Data processing method, device and system
By obtaining and analyzing the characteristic code information of the power grid equipment, performing data detection and graphical display, and storing it in a preset database, it solves the complexity of the power grid equipment data management, improves the data acquisition efficiency and quality, and realizes data call and management between multi-service systems.
Patent Information
- Application Number
- CN202011194105.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-30
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2040-10-30
AI Technical Summary
The prior art has complexity in the data management of power grid equipment, resulting in low data collection efficiency, low quality, and requires a lot of manpower, material resources and time costs.
By obtaining the feature code information on the power grid equipment, the data information is obtained, and the data information is detected and graphically displayed, and stored in a preset database for multiple business system calls, realizing the integration of data acquisition and quality verification.
It improves data collection efficiency and quality, reduces manpower, material resources and time costs, and realizes data call and management between multiple business systems.
Smart Images

Figure CN112288171B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing, and in particular to a data processing method, device and system. Background Art
[0002] With the comprehensive advancement of State Grid Corporation's digital new infrastructure work, in order to adapt to the company's development needs and power grid equipment development trends under the new situation, it is urgently necessary to make adjustments and innovations in the original production management model.
[0003] In terms of power grid information management, existing technologies mainly use the traditional operation and inspection model that mainly relies on human resources to manage the equipment and data in the operation and inspection business of power grid companies. For example, Figure 1 The existing data collection process is shown. Figure 1 It can be seen that in terms of data collection, the existing technology uses handheld terminals, RTK (Real-Time Kinematic, real-time dynamic differential) measuring instruments, tablet computers and other devices to conduct on-site information collection and recording of power grid equipment. After completing the collection and recording of information, the collected data is imported into the intermediate library offline, and then the data is sorted internally, manually drawn, maintained in the graphic ledger, and quality checked in the intermediate library. After that, it is synchronized to the corresponding business system through the interface between each business system to form the basic data between each business system (that is, data rectification). If the data between each business system needs to be integrated and applied, the corresponding data is extracted from each business system, compared and checked by establishing rules, and then the successfully compared data is synchronized to the opposite business system to form the final data or results.
[0004] Moreover, the existing technology can only collect and maintain the business data and graphic data of the system independently. Finally, a corresponding relationship is established for the data between the systems to establish graphics and topological relationships. The above process will consume a lot of manpower, material resources and time costs.
[0005] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0006] The embodiments of the present invention provide a data processing method, device and system to at least solve the technical problem of complex management of data related to power grid equipment in the prior art.
[0007] According to one aspect of an embodiment of the present invention, a data processing method is provided. The method is applied in a data processing system, wherein the data processing system includes multiple business systems, including: acquiring characteristic information of a characteristic code on a current power grid device; parsing the characteristic information to obtain data information of the current power grid device; detecting the data information to obtain a detection result; when the detection result indicates that the data information is normal, storing the data information in a preset database and graphically displaying the data information, wherein the preset database can be called by multiple business systems.
[0008] Furthermore, the data processing method also includes: after graphically displaying the data information, obtaining graphic data for graphically displaying the data information; when the data information and the graphic data do not match, updating the graphic data to obtain updated graphic data; and displaying the updated graphic data.
[0009] Furthermore, the data processing method also includes: after updating the graphic data and obtaining the updated graphic data, detecting the occupancy status of the data information of the current power grid equipment, wherein the occupancy status includes at least: a use status and an unused status; when it is determined that the occupancy status is a use status, generating a first prompt information, wherein the first prompt information is used to prompt that the data information is prohibited from being modified.
[0010] Furthermore, the data processing method also includes: after graphically displaying the data information, obtaining identification information of the current power grid equipment from the data information; determining the inspection content of the current power grid equipment based on the identification information; inspecting the current power grid equipment based on the inspection content to obtain the inspection results; and recording the inspection results.
[0011] Furthermore, the data processing method also includes: after recording the inspection results, obtaining the first location information of the current power grid device and the second location information of the next power grid device; and generating a planned route from the first location information to the second location information.
[0012] Furthermore, the data processing method also includes: obtaining fault information of the current power grid equipment according to the identification information; when the fault information indicates that the current power grid equipment has an uneliminated fault, determining the inspection information required to check the fault; and setting the inspection information as part of the inspection content.
[0013] According to another aspect of an embodiment of the present invention, a data processing device is also provided, which is applied to a data processing system. The data processing system includes multiple business systems, including: an acquisition module, used to acquire characteristic information of a characteristic code on a current power grid device; a parsing module, used to parse the characteristic information to obtain data information of the current power grid device; a detection module, used to detect the data information to obtain a detection result; and a display module, used to store the data information in a preset database and graphically display the data information when the detection result indicates that the data information is normal, wherein the preset database can be called by multiple business systems.
