connecting the first front plate, the first rear plate and the clip member are set as first steel strands, the steel strands penetrating and connecting the first front plate, the first rear plate, the second front plate and the second rear plate are set as second steel strands, and the length of the second steel strands is longer than the length of the first steel strands; The clip member is arranged between the first front plate and the first rear plate, the groove is arranged on one side of the first front plate and matches with the front end of the clip member, the rear end of the clip member is connected to the first rear plate, and the displacement of the clip member toward the groove is determined according to the measured length of the deformation difference between the first steel strand and the second steel strand, the material limit value and the locking value; The anchor cable is filled with a cement mortar anchoring layer, the cement mortar anchoring layer is mixed with the first steel strand, the second steel strand, the first bearing body and the second bearing body, and the first steel strand and the second steel strand have opposite forces to the cement mortar anchoring layer; The first steel strand and the second steel strand are coated with anti-corrosion grease and then covered with a PE protective sheath.
2. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cables according to claim 1, characterized in that: The shear key is arranged around the surface of the clip component, the front end of the clip component is set to a wedge-shaped structure, the groove is set to a concave wedge-shaped structure matching the front end of the clip component, the first front plate and the first rear plate are set with through holes that pass through the bottom of the groove and match the diameter of the first steel strand, and the first front plate, the first rear plate, the second front plate and the second rear plate are correspondingly penetrated by through holes that match the diameter of the second steel strand.
3. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cable according to claim 2, characterized in that: It also includes an anchor cable, wherein the first steel strand and the second steel strand are arranged in the anchor cable, the first steel strand and the second steel strand are respectively divided into a first tensioning unit and a second tensioning unit corresponding to the anchor cable, and the portion extending out of the anchor cable is a tensioning section; After being locked, the anchor cable is deformed again. According to Hooke's law, , where F is the tensile load on the outside of the first steel strand or the second steel strand, K is the axial stiffness coefficient, l is the length of the first steel strand or the second steel strand, The elongation deformation of the first steel strand or the second steel strand under load, the length of the first steel strand is shorter than the length of the second steel strand, so the tension generated by the first steel strand increases faster than that of the second steel strand; The clip component moves toward the bottom of the groove under the tension of the first steel strand, and the shear key is blocked by the open end surface of the groove and reaches the limit shear force and is cut off, so that the clip component continues to move a certain distance toward the bottom of the groove, and the retraction tension load of the first steel strand is reduced. When the tension continues to increase so that the first steel strand and the second steel strand continue to be deformed by the force, the first steel strand and the second steel strand are finally disconnected at the same time.
4. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cables according to claim 3, characterized in that: The first front plate and the first rear plate are fixedly connected by through-screws to form a certain gap, the clip component is arranged in the gap formed by the first front plate and the first rear plate, and the first steel strand is movably connected to the first front plate and the first rear plate through the clip component.
5. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cables according to claim 3, characterized in that: The second front plate and the second rear plate are fixedly connected by through-screws to form a certain gap. The second steel strand penetrates and connects the second front plate and the second rear plate. The second steel strand located between the second front plate and the second rear plate is sleeved with an extruded steel sleeve. The extruded steel sleeve and the second steel strand are fixedly connected after extrusion deformation. The second steel strand is fixedly connected to the second front plate and the second rear plate through the extruded steel sleeve.
6. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cables according to claim 3, characterized in that: The first steel strand of the first tensioning unit and the second steel strand of the second tensioning unit are fixed with a rubber bracket at a certain distance, and the rubber bracket is provided with threading holes matching the first steel strand and the second steel strand.
7. The elongation deformation compensation device after stress locking of two-unit pressure-dispersed anchor cables according to claim 1, characterized in that: The clip component is composed of a plurality of clips, and a steel wire binding groove for winding a steel wire is provided at the rear end of the clip component.