[0014] According to another aspect of an embodiment of the present invention, a data processing system is also provided. The data processing system includes multiple business systems, including: a terminal device, used to collect characteristic information of a characteristic code on a current power grid device, parse the characteristic information to obtain data information of the current power grid device, and then detect the data information to obtain a detection result. When the detection result indicates that the data information is normal, the data information is graphically displayed and the data information is sent to a server; a server, used to store the data information in a preset database, wherein the preset database can be called by multiple business systems.
[0015] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the above-mentioned data processing method.
[0016] According to another aspect of an embodiment of the present invention, a processor is further provided. The processor is used to run a program, wherein the above-mentioned data processing method is executed when the program is run.
[0017] In an embodiment of the present invention, a method of integrating data entry and quality verification is adopted. After acquiring the characteristic information of the characteristic code on the current power grid equipment, the characteristic information is parsed to obtain the data information of the current power grid equipment, and the data is tested to obtain the test result. Finally, when the test result indicates that the data information is normal, the data information is stored in a preset database and the data information is graphically displayed, wherein the preset database can be called by multiple business systems.
[0018] In the above process, the data information of the power grid equipment is obtained by parsing the feature code information, thereby avoiding the high time cost and high error rate caused by manually inputting the relevant data of the power grid equipment. In addition, in the present application, data calls between multiple business systems are realized by calling the preset database, further saving manpower, material resources and time costs. Finally, the present application can realize the function of integrating data collection and data verification, which not only improves the efficiency of data collection, but also ensures the quality of collected data.
[0019] It can be seen that the solution provided in this application achieves the purpose of improving data collection efficiency and data collection quality, thereby achieving the technical effect of improving the management efficiency of data related to power grid equipment, and further solving the technical problem of complex management of data related to power grid equipment in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0021] Figure 1 It is a schematic diagram of a data collection process according to the prior art;
[0022] Figure 2 is a business architecture diagram of an optional data processing system according to an embodiment of the present invention;
[0023] Figure 3 is a flow chart of a data processing method according to an embodiment of the present invention;
[0024] Figure 4 is a schematic diagram of an optional data collection according to an embodiment of the present invention;
[0025] Figure 5 It is a schematic diagram of a data governance model based on existing technologies;
[0026] Figure 6 is a schematic diagram of an optional data governance mode according to an embodiment of the present invention;
[0027] Figure 7 It is a schematic diagram of a new data processing mode according to the prior art;
[0028] Figure 8 is a schematic diagram of an optional new data processing mode according to an embodiment of the present invention;
[0029] Fig. 9 is a schematic diagram of a data processing device according to an embodiment of the present invention;
[0030] Fig.10 is a functional structure diagram of an optional data processing system according to an embodiment of the present invention;
[0031] Fig.11 It is a technical structure diagram of an optional data processing system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0032] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0033] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0034] Example 1
[0035] According to an embodiment of the present invention, an embodiment of a data processing method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0036] In addition, it should be noted that the data processing method in this embodiment can be applied to a data processing system, wherein the data processing system may include multiple business systems, each of which has at least one business function. Figure 2 An optional business architecture diagram of a data processing system is shown, comprising Figure 2It can be seen that the data processing system includes data collection business, equipment maintenance business, inspection management business, detection management business, fault management business, work ticket management business, equipment commissioning acceptance business, equipment inventory management business and financial inventory management business. Each business can realize multiple functions. For example, the data collection business can realize coordinate positioning, graphic plotting, topology analysis and other functions. Among them, the functions realized by other businesses have been Figure 2 It is described in , and will not be repeated here.
[0037] Figure 3 is a flow chart of a data processing method according to an embodiment of the present invention. Figure 3 As shown, the method comprises the following steps:
[0038] Step S202, acquiring characteristic information of the characteristic code on the current power grid device.
[0039] Optionally, the power grid equipment may include but is not limited to high-voltage user points, user dedicated lines, user stations, transformers, and meter boxes, wherein user dedicated lines include but are not limited to overhead lines, cables, etc., and user stations include but are not limited to switch stations, box-type transformers, distribution rooms, and distribution rooms, etc.
[0040] In addition, the feature code may be, but is not limited to, a QR code or an RFID (Radio Frequency Identification) code.
[0041] In an optional embodiment, a QR code and / or RFID code can be used as a unique identifier of a power grid device. A user can obtain characteristic information of the QR code and / or RFID code by scanning the QR code and / or RFID code through a terminal device, wherein the characteristic information represents the data information of the power grid device. In addition, the terminal device includes at least a mobile terminal and a non-mobile terminal, wherein the mobile terminal can be a tablet computer, a smart phone or other device capable of scanning a QR code and / or RFID code, and the non-mobile device can be a computer. Optionally, a security encryption chip is installed inside the mobile terminal, and the computer is an intranet computer. By installing a security encryption chip on the mobile terminal and setting the computer in the intranet, information leakage can be effectively prevented.
[0042] It should be noted that by scanning the feature code on the current power grid equipment to obtain the relevant data of the current power grid equipment without manual input, not only the data collection efficiency is improved, but also the error rate of manual data collection is reduced.
[0043] Step S204: parse the characteristic information to obtain data information of the current power grid equipment.
[0044] In step S204, the data information of the power grid equipment includes but is not limited to the location, photo, maintenance user name, electricity address, importance level, administrative area of the high-voltage user point, tower location, cable / cable pipe direction, cable / cable pipe photo, user station location, photo, maintenance station name, feeder, address, box transformer type, total distribution transformer capacity, meter box location, maintenance asset number, installation address, asset nature and other information.
[0045] Step S206, testing the data information to obtain a test result.
[0046] It should be noted that in the existing technology, the ledger of power grid equipment is the basis for business development, and the quality of its data is directly related to the improvement of the lean management level of the power grid. In particular, with the gradual promotion of the physical identification construction work of State Grid Corporation, the quality of the basic data of the ledger is affecting the comprehensive and in-depth application of physical identification. In the existing data management system, due to historical data migration, non-standard system application and other reasons, there are problems such as inconsistent graph numbers, unconnected graph topology, incomplete or non-standard ledger data, and missing associations. In response to the above problems, the existing data governance methods have problems such as large data governance workload, low efficiency, and repeated work, resulting in little data governance results.
[0047] To solve the above problems, this application first tests the collected data information before storing it to ensure the accuracy and completeness of the data information, providing technical support for the lean management of the basic data of the power grid equipment ledger, ensuring the completeness and accuracy of the parameters of the power grid equipment and the consistency of the graph and numbers, improving the business collaboration capability, meeting the accuracy requirements of the equipment ledger for docking with other business systems, and greatly reducing the impact of basic data on the line loss management, distribution automation graph and model interaction, and operation and distribution integration in the same period, thereby achieving the goal of further improving the lean management level of operation and maintenance professionals.
[0048] In addition, this application can realize the functional application of integrating basic data entry and quality verification, and verify and manage the quality of distribution and operation data line by line and substation by substation.
[0049] Step S208, when the detection result indicates that the data information is normal, the data information is stored in a preset database and the data information is graphically displayed, wherein the preset database can be called by multiple business systems.
[0050] It should be noted that the marketing and distribution graphic data is the foundation of the construction of the power grid GIS (Geographic Information System), which requires the completion of the internal data initialization, field survey, and subsequent data change maintenance of the data of each link of the distribution network, such as substations, distribution transformers, power customers, and low-voltage lines. However, the distribution network has the characteristics of complex trend and dense distribution. Therefore, when collecting marketing and distribution graphic data, it is necessary to conduct a field survey of the use of the distribution network, and redraw the line equipment connection diagram and layout diagram of the system according to the actual situation, and timely enter the collected equipment information into the relevant system and marketing system in a complete, accurate, and timely manner. For the above-mentioned different business systems, the existing technology can only collect and maintain the business data and graphic data of each system independently. Finally, the corresponding relationship between the data of each system is formulated to achieve the establishment of graphics and topological relationships. This process will consume a lot of manpower, material resources and time costs.
[0051] To solve the above problems, this application stores the collected data information in a preset database, so that the data source of each business system is the preset database, thereby realizing the construction and application of the power Internet of Things with "one source for data, one map for the power grid, and one line for business".
[0052] Based on the scheme defined in the above steps S202 to S208, it can be learned that, by adopting a method of integrating data entry and quality verification, after obtaining the characteristic information of the characteristic code on the current power grid equipment, the data information of the current power grid equipment is obtained by parsing the characteristic information, and the data is tested to obtain the test results. Finally, when the test results indicate that the data information is normal, the data information is stored in a preset database and the data information is graphically displayed, wherein the preset database can be called by multiple business systems.
[0053] It is easy to notice that in the above process, the data information of the power grid equipment is obtained by parsing the feature code information, which avoids the high time cost and high error rate caused by manually entering the relevant data of the power grid equipment. In addition, in this application, data calls between multiple business systems are realized by calling the preset database, which further saves manpower, material resources and time costs. Finally, this application can realize the function of integrating data collection and data verification, which improves the efficiency of data collection while ensuring the quality of collected data.
[0054] It can be seen that the solution provided in this application achieves the purpose of improving data collection efficiency and data collection quality, thereby achieving the technical effect of improving the management efficiency of data related to power grid equipment, and further solving the technical problem of complex management of data related to power grid equipment in the prior art.
[0055] In an optional embodiment, in the present application, the collection of data information of power grid equipment may include the collection of marketing data and the collection of distribution network data, wherein the marketing data collection mainly includes the collection of data on high-voltage user points, user dedicated lines (overhead lines, cables), user stations (switch stations, box-type transformers, distribution rooms, distribution rooms), transformers, meter boxes, etc., and the distribution network data collection mainly includes the collection of data on three aspects: distribution overhead line data collection, distribution cable data collection, and distribution station building data collection.
[0056] Optionally, taking the collection of distribution network data as an example, after the data information is graphically displayed, the graphic data for graphically displaying the data information is first obtained, and then when the data information does not match the graphic data, the graphic data is updated to obtain the updated graphic data, and the updated graphic data is displayed. For example, the graphical data includes the location information of the power grid equipment on the map. If it is detected that the location information of the power grid equipment does not match the location information displayed on the map, the user can directly drag the position on the geographic map to revise the coordinates, or directly select the power grid equipment to maintain the basic data (for example, the equipment name, model, manufacturer, etc.) to achieve the modification of the graphic data. After the graphic data is modified, the modified graphic data is displayed on the graphical user interface of the data processing system, for example, the icon corresponding to the power grid equipment is displayed at the modified coordinate position.
[0057] In an optional embodiment, the data processing system can also display the equipment according to the relationship of the current power grid equipment in the form of a large feeder. In order to facilitate the operation and maintenance personnel to modify the equipment parameters on site, the equipment information can be switched between two modes: key parameters and all parameters. Among them, when entering the equipment information page, the key parameters of the current power grid equipment are displayed by default. The parameters can be obtained on the equipment nameplate. The on-site staff can modify the parameters quickly and conveniently. After the parameters of the current power grid equipment are modified, the system automatically generates a change application form for the parameters of the current power grid equipment. The team members select the power grid equipment to be submitted and push the process to the relevant system, and perform ledger review and process termination operations in the relevant system. In addition, after the parameters of the current power grid equipment are modified, the power grid equipment in the change list can also be deleted, and the parameter information of the power grid equipment can be restored to the original data.
[0058] In an optional embodiment, after updating the graphic data and obtaining the updated graphic data, the data processing system further detects the occupation status of the data information of the current power grid device, and generates a first prompt message when the occupation status is determined to be a use status, wherein the first prompt message is used to prompt that the data information is prohibited from being modified, and the occupation status includes at least: a use status and an unused status. For example, if the current power grid device is locked by other processes, the system gives a prompt that the parameters of the power grid device are not allowed to be modified, so as to avoid repeated operations on a power grid device causing data anomalies.
[0059] Optional, due to the large scale of power grid equipment, especially the line equipment of power transmission and distribution, there are many points, wide areas, long lines and many faults. The current equipment inspection work is carried out by manual regular inspection. Due to the large number of inspection equipment and the wide dispersion area, the inspection task is heavy, the labor intensity is high, the inspection quality cannot be guaranteed, and the management of inspection standardization and personnel presence is also very difficult.
[0060] To solve the above problems, this application builds a mobile inspection application based on physical identification, scans physical identification codes, conducts in-depth application practice of core operation and inspection services such as equipment inspection and testing, establishes and improves the relationship between equipment with physical identification codes and other equipment, and sorts out the systems and standards for inspection, testing and maintenance. At the same time, mobile technology and Internet of Things technology are used to realize on-site equipment inspection and mobile testing operations, standardize operation and maintenance management, optimize the collection method and quality of operation and maintenance records, and improve the quality and efficiency of operation and maintenance.
[0061] Specifically, after the data information is graphically displayed, the identification information of the current power grid equipment is obtained from the data information, and the inspection content of the current power grid equipment is determined based on the identification information. Then, the current power grid equipment is inspected based on the inspection content, the inspection results are obtained, and the inspection results are recorded.
[0062] Optionally, each power grid device has corresponding inspection content, and the inspection content of different power grid devices may be different. Preferably, in the present application, the inspection content of the power grid device is associated with the identification information of the power grid device. The inspection personnel can obtain data information by scanning the QR code or RFID code of the current power grid device to be inspected, obtain the identification information of the current power grid device from the data information, and obtain the inspection content corresponding to the identification information through the Internet based on the identification information. The inspection content includes the operating steps, precautions and other contents required for inspecting the current power grid equipment. The inspection personnel can inspect the current power grid equipment according to the inspection content.
[0063] Furthermore, after the inspection is completed and the inspection results are recorded, the data processing system can also obtain the first location information of the current power grid device and the second location information of the next power grid device, and generate a planned route from the first location information to the second location information.
[0064] It should be noted that in this application, the inspection work can be carried out in four categories according to the inspection scope: the entire line, pole-mounted transformers, pole-mounted switches, and specific equipment inspections. Equipment inspection standards (i.e., inspection content) are provided, and inspectors inspect the equipment according to the inspection standards. The data processing system can also provide a GIS route map display to guide on-site personnel to plan inspection routes. For personnel who are not familiar with the location of the equipment, a patrol equipment navigation function is provided to guide patrol personnel to quickly reach the location of the patrol equipment. In addition, the data processing system can also automatically match the patrol equipment according to the coordinates of the patrol personnel. If they do not reach the patrol range, they are deemed to have not patrolled; and the patrol personnel are located in real time with coordinates and the patrol trajectory is recorded. The patrol record is automatically registered after the patrol is completed, and the system automatically generates standard patrol card information.
[0065] Furthermore, when the inspection equipment has defects, hidden dangers, or faults that have not been eliminated, users can be reminded to conduct key inspections.
[0066] In an optional embodiment, the data processing system obtains the fault information of the current power grid equipment according to the identification information, and when the fault information indicates that the current power grid equipment has an uneliminated fault, determines the inspection information required to check the fault, and sets the inspection information as part of the inspection content. When the next inspection of the current power grid equipment is carried out, the uneliminated defects, hidden dangers, and faults are used as the inspection content. Preferably, the uneliminated defects, hidden dangers, and faults are highlighted in the inspection content to remind the inspection personnel to carry out key inspections.
[0067] In an optional embodiment, before obtaining the identification information of the current power grid equipment from the data information, the data processing system may also collect image information of the inspection object of the current power grid equipment and the electronic signature of the inspection object, and detect whether the image information matches the electronic signature. If the image information matches the electronic signature, an electronic work ticket is generated.
[0068] It should be noted that in this application, the paperless office of work tickets is extended to the work site, and the on-site approval and termination of electronic tickets are realized, which is synchronized with the on-site work, thereby improving the efficiency of on-site work. In addition, the electronic work ticket uses electronic signature combined with face recognition technology to ensure that the staff and the signatory are the same, avoiding safety accidents and disputes caused by proxy signing.
[0069] In another optional embodiment, before collecting the image information of the inspection object and the electronic signature of the inspection object for inspecting the current power grid equipment, the data processing system also obtains the object information of the inspection object, and determines the authority information of the inspection object based on the object information, and obtains the image information and electronic signature of the inspection object when the authority information indicates that the inspection object has inspection authority.
[0070] Optionally, the object information of the inspection object includes but is not limited to name, photo, avatar, ID card, safety test results, authority information, etc., among which the authority information of the inspection object at least includes the safety qualification of the work ticket. Among them, the inspection object can only carry out the work related to the work ticket after the object information is reviewed and approved. At the same time, the qualifications of non-main industry personnel have a validity period management, that is, they can only participate in the work within the validity period. After the expiration of the validity period, the relevant qualification information needs to be collected again, and the work can only continue after approval. It should be noted that the collection of the object information of the inspection object is the basis for the face recognition of the work ticket signature and the identification of the work ticket authority.
[0071] Optional, Figure 4 A schematic diagram of an optional data collection is shown, comprising Figure 4 It can be seen that in this application, after completing the on-site data collection, nameplates, ledgers and other information can be automatically generated, and after data review, data can be published. Figure 1 It can be seen from the data collection process of the prior art shown that the solution provided by the present application optimizes the data collection and maintenance mode and realizes the integration of data collection and maintenance.
[0072] in addition, Figure 5 The data governance model in the prior art is shown. Figure 6 A schematic diagram of a data governance model based on this application is shown. Figure 5 It can be seen that in the prior art, after initiating the data change process, it is necessary to enter the equipment parameters one by one, issue a change order, conduct a quality check, and finally implement data rectification. Figure 6 It can be seen that in this application, batch maintenance of parameters can be carried out according to the actual objects on site, and the input quality can be checked synchronously according to the equipment parameter quality verification library, and then the input data can be reviewed, and finally, the reviewed data can be released. It can be seen that this application is based on mobile Internet technology to build an integrated application of basic data entry, quality verification and consistency of figures and numbers, optimize the data governance model, strictly control the data quality at the data entry, and avoid repeated rectification of data.
[0073] at last, Figure 7 It shows the newly added data processing mode in the prior art. Figure 8 A schematic diagram of a newly added data processing mode based on the present application is shown. Figure 7It can be seen that in the prior art, the processing of new data is relatively complicated and inefficient. Figure 8 It can be seen that in this application, the newly added data is first strongly associated with the engineering project, and then the equipment parameters are quickly batch-entered according to the battle line, and the parameters are automatically maintained using the standard parameter library. Finally, after the ledger, nameplate, and graphics are automatically generated, the application form is automatically created and archived. It can be seen that this application combines the idea of the power Internet of Things and the idea of big data to complete the resume of the equipment standard library, optimize the equipment addition mode based on the mobile side equipment data maintenance, quickly generate graphics, ledgers, and nameplates, and realize the process optimization and efficiency improvement of daily business application processes and results.
[0074] Example 2
[0075] According to an embodiment of the present invention, an embodiment of a data processing device is also provided, and the device is applied to a data processing system, and the data processing system includes multiple business systems. Fig. 9 is a schematic diagram of a data processing device according to an embodiment of the present invention. Fig. 9 As shown, the device includes: an acquisition module 901, a parsing module 903, a detection module 905 and a display module 907.
[0076] Among them, the acquisition module 901 is used to obtain the characteristic information of the characteristic code on the current power grid equipment; the analysis module 903 is used to analyze the characteristic information to obtain the data information of the current power grid equipment; the detection module 905 is used to detect the data information and obtain the detection result; the display module 907 is used to store the data information in a preset database and graphically display the data information when the detection result indicates that the data information is normal, wherein the preset database can be called by multiple business systems.
[0077] It should be noted that the above-mentioned acquisition module 901, analysis module 903, detection module 905 and display module 907 correspond to steps S202 to S208 in the above-mentioned embodiments, and the examples and application scenarios implemented by the four modules are the same as the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0078] Optionally, the data processing device also includes: a first acquisition module, used to acquire graphic data for graphically displaying the data information after the data information is graphically displayed; an update module, used to update the graphic data when the data information and the graphic data do not match, to obtain updated graphic data; and a first display module, used to display the updated graphic data.
[0079] Optionally, the data processing device also includes: a first detection module, used to detect the occupancy status of the data information of the current power grid equipment after updating the graphic data to obtain the updated graphic data, wherein the occupancy status includes at least: a use status and an unused status; a first generation module, used to generate a first prompt message when it is determined that the occupancy status is a use status, wherein the first prompt message is used to prompt that the data information is prohibited from being modified.
[0080] Optionally, the data processing device also includes: a second acquisition module, used to obtain the identification information of the current power grid equipment from the data information after the data information is graphically displayed; a first determination module, used to determine the inspection content of the current power grid equipment based on the identification information; an inspection module, used to inspect the current power grid equipment based on the inspection content to obtain the inspection results; and a recording module, used to record the inspection results.
[0081] Optionally, the data processing device also includes: a third acquisition module, used to obtain the first location information of the current power grid equipment and the second location information of the next power grid equipment after recording the inspection results; a second generation module, used to generate a planned route from the first location information to the second location information.
[0082] Optionally, the first determination module includes: a fourth acquisition module, used to obtain fault information of the current power grid equipment based on identification information; a second determination module, used to determine the inspection information required to check the fault when the fault information indicates that the current power grid equipment has an uneliminated fault; and a setting module, used to set the inspection information as part of the patrol content.
[0083] Example 3
[0084] According to an embodiment of the present invention, an embodiment of a data processing system is also provided. The data processing system includes a plurality of business systems, wherein the system further includes: a terminal device and a server.
[0085] Among them, the terminal device is used to collect characteristic information of the characteristic code on the current power grid equipment, parse the characteristic information, obtain the data information of the current power grid equipment, and then detect the data information to obtain the detection result. When the detection result indicates that the data information is normal, the data information is graphically displayed and sent to the server; the server is used to store the data information in a preset database, wherein the preset database can be called by multiple business systems.
[0086] From the above, it can be seen that by adopting a method of integrating data entry and quality verification, after obtaining the characteristic information of the characteristic code on the current power grid equipment, the data information of the current power grid equipment is obtained by parsing the characteristic information, and the data is tested to obtain the test results. Finally, when the test results indicate that the data information is normal, the data information is stored in a preset database and the data information is graphically displayed, wherein the preset database can be called by multiple business systems.
[0087] It is easy to notice that in the above process, the data information of the power grid equipment is obtained by parsing the feature code information, which avoids the high time cost and high error rate caused by manually entering the relevant data of the power grid equipment. In addition, in this application, data calls between multiple business systems are realized by calling the preset database, which further saves manpower, material resources and time costs. Finally, this application can realize the function of integrating data collection and data verification, which improves the efficiency of data collection while ensuring the quality of collected data.
[0088] It can be seen that the solution provided in this application achieves the purpose of improving data collection efficiency and data collection quality, thereby achieving the technical effect of improving the management efficiency of data related to power grid equipment, and further solving the technical problem of complex management of data related to power grid equipment in the prior art.
[0089] In an optional embodiment, Fig.10 The functional structure diagram of the data processing system is shown. Fig.10 It can be seen that this application is based on the mobile operation and maintenance of the intelligent operation and maintenance system, based on the in-depth application of on-site physical identification, deeply combining the basic data of on-site equipment, on-site operation and maintenance business management and physical identification, and using physical identification as the unique identification of on-site equipment. It realizes the connection between on-site mobile operation and maintenance operations and PMS system and GIS system, and completely solves the problem of the separation of the site and the system.
[0090] In an optional embodiment, Fig.11 The technical structure diagram of the data processing system is shown. Fig.11 It can be seen that the data processing system provided in this application is implemented using a layered architecture design. During operation, it undergoes multiple functional level interactions from the user interface to the data storage, and sequentially performs multiple stages such as data display and input, data transmission and access, service request dispatch, business logic execution, and data persistence operations.
[0091] Optionally, the presentation layer includes the platform presentation framework, and public presentation components and business function pages built based on the platform presentation framework; the service interaction layer includes the communication client running in the browser and the service access point running on the server; the business logic layer includes platform standard logic components, public logic components and business logic components; the persistence layer provides data persistence and data access capabilities.
[0092] It should be noted that the data processing system provided in this application provides various infrastructures and tools such as presentation framework, service interaction, service encapsulation, persistence, public services, integration, etc. at different levels of Web applications based on the layered concept, so that business system developers only need to focus on the development of components closely related to the business, such as business presentation pages and business logic.
[0093] In addition, it should be noted that the data processing system in this embodiment can be used as the execution subject of the data processing method in Example 1. The relevant content has been explained in Example 1 and will not be repeated here.
[0094] Example 4
[0095] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the data processing method in the above-mentioned embodiment 1.
[0096] Example 5
[0097] According to another aspect of an embodiment of the present invention, a processor is further provided. The processor is used to run a program, wherein the data processing method in the above-mentioned embodiment 1 is executed when the program is run.
[0098] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0099] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0100] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0101] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0102] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0103] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0104] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A data processing method, applied in a data processing system, wherein the data processing system includes a plurality of business systems, characterized in that: The method comprises: Obtain characteristic information of characteristic codes on current power grid equipment; Parsing the characteristic information to obtain data information of the current power grid equipment; Testing the data information to obtain a test result; When the detection result indicates that the data information is normal, the data information is stored in a preset database and graphically displayed, wherein the preset database can be called by the multiple business systems; After the data information is graphically displayed, the method further includes: Acquire identification information of the current power grid device from the data information; Determine the inspection content of the current power grid equipment according to the identification information; Performing an inspection on the current power grid equipment based on the inspection content to obtain an inspection result; Recording the inspection results; Before obtaining the identification information of the current power grid equipment from the data information, the image information of the inspection object and the electronic signature of the inspection object for inspecting the current power grid equipment are collected, and it is detected whether the image information matches the electronic signature. If the image information matches the electronic signature, an electronic work ticket is generated; After the data information is graphically displayed, the method further includes: Acquire the data information to perform graphic data for the graphical display; In the case where the data information does not match the graphic data, updating the graphic data to obtain updated graphic data; displaying the updated graphical data; Wherein, after the graphic data is updated to obtain updated graphic data, the method further includes: Detecting the occupation status of the data information of the current power grid equipment, wherein the occupation status at least includes: a use status and an unuse status; In the case where it is determined that the occupied state is the used state, generating first prompt information, wherein the first prompt information is used to prompt that the modification of the data information is prohibited; Wherein, determining the inspection content of the current power grid equipment according to the identification information includes: Acquire the fault information of the current power grid device according to the identification information; In the case where the fault information indicates that the current power grid device has an uneliminated fault, determining inspection information required to check the fault; The inspection information is set as part of the inspection content.
2. The method according to claim 1, characterized in that After recording the inspection result, the method further includes: Acquire the first location information of the current power grid device and the second location information of the next power grid device; Generate a planned route from the first location information to the second location information.
3. A data processing device, applied to a data processing system, wherein the data processing system includes a plurality of business systems, characterized in that: The device comprises: An acquisition module is used to acquire characteristic information of characteristic codes on current power grid equipment; A parsing module, used to parse the characteristic information to obtain data information of the current power grid equipment; A detection module, used to detect the data information and obtain a detection result; A display module, configured to store the data information in a preset database and graphically display the data information when the detection result indicates that the data information is normal, wherein the preset database can be called by the multiple business systems; The second acquisition module is used to obtain the identification information of the current power grid equipment from the data information after the data information is graphically displayed; the first determination module is used to determine the inspection content of the current power grid equipment according to the identification information; the inspection module is used to inspect the current power grid equipment based on the inspection content and obtain the inspection result; the recording module is used to record the inspection result; The device is further used to collect image information of an inspection object inspecting the current power grid equipment and an electronic signature of the inspection object before obtaining the identification information of the current power grid equipment from the data information, and detect whether the image information matches the electronic signature, and generate an electronic work ticket if the image information matches the electronic signature; The data processing device further comprises: a first acquisition module, which is used to acquire graphic data for graphically displaying the data information after the data information is graphically displayed; an update module, which is used to update the graphic data to obtain updated graphic data when the data information does not match the graphic data; and a first display module, which is used to display the updated graphic data; The data processing device further includes: a first detection module, which is used to detect the occupation state of the data information of the current power grid device after updating the graphic data and obtaining the updated graphic data, wherein the occupation state at least includes: a use state and an unuse state; a first generation module, which is used to generate a first prompt message when determining that the occupation state is a use state, wherein the first prompt message is used to prompt that the data information is prohibited from being modified; Among them, the first determination module includes: a fourth acquisition module, used to obtain the fault information of the current power grid equipment according to the identification information; a second determination module, used to determine the inspection information required to check the fault when the fault information indicates that the current power grid equipment has an uneliminated fault; a setting module, used to set the inspection information as part of the patrol content.
4. A data processing system, comprising a plurality of business systems, characterized in that: The system comprises: The terminal device is used to collect characteristic information of the characteristic code on the current power grid device, parse the characteristic information to obtain data information of the current power grid device, and then detect the data information to obtain a detection result. When the detection result indicates that the data information is normal, the data information is graphically displayed and sent to the server; The server is used to store the data information in a preset database, wherein the preset database can be called by the multiple business systems; The system is further configured to obtain identification information of the current power grid device from the data information after graphically displaying the data information; determine the inspection content of the current power grid device according to the identification information; inspect the current power grid device based on the inspection content to obtain inspection results; and record the inspection results; The system is further used to collect image information of an inspection object inspecting the current power grid equipment and an electronic signature of the inspection object before obtaining the identification information of the current power grid equipment from the data information, and detect whether the image information matches the electronic signature, and generate an electronic work ticket if the image information matches the electronic signature; The system is further configured to obtain graphic data for graphically displaying the data information after graphically displaying the data information; update the graphic data to obtain updated graphic data when the data information does not match the graphic data; and display the updated graphic data; The system is further configured to detect the occupation state of the data information of the current power grid device after updating the graphic data to obtain the updated graphic data, wherein the occupation state includes at least: a use state and an unuse state; and when it is determined that the occupation state is the use state, generate first prompt information, wherein the first prompt information is used to prompt that the data information is prohibited from being modified; Among them, determining the inspection content of the current power grid equipment according to the identification information includes: obtaining the fault information of the current power grid equipment according to the identification information; when the fault information indicates that the current power grid equipment has an uneliminated fault, determining the inspection information required to check the fault; setting the inspection information as part of the inspection content.
5. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the data processing method according to any one of claims 1 to 2.
6. A processor, characterized in that: The processor is used to run a program, wherein the program executes the data processing method according to any one of claims 1 to 2 when running.
Citation Information
Patent Citations
Power grid PMS and EMS based power grid equipment operation state evaluation system
CN107292760A
Power equipment operation and inspection auxiliary system based on RFID technology
CN110059777A
Intelligent inspection system for dispatching master station system equipment
CN110648420A
Digital work ticket management and control system and method for power industry
CN111091304